ASX / MEDIA ANNOUNCEMENT 3 September 2021

ABN: 72 002 261 565

==> picture [146 x 54] intentionally omitted <==

Extension of Gold System Confirmed at Stirling Well

Highlights:

  • Significant high-grade gold mineralisation intercepted:

  • 1m @ 2.70 g/t Au from 32m (MSWRC019)

  • 1m @ 8.44 g/t Au from 23m (MSWRC025)

  • 1m @ 2.41 g/t Au from 68m (MSWRC029)

  • 3m @ 6.50 g/t Au from 127m (MSWRC037); inc 1m @ 16.81 g/t Au from 127m

  • 2m @ 2.95 g/t Au from 86m (MSWRC046); inc 1m @ 4.92 g/t Au from 87m

  • Multiple intercepts occur beyond existing Stirling Well resource estimate boundary.

  • Previous historical drilling pulled short 12-27m surrounding the recent MSWRC037 high-grade Au extensional discovery intercept of 3m @ 6.50 g/t Au from 127m inc 1m @ 16.81 g/t Au - this newly discovered high-grade Au lode interpreted depth position, provides immediate high-grade extensional potential.

  • RC drilling at Diorite has been reduced due to permitting now received for continued Mt Stirling / Viserion, Hydra, and Tyrannus drilling.

  • RC drilling has now resumed at Mt Stirling and Hydra prospects, with regional update as well as drill results from recent drilling forthcoming.

Torian Resources Limited ( Torian or the Company ) is pleased to announce results from its latest drilling campaigns at Stirling Well. Results have increased the footprint of gold mineralisation at Stirling Well, with pierce point intercepts beyond the maiden resource boundary. The tenor of high-grade intercepts are also significantly above the global resource grade.

==> picture [596 x 71] intentionally omitted <==

==> picture [82 x 31] intentionally omitted <==

Stirling Well Drill update

Two phases of shallow RC drilling were conducted at Mt Stirling Well between December 2020 and May 2021:

  • the first 18 shallow drillholes for 888m to confirm mineralisation and grade continuity;

  • a follow-up second phase of 17 drillholes for 2,618m targeting structural horizontal repetitions and extensions of mineralisation; and

  • All RC drilling was vertical (-90° dip).

Encouraging gold mineralisation of 1m @ 2.70 g/t Au from 32m (MSWRC019); 1m @ 8.44 g/t Au from 23m (MSWRC025); and 1m @ 2.41 g/t Au from 68m (MSWRC029) were encountered during the 1[st] Phase of drilling to confirm and extend continuity of the 253,500t @ 2.01 g/t Au for 16,384k oz MSW (Mt Stirling Well) 2018 inferred resource.

The 2[nd] phase of drilling, targeted deeper continuity and likely proposed repetition of possible stacked lodes, and produced anomalous gold results, amongst further encouraging extension intercepts of 3m @ 6.50 g/t Au from 127m (MSWRC037), inc 1m @ 16.81 g/t Au from 127m; 2m @ 2.95 g/t Au from 86m (MSWRC046), inc 1m @ 4.92 g/t Au from 87m; and 1m @ 1.85 g/t Au from 10m (MSWRC052).

Significantly, all historical drilling surrounding the MSWRC037 high-grade Au extensional discovery intercept, pulled up 12 to 27m too short of the high-grade Au lode interpreted depth position.

The potential for mineralisation beyond the granitic contacts has potential to further expand the footprint of mineralisation, and as such warrants follow up exploration.

Torian’s Executive Director Mr Peretz Schapiro said “We are very encouraged by the results received from our recent Stirling Well campaigns, as it confirms our structural hypothesis of multiple stacked horizontal lodes, with drilling intercepting high grade gold mineralisation deeper than what has been previously explored. This campaign has also increased the footprint of mineralisation at Stirling Well, warranting follow up exploration.

Drilling has also recently been undertaken, (with results pending) and further drilling is planned to try and prove up another hypothesis, being a connection between the Stirling Well and Mt Stirling Gold Systems.

These results continue to affirm our belief that our Mt Stirling Gold Project has the potential to turn into a significant gold camp. We are continuing to drill out further high priority targets, as our attention now turns to growing the resource at Viserion, and following up on significant arsenic anomalies at Hydra and Tyrannus.

We are anticipating results from our recent Diorite drilling campaign, in approximately 4-6 weeks. We look forward to keeping the market updated on our progress.

==> picture [79 x 30] intentionally omitted <==

==> picture [510 x 443] intentionally omitted <==

==> picture [510 x 112] intentionally omitted <==

Figure 1: A regional map of the Mt Stirling Gold Project tenements showing the Stirling and Diorite Blocks and surrounding Red 5 (ASX:RED) tenements including the 4.1Moz King of the Hills gold mine and Cerebus-Eclipse and Centauri deposits

==> picture [79 x 30] intentionally omitted <==

Mt Stirling Well - Results Update

Table 1: Mt Stirling Well Intercepts from Phase 1 drilling:

Prospect Hole ID from(m) to(m) interval(m) **Aug/t ** Intercept (g/t Au)
Mt
Stirling
Well
MSWRC019
32
33
1
2.70
1m@ 2.70
MSWRC020 NSI
MSWRC021
14
15
28
29
1
0.45
1m @ 0.45
1
0.20
[email protected]
MSWRC022
39
40
1
0.34
[email protected]
MSWRC023 NSI
MSWRC024
5
6
1
0.39
[email protected]
MSWRC025
7
8
23
24
1
0.21
1m @ 0.21
1
8.44
1m@ 8.44
MSWRC026 NSI
MSWRC027
44
45
1
0.25
[email protected]
MSWRC028
39
40
1
0.73
[email protected]
MSWRC029
68
69
1
2.41
1m@ 2.41
MSWRC030
33
34
1
0.58
[email protected]
MSWRC031
69
70
1
0.97
[email protected]
MSWRC032
67
68
1
0.41
[email protected]
MSWRC033 NSI
MSWRC034
16
20
4
0.42
[email protected]
MSWRC035 NSI
MSWRC036 NSI

==> picture [79 x 30] intentionally omitted <==

Table 2: Mt Stirling Well Intercepts from recent Phase 2 drilling:

Prospect Hole ID from(m) to(m) interval(m) **Aug/t ** Intercept (g/t Au)
Mt
Stirling
Well
MSWRC037
80
84
96
100
127
130
inc
127
128
4
0.29
4m @ 0.29
4
0.12
4m @ 0.12
3
6.50
3m @ 6.50
1
16.81
1m@ 16.81
MSWRC038
4
5
20
23
1
0.59
1m @ 0.59
2
0.23
[email protected]
MSWRC039
8
12
76
80
96
100
151
152
153
154
4
0.13
4m @ 0.13
4
0.10
4m @ 0.10
4
0.20
4m @ 0.20
1
0.26
1m @ 0.26
1
0.37
[email protected]
MSWRC040
94
96
inc
94
95
2
0.18
2m @ 0.18
1
0.24
[email protected]
MSWRC041 NSI
MSWRC042
1
2
13
14
120
121
1
0.38
1m @ 0.38
1
0.39
1m @ 0.39
1
0.35
[email protected]
MSWRC043
40
44
inc
40
41
84
86
112
114
4
0.25
4m @ 0.25
1
0.40
1m @ 0.40
2
0.14
2m @ 0.14
2
0.12
[email protected]
MSWRC044
2
3
1
0.27
[email protected]
MSWRC045
5
6
60
62
148
149
1
0.22
1m @ 0.22
2
0.12
2m @ 0.12
1
0.23
[email protected]
MSWRC046
76
77
86
88
inc
87
88
155
156
1
0.83
1m @ 0.83
2
2.95
2m @ 2.95
1
4.92
1m @ 4.92
1
0.64
[email protected]
MSWRC047
104
105
1
0.36
[email protected]
MSWRC048
85
86
108
109
1
0.46
1m @ 0.46
1
0.47
[email protected]
MSWRC049
9
10
52
53
1
0.21
1m @ 0.21
1
0.93
[email protected]
MSWRC050 NSI
MSWRC051 NSI
MSWRC052
8
9
10
11
104
107
inc
106
107
113
116
1
0.47
1m @ 0.47
1
1.85
1m @ 1.85
3
0.23
3m @ 0.23
1
0.31
1m @ 0.31
3
0.10
[email protected]
MSWRC053
16
18
2
0.21
[email protected]

==> picture [78 x 30] intentionally omitted <==

Figure 2 : Mt Stirling Well gold mineralisation contours

==> picture [683 x 235] intentionally omitted <==

==> picture [683 x 235] intentionally omitted <==

==> picture [121 x 45] intentionally omitted <==

Table 3A: Mt Stirling Well – Phase 1 Drill Collar Table

Tenement Prospect Hole ID Type East North RL Az (mag) Dip Depth
(m)
M37/1305 Mt
Stirling
Well
MSWRC019
RC
MSWRC020
RC
MSWRC021
RC
MSWRC022
RC
MSWRC023
RC
MSWRC024
RC
MSWRC025
RC
MSWRC026
RC
MSWRC027
RC
MSWRC028
RC
MSWRC029
RC
MSWRC030
RC
MSWRC031
RC
MSWRC032
RC
MSWRC033
RC
MSWRC034
RC
MSWRC035
RC
311356
6834306
422
0
‐90
46
311375
6834307
422
0
‐90
46
311377
6834329
422
0
‐90
40
311377
6834289
423
0
‐90
40
311415
6834306
424
0
‐90
40
311396
6834329
423
0
‐90
40
311358
6834347
421
0
‐90
46
311375
6834347
423
0
‐90
40
311379
6834265
424
0
‐90
58
311394
6834285
424
0
‐90
46
311379
6834204
428
0
‐90
70
311341
6834168
429
0
‐90
82
311300
6834160
428
0
‐90
76
311239
6834162
431
0
‐90
86
311176
6834172
431
0
‐90
42
311175
6834195
430
0
‐90
46
311171
6834259
432
0
‐90
22
MSWRC036
RC
311168
6834280
434
0
‐90
22

Table 3B: Mt Stirling Well – Phase 2 Drill Collar Table


Tenement

Prospect

Hole ID
Type East North RL Az (mag) Dip Depth
(m)
M37/1305 Mt
Stirling
Well
MSWRC039
RC
MSWRC038
RC
MSWRC037
RC
MSWRC040
RC
MSWRC045
RC
MSWRC048
RC
MSWRC046
RC
MSWRC049
RC
MSWRC044
RC
MSWRC043
RC
MSWRC047
RC
MSWRC042
RC
MSWRC041
RC
MSWRC050
RC
MSWRC052
RC
MSWRC053
RC
311376
6834083
429
0
‐90
172
311455
6834163
430
0
‐90
148
311376
6834122
429
0
‐90
142
311455
6834203
430
0
‐90
170
311336
6834121
429
0
‐90
152
311376
6834164
429
0
‐90
152
311257
6834080
430
0
‐90
164
311297
6834120
429
0
‐90
166
311416
6834244
427
0
‐90
164
311454
6834283
426
0
‐90
168
311257
6834120
428
0
‐90
152
311453
6834322
425
0
‐90
172
311414
6834323
425
0
‐90
170
311173
6834157
431
0
‐90
154
311294
6834401
426
0
‐90
124
311253
6834401
427
0
‐90
124
MSWRC051
RC
311173
6834399
429
0
‐90
124

==> picture [79 x 30] intentionally omitted <==

This release has been authorised for release by the Board of Directors.

Peretz Schapiro Executive Director Torian Resources Ltd [email protected]

-ENDS-

About Torian:

Torian Resources Ltd (ASX: TNR) is a highly active gold exploration and development company with an extensive and strategic land holding comprising six projects and over 400km² of tenure in the Goldfields Region of Western Australia. All projects are nearby to excellent infrastructure and lie within 50km of major mining towns.

Torian’s flagship Mt Stirling Project is situated approximately 40km NW of Leonora, and neighbours Red 5’s Kind of the Hills mine. The region has recently produced approximately 14M oz of gold from mines such as Tower Hills, Sons of Gwalia, Thunderbox, Harbour Lights and Gwalia.

The Mt Stirling Project consists of 2 blocks:

  1. The Stirling Block to the north which contains two JORC compliant resources at a 0.5g/t cut-off: (refer ASX release 27/5/21 for further information)

  2. a. Mt Stirling – 355,000t at 1.7 g/t Au for 20,000oz (Indicated)

    • 1,695,000 at 1.5 g/t Au for 82,000oz (Inferred)
  3. b. Stirling Well – 253,500t at 2.01 g/t Au for 16,384oz (Inferred)

  4. The Diorite Block to the south, home of the historic 73 g/t Diorite King Mine.

Another project in the Kalgoorlie region is the Zuleika project in which the Company is involved in a JV with Zuleika Gold Ltd (ASX: ZAG). The Zuleika project is located along the world-class Zuleika Shear, which is the fourth largest gold producing region in Australia and consistently produces some of the country’s highest grade and lowest cost gold mines. This project lies north and partly along strike of several major gold deposits including Northern Star’s (ASX: NST) 7.0Moz East Kundana Joint Venture and Evolution’s (ASX: EVN) 1.8Moz Frogs Legs and White Foil deposits.

Torian’s other projects within the Kalgoorlie region include the Bonnie Vale and Gibraltar Projects, and its Credo Well JV with Zuleika Gold Ltd (ASX: ZAG), host of a JORC Inferred resource of 86,419t at 4.41 g/t Au for 12,259 oz.

Torian also holds ~10.7% of Monger Gold (ASX:MMG) as well as a 20% free carried JV interest in its projects.

==> picture [79 x 30] intentionally omitted <==

Competent Person Statement

The information in this report relating to exploration results and Mineral Resource Estimates is based on information compiled, reviewed and relied upon by Mr Dale Schultz. Mr Dale Schultz, Principle of DjS Consulting, who is a Torian Director, compiled, reviewed and relied upon prior data and ASX releases dated 27 May 2021, 25 February 2019 and 29 January 2020 to put together the technical information in this release and is a member of the Association of Professional Engineers and Geoscientists of Saskatchewan (APEGS), which is ROPO, accepted for the purpose of reporting in accordance with ASX listing rules. Mr Schultz has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Schultz consents to the inclusion in the report of the matters based on information in the form and context in which it appears.

The JORC Resource estimate released on 27 May 2021 and 25 February 2019 were reviewed and relied upon by Mr Dale Schultz were reported in accordance with Clause 18 of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (2012 Edition) (JORC Code).

Torian Resources confirms in the subsequent public report that it is not aware of any new information or data that materially affects the information included in the relevant market announcements on the 25 February 2019, 29 January 2020 and 27 May 2021 and, in the case of the exploration results, that all material assumptions and technical parameters underpinning the results in the relevant market announcement reviewed by Mr Dale Schultz continue to apply and have not materially changed.

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any statements that are not historical facts may contain forward-looking information, and forward looking information can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget” “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.” Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, Gold and other metal prices, the estimation of initial and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources, assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures, receipt of required regulatory approvals, the availability of necessary financing for the Project, permitting and such other assumptions and factors as set out herein.

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks related to changes in Gold prices; sources and cost of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the estimation of initial targeted mineral resource tonnage and grade for the Project; risks associated with uninsurable risks arising during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing, capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development activities at the Project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of additional common shares of the Company; the risk of litigation.

==> picture [79 x 30] intentionally omitted <==

Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Forward looking information is made as of the date of this announcement and the Company does not undertake to update or revise any forward-looking information this is included herein, except in accordance with applicable securities laws.

==> picture [122 x 45] intentionally omitted <==

Mt Stirling Project: JORC Table 1

Section 1 ‐ Sampling Techniques and Data

Criteria Commentary
Sampling techniques  Drilling results reported are from previous and current exploration completed by Torian Resources Ltd and historical explorers including the original vendors of
M37/1306, North Ltd, Dominion Mining Limited and Tern Minerals Ltd.
 Reverse circulation drilling was used to obtain 1m split samples from which 2‐3kg was pulverised to produce a 500g tub for Photon assay. Sampling has been
carried out to company methodology and QA/QC to industry best practice. Zones of interest were 1m split sampled, and comp spear sampling was carried out on
interpreted barren zones. Samples were dispatched to MinAnalytical in Kalgoorlie were prep included sorting, drying and pulverisation for a 500gm Photon Assay
(PAAU02)

Diamond drilling was utilised to obtain NQ core which was cut to obtain half core for representative sampling of selective geological sampling
Drilling techniques  Historical drilling techniques include reverse circulation (RC) drilling. Standard industry techniques have been used where documented. Current RC drilling was
carried out by PXD and Orlando utilising a Schramm truck and track mounted rig respectively

Diamond drilling was carried out by Orlando drilling, with RC precollars followed by Diamond tail NQ tails.
 The more recent RC drilling utilised a face sampling hammer with holes usually 155mm in diameter.
Drill sample recovery
Logging
 Drill recovery has not been routinely recorded on historical work, and is captured for all recent drilling

Drill recovery and geotechnical logging is captured from core logging, including RQD
 Geological logs are accessible and have been examined over the priority prospect areas. The majority of the logging is of high quality and has sufficiently
captured key geological attributes including lithology, weathering, alteration and veining.
 Logging is qualitative in nature, to company logging coding.
 All samples / intersections have been logged. 100% of relevant length intersections have been logged.
Sub‐sampling techniques and
sample preparation
 Standard industry sampling practices have been undertaken by the historical exploration companies. Appropriate analytical methods have been used
considering the style of mineralisation being sought.
 Sample sizes are considered appropriate.
 QC/QC data is absent in the historical data with the exception of the more recent Torian drilling, where sample standards and blanks are routinely used.
 In the more recent Torian drilling duplicate samples (same sample duplicated) were commonly inserted for every 20 samples taken. Certified Reference
Materials (CRM's), blanks and duplicates, are included and analysed in each batch of samples.
 There is a significant amount of coarse gold at the Mt Stirling Well Prospect. This is reflected in the poor repeatability of some samples and was also noted on
the drill logs.
Quality of assay data and
laboratory tests
 The historical drill sample gold assays are a combination of Fire Assay and Aqua Regia. The assay techniques and detection limits are appropriate for the
included results.
 Various independent laboratories have assayed samples from the historical explorers drilling. In general they were internationally accredited for QAQC in
mineral analysis.
 Downhole density surveying is being carried out, and calibrated against SG data obtained from drill core.
 The laboratories inserted blank and check samples for each batch of samples analysed and reports these accordingly with all results.
 Reference Photon pulps have been submitted to Nagrom Laboratory, in order to verify MinAnalytical mineralised assays accuracy and precision.
 Samples were analysed for gold via a 50 gram Lead collection fire assay and Inductively Coupled Plasma optical (Atomic) Emission Spectrometry to a detection
limited of 0.005ppm Au.
 Intertek Genalysis routinely inserts analytical blanks, standards and duplicates into the client sample batches for laboratory QAQC performance monitoring.
 The laboratory QAQC has been assessed in respect of the RC chip sample assays and it has been determined that the levels of accuracy and precision relating
to the samples are acceptable.
Verification of sampling and
assaying
 The historical and current drill intercepts reported have been calculated using a 0.5g/t Au cut‐off, with a maximum 2m internal waste.
Twinned holes have been completed to verify repeatability of sampling and assaying used to date.
 Documentation of primary data is field log sheets (handwritten) or logging to laptop templates. Primary data is entered into application specific data base. The
data base is subjected to data verification program, erroneous data is corrected. Data storage is retention of physical log sheet, two electronic backup storage
devices and primary electronic database.
Location of data points  Drill hole collarswere located using a handheld GPS system. The coordinated are stored in a digital exploration database and are referenced to MGA Zone 51
Datum GDA 94.
 Location of the majority of the historical drill holes has been using a handheld GPS system, or local grids that have been converted to MGA Zone 51 Datum GDA
94. Survey control used is handheld GPS for historic holes and
 The more recent Torian drilling has been located utilising a differential GPS and the majority of these holes have been surveyed downhole.
Data spacing and distribution  The historical drill spacing is variable over the project as depicted on map plan diagrams.
 Drill spacing over the more advanced Mt Stirling and Stirling Well Prospects varies from 40m by 40m to 20m by 20m respectively.
 Sample compositing has been used in areas where mineralisation is not expected to be intersected. If results return indicate mineralisation, 1m split samples
were submitted for analysis.
Orientation of data in relation to
geological structure
 The orientation of the drilling is approximately at right angles to the known mineralisation trend and so gives a fair representation of the true width of
mineralisation intersected.
 No sampling bias is believed to occur due to the orientation of the drilling.
Sample security
 Drill samples were compiled and collected by Torian employees/contractors. All sample were bagged into calico bags and tied. Samples were transported from
site to the MinAnalytical laboratory in Kalgoorlie by Torian employees/contractors.
 A sample submission form containing laboratory instructions was submitted to the laboratory. The sample submission form and sample summary digitised
records were compiled and reviewed so as to check for discrepancies.
Audits or reviews Areview of historical data over the main Mt Stirling and Stirling Well Prospects has been undertaken. The QA/QC on data over the remainder of the project
tenements is ongoing.

Section 2 - Reporting of Exploration Results

Criteria Commentary
Mineral tenement and land tenure
status Mt Stirling is located on M37/1306 and forms part of the Mt Stirling Joint Venture. This tenement is held by a third party on behalf of the Joint Venture. Torian
Resources is the Manager of the Joint Venture and holds executed transfers which will permit this tenement becoming the property of the Joint Venture.
Torian has purchased a 51% interest in the project and is earning up to 90% by completing exploration on the tenements.
Stirling Well sits entirely with M37/1305, Torian Resources has a 100% interest in this tenement.
The tenements are in good standing.
Exploration done by other parties

Previous exploration completed by Torian Resources Ltd and historical explorers including the original vendors of M37/1306, North Ltd, Dominion Mining
Limited and Tern Minerals Ltd.
Geology
The Mt Stirling Project tenements are located 40 km northwest of Leonora within the Mt Malcolm District of the Mt Margaret Mineral Field.

The project tenements are located within the Norseman‐Wiluna Greenstone Belt in the Eastern Goldfields of Western Australia.

The project tenements cover a succession of variolitic, pillowed high Mg basalts that have been intruded by the Mt Stirling syenogranite/monzogranite.

Historical prospecting and exploration activities have identified areas of gold mineralisation at the Mt Stirling and Stirling Well Prospects. The orogenic style
gold mineralisation appears in different manifestations at each of the prospects.

At the Mt Stirling Prospect gold mineralisation is associated with zones of alteration, shearing and quartz veining within massive to variolitic high Mg basalt.
The alteration zones comprise quartz‐carbonate‐sericite‐pyrite+/‐ chlorite.

At the Stirling Well Prospect gold mineralisation is associated with millimetre to centimetre scale quartz veining within the Mt Stirling
syenogranite/monzogranite. The gold mineralised quartz veins have narrow sericite/muscovite‐ epidote‐pyrite alteration selvages.

The characteristic of each prospect adheres to generally accepted features of orogenic gold mineralisation of the Eastern Goldfields of Western Australia.
Drill hole Information
The location of drill holes is based on historical reports and data originally located on handheld GPS devices.

Northing and easting data for historic drilling is generally within 10m accuracy.

Recent Torian RC drill holes located with differential GPS.

Northing and easting on current Feb 2021 drilling is ± 3m accuracy.

No material information, results or data have been excluded.
Data aggregation methods
Best gold in drill hole was calculated by taking the maximum gold value in an individual down hole interval from each drill hole and plotting at the corresponding
drill hole collar position. Individual downhole intervals were mostly 1m, but vary from 1m to 4m in down hole length.

In relation to the reported historical drill hole intersection a weighted average was calculated by a simple weighting of from and to distances down hole. The
samples were 2m down hole samples. No top cuts were applied.

The current drill hole intersection is reported using a weighted average calculation by a simple weighting of from and to distances down hole at 1m intervals
per sample.

The historical drilling intercept reported has been calculated using a 1g/t Au cut off, no internal waste and with a total intercept of greater than 1 g/t Au.

No metal equivalent values are used
Relationship between mineralisation
widths and intercept lengths

The orientation of the drilling is approximately at right angles to the known trend mineralisation.

At Stirling Well the gently dipping nature of the mineralisation means that steeply inclined holes give approximately true widths.

At Mt Stirling the steep dip of the mineralisation means that drill widths are exaggerated.

Down hole lengths are reported, true width not known.
Diagrams
The data has been presented using appropriate scales and using standard aggregating techniques for the display of data at prospect scale.

Geological and mineralisation interpretations based off current understanding and will change with further exploration.
Balanced reporting
Historical Torian drilling at the Mt Stirling and Stirling Well Prospects has been reported in TNR:ASX announcements dated: 16/05/2019, 25/02/2019,
23/11/2016, 18/11/2016, 20/09/2016, 03/03/2016.
Other substantive exploration data
Geological interpretations are taken from historical and ongoing exploration activities. Detailed historical exploration with the existing Mt Stirling and Stirling
Well Prospects has provided a reasonable understanding of the style and distribution of local gold mineralised structures at these prospects.

Other areas outside of the existing Mt Stirling and Stirling Well prospects are at a relatively early stage and further work will enhance the understanding of the
gold prospectivity of these areas.
Further work
A review of the historical exploration data is ongoing with a view to identify and rank additional target areas for further exploration.

The results of this ongoing review will determine the nature and scale of future exploration programs.

Diagrams are presented in this report outlining areas of existing gold mineralisation and the additional gold target areas identified to date.