GRANGE RESOURCES LIMITED. — Annual Report 2005
Feb 9, 2005
65014_rns_2005-02-09_dd4308ee-1da8-4f35-8b92-f6bf281a3c3c.pdf
Annual Report
Open in viewerOpens in your device viewer

February 2005
Grange Resources Limited, Level 13, 221 St Georges Terrace, Perth, WA 6000, Australia Phone: +61 8 9321 1118 Fax: +61 8 9321 1523 Website: www.grangeresources.com.au
CORPORATE PROFILE
Grange Resources Limited is a Western Australian based publicly listed mining company. It holds equity positions and royalty interests in mining, development and exploration projects throughout Australia. The Company's principal objective is to grow through the acquisition, development and exploration of resource projects.
BOARD OF DIRECTORS
Anthony Bohnem Atam Rankhe-Wison :-Geoff Weckock Alex Nutter Hans-Rudolf Moser
Non Executive Chairman Managing Director Executive Director Technical Director Non Executive Director
SHARE CAPITAL AT 3rd FERUARY 2005
Issued Securities
Ordinary Fully Paid Shares
Options 50 cent expiring 28 Nov 2006
Options 12 cent expiring 30 Jun 2007
Options 50 cent expiring 30 Jun 2007
73,249,259 4,285,715 1,500,000
Number
4,500,000

MAJOR SHAREHOLDERS AT 31 DECEMBER 2004
AVZNOmness Trifts National Northers Trifes REC Global Services Aust Nominees Pty Ltd DIASSIMOSSSIM HSEC Custody Nominees (Aust) Limited Equitas Finance Pty Ltd Zero Nominees Pty Ltd Blackmon Nominees Ply Ltd Westpac Custodian Nominees Limited King Chong Chai DESTITI QUESTION Alexander Henry Nutter The Resident Contract of the Contract of the Contract of the Contract of the Contract of the Contract of the C Bayonet Investments Pty Ltd Neteo Nominees Pty Ltd Filst Distribution Services Limited Mr James Ne Bayonet Investments Pty Ltd Golvic Pty Ltd, Officers Nominees Pty Ltd.
24651226 181022444 4,283745 2675742 PAVARZO 2023233 1,350,000 AROLOGIO TAOTO 421 LOGAG50 1,000,000 849,999 MAOZIAO 700,000 RESIGN GOOLOOO 574500 523,606 492450 ZOSTAT
Australia PROJECT LOCATIONS




Southdown Magnetite Project PROJECT SUMMARY
- ♦ Located 90km north east of Port of Albany on south coast of WA
- ♦ 3 granted mining leases, 1700 hectares, freehold farming property
- ♦ Mineralisation occurs within a banded quartz magnetite gneiss
- $\le$ Thickness 50-100m, dipping 60 degrees south
- Weathered surface zone 20 40m thick
- ♦ Drilling and evaluation during 1986/1987 reported a resource of 83 mt at a magnetite cut-off grade of 15% to a depth of 150 - 170 metres in the western 2Km of the mining leases.
- ♦ Deposit is sparsely drilled and potential exists to significantly increase resources both at depth and along strike.
- ◆ A new drilling programme by Grange commenced in November 2004 to evaluate resources at depth and along strike.
- ♦ Metallurgical evaluation in 1987 showed:
- $\bullet$ A coarse concentrate grade of 64.6%Fe could be achieved by
- grinding ore to 0.15mm and using magnetic separation
- $\triangle$ At a 15% magnetite cut-off grade, magnetite recovery to concentrate at 69.3%Fe estimated at 37.4%
Southdown Magnetite Project
BMR AEROMAĞNETIC SURVEY - 1980

Southdown Magnetite Project
GROUND MAGNETICS & GRAVITY SURVEY - 2004



Southdown Magnetite Project OPEN PIT OPTIMIŠATION AND PROJECTION

GOLDER ASSOCIATES UNDERTOOK AN OPEN PIT OPTIMISATION BASED ON THE 2 KM OF DRILLED RESOURCES AT SOUTHDOWN, EXTENDED TO A DEPTH OF 300 METRES.
TREATHER.
| nan an 22 an 23 an 23 an 23 an 24 an 25 | |||||
|---|---|---|---|---|---|
| CASE | WASTE (Mt) |
ORE (Mt) |
STRIP (t/t) |
DEPTH $(m \, RL)$ |
DTR $(%)$ |
| EASE | 4720 | 6663 | 408 | -620 | RGIER |
| EASE | ARKI | 488/6 | 3.09 | 5260) | 86159 |
| EASE | 5817 | 445.8 | 8.65 | 570 | 86.34 |
| WDE | 460 | GOWA | 169 | -180 | 86%19 |
| WIDE | 47704 | 1574 | 610Z | 570 | 86 T.L |
| WIDE | 678 XI | 16746 | 822 | E230 | 8622 |
OPTIMISATION INDICATES THAT 157.1 Mt OF MAGNETITE ORE AT A MAGNETITE CUT OFF COULD BE ACHIEVED AT A STRIP RATIO OF 3.04 [WASTE(t): ORE(t)]
Southdown Magnetite Project OPEN PIT OPTIMIŠATION AND PROJECTION

PROJECTION TO THE ADDITIONAL 4KM OF MINERALISATION ON GRANGE'S MINING LEASES INDICATES THAT 400 MT OF MAGNETITE RESOURCE IS A SUITABLE TARGET FOR THE NEXT STAGE OF DRILLING PROGRAMME
DRILLING OVER THE UNTESTED 4 KM ZONE COMMENCED IN NOVEMBER 2004. DURING 2005 GRANGE WILL HAVE 4 DRILL RIGS ON SITE.

Southdown Magnetite Project DEVELOPMENT DI AN
MINING AND CONCENTRATION Production of 6.6 Mtpa of Magnetite Concentrate at 69%Fe
G TRANSPORT AND SHIPLOADING
Concentrates transported by slurry pipeline to Port of Albany (90kms), dewatered, stockpiled and loaded onto Capesize vessels for transport to Southeast Asia.
4 PELLETIZATION
Concentrates to be made into Direct Reduction (DR) and Blast Furnace (BF) pellets at a new plant to be constructed in Southeast Asia.
MARKETS
Pellets to be sold to Direct Reduction market (Malaysia, Indonesia, Middle East) and to steel producers in China, Japan, South Korea and Taiwan.
Southdown Magnetite Project
INFRASTRUCTURE SLURRY PIPELINE


Southdown Magnetite Project
INFRASTRUCTURE - PELLET PLANT n an san san san san san san san san san ADMIN LOCALLY MINED EXPORT CONVEYOR STACKER/ RECLAIMER DS 6 EaTM(49) DS 6 CRUSHING & SCREENING
PLANT PELLET STOCKPILE $200m$ $\Omega$ CONCEPTUAL PELLET PLANT LAYOUT
Southdown Magnetite Project
INFRASTRUCTURE PELLET PLANT


BOUTHDOMN 6.6 M(JA IRONORE CONQENIEVATE
ESTIMATED GAPITAL COSTS 71911
Bankable Feasibility Study Infrastructure (Land, Pipeline, Power Supply, Port facilities and dredging) Concentrator Plant
13.0 217.0 185.0 415.0
SOUTHEAST ASIA 6.9 MIOA PELLET PLANT
ESTIWATED GAPTAL COSTS
Land Port, shiploader, stockyards Pellet Plant
10.0 43.0 260.5 313.5
NISANTI

Southdown Magnetite Project PROJECT SUMMARY

Magnetite Ore Water Electricity Power Generation Requirement Slurry Pipeline Diameter Operational Workforce Life of Mine
17.3 Mtpa 2.0 Glitres pa 263 Gwh 42 Mwatts 150-200mm 200 +25 years
I SOUTHEOWN PLANT OUTPUTS
Iron Ore Concentrate (at 37% magnetic recovery)
6.6 Mtpá
Southdown Magnetite Project PROJECT SUMMARY
SOUTHEAST ASIA PELA ET PLANT INFUTS
Iron Ore Concentrate Feed Water Linestone Electricity Natural Gas
G.G.Mtpa 0.21 Glitres pa 0.07 Mtpa 275 Gwn 2.75 Pi
Operating Workforce 60-100 (excluding Maintenance and Port services)
QUEELES
Iron Ore Pellets Produced
G.9 Mtpa
Southdown Magnetite Project PROJECT TIMETABLE
INDIOZVING TIME 1/ABRE
74
Re-commence Diamond Drilling Commence Bankable Feasibility Study Complete Bankable Feasibility Study Southeast Asian Plant Approvals Southdown Mining Approvals Project Construction Commences Pellet Plant Commissioned
4an 06 Féb 05 Dec 05 Mar 06 Jun 06 Jul 06 Dec 08
Mt Windsor Joint Venture LOCATION AND GEOLOGY

Highway Open Pit Mine
PANORAMIC OVERVIEW
Territorium et al.
la kazili kilik 2 kilik 2, 2, 1 ko hili ki
2000 - Paris Carl 1999 - Johann Harry Start, fransk konge og forskellige og forskellige og stoffen og stoffen og stoffen og s

SA MARIN
Highway and Reward Open Pit Manual CROSS SECTION

Reward Deeps Project
LOCATION OF ORE BODIES
gan masara

Mt Windsor Joint Venture ginnar y
Underground Mining at Highway South KG Mining Scheduled to finish in May 2005 214,000t @ 4.4% cooper to be produced in 2005 K 1 Grange share of production +12,0001 concentrate Final Shipment of Copper concentrate - June 2005 KO Projected net cash surplus to Crange A\$3.0 million 69 (assuming Cu @ US\$3000/t, A\$:US\$ 0.76)
Freshwater Project - Plutonic/Marymia District
REGIONAL GEOLOGY

Freshwater Gold Project

Freshwater Gold Project gi nana a pv
MITHILIA

Owned and Operated by Bardek Gold of Austfalla

Shding Scale Royalty on gold production from underground and open pit operations

Over \$3 million in royalites paid since 1996 on production of 276,000 ozs

Over 600,000 ozs of gold in indicated and inferred TESOUTORS
Freshwater Project
PRODUCTION & ROYALTY RECEIPTS - OPEN PIT ORE

| Year | Tonnes | Grade g/t Au |
Payment \$ | Gold OZ'S |
Royalty \$/oz |
|---|---|---|---|---|---|
| 4096 | 132,669 | 2403 | 54,699 | 8,174 | 6169 |
| 4997 | 1,185,591 | 240Z) | 476,456 | 72,509 | 657 |
| 4008 | 763,398 | THE REA | 454,780 | 45,445 | 20074 |
| 1099 | 942,121 | 1184 | 587,569 | 53,086 | ET NOTE |
| 2000 | 242,227 | $2\pi$ | 430,139 | 18,971 | 22.67 |
| 2001 | 257,758 | 240 | 290,025 | 17,129 | 46.98 |
| 2002 | 104,893 | THE 22 | 110,117 | 6,141 | 1798 |
| ZOOS | 117,342 | $\mathcal{V}(\mathcal{N})$ | 125,923 | 6,995 | 48400 |
| 2004 | 212,862 | TIGS | 76,184 | 10,155 | 7450 |
| TOTAL | 61326746 | TAGE | 200609 | PAIDING | EDEST |
Freshwater Project
PRODUCTION & ROYALTY RECEIPTS - UNDERGROUND ORE
| Year | Tonnes | Grade g/t Au |
Payment \$ | Gold OZ'S |
Royalty $\sqrt{2}$ |
|---|---|---|---|---|---|
| 2001 | 600 | 5,00 | 930 | 420 | 802 |
| 2002 | 54,235 | GWO | 185,590 | 10,863 | ETAOS |
| 2003 | 46,117 | 6108 | 128,645 | 8.388 | 15.34 |
| 2004 | 78,080 | GWZ | 268,736 | 46,940 | 15.86 |
| TOTAL | TAS 231 | GEO | RECEPTE | REALE | TEACH |
Freshwater Project
ORE RESERVES AS AT 31 DECEMBER 2003

| Location | Category | Tonnes | Grade Au g/t |
Contained Ounces |
|---|---|---|---|---|
| Underground | ||||
| Plutonic East | Probable | 328,000 | 646 | 69,600 |
| Open Pit | ||||
| Salmon | Probable | 419,000 | 340 | 40,200 |
| Callop | Probable | 73.000 | W. | 4,400 |
| TOTAL RESERVES | ESZOTOTO | ZIC | CELLEZOOT |
Freshwater Project
MINERAL RESOURCES AS AT 31 DECEMBER 2003
| Location | Category | Tonnes | Contained Ounces |
|
|---|---|---|---|---|
| Underground | ||||
| Plutonic East | Indicated Inferred |
578,000 3,068,000 |
HX 58 |
98,000 523,000 |
| TOTAL U/GROUND | 6646000 | STO | C22 TOOO | |
| Open Pit | ||||
| Salmon | Indicated | 304,000 | 224 | 23,000 |
| Callop | Incred Indicated Interred |
5,000 48,000 23,000 |
80 EK. EK) |
500 900 4200 |
| Barramundi | Indicated | 35,000 | 82 | 3700 |
| Goldfish | Inferred Indicated |
6,000 64,000 |
243 276 |
500 44600 |
| TOTALOPENEET | ZEEZOOOO | 24 | 84.00 | |
| TOTAL RESOURGES | ZZOZNOVO | EAO | GESZATO |
Note: Measured and Indicated Resources are exclusive of those Mineral Resources modified to produce the Ore Reserves
Red Hill Project --
TENEMENT LOCATION PLAN

Red Hill Project SUMMARY
- Grange has 4% Gross Revenue Royalty after first 85,000oz's of gold production from M27/57
- Owned and operated by ALACER DOME ASIA PACIFIC
- 4km NE of Kanowna Belle Gold Mine, 20km NE of Kalgoorlie
- Continuous gold mineralisation from surface within porphyry
- Large tonnage low grade gold resource (6.8mt@ 1.80g/t Au) K) containing 365,000ozs within M27157 to 150 metres depth
- Mining commenced rebriery 2006
- 122,898 ozs góld produced from M27/57 to 81 Dec 2004 Royalty payments of \$847,504 received up to 31 Dec 2004
Red HIII Project
ESTIMATED ROYALTY INCOME

Wembley Gold Project SUMMARY
- Located 14 km south of the Peak Hill Gold Mine, 120 km NNE of Meekatharra in the Peak Hill Mineral Field in WA
- Cientet Mining Lesse contains in Differ koold tesoure of 557,000 tonnes @ 2.4 8g/t gold (39,000 contained ounces gold)
- Potential to extend known resource and locate additional deposits
- Mineralisation occurs as steeply dipping lodes within altered volcanies
- 100% owned by Grange Resources with Glancagle Gold Limited farming in by expending \$500,000 to earn 80%
- Grange free carried to decision to mine at which stage Grange can 67 elect to contribute, sell or convert to a 3% gross revenue royalty
- Durack deposit located 50 km from Fortnum treatment plant KC. owned by Gleneagle
Wembley Gold Project
DURACK PROSPECT DRILL HOLE LOCATIONS

Abercromby Well Project SUMMARY
- Located approximately 30 km SE of Willina in the Agnew-67 Wittna Greenstone Bah
- Crange holds a 10% free carried interest in M58/886 to a K 20 decision to mine or expenditure of \$2 million
- The tenement forms bart of the Honeymoon Well gold 51 project being explored by Perilya Limited in joint venture WHA MPI PHY LIG
- « Tenement is prospective for cold mineralisation and significant intersections recorded from the Capital and Bungarra prospects located along strike including: 16m @ 17.6gA Au, 24n @ 11.3gA Au, 9n @ 16.7gA Au
STEP
M53/336 covered by Lake Way alluvials and calcrete which has hampered exploration
Abercromby Well Project
LOCATION AND GEOLOGY

Horseshoe Lights Project

Horseshoe Lights Project
MINERAL RESOURCES AS AT 31 DECEMBER 2004
| Location | Category | Tonnes | Grade $%$ Cu |
Contained Copper (t) |
|---|---|---|---|---|
| NW Stringer Ore | Indicated | 1,606,000 | OK:Ko | 13,800 |
| Inferred | 1,606,000 | OWE | 42,500 | |
| Main Zone | Indicated | 949.000 | ENACI | 12,200 |
| Inferred | 233,000 | EKOS | 2,600 | |
| Motters Zone | Indicated | 169,000 | 0.30 | 1.300 |
| Inferred | 61,000 | (0,30) | 500 | |
| MEH | Indicated | 250,000 | (0, 0) | 2,000 |
| Indicated | 40,000 | (0,30) | 300 | |
| Flotation Tailings | Measured | 1,420,000 | 0133 | 74300 |
| Barrack Waste Dump | Inferred | 250,000 | (0,30) | 24000 |
| TOTAL RESOURCES | GEEZIOOO | DR:ZE | EZREDO |
Mount Samuel Project SUMMARY

Grange 85%, Prospectors 15%
KO.
K÷
67
STANDARD
ANDRO
Z,
- 6km south of Tennant Oreek
- Located along same structural trend as previous producing mines June (810,000oz/Au), Nobles Nob (1,100,000oz Au) and Eldorado (100,000oz Au)
- Polenta for high grade gold, copyrig, bismugh CCOOST
- Last drilling programme in 1987/88 recorded Significant intersections including 17th @ 10807.Au from 28 metres depth
- Access currently not available due to Aboriginal Sacred Site
Mount Samuel Project LOCATION PLAN

Mount Samuel Project
GEOLOGICAL CRÓSS SECTION