Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

GOLDEN DEEPS LIMITED. Capital/Financing Update 2013

Feb 24, 2013

64977_rns_2013-02-24_b8991670-7264-426d-9506-649af83868f9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [55 x 36] intentionally omitted <==

==> picture [55 x 36] intentionally omitted <==

==> picture [54 x 36] intentionally omitted <==

==> picture [55 x 36] intentionally omitted <==

==> picture [21 x 36] intentionally omitted <==

ASX Announcement 25 February 2013

H IGH- G RAD E COP P ER A N D EM COND U CTO R S A T DEBLIN

==> picture [33 x 101] intentionally omitted <==

==> picture [19 x 202] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [33 x 102] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

RC drilli n g operations a t DBRC0006

HI G HLIGH T S

  • RC drilling intersects further high-grade copper at the Deblin Copper Mine, Otavi Mountain Land, Namibia

  • New drilling results include:

DBRC0007 7 m @ 2.15% Cu & 1.50 g/ t Ag from 71m Including 2 m @ 4.12% Cu & 3.00 g/ t Ag from 74m

  • Drilling identifies copper mineralisation near to surface and confirms mineralisation remains open to the south-east

  • A surface electromagnetic survey has identified three highly conductive bodies south east of the known copper mineralisation which represent targets for further copper discoveries

  • Several copper-in-soils anomalies of a magnitude in excess of 1,000ppm (0.1%Cu) have been identified along strike from the Deblin mine representing high-priority drilling targets

  • Assays remain outstanding for five holes of the current program

  • Follow up drilling on strong copper-in-soil anomalies, gossans, and EM targets are planned for the 2013 field season

___ _ _ _ __ _ _ __ _ _ __ _ _ _ __ _ ___

st 1 Floor, 8 Parliament Place, West Pe r th, WA 6005  PO Box 1618, West P e rth, WA 6872  t: +61 8 9481 7 8 33  f: + 61 8 9481 78 3 5  email: ged@golde n deeps.com

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

1. R C DRIL L ING AT D EBLIN

Gol d en Deeps is pleased to confirm the compl e tion of, an d initial res u lts from ei g ht RC drill h oles recently complet e d at the D e blin Copp e r Project, l o cated with i n the Groo t fontein Base Metals Pr o ject in the Otavi Moun t ain Land of Namibia. T he aim of t h e program m e was to extend the c o pper miner a lisation int e rsected by earlier drilli n g.

The programme was successful, d emonstrati n g that the copper m i neralisation exists nearer to the surface than previously identified. The mineralisation remains open to the south-east.

Thi s drilling pr o gramme w a s complet e d at the e n d of the 2 0 12 field s e ason follo w ing the exc e llent result s achieved b y a maide n four hole drilling progr a mme com p leted in Oc t ober of 2012[1] . The Oc t ober progr a mme inter s ected significant copp e r sulphide s at Deblin, paving the w ay for the developme n t of JORC c lassified m i neral resources in 201 3 .

Best results from the October 2012 programme included:

  • 8m at 1.28% Cu from 87m, including 3m at 2.96% Cu from 87m in DBRC0001

  • 7m at 3.23% Cu from 169m, including 3m at 6.08% Cu from 172m in DBRC0002 (see Figure 2 Cross Section)

To d ate, Golde n Deeps has drilled on l y 12 holes at Deblin a n d identifie d a significa n t body of c opper min e ralisation. In 2013 the Company intends to e xpand on t he zones o f highgra d e copper, w ith a focus on the ope n deeper extensions to the south a n d south-ea s t.

The December 2012 drilli n g program m e intersec t ed strong v isual copp e r mineralis a tion in DB R C0007 an d DBRC000 5 . Significa n t copper mineralisatio n was inters e cted in all but two hol e s of the most recent dr i lling.

Best assay results received to date for the latest programme included; DBRC0007 7 m @ 2.15% Cu & 1.50 g/t Ag from 71m Including 2 m @ 4.12% Cu & 3.00 g/t Ag from 73m

A c o mplete list of assay re s ults can b e found in A p pendix 1. Results fro m five holes are yet to be received.

A r e vised long s ection inte r pretation o f the Deblin Mineralisation (see Fig u re 3) supp o rts the inte r pretation o f a south- e ast plungi n g (a near vertical zone of min e ralisation o riented tow a rds the south east) c o pper rich z one exten d ing from s u rface. Thi s remains untested fro m 150m bel o w the surf a ce and is o pen to the south-east. Drilling h a s also ide n tified a fold e d or thrust repeated target hori z on with co p per miner a lisation de v eloped in several pos i tions (Figu r e 1).

In a ddition to t h e potential deeper ex t ensions an d repetition s , explorati o n vectors s uch as Cu- i n-soils an o malies of a magnitud e in exces s of 1000p p m (0.1% C u) and thr e e new unt e sted elect r omagnetic conductor s demonstr a te the high potential for disco v ery of sub s tantial add i tional copp e r mineralis a tion at De b lin.

1 Se e ASX announcement 08 N o vember 201 2 Drilling Intersects High‐Grade Copper

2

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

Assays remain outstandi n g for five holes of the Decem b er 2012 drilling prog r amme. Pre l iminary XR F analyses of these fiv e holes are encouragin g . Delays a re expecte d in the rep o rting of th e assay re s ults due to key lab e q uipment at the Swak o pmund La b oratory bei n g out of co m mission. Final assaying is being completed at a Canadia n Laborator y .

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

==> picture [19 x 150] intentionally omitted <==

==> picture [35 x 100] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [35 x 101] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [19 x 150] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [35 x 100] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

Figure 1– Interpre t ed geological cross section a t 758515mE, looking west, showing rece n tly completed drillholes DBRC0007 and D B RC0008 (ass a ys pending)

3

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [35 x 102] intentionally omitted <==

==> picture [19 x 153] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [35 x 103] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [54 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [54 x 62] intentionally omitted <==

==> picture [19 x 153] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [54 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [54 x 62] intentionally omitted <==

==> picture [35 x 102] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [54 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [55 x 62] intentionally omitted <==

==> picture [54 x 62] intentionally omitted <==

Figure 2– Interpre t ed geological cross section a t 758575mE, l ooking west, showing previ o us drilling and recently logged int e rsections for d rillholes DBR C 0005 (assay s pending) and DBRC0006 (a s says pending)

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [19 x 137] intentionally omitted <==

==> picture [23 x 137] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [19 x 136] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [54 x 68] intentionally omitted <==

==> picture [55 x 68] intentionally omitted <==

==> picture [23 x 136] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

Figure 3– De b lin Interpreted long section l o oking north s h owing recentl y completed dri llhole pierce p o ints

4

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

2. E LECTR O MAGNE T IC SUR V EYING

Tw o programm e s of electr o magnetic s u rveying w e re recently completed o ver Deblin; a fixed loo p EM (FLTE M ) and dow n hole EM ( D HTEM) sur v ey. The results were v ery encour a ging.

A l a rge and v e ry strong a nomaly w a s detected by the FL T EM surve y (Figure 4 ) . The anomaly is loc a ted approxi m ately 600 m south we s t of the historic Deblin C opper min e shaft, wh e re the pro s pective co n tact betwe e n the Ask e vold Volca n ics and A b enab Dolo m ites is inte r preted to b e folded cl o se to the s urface. The source of the EM a n omaly is al s o very clo s e to the surface.

==> picture [19 x 150] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [35 x 100] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

==> picture [35 x 101] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [19 x 150] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [55 x 61] intentionally omitted <==

==> picture [54 x 61] intentionally omitted <==

==> picture [35 x 100] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [55 x 60] intentionally omitted <==

==> picture [54 x 60] intentionally omitted <==

Figure 4– Image r y from recent FLTEM surve y showing the l o cation of the F LTEM anoma l y in relation to recent drill colla r s and the Deblin Mine Shaft

Interpretation o f the FLTEM survey d ata has id e ntified thr e e distinct c omponents to the anomaly for follow up work. The west e rn part of t h e anomaly is caused b y a large v e rtically dip p ing conduc t or which remains ope n along strik e to the we s t. The top of the conductor is ver y shallow a n d is possibl y outcroppi n g. A linear outcrop of g ossanous m aterial ap p ears to be t he surface expression of the conductor (Figu r e 5). Mapping and sa m pling programmes are underway to refine drill targeting. The Com p any intend s to drill te s t the cond u ctor as soo n as possible.

The eastern end of the an o maly is caused by tw o discrete flat dipping c onductors. These two conductors are the most interesting. Several gossans a n d an area o f highly brecciated dol o mite appear to be the s urface exp r ession of t h ese two conductors (F i gure 5). T h is type of brecciation commonly surrounds the high grade co p per depo s its of the Otavi Mo u ntainland. A good ex a mple of th i s is seen a t the Khusib Springs C opper Min e which pro d uced appr o ximately 5 0 0,000t @ 10% Cu a n d 584g/t A g . For this reason, th e se two con d uctors are considered very high p riority. M a pping and s urface sa m pling is un d erway. Drill testing is planned to intersect the c onductors a t depth.

5

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

==> picture [26 x 83] intentionally omitted <==

==> picture [19 x 165] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [54 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [54 x 55] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [26 x 83] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [19 x 165] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [54 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [54 x 55] intentionally omitted <==

==> picture [26 x 83] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [26 x 83] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

Figure 5– Exa m ples of breccia (top) and go s san (bottom) outcrops asso c iated with the FLTEM conductors

3. S OIL GE O CHEMISTRY TA R GETS

An u ltra-detaile d soil samp l ing and ma p ping progr a mme was r ecently co m pleted ove r 3.6km of s trike to the east and w est of the Deblin Mi n e. This detailed work, aimed to improve geochemical re s olution ov e r the entire strike length of the +2 5 0ppm copp e r-in-soils anomaly ass o ciated with Deblin, an d to provide information on the controls of min e ralisation. S everal ver y high amplitude +100 0 ppm copp e r in soil anomalies were generat e d (Figure 6). The Co m pany inten d s to drill te s t these hig h amplitude copper anomalies as s o on as pos s ible.

Re g ional soil s a mpling an d mapping p rogramme s are ongoi n g over the entire 30k m strike len g th of the A s kevold Tre n d.

6

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [19 x 214] intentionally omitted <==

==> picture [35 x 107] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [54 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [54 x 55] intentionally omitted <==

==> picture [35 x 108] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

Figure 6 – Deblin soil a n omaly map sh o wing the ver y high amplitud e copper ano m alies in purple

4. O THER A CTIVITY ON THE ASKEVOLD COPPER TRE N D

The Deblin Pr o spect is just one of s everal cop p er prospects identifie d by the C o mpany alo n g the Ask e vold Copp e r Trend. T he Askevol d Trend is d efined by a series of copper occ u rrences a n d geochemical anomal i es associa t ed with the sheared c o ntact betw e en the Askevold Volc a nics and o v erlying Ab e nab Dolo m ites. Appr o ximately 3 0 kilometre s strike len g th of the A s kevold Tre n d lies withi n the Comp a ny’s EPL3 7 43. In ad d ition to the w ork at De b lin, explora t ion is prog r essing on s everal high-priority tar g ets along t he trend, including the Neuwerk, Askevold So u th and Redrob prospe c ts (Figure 7).

==> picture [19 x 196] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [54 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [54 x 66] intentionally omitted <==

==> picture [35 x 99] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [54 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [54 x 66] intentionally omitted <==

==> picture [35 x 98] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [54 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [55 x 66] intentionally omitted <==

==> picture [54 x 66] intentionally omitted <==

Figure 7 – Geological map of the A s kevold Trend showing high p riority explora t ion targets

7

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

A channel sampling and ma p ping pro g ramme is i n progress a t Redrob w h ere a 1km long z o ne of str o ng outcropping cop p er min e ralisation has b een dis c overed. The channel sam p ling pro g ressed slo w ly at the e n d of 2012, with the hand dug trenches r e quiring gr e ater effort than anti c ipated to p e netrate to fresh roc k . These issues h a ve now b een addressed an d the Co m pany aim s to co m plete the w o rk as soon as possible. Foll o w up geo p hysics an d drilling wi l l be pla n ned depending on th e results of the cha n nel sampli n g.

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [26 x 111] intentionally omitted <==

==> picture [26 x 111] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

==> picture [26 x 111] intentionally omitted <==

==> picture [26 x 111] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [54 x 56] intentionally omitted <==

Figure 8– Exampl e of a hand du g trench at Re d rob

For further information please contact: Vin c ent Algar, C hief Opera t ing Officer Or L uke Marsh a ll, General Manager E x ploration Phone (08 ) 9481 783 3 Or consult our website: n m

www.golde n deeps.co m

Competent Person Declaration

The information in this report th a t relates to E x ploration Targets, Exploratio n Results, Min e ral Resource s or Ore Res e rves is based on informatio n compiled by Luke Marshall , who is a member of The A ustralasian In s titute of Geo s cientists. Mr M arshall is a f u ll time emplo y ee of Golden Deeps Limited and has suffi c ient experience that is relevant to the style of mineralisati o n and type of deposit under c o nsideration an d to the activity t hat he is unde r taking to quali f y as a Competent Person as defined in the 2012 Edition o f the “Australa s ian Code for R eporting of E x ploration Res u lts, Mineral Re s ource and Or e Reserves”. M r Marshall cons e nts to the incl u sion in the rep o rt of the matt e rs based on his information in the form and context in which it appears.

Forward-Looking Statements

This document ma y include forw a rd-looking stat e ments. Forward-looking stat e ments include, but are not limited to, statements concerning Golden D e eps Limited’s planned explo r ation program m e and other s tatements th a t are not histo r ical facts. Wh e n used in this document, th e words such a s "could," "plan," "estimate," " e xpect," "inten d ," "may”, "pot e ntial," "should, " and similar e x pressions are f orward-looking statements. Although Golden Deeps Limite d believes that i ts expectation s reflected in t h ese forward-lo o king stateme n ts are reason a ble, such stat e ments involve risks and uncertainties and n o assurance ca n be given that a ctual results w i ll be consistent with these for w ard-looking st a tements.

8

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

ABOUT GOLDEN DEEPS LIMITED

Gol d en Deeps L imited is an ASX listed c ompany (A S X:GED) foc u sed on the exploration f or gold and base metal s . The Com p any has pr o jects in the R epublic of N amibia, W e stern Austr a lia and Vict o ria.

The Company’ s current focus is its 1, 1 00km[2 ] Gro o tfontein Ba s e Metal Pr o ject locate d in the Ota v i Mountain Land (OM L ) of Northern Namibia, an area r o ughly bou n ded by a t riangle linking the tow n s of Tsumeb, Grootf o ntein and O tavi. The region hos t s several g lobally sig n ificant cop p er, zinc, lead, silver and vanadium mines, i n cluding th e Tsumeb, Khusib Springs, Abenab, Berg Aukas & Kombat mines.

The region is w ell served b y sealed r o ads, rail t o port, high voltage po w er, teleph o ne and wat e r, and is c lose to major towns a n d mining p rocessing f a cilities, in c luding the K ombat cop p er concen t rator and T sumeb Sm e lter compl e x (one of o nly five op e rating sm e lters in Afri c a).

The Grootfonte i n Project h as a num b er of signif i cant prosp e cts near h i storical pro d uction cen t res located on its licenc e package. T hese prosp e cts include the Askevol d Copper tr e nd, the Abenab/Christiana Zinc-Vanadium Lead trend and t h e Khusib.S p rings Copp e r prospect.

The Company i s actively exploring its P roject area w ith a view t o an early d efinition of m ineral res o urces.

==> picture [19 x 138] intentionally omitted <==

==> picture [35 x 92] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [54 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [54 x 70] intentionally omitted <==

==> picture [35 x 92] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [55 x 69] intentionally omitted <==

==> picture [54 x 69] intentionally omitted <==

==> picture [19 x 138] intentionally omitted <==

==> picture [35 x 92] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [54 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [55 x 70] intentionally omitted <==

==> picture [54 x 70] intentionally omitted <==

==> picture [298 x 9] intentionally omitted <==

----- Start of picture text -----

Figure 9 – The G rootfontein B a se Metal Proj e ct, Otavi Mountain Land, N a mibia
----- End of picture text -----

9

==> picture [5 x 41] intentionally omitted <==

==> picture [55 x 41] intentionally omitted <==

==> picture [28 x 41] intentionally omitted <==

APPENDIX 1 – DEBLIN RC DRILLING RESULTS

H o
le ID
Depth Depth Collar Locati Collar Locati o
n WGS84 Z33
o
n WGS84 Z33
Dip Azimuth Azimuth From
m
T
o
m
Cu Grade
%
W
idth
m
Inters e
ction Decription
East N o
rth
RL
DB R
C0001 *
169 758576 781 4
738
1508 ‐55 0 75 7 6 0.59 1 1m@0. 59
% Cu,0.50g/t Ag
87 9 5 1.28 8 8m@1. 28
% Cu,2.00g/t Ag
incl 87 9 0 2.96 3 3m @ 2. 9
6% Cu,4.83g/t Ag
DB R
C0002 *
204 758580 781 4
687
1505 ‐55 0 169 1 7
6
3.23 7 7m@3. 2
3% Cu,7.93g/t Ag
incl 172 1 7
5
6.08 3 3m @ 6. 08
% Cu, 17.67g/t Ag
DB R
C0003 *
200 758467 781 4
708
1506 ‐55 0 10 1 3 0.22 3 3m@0. 2
2% Cu,0.50g/t Ag
159 1 6
0
0.01 1 1m @ 0. 0
1% Cu,11.00g/t Ag
DB R
C0004 *
204 758337 781 4
975
1512 ‐55 0 4 1 0 0.7 6 6m@0. 70
% Cu,3.25g/t Ag
incl 5 6 1.38 1 1m@1. 38
% Cu,6.00g/t Ag
13 1 4 0.39 1 1m@0. 39
% Cu,2.00g/t Ag
58 5 9 0.33 1 1m@0. 3
3% Cu,1.00g/t Ag
81 8 2 0.44 1 1m@0. 44
% Cu,3.00g/t Ag
DBR C
0007
1 3
5
758515 78 1
4744
1505.872 ‐55 0 13 1 6 0.31 3 3m @ 0. 3
1% Cu, 0.00g/t Ag
30 3 5 0.38 5 5m@0. 38
% Cu,0.00g/t Ag
72 7 9 2.15 7 7m@2. 1
5% Cu,1.50g/t Ag
74 7 6 4.12 2 2m@ 4. 12
% Cu, 3.00g/t Ag
94 9 6 0.53 2 2m@0. 5
3% Cu,0.00g/t Ag
DBR C
0009
1 3
1
758467 78 1
4783
1507.375 ‐55 0 16 1 7 0.4 1 1m @ 0. 40
% Cu, 0.00g/t Ag
26 2 9 0.26 3 3m@0. 2
6% Cu,0.50g/t Ag
DBR C
0011
1 0
0
758405 78 1
4830
1508.388 ‐55 0 38 4 0 0.13 2 2m@0. 1
3% Cu,0.00g/t Ag

Notes

Pre v iously Report e d holes Ass a ys Outstandin g for Holes DBRC005,DBRC 0* 06, DBRC008, DBRC010, DBRC011

10