Australia’s leading magnetite producer

Russell Clark Managing Director & CEO 4 May 2012

30 April 2012

Slide 2

30 April 2012

Slide 3

==> picture [97 x 59] intentionally omitted <==

==> picture [90 x 54] intentionally omitted <==

==> picture [95 x 58] intentionally omitted <==

==> picture [144 x 90] intentionally omitted <==

==> picture [109 x 66] intentionally omitted <==

----- Start of picture text -----

~67% Fe
----- End of picture text -----

==> picture [97 x 57] intentionally omitted <==

==> picture [101 x 61] intentionally omitted <==

----- Start of picture text -----

~63% Fe
----- End of picture text -----

Iron Ore Pellet ~65.5% Fe ~US$172[1] FOB Tasmania

2prices from Dec 11 quarterly

Lower

Price

Higher

30 April 2012

Slide 4

==> picture [145 x 242] intentionally omitted <==

30 April 2012

Slide 5

==> picture [145 x 101] intentionally omitted <==

20% - 50% Lump and Pellets

50% - 80% Sinter

New products from new producers:

==> picture [46 x 57] intentionally omitted <==

Contaminants are rising

Molten slag out

Molten iron out

30 April 2012

Slide 6

30 April 2012

Slide 7

x 2

30 April 2012

Slide 8

Ordinary shares on issue 27 April 2012 1,155m Last share price 27 April 2012 $0.575 Market capitalization 27 April 2012 $664m Cash & Receivables 31 March 2012 $274.2m Research Bell Potter Patersons Citi Petra Capital JP Morgan RBS Macquarie RBS Morgans Merrill L nch UBS y

==> picture [226 x 226] intentionally omitted <==

----- Start of picture text -----

9%
7.80%
36.70%
46.50%
----- End of picture text -----

30 April 2012

Slide 9

Australia’s Leading Magnetite Producer

==> picture [206 x 185] intentionally omitted <==

==> picture [202 x 183] intentionally omitted <==

Quality assets in Tasmania and Western Australia.

30 April 2012

Slide 10

30 April 2012

Slide 11

Production and Costs
March Quarter
2012
Production and Costs
March Quarter
2011
Total BCM Mined 4,342,253 4,098,752
Total Ore BCM 490,301 248,221
Weight Recovery (% DTR) 43.10 38.10
Concentrate Produced(t) 573,625 349,328
Pellets Produced (t) 511,630 319,233
Pellets shipped (t) 732,551 209,798
“C1” Cost A$/tonne Pellet
Produced
111.09 161.00

30 April 2012

Slide 12

DFS

30 April 2012

Slide 13

The Southdown Project DFS Highlights

30 April 2012

Slide 14

The Southdown Project DFS Highlights

30 April 2012

Slide 15

The Resource The Southdown Project

DFS: 14 year: 397 million tonne reserve @ 35.7% DTR

LOM: 30+ years: 1.22 billion tonnes resource @ 34.1%DTR

30 April 2012

Slide 16

Mineral Resources & Reserves The Southdown Project

Tonnes (Mt) Grade (% DTR) Measured 423.0 37.6 Indicated 87.4 38.4 Inferred 710.6 31.5 Total 1 221 34.1 ,

Concentrate Fe Tonnes (Mt) Grade (%DTR) (%) Proven ore 221 35.5 68.5 Probable ore 176 35.9 68.6 Total 397 35.7 68.6

30 April 2012

Slide 17

==> picture [583 x 437] intentionally omitted <==

==> picture [49 x 12] intentionally omitted <==

----- Start of picture text -----

Slide 18
----- End of picture text -----

30 April 2012

Southdown Magnetite Project Mining

Open pit miningConventional bulk mining methods utilising Mining Method hydraulic face shovels, dump trucks and drill and blast coupled to a Run of Mine (ROM) stockpile Material~110 Mtpa for first six years MovementShovel size – 650 tonnes EquipmentTruck size – 220 tonnes ProductionProvide 78,000 tonnes per day to the primary Schedule crusher Waste : Ore Ratio2.3 : 1 (tonnes) Mine Life>14 years (potential for 40 years)

==> picture [166 x 165] intentionally omitted <==

==> picture [167 x 185] intentionally omitted <==

30 April 2012

Slide 19

Concentrator Flow Sheet Southdown Magnetite Project

==> picture [650 x 403] intentionally omitted <==

----- Start of picture text -----

PRIMARY CRUSHER (x1)
COARSE ORE STOCKPILE (x1)
AG MILL FEED
CONVEYOR 2
AG MILL FEED CONVEYORS (x2) AG MILLS (x2)P80 500um
INTERMEDIATE MAGNETIC
SEPARATION (2x8)
MAGS BALL MILL
ISAMILLS (2x4)P80 34um CYCLONE CLUSTER (x2) FINE SCREENS (2x2)
BALL MILLS (x2)P80 100um MAGS
ROUGHER MAGNETIC
SEPARATION (2x9)
PAXH2SO4 HYDRO-SEPARATION (x2) NON-MAGS
MAGS NON-MAGS
Frother
CLEANER MAGNETIC RMS TAILS
SULPHIDE FLOTATION (x2) SEPARATION (2x10) CYCLONES (x2)
NON-MAGS
TAILINGS
THICKENER
Lime FEED TANK
CONCENTRATE TAILINGS
THICKENER PROCESS WATER TO PLANT THICKENER
SULPHIDE
THICKENER
CONCENTRATE PIPELINE PROCESS TAILINGS TANKTHICKENED
HEADER TANKS (x2) WATERPOND POTABLE WATER
SEA WATER DESALINATION PLANT PIPELINE DESALINATED WATER SUPPLY TO PLANTPROCESS WATER MAKE-UP
CONCENTRATE TANKS (x2) STORAGE DECANT WATERPOND BRINE DESALINATED
PIPELINE FILTRATE TANK TAILINGS DAM WATERDAM
CERAMEC
FILTRATE DISC FILTERS (x9) TO DIRECT SALES
PORT
CONCENTRATE THICKENER STACKER RECLAIMER
BY SHIP
TO
CONCENTRATE STOCKPILE KEMAMAN PELLET PLANT
FILTER FEED
TANKS
ALTERNATE FLOW
----- End of picture text -----

30 April 2012

Slide 20

Southdown Magnetite Project Product Quality (Process Design Criteria)

Southdown Magnetite
Concentrate
%
Total Fe 69.5
SiO2 1.50
Al2O3 1.48
TiO2 0.38
P 0.04
S 0.08
LOI (Loss of ignition) -3.15

30 April 2012

Slide 21

Southdown Magnetite Project Power and Pipelines

Ke Facts - Power: y Estimated Len th 288km g Ca acit 330kV transmission line p y Ke Facts – Pi elines y p Estimated Len th 100km g

30 April 2012

Slide 22

Southdown Magnetite Project Water Supply

Source Seawater reverse osmosis desalination lant p Ca acit 11 GL/a p y Location Coastal location 25km from mine

30 April 2012

Slide 23

Port Infrastructure Southdown Magnetite Project

Cape size (18m draft) Cape size (18m draft)
Vessels Cape size (18m draft)
Activities Deepen, widen and extend existing shipping channel
New wharf
Dewatering plant and storage shed
Area Reclaimed 9ha
Increases port capacity from 2.5Mt to 14Mt

30 April 2012

Slide 24

Southdown Magnetite Project Permitting

Granted November 2009, amendment Mine environmental permit þ required in 2011 for 10mtpa Port permits Granted November 2010 þ Water permit Desalination permit targeted Q2 2012

==> picture [647 x 215] intentionally omitted <==

30 April 2012

Slide 25

Southdown Project DFS Capital Expenditure

Description

Total Cost (A$ M)

Mine & Concentrator Desalination Plant, Pipelines and Transmission Line Albany Port Works, Berth, Storage Facilities Sub-total enc Owners Costs, EPCM and Conting y Total Estimate Project Costs

1,330

640

380

2,350

535

2,885

30 April 2012

Slide 26

Southdown Project DFS Operating Cost Summary

Operating Costs A$/t
Concentrate
Mining 24.4
Concentrator 24.6
Pipeline, Filtration and Port 5.7
Overheads 3.8
Total Operating Costs 58.5

30 April 2012

Slide 27

Southdown Project DFS price and FX assumptions

==> picture [500 x 404] intentionally omitted <==

----- Start of picture text -----

Forecast Iron Ore Price
(68.5% Fe content)
180
170
160
150
140
130
120
110
100
Year
Forecast Foreign Exchange Rate
(AUD:USD)
1.00
0.95
0.90
0.85
0.80
0.75
0.70
Year
Iron Ore Price (USD per DMT)
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
FX Rate (AUD:USD)
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
----- End of picture text -----

30 April 2012

Slide 28

NPV Sensitivities Southdown Magnetite Project

10% Net Present Value (NPV ) Sensitivity A$m

DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M DFS NPV = $1,008M Sensitivity Range on Average Price Sensitivity Range on Average Price Sensitivity Range on Average Price Sensitivity Range on Average Price
Adjusted NPV
Adjusted NPV
Downside Case DFS Base Case Upside Case
Iron Ore Price $168 - 15% + 15% $1,848
US$106/t
US$125/t
US$143/t
Foreign
Exchange
$278 +15% - 15% $1,996
1 AUD = US$0.98
1 AUD = US$0.85
1 AUD = US$0.72
Operating
Expenses
$802 +10% -10% $1,214
A$64/t
A$58/t
A$52/t
Capital
Expenditure
$717 +15% -15% $1,300 A$3,318m
A$2,885m
A$2,453m

30 April 2012

Slide 29

Extended mine life case Southdown Project

30 April 2012

Slide 30

Southdown Magnetite Project Target Time Line

2011 2012 2013 2014 2015
Pre-
feasibility
Definitive
Feasibility
Financing
Construction
Production

30 April 2012

Slide 31

Primary contacts:

Russell Clark

[email protected]

Tarryn Truscott

[email protected]

30 April 2012

Slide 32

Southdown Project

  • The information in this report which relates to the Mineral Resources of the Southdown Project is based

  • The information in this report which relates to the Ore Reserves of the Southdown Project is based on

30 April 2012

Slide 33