GOLDARC RESOURCES LIMITED Capital/Financing Update 2016

Sep 19, 2016

64961_rns_2016-09-19_38dd28e6-321c-4dbf-8321-177eb61481a8.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

20 SEPTEMBER 2016

==> picture [222 x 84] intentionally omitted <==

Mt Stirling Drilling Results

1. Highlights

2m @ 27.21g/t Au from 55m;

o including 1m @ 45.50g/t Au from 55m

  • 1m @ 8.50g/t Au from 50m

  • 1m @ 8.00g/t Au from 59m

  • 7m @ 10.80 g/t Au from 46m;

  • including 1m @ 69.00g/t Au from 47m

Torian Resources Limited (TNR:ASX) is pleased to announce the first results from the current RC drilling programme at Mt Stirling Well.

The initial round of 48 holes were designed to step out laterally from the area previously drilled to determine the strike extent of the mineralisation. No holes to date have been drilled deeper than 72m.

Drilling is continuing, with approximately 2,431m completed to date. A further 1,330m of drilling is in the process of being completed as part of the Phase 1 program.

The remaining Mt Stirling drilling program is expected to be completed in October 2016.

2. Mt Stirling

The Mt Stirling Project is located 40km northwest of Leonora in Western Australia. The Project lies 8km NW of the Tarmoola Gold Mine, which has produced in excess of one million ounces of gold to date.

Current unmined resources at Tarmoola are believed to be in the order of 2.5 million ounces at an average grade of 5.3 g/t Au. The location of the Mt Stirling Project can be seen in Figure 1 below.

ABN: 72 002 261 565 Unit G4, 49 Melville Parade, South Perth, 6151 Australia Phone +61 2 9923 1786 Fax +61 2 9923 1371 [email protected] www.torianresources.com.au

==> picture [103 x 39] intentionally omitted <==

==> picture [452 x 452] intentionally omitted <==

Figure 1: Torian’s Mt Stirling and Malcolm Projects in relation to regional deposits and geology.

The Mt Stirling Project is covered by extensive basalt outcrop and sub crop with minor areas of alluvial cover. The basalt is gently north-dipping and can be divided into predominantly massive basalts in the west and pillowed, variolitic basalts in the east. The massive basalts have been intruded by the Mt Stirling monzogranite, parts of which outcrop on the tenements.

- 2 -

==> picture [103 x 39] intentionally omitted <==

==> picture [449 x 419] intentionally omitted <==

Figure 2: Torian’s Mt Stirling Project, tenure, drilling and geology.

The project area is located in the hinge zone of the gently north-plunging Tarmoola anticline. The greenstone sequence is suggested to overlie a major detachment fault separating a granite gneiss complex (Leonora Batholith) from the overlying greenstones. This detachment fault hosts the 7.2 million ounce Sons of Gwalia gold deposit at Leonora.

In the west of the project area are massive predominantly unaltered basalts intruded by the Mt Stirling monzogranite. In the east is a succession of variolitic, pillowed high Mg basalts that contain differentiated dolerite/gabbro sills. These two basalt lithotypes are divided by a central shear zone which trends ~310-330º and consists of chlorite ± tremolite/actinolite schist with narrow quartz veins. Widely spaced sinistral shear bands trending 300-320º overprint the main foliation within the shear zone. Some quartz veins are conformable with the sinistral movement indicated by the shear bands.

The main, well developed, steep (65-80º) east-dipping fabric locally contains a well-developed sub horizontal mineral lineation. Some minor chlorite, silica and pyritic alteration is observed within the shear zone. The Mt Stirling granitoid outcrops in the northeast corner of P37/8008. Finer grained phases are present on the pluton margins especially in the east. Extensive millimetre to centimetre scale quartz veining is present with sericite-muscovite-epidote-pyrite alteration selvages adjacent to many veins. Alteration however is not pervasive and only associated with veining. Multiple quartz vein sets occur as local stockwork arrays.

- 3 -

==> picture [103 x 39] intentionally omitted <==

Numerous felsic dykes and plugs are observed throughout the area with most dykes trending broadly north (340-030º), with less common dykes trending broadly east-west. Some of the dykes may be associated with deeper intrusive bodies which are interpreted to exist from aeromagnetic/gravity data.

==> picture [471 x 332] intentionally omitted <==

Figure 3: Torian’s Mt Stirling Project showing geology, tenure and the location of the 3Moz Tarmoola Gold Mine.

3. Drilling Program

As advised to shareholders on 25 July 2016, Torian’s drilling program for FY2017 will see exploration targeted in two areas of mineralisation identified at the Mt Stirling Project, with approximately 5,000m of infill and extensional RC drilling. It is anticipated that results from this programme will be used to define the mineralised areas, resulting in the calculation of a JORC compliant Resource.

Additionally, a 3,000m RAB programme has also been planned to determine if mineralisation exists at the granites/greenstone contact to the north of Mt Stirling Well.

The majority of the holes assayed to date were drilled vertically to intersect the relatively flat lying vein. One hole was drilled at -60 to intersect the vein beneath historic workings. Some holes have intersected steep dipping veins that warrant further drilling using angled holes.

Results greater than 1g/t Au, returned from the first batches submitted to the laboratory are shown in Table 1 below.

- 4 -

==> picture [103 x 39] intentionally omitted <==

Hole N
(local)
E
(Local)
Depth
(m)
Az Dip From
(m)
To
(m)
Width
(m)
Grade
g/t Au
SWC053 10121 5358 68 0 -90 63 64 1 1.96
SWC054 10140 5358 64 0 -90 56 57 1 1.21
SWC056 10180 5359 52 0 -90 43 44 1 5.43
SWC059 10216 5399 40 0 -90 33 34 1 2.62
SWC061 10137 5397 72 0 -90 62 63 1 2.70
SWC063 10213 5438 44 0 -90 37 38 1 2.12
SWC068 10100 5339 70 0 -90 66 67 1 2.12
SWC069 10119 5339 64 0 -90 60 61 1 1.14
SWC071 10120 5320 58 0 -90 55 57 2 27.21
including 55 56 1 45.50
SWC072 10121 5300 58 0 -90 50 51 1 8.50
and 55 56 1 1.69
SWC073 10102 5299 64 0 -90 56 57 1 3.62
and 59 60 1 8.00
SWC074 10118 5280 55 0 -90 46 53 7 10.80
including 47 48 1 69.00
SWC078 10260 5263 15 0 -90 7 9 2 Stope

Table 1: Results from RC Drilling greater than 1g/t Au at Mt Stirling

Several of the holes intersected values between 0.5 and 1g/t Au. The planning of additional step out drilling is nearing completion. The objective will be to test the area between 80m and 100m depth.

==> picture [472 x 266] intentionally omitted <==

Figure 4: RC Rig drilling at Torian’s Mt Stirling project.

- 5 -

==> picture [103 x 39] intentionally omitted <==

4. Interpretation

Based upon the assays received to date, Torian’s preliminary interpretations are:

  • the discovery of steeper veins requires further investigation;

  • there appear to be subtle variations in the dip of the main flat lying veins, alternatively there may be small fault offsets that disrupt the vein locally; and

  • Mt Stirling Well continues to grow with mineralisation open in all directions.

Geological interpretation is showing the granite intrusion to be more complex than previously understood. This added complexity is encouraging and suggests potential for additional mineralisation styles to be present away from the main vein structure.

5. Next Steps

Over the next two months Torian plans the following at the Mt Stirling Project:

  • Complete Phase 1 of the step out RC drilling;

  • Commence a limited phase 2 RC drilling programme to test several areas down to depths of approximately 100m vertical; and

  • Carry out an interpretation of all results received and plan further work.

When drilling is complete at Mt Stirling Well the rig will move to Mt Stirling to test an area of mineralisation historically identified to be present within a steeply dipping shear zone contained within a basaltic host.

6. Commentary

Torian’s Managing Director, Matthew Sullivan comments:

“These results are very encouraging. They exceed Torian’s expectations by a significant margin. Further drilling will define the mineralisation over a larger area. The location of steeper veins is also good news and may lead to a reappraisal of the mineralisation”.

Geological interpretation is showing the granite intrusion to be more complex than previously understood. This added complexity is encouraging and suggests potential for additional mineralisation styles to be present away from the main vein structure. “

For further information, please contact Matthew Sullivan (Torian’s MD) on (08) 6216 0424.

Yours sincerely,

==> picture [141 x 37] intentionally omitted <==

Matthew Sullivan Managing Director

- 6 -

==> picture [103 x 39] intentionally omitted <==

About Torian:

Torian Resources Ltd ( ASX:TNR ) is a highly active Australian gold company that is focused on developing the gold mines of tomorrow. The Company has four advanced projects located in the Goldfields region of Western Australia.

Torian’s flagship Project, the Zuleika JV, lies north and partly along strike of several major gold mines including Northern Star (ASX:NST), Tribune Resources (ASX:TBR) and Rand Mining’s (ASX:RND) 7Moz East Kundana Joint Venture and Evolution’s (ASX:EVN) Frogs Legs and White Foil operations.

Since May 2015, Torian has increased its landholding at the Zuleika Project by approximately 86% via eight separate acquisitions. Torian is now the second largest landholder in this highly sought after region and is focused on fast tracking its development.

Torian has commenced a large, 4 Phase, exploration program that is targeting the Zuleika Shear and intends to further consolidate ground in this region.

Torian is also developing the high grade Mt Stirling Project which has an outcropping inferred resource located 40km northwest of Leonora. Following a successful infill drilling program in December, Torian is currently completing an internal economic study on the project to assess it as a standalone mining operation.

Torian’s exploration team has an enviable track record of discovering and developing a number of multi-million ounce gold mines in this region. Torian is commencing an exciting phase in its development and we look forward to updating the market as things progress.

Hole N E RL Depth
(m)
Az Dip
(local) (Local)
SWC052 10101 5356 425 74 0 -90
SWC053 10121 5358 425 68 0 -90
SWC054 10140 5358 425 64 0 -90
SWC055 10160 5359 425 58 0 -90
SWC056 10180 5359 425 52 0 -90
SWC057 10295 5401 425 22 0 -90
SWC058 10255 5400 425 40 0 -90
SWC059 10216 5399 425 40 0 -90
SWC060 10178 5398 425 49 0 -90
SWC061 10137 5397 425 72 0 -90
SWC062 10176 5437 425 72 0 -90
SWC063 10213 5438 425 44 0 -90
SWC064 10253 5439 425 50 0 -90
SWC065 10331 5442 425 20 0 -90
SWC066 10057 5276 427 76 0 -90
SWC067 10055 5316 426 78 0 -90
SWC068 10100 5339 425 70 0 -90
SWC069 10119 5339 425 64 0 -90
SWC070 10100 5319 425 67 0 -90
SWC071 10120 5320 425 58 0 -90
SWC072 10121 5300 425 58 0 -90
SWC073 10102 5299 425 64 0 -90
SWC074 10118 5280 426 55 0 -90
SWC075 10161 5275 425 40 0 -90
SWC076 10262 5278 425 18 0 -90

- 7 -

==> picture [103 x 39] intentionally omitted <==

SWC077 10240 5262 426 20 0 -90
SWC078 10260 5263 426 15 0 -90
SWC079 10259 5218 428 12 0 -90
SWC080 10260 5241 427 15 3 -60
SWC081 10240 5240 427 18 0 -90
SWC082 10156 5239 427 35 0 -90
SWC083 10119 5239 427 48 0 -90
SWC084 10099 5239 427 62 0 -90
SWC085 10058 5237 428 72 0 -90
SWC086 10018 5235 429 82 0 -90
SWC087 10019 5196 430 60 0 -90
SWC088 10060 5197 429 50 0 -90
SWC089 10096 5195 429 40 0 -90
SWC090 10115 5196 428 34 0 -90
SWC091 10134 5197 428 28 0 -90
SWC092 10154 5197 429 26 0 -90
SWC096 10139 5160 431 22 0 -90
SWC097 10219 5162 431 15 0 -90
SWC098 10179 5161 431 16 0 -90
SWC095 10100 5159 430 24 0 -90
SWC094 10060 5157 432 46 0 -90
SWC093 10021 5156 432 58 0 -90
SWC099 10023 5117 425 40 0 -90
SWC099A 10020 5117 425 55 0 -90
SWC100 10067 5118 434 46 0 -90
SWC101 10102 5119 434 40 0 -90
SWC102 10140 5120 436 30 0 -90
SWC103 10099 5216 428 49 0 -90

Table 2: Collar details of all holes drilled to date from the current drilling program.

- 8 -

==> picture [104 x 40] intentionally omitted <==

Appendix 2 Mt Stirling Project

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Sampling Nature and quality of sampling (eg cut channels, random chips, or specific All data and results referred to in this report are historic or new, and date from the
techniques specialised industry standard measurement tools appropriate to the minerals under late 1980s to the present day. This data has been judged to be reliable following
investigation, such as down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
independent research, including discussions with previous operators and explorers
in person.
Samples were collected via Rotary Air Blast (RAB) and Reverse Circulation (RC) drill
Aspects of the determination of mineralisation that are Material to the Public chips.
Report. All drilling yielded samples on a metre basis. RAB drilling samples were commonly
In cases where ‘industry standard’ work has been done this would be relatively composited into intervals of 4 or 5m, with selected individual or 2m resamples
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 collected. Reverse Circulation (RC) drilling is utilised to obtain 1 m samples which
kg was pulverised to produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types (eg submarine
nodules) may warrant disclosure of detailed information.
are cone split, from which approx. 2-3 kg is pulverised to produce a 40 g charge for
fire assay.
Sample preparation method is total material dried and pulverized to nominally 85%
passing 75 µm particle size. Gold analysis method is generally by 40g Fire Assay,
with Atomic Absorption Spectrometry (AAS) finish (DL 0.01 – UL 50 ppm Au).
Samples exceeding the upper limit of the method were automatically re-assayed
utilizing a high grade gravimetric method.
Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, RAB holes were typically 100mm in diameter, RC drilling usually 155mm in diameter.
techniques Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of RC drilling was via a face sampling hammer.
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
_what method, etc). _
Drill sample Method of recording and assessing core and chip sample recoveries and results Recoveries were logged onto paper logs during drilling. Recoveries were visually
recovery assessed. assessed.
Measures taken to maximise sample recovery and ensure representative nature of Sample recoveries were maximised in RAB and RC drilling via collecting the samples
the samples. in a cyclone prior to sub sampling. RAB drillholes were stopped if significant water
Whether a relationship exists between sample recovery and grade and whether flows were encountered.
sample bias may have occurred due to preferential loss/gain of fine/coarse material. No relationship appears from the data between sample recovery and grade of the
samples.
Logging Whether core and chip samples have been geologically and geotechnically logged to All drillholes were geologically logged. This logging appears to be of high quality and
a level of detail to support appropriate Mineral Resource estimation, mining studies suitable for use in further studies.

- 9 -

==> picture [104 x 40] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
and metallurgical studies. Logging is qualitative in nature.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, All samples / intersections are logged. 100% of relevant length intersections are
etc) photography. logged.
The total length andpercentage of the relevant intersections logged.
Sub-sampling If core, whether cut or sawn and whether quarter, half or all core taken. Non-core RC drill chip sample material is riffle split, where sample is dry. In case of
techniques and If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet wet sample a representative ‘grab’ sample method is utilized.
sample or dry. The sample preparation technique is total material dried and pulverized to
preparation For all sample types, the nature, quality and appropriateness of the sample nominally 85% passing 75 µm particle size, from which a 40g charge was
preparation technique. representatively riffle split off, for assay.
Quality control procedures adopted for all sub-sampling stages to maximise Standard check (known value) sample were not used in all cases. Where used the
representivity of samples. known values correspond closely with the expected values. A duplicate (same
Measures taken to ensure that the sampling is representative of the in situ material sample duplicated) were commonly inserted for every 20 or 30 samples taken.
collected, including for instance results for field duplicate/second-half sampling. There is a significant amount of coarse gold at Mt Stirling Well. This is reflected in
Whether sample sizes are appropriate to the grain size of the material being the poor repeatability of some samples and also was noted on the drill logs.
sampled.
Quality of assay The nature, quality and appropriateness of the assaying and laboratory procedures Various independent laboratories have assayed samples from the project over the
data and used and whether the technique is considered partial or total. years. In general they were internationally accredited for QAQC in mineral analysis.
laboratory tests For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
No geophysical tools have been used to date.
used in determining the analysis including instrument make and model, reading The laboratories inserted blank and check samples for each batch of samples
times, calibrations factors applied and their derivation, etc. analysed and reports these accordingly with all results.
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of
bias) andprecision have been established.
Verification of The verification of significant intersections by either independent or alternative Selected significant intersections were resampled from original remnant sample
sampling and company personnel. material and analysed again.
assaying The use of twinned holes. No twinned holes have been used to date.
Documentation of primary data, data entry procedures, data verification, data Documentation of primary data is field log sheets (hand written). Primary data is
storage (physical and electronic) protocols. entered into application specific data base. The data base is subjected to data
Discuss any adjustment to assay data. verification program, erroneous data is corrected. Data storage is retention of
physical log sheet, two electronic backup storage devices and primary electronic
database.
Location of data Accuracy and quality of surveys used to locate drill holes (collar and down-hole Survey control used is hand held GPS for historic holes and differential GPS for the
points surveys), trenches, mine workings and other locations used in Mineral Resource new holes. No down hole surveys were completed to date. As these areas contain
estimation. drillholes to no more than 100m significant deviations are not expected.
Specification of the grid system used. Grid systems are various local grid converted to MGA coordinates.
Quality and adequacy of topographic control. Topographic control is accurate to +/- 0.5 m for the historic holes and 0.1m for the
new holes..

- 10 -

==> picture [104 x 40] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Data spacing Data spacing for reporting of Exploration Results. The drill spacing of the historic drilling is variable but generally no greater than
and distribution Whether the data spacing and distribution is sufficient to establish the degree of 200m by 40m, with some areas infilled to 80m by 40m. The new drilling is 20m by
geological and grade continuity appropriate for the Mineral Resource and Ore 20m spaced.
Reserve estimation procedure(s) and classifications applied. The areas have drilling density sufficient for JORC Inferred category. Further infill
Whether sample compositing has been applied. will be required for other categories.
Sample compositing has been used in areas where mineralisation is not expected to
be intersected. If results return indicate mineralisation, 1m split samples will be
submitted for analysis.
Orientation of Whether the orientation of sampling achieves unbiased sampling of possible Apart from some reconnaissance RAB drilling, the orientation of the drilling is
data in relation structures and the extent to which this is known, considering the deposit type. approximately at right angles to the known mineralisation and so gives a fair
to geological If the relationship between the drilling orientation and the orientation of key representation of the mineralisation intersected.
structure mineralised structures is considered to have introduced a sampling bias, this should No sampling bias is believed to occur due to the orientation of the drilling.
be assessed and reported if material.
Sample security The measures taken to ensure sample security. Samples were delivered to the laboratory in batches at regular intervals. These are
temporarilystored in a secure facilityafter drillingand before delivery
Audits or reviews The results of any audits or reviews of sampling techniques and data. The company engages independent consultants who regularly audit the data for
inconsistencies and other issues. None have been reported to date.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Mineral Type, reference name/number, location and ownership including agreements or The Mt Stirling Well Prospect is wholly contained within P37/7172. This is
tenement and material issues with third parties such as joint ventures, partnerships, overriding beneficially held 100% by the company, transfers are pending. An application for
land tenure royalties, native title interests, historical sites, wilderness or national park and Mining Lease M37/1305 has been submitted to the DMP, and is pending approval.
status environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Exploration done
Acknowledgment and appraisal of exploration by other parties. All work relating to previous exploration contained within this report was completed
by other parties by other parties. Details are included in the references.
Geology Deposit type, geological setting and style of mineralisation. Details of the geology are found elsewhere in this report.
Drill hole A summary of all information material to the understanding of the exploration Details of the drilling, etc are found within the various tables and diagrams
Information results including a tabulation of the following information for all Material drill holes: elsewhere in this report.
o easting and northing of the drill hole collar No material information, results or data have been excluded.
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o dip and azimuth of the hole

- 11 -

==> picture [104 x 40] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report,
the Competent Person should clearly explain why this is the case.
Data In reporting Exploration Results, weighting averaging techniques, maximum and/or Weighted averages were calculated by a simple weighting of from and to distances
aggregation minimum grade truncations (eg cutting of high grades) and cut-off grades are down each hole. Most samples are 1 metre samples. No top cuts were applied.
methods usually Material and should be stated. Lower cut-offs used were – Mt Stirling 1.0g/t Au.
Where aggregate intercepts incorporate short lengths of high grade results and The high grade nature of the resource at Mt Stirling Well means that little low grade
longer lengths of low grade results, the procedure used for such aggregation should material has been included in the intersection table. At Mt Stirling a small amount
be stated and some typical examples of such aggregations should be shown in detail. of higher grade is consistently present in each intersection as shown in the drill
The assumptions used for any reporting of metal equivalent values should be clearly results tables above.
stated.

No metal equivalent values are used
Relationship These relationships are particularly important in the reporting of Exploration Results.
Details of geology, and selected cross sections are given elsewhere in this report
between If the geometry of the mineralisation with respect to the drill hole angle is known, its
At Mt Stirling Well the gently dipping nature of the mineralisation means that
mineralisation nature should be reported. steeply inclined holes give approximately true widths. At Mt Stirling the steep
widths and If it is not known and only the down hole lengths are reported, there should be a dip of the mineralisation means that drill widths are exaggerated. These are
intercept lengths clear statement to this effect (eg ‘down hole length, true width not known’). shown in the tables above.
The tables above show drill widths not true widths. In the case of Mt Stirling
Well the drill widths are approximatelythe same as true widths.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be Details of geology, and selected cross sections are given elsewhere in this report.
included for any significant discovery being reported These should include, but not be
limited to aplan view of drill hole collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not practicable, Details of the results, drilling, etc are reported elsewhere in this report.
reporting representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
Other Other exploration data, if meaningful and material, should be reported including Details of geology, and selected cross sections are given elsewhere in this report.
substantive (but not limited to): geological observations; geophysical survey results; geochemical
exploration data survey results; bulk samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
Further work The nature and scale of planned further work (eg tests for lateral extensions or depth
Proposed work included drilling of selected twin holes followed by infill and step out
extensions or large-scale step-out drilling). RC drilling across all resources. The aim of such work is to increase confidence in
Diagrams clearly highlighting the areas of possible extensions, including the main the data and also to test for extensions to the known resources. Budgets are being
geological interpretations andfuture drilling areas, provided this information is not prepared for this work atpresent.

- 12 -

==> picture [104 x 40] intentionally omitted <==

  • Criteria JORC Code explanation Commentary commercially sensitive.  In addition a significant number of additional prospects are known to exist within the projects as defined by previous RAB and RC drilling intersections. These will form the second phase of exploration.

  • Various maps and diagrams are presented elsewhere in this report to highlight possible extensions and new targets.

- 13 -