==> picture [222 x 84] intentionally omitted <==
Mt Stirling Drilling Results
1. Highlights
2m @ 27.21g/t Au from 55m;
o including 1m @ 45.50g/t Au from 55m
-
1m @ 8.50g/t Au from 50m
-
1m @ 8.00g/t Au from 59m
-
7m @ 10.80 g/t Au from 46m;
-
including 1m @ 69.00g/t Au from 47m
Torian Resources Limited (TNR:ASX) is pleased to announce the first results from the current RC drilling programme at Mt Stirling Well.
The initial round of 48 holes were designed to step out laterally from the area previously drilled to determine the strike extent of the mineralisation. No holes to date have been drilled deeper than 72m.
Drilling is continuing, with approximately 2,431m completed to date. A further 1,330m of drilling is in the process of being completed as part of the Phase 1 program.
The remaining Mt Stirling drilling program is expected to be completed in October 2016.
2. Mt Stirling
The Mt Stirling Project is located 40km northwest of Leonora in Western Australia. The Project lies 8km NW of the Tarmoola Gold Mine, which has produced in excess of one million ounces of gold to date.
Current unmined resources at Tarmoola are believed to be in the order of 2.5 million ounces at an average grade of 5.3 g/t Au. The location of the Mt Stirling Project can be seen in Figure 1 below.
ABN: 72 002 261 565 Unit G4, 49 Melville Parade, South Perth, 6151 Australia Phone +61 2 9923 1786 Fax +61 2 9923 1371 [email protected] www.torianresources.com.au
==> picture [103 x 39] intentionally omitted <==
==> picture [452 x 452] intentionally omitted <==
Figure 1: Torian’s Mt Stirling and Malcolm Projects in relation to regional deposits and geology.
The Mt Stirling Project is covered by extensive basalt outcrop and sub crop with minor areas of alluvial cover. The basalt is gently north-dipping and can be divided into predominantly massive basalts in the west and pillowed, variolitic basalts in the east. The massive basalts have been intruded by the Mt Stirling monzogranite, parts of which outcrop on the tenements.
- 2 -
==> picture [103 x 39] intentionally omitted <==
==> picture [449 x 419] intentionally omitted <==
Figure 2: Torian’s Mt Stirling Project, tenure, drilling and geology.
The project area is located in the hinge zone of the gently north-plunging Tarmoola anticline. The greenstone sequence is suggested to overlie a major detachment fault separating a granite gneiss complex (Leonora Batholith) from the overlying greenstones. This detachment fault hosts the 7.2 million ounce Sons of Gwalia gold deposit at Leonora.
In the west of the project area are massive predominantly unaltered basalts intruded by the Mt Stirling monzogranite. In the east is a succession of variolitic, pillowed high Mg basalts that contain differentiated dolerite/gabbro sills. These two basalt lithotypes are divided by a central shear zone which trends ~310-330º and consists of chlorite ± tremolite/actinolite schist with narrow quartz veins. Widely spaced sinistral shear bands trending 300-320º overprint the main foliation within the shear zone. Some quartz veins are conformable with the sinistral movement indicated by the shear bands.
The main, well developed, steep (65-80º) east-dipping fabric locally contains a well-developed sub horizontal mineral lineation. Some minor chlorite, silica and pyritic alteration is observed within the shear zone. The Mt Stirling granitoid outcrops in the northeast corner of P37/8008. Finer grained phases are present on the pluton margins especially in the east. Extensive millimetre to centimetre scale quartz veining is present with sericite-muscovite-epidote-pyrite alteration selvages adjacent to many veins. Alteration however is not pervasive and only associated with veining. Multiple quartz vein sets occur as local stockwork arrays.
- 3 -
==> picture [103 x 39] intentionally omitted <==
Numerous felsic dykes and plugs are observed throughout the area with most dykes trending broadly north (340-030º), with less common dykes trending broadly east-west. Some of the dykes may be associated with deeper intrusive bodies which are interpreted to exist from aeromagnetic/gravity data.
==> picture [471 x 332] intentionally omitted <==
Figure 3: Torian’s Mt Stirling Project showing geology, tenure and the location of the 3Moz Tarmoola Gold Mine.
3. Drilling Program
As advised to shareholders on 25 July 2016, Torian’s drilling program for FY2017 will see exploration targeted in two areas of mineralisation identified at the Mt Stirling Project, with approximately 5,000m of infill and extensional RC drilling. It is anticipated that results from this programme will be used to define the mineralised areas, resulting in the calculation of a JORC compliant Resource.
Additionally, a 3,000m RAB programme has also been planned to determine if mineralisation exists at the granites/greenstone contact to the north of Mt Stirling Well.
The majority of the holes assayed to date were drilled vertically to intersect the relatively flat lying vein. One hole was drilled at -60 to intersect the vein beneath historic workings. Some holes have intersected steep dipping veins that warrant further drilling using angled holes.
Results greater than 1g/t Au, returned from the first batches submitted to the laboratory are shown in Table 1 below.
- 4 -
==> picture [103 x 39] intentionally omitted <==
| Hole | N (local) |
E (Local) |
Depth (m) |
Az | Dip | From (m) |
To (m) |
Width (m) |
Grade g/t Au |
|---|---|---|---|---|---|---|---|---|---|
| SWC053 | 10121 | 5358 | 68 | 0 | -90 | 63 | 64 | 1 | 1.96 |
| SWC054 | 10140 | 5358 | 64 | 0 | -90 | 56 | 57 | 1 | 1.21 |
| SWC056 | 10180 | 5359 | 52 | 0 | -90 | 43 | 44 | 1 | 5.43 |
| SWC059 | 10216 | 5399 | 40 | 0 | -90 | 33 | 34 | 1 | 2.62 |
| SWC061 | 10137 | 5397 | 72 | 0 | -90 | 62 | 63 | 1 | 2.70 |
| SWC063 | 10213 | 5438 | 44 | 0 | -90 | 37 | 38 | 1 | 2.12 |
| SWC068 | 10100 | 5339 | 70 | 0 | -90 | 66 | 67 | 1 | 2.12 |
| SWC069 | 10119 | 5339 | 64 | 0 | -90 | 60 | 61 | 1 | 1.14 |
| SWC071 | 10120 | 5320 | 58 | 0 | -90 | 55 | 57 | 2 | 27.21 |
| including | 55 | 56 | 1 | 45.50 | |||||
| SWC072 | 10121 | 5300 | 58 | 0 | -90 | 50 | 51 | 1 | 8.50 |
| and | 55 | 56 | 1 | 1.69 | |||||
| SWC073 | 10102 | 5299 | 64 | 0 | -90 | 56 | 57 | 1 | 3.62 |
| and | 59 | 60 | 1 | 8.00 | |||||
| SWC074 | 10118 | 5280 | 55 | 0 | -90 | 46 | 53 | 7 | 10.80 |
| including | 47 | 48 | 1 | 69.00 | |||||
| SWC078 | 10260 | 5263 | 15 | 0 | -90 | 7 | 9 | 2 | Stope |
Table 1: Results from RC Drilling greater than 1g/t Au at Mt Stirling
Several of the holes intersected values between 0.5 and 1g/t Au. The planning of additional step out drilling is nearing completion. The objective will be to test the area between 80m and 100m depth.
==> picture [472 x 266] intentionally omitted <==
Figure 4: RC Rig drilling at Torian’s Mt Stirling project.
- 5 -
==> picture [103 x 39] intentionally omitted <==
4. Interpretation
Based upon the assays received to date, Torian’s preliminary interpretations are:
-
the discovery of steeper veins requires further investigation;
-
there appear to be subtle variations in the dip of the main flat lying veins, alternatively there may be small fault offsets that disrupt the vein locally; and
-
Mt Stirling Well continues to grow with mineralisation open in all directions.
Geological interpretation is showing the granite intrusion to be more complex than previously understood. This added complexity is encouraging and suggests potential for additional mineralisation styles to be present away from the main vein structure.
5. Next Steps
Over the next two months Torian plans the following at the Mt Stirling Project:
-
Complete Phase 1 of the step out RC drilling;
-
Commence a limited phase 2 RC drilling programme to test several areas down to depths of approximately 100m vertical; and
-
Carry out an interpretation of all results received and plan further work.
When drilling is complete at Mt Stirling Well the rig will move to Mt Stirling to test an area of mineralisation historically identified to be present within a steeply dipping shear zone contained within a basaltic host.
6. Commentary
Torian’s Managing Director, Matthew Sullivan comments:
“These results are very encouraging. They exceed Torian’s expectations by a significant margin. Further drilling will define the mineralisation over a larger area. The location of steeper veins is also good news and may lead to a reappraisal of the mineralisation”.
Geological interpretation is showing the granite intrusion to be more complex than previously understood. This added complexity is encouraging and suggests potential for additional mineralisation styles to be present away from the main vein structure. “
For further information, please contact Matthew Sullivan (Torian’s MD) on (08) 6216 0424.
Yours sincerely,
==> picture [141 x 37] intentionally omitted <==
Matthew Sullivan Managing Director
- 6 -
==> picture [103 x 39] intentionally omitted <==
About Torian:
Torian Resources Ltd ( ASX:TNR ) is a highly active Australian gold company that is focused on developing the gold mines of tomorrow. The Company has four advanced projects located in the Goldfields region of Western Australia.
Torian’s flagship Project, the Zuleika JV, lies north and partly along strike of several major gold mines including Northern Star (ASX:NST), Tribune Resources (ASX:TBR) and Rand Mining’s (ASX:RND) 7Moz East Kundana Joint Venture and Evolution’s (ASX:EVN) Frogs Legs and White Foil operations.
Since May 2015, Torian has increased its landholding at the Zuleika Project by approximately 86% via eight separate acquisitions. Torian is now the second largest landholder in this highly sought after region and is focused on fast tracking its development.
Torian has commenced a large, 4 Phase, exploration program that is targeting the Zuleika Shear and intends to further consolidate ground in this region.
Torian is also developing the high grade Mt Stirling Project which has an outcropping inferred resource located 40km northwest of Leonora. Following a successful infill drilling program in December, Torian is currently completing an internal economic study on the project to assess it as a standalone mining operation.
Torian’s exploration team has an enviable track record of discovering and developing a number of multi-million ounce gold mines in this region. Torian is commencing an exciting phase in its development and we look forward to updating the market as things progress.
| Hole | N | E | RL | Depth (m) |
Az | Dip |
|---|---|---|---|---|---|---|
| (local) | (Local) | |||||
| SWC052 | 10101 | 5356 | 425 | 74 | 0 | -90 |
| SWC053 | 10121 | 5358 | 425 | 68 | 0 | -90 |
| SWC054 | 10140 | 5358 | 425 | 64 | 0 | -90 |
| SWC055 | 10160 | 5359 | 425 | 58 | 0 | -90 |
| SWC056 | 10180 | 5359 | 425 | 52 | 0 | -90 |
| SWC057 | 10295 | 5401 | 425 | 22 | 0 | -90 |
| SWC058 | 10255 | 5400 | 425 | 40 | 0 | -90 |
| SWC059 | 10216 | 5399 | 425 | 40 | 0 | -90 |
| SWC060 | 10178 | 5398 | 425 | 49 | 0 | -90 |
| SWC061 | 10137 | 5397 | 425 | 72 | 0 | -90 |
| SWC062 | 10176 | 5437 | 425 | 72 | 0 | -90 |
| SWC063 | 10213 | 5438 | 425 | 44 | 0 | -90 |
| SWC064 | 10253 | 5439 | 425 | 50 | 0 | -90 |
| SWC065 | 10331 | 5442 | 425 | 20 | 0 | -90 |
| SWC066 | 10057 | 5276 | 427 | 76 | 0 | -90 |
| SWC067 | 10055 | 5316 | 426 | 78 | 0 | -90 |
| SWC068 | 10100 | 5339 | 425 | 70 | 0 | -90 |
| SWC069 | 10119 | 5339 | 425 | 64 | 0 | -90 |
| SWC070 | 10100 | 5319 | 425 | 67 | 0 | -90 |
| SWC071 | 10120 | 5320 | 425 | 58 | 0 | -90 |
| SWC072 | 10121 | 5300 | 425 | 58 | 0 | -90 |
| SWC073 | 10102 | 5299 | 425 | 64 | 0 | -90 |
| SWC074 | 10118 | 5280 | 426 | 55 | 0 | -90 |
| SWC075 | 10161 | 5275 | 425 | 40 | 0 | -90 |
| SWC076 | 10262 | 5278 | 425 | 18 | 0 | -90 |
- 7 -
==> picture [103 x 39] intentionally omitted <==
| SWC077 | 10240 | 5262 | 426 | 20 | 0 | -90 |
|---|---|---|---|---|---|---|
| SWC078 | 10260 | 5263 | 426 | 15 | 0 | -90 |
| SWC079 | 10259 | 5218 | 428 | 12 | 0 | -90 |
| SWC080 | 10260 | 5241 | 427 | 15 | 3 | -60 |
| SWC081 | 10240 | 5240 | 427 | 18 | 0 | -90 |
| SWC082 | 10156 | 5239 | 427 | 35 | 0 | -90 |
| SWC083 | 10119 | 5239 | 427 | 48 | 0 | -90 |
| SWC084 | 10099 | 5239 | 427 | 62 | 0 | -90 |
| SWC085 | 10058 | 5237 | 428 | 72 | 0 | -90 |
| SWC086 | 10018 | 5235 | 429 | 82 | 0 | -90 |
| SWC087 | 10019 | 5196 | 430 | 60 | 0 | -90 |
| SWC088 | 10060 | 5197 | 429 | 50 | 0 | -90 |
| SWC089 | 10096 | 5195 | 429 | 40 | 0 | -90 |
| SWC090 | 10115 | 5196 | 428 | 34 | 0 | -90 |
| SWC091 | 10134 | 5197 | 428 | 28 | 0 | -90 |
| SWC092 | 10154 | 5197 | 429 | 26 | 0 | -90 |
| SWC096 | 10139 | 5160 | 431 | 22 | 0 | -90 |
| SWC097 | 10219 | 5162 | 431 | 15 | 0 | -90 |
| SWC098 | 10179 | 5161 | 431 | 16 | 0 | -90 |
| SWC095 | 10100 | 5159 | 430 | 24 | 0 | -90 |
| SWC094 | 10060 | 5157 | 432 | 46 | 0 | -90 |
| SWC093 | 10021 | 5156 | 432 | 58 | 0 | -90 |
| SWC099 | 10023 | 5117 | 425 | 40 | 0 | -90 |
| SWC099A | 10020 | 5117 | 425 | 55 | 0 | -90 |
| SWC100 | 10067 | 5118 | 434 | 46 | 0 | -90 |
| SWC101 | 10102 | 5119 | 434 | 40 | 0 | -90 |
| SWC102 | 10140 | 5120 | 436 | 30 | 0 | -90 |
| SWC103 | 10099 | 5216 | 428 | 49 | 0 | -90 |
Table 2: Collar details of all holes drilled to date from the current drilling program.
- 8 -
==> picture [104 x 40] intentionally omitted <==
Appendix 2 Mt Stirling Project
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Sampling | | Nature and quality of sampling (eg cut channels, random chips, or specific | | All data and results referred to in this report are historic or new, and date from the |
| techniques | specialised industry standard measurement tools appropriate to the minerals under | late 1980s to the present day. This data has been judged to be reliable following | ||
| | investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. |
| independent research, including discussions with previous operators and explorers in person. Samples were collected via Rotary Air Blast (RAB) and Reverse Circulation (RC) drill |
|
| | Aspects of the determination of mineralisation that are Material to the Public | chips. | ||
| Report. | | All drilling yielded samples on a metre basis. RAB drilling samples were commonly | ||
| | In cases where ‘industry standard’ work has been done this would be relatively | composited into intervals of 4 or 5m, with selected individual or 2m resamples | ||
| simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 | collected. Reverse Circulation (RC) drilling is utilised to obtain 1 m samples which | |||
| kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information. |
| are cone split, from which approx. 2-3 kg is pulverised to produce a 40 g charge for fire assay. Sample preparation method is total material dried and pulverized to nominally 85% |
||
| passing 75 µm particle size. Gold analysis method is generally by 40g Fire Assay, | ||||
| with Atomic Absorption Spectrometry (AAS) finish (DL 0.01 – UL 50 ppm Au). | ||||
| Samples exceeding the upper limit of the method were automatically re-assayed | ||||
| utilizing a high grade gravimetric method. | ||||
| Drilling | | Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, | | RAB holes were typically 100mm in diameter, RC drilling usually 155mm in diameter. |
| techniques | Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of | RC drilling was via a face sampling hammer. | ||
| diamond tails, face-sampling bit or other type, whether core is oriented and if so, by | ||||
| _what method, etc). _ | ||||
| Drill sample | | Method of recording and assessing core and chip sample recoveries and results | | Recoveries were logged onto paper logs during drilling. Recoveries were visually |
| recovery | assessed. | assessed. | ||
| | Measures taken to maximise sample recovery and ensure representative nature of | | Sample recoveries were maximised in RAB and RC drilling via collecting the samples | |
| the samples. | in a cyclone prior to sub sampling. RAB drillholes were stopped if significant water | |||
| | Whether a relationship exists between sample recovery and grade and whether | flows were encountered. | ||
| sample bias may have occurred due to preferential loss/gain of fine/coarse material. | | No relationship appears from the data between sample recovery and grade of the | ||
| samples. | ||||
| Logging | | Whether core and chip samples have been geologically and geotechnically logged to | | All drillholes were geologically logged. This logging appears to be of high quality and |
| a level of detail to support appropriate Mineral Resource estimation, mining studies | suitable for use in further studies. |
- 9 -
==> picture [104 x 40] intentionally omitted <==
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| and metallurgical studies. | | Logging is qualitative in nature. | ||
| | Whether logging is qualitative or quantitative in nature. Core (or costean, channel, | | All samples / intersections are logged. 100% of relevant length intersections are | |
| etc) photography. | logged. | |||
| | The total length andpercentage of the relevant intersections logged. | |||
| Sub-sampling | | If core, whether cut or sawn and whether quarter, half or all core taken. | | Non-core RC drill chip sample material is riffle split, where sample is dry. In case of |
| techniques and | | If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet | wet sample a representative ‘grab’ sample method is utilized. | |
| sample | or dry. | | The sample preparation technique is total material dried and pulverized to | |
| preparation | | For all sample types, the nature, quality and appropriateness of the sample | nominally 85% passing 75 µm particle size, from which a 40g charge was | |
| preparation technique. | representatively riffle split off, for assay. | |||
| | Quality control procedures adopted for all sub-sampling stages to maximise | | Standard check (known value) sample were not used in all cases. Where used the | |
| representivity of samples. | known values correspond closely with the expected values. A duplicate (same | |||
| | Measures taken to ensure that the sampling is representative of the in situ material | sample duplicated) were commonly inserted for every 20 or 30 samples taken. | ||
| collected, including for instance results for field duplicate/second-half sampling. | | There is a significant amount of coarse gold at Mt Stirling Well. This is reflected in | ||
| | Whether sample sizes are appropriate to the grain size of the material being | the poor repeatability of some samples and also was noted on the drill logs. | ||
| sampled. | ||||
| Quality of assay | | The nature, quality and appropriateness of the assaying and laboratory procedures | | Various independent laboratories have assayed samples from the project over the |
| data and | used and whether the technique is considered partial or total. | years. In general they were internationally accredited for QAQC in mineral analysis. | ||
| laboratory tests | | For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters | |
No geophysical tools have been used to date. |
| used in determining the analysis including instrument make and model, reading | | The laboratories inserted blank and check samples for each batch of samples | ||
| times, calibrations factors applied and their derivation, etc. | analysed and reports these accordingly with all results. | |||
| | Nature of quality control procedures adopted (eg standards, blanks, duplicates, | |||
| external laboratory checks) and whether acceptable levels of accuracy (ie lack of | ||||
| bias) andprecision have been established. | ||||
| Verification of | | The verification of significant intersections by either independent or alternative | | Selected significant intersections were resampled from original remnant sample |
| sampling and | company personnel. | material and analysed again. | ||
| assaying | | The use of twinned holes. | | No twinned holes have been used to date. |
| | Documentation of primary data, data entry procedures, data verification, data | | Documentation of primary data is field log sheets (hand written). Primary data is | |
| storage (physical and electronic) protocols. | entered into application specific data base. The data base is subjected to data | |||
| | Discuss any adjustment to assay data. | verification program, erroneous data is corrected. Data storage is retention of | ||
| physical log sheet, two electronic backup storage devices and primary electronic | ||||
| database. | ||||
| Location of data | | Accuracy and quality of surveys used to locate drill holes (collar and down-hole | | Survey control used is hand held GPS for historic holes and differential GPS for the |
| points | surveys), trenches, mine workings and other locations used in Mineral Resource | new holes. No down hole surveys were completed to date. As these areas contain | ||
| estimation. | drillholes to no more than 100m significant deviations are not expected. | |||
| | Specification of the grid system used. | | Grid systems are various local grid converted to MGA coordinates. | |
| | Quality and adequacy of topographic control. | | Topographic control is accurate to +/- 0.5 m for the historic holes and 0.1m for the | |
| new holes.. |
- 10 -
==> picture [104 x 40] intentionally omitted <==
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Data spacing | | Data spacing for reporting of Exploration Results. | | The drill spacing of the historic drilling is variable but generally no greater than |
| and distribution | | Whether the data spacing and distribution is sufficient to establish the degree of | 200m by 40m, with some areas infilled to 80m by 40m. The new drilling is 20m by | |
| geological and grade continuity appropriate for the Mineral Resource and Ore | 20m spaced. | |||
| Reserve estimation procedure(s) and classifications applied. | | The areas have drilling density sufficient for JORC Inferred category. Further infill | ||
| | Whether sample compositing has been applied. | will be required for other categories. | ||
| | Sample compositing has been used in areas where mineralisation is not expected to | |||
| be intersected. If results return indicate mineralisation, 1m split samples will be | ||||
| submitted for analysis. | ||||
| Orientation of | | Whether the orientation of sampling achieves unbiased sampling of possible | | Apart from some reconnaissance RAB drilling, the orientation of the drilling is |
| data in relation | structures and the extent to which this is known, considering the deposit type. | approximately at right angles to the known mineralisation and so gives a fair | ||
| to geological | | If the relationship between the drilling orientation and the orientation of key | representation of the mineralisation intersected. | |
| structure | mineralised structures is considered to have introduced a sampling bias, this should | | No sampling bias is believed to occur due to the orientation of the drilling. | |
| be assessed and reported if material. | ||||
| Sample security | | The measures taken to ensure sample security. | | Samples were delivered to the laboratory in batches at regular intervals. These are |
| temporarilystored in a secure facilityafter drillingand before delivery | ||||
| Audits or reviews | | The results of any audits or reviews of sampling techniques and data. | | The company engages independent consultants who regularly audit the data for |
| inconsistencies and other issues. None have been reported to date. |
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Mineral | | Type, reference name/number, location and ownership including agreements or | | The Mt Stirling Well Prospect is wholly contained within P37/7172. This is |
| tenement and | material issues with third parties such as joint ventures, partnerships, overriding | beneficially held 100% by the company, transfers are pending. An application for | ||
| land tenure | royalties, native title interests, historical sites, wilderness or national park and | Mining Lease M37/1305 has been submitted to the DMP, and is pending approval. | ||
| status | environmental settings. | |||
| | The security of the tenure held at the time of reporting along with any known | |||
| impediments to obtaining a licence to operate in the area. | ||||
| Exploration done | |
Acknowledgment and appraisal of exploration by other parties. | | All work relating to previous exploration contained within this report was completed |
| by other parties | by other parties. Details are included in the references. | |||
| Geology | | Deposit type, geological setting and style of mineralisation. | | Details of the geology are found elsewhere in this report. |
| Drill hole | | A summary of all information material to the understanding of the exploration | | Details of the drilling, etc are found within the various tables and diagrams |
| Information | results including a tabulation of the following information for all Material drill holes: | elsewhere in this report. | ||
o easting and northing of the drill hole collar |
| No material information, results or data have been excluded. | ||
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill |
||||
| hole collar | ||||
o dip and azimuth of the hole |
- 11 -
==> picture [104 x 40] intentionally omitted <==
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
o down hole length and interception depth |
||||
o hole length. |
||||
| | If the exclusion of this information is justified on the basis that the information is not | |||
| Material and this exclusion does not detract from the understanding of the report, | ||||
| the Competent Person should clearly explain why this is the case. | ||||
| Data | | In reporting Exploration Results, weighting averaging techniques, maximum and/or | | Weighted averages were calculated by a simple weighting of from and to distances |
| aggregation | minimum grade truncations (eg cutting of high grades) and cut-off grades are | down each hole. Most samples are 1 metre samples. No top cuts were applied. | ||
| methods | usually Material and should be stated. | Lower cut-offs used were – Mt Stirling 1.0g/t Au. | ||
| | Where aggregate intercepts incorporate short lengths of high grade results and | | The high grade nature of the resource at Mt Stirling Well means that little low grade | |
| longer lengths of low grade results, the procedure used for such aggregation should | material has been included in the intersection table. At Mt Stirling a small amount | |||
| be stated and some typical examples of such aggregations should be shown in detail. | of higher grade is consistently present in each intersection as shown in the drill | |||
| | The assumptions used for any reporting of metal equivalent values should be clearly | results tables above. | ||
| stated. | ||||
| No metal equivalent values are used |
||||
| Relationship | | These relationships are particularly important in the reporting of Exploration Results. | |
Details of geology, and selected cross sections are given elsewhere in this report |
| between | | If the geometry of the mineralisation with respect to the drill hole angle is known, its | At Mt Stirling Well the gently dipping nature of the mineralisation means that |
|
| mineralisation | nature should be reported. | steeply inclined holes give approximately true widths. At Mt Stirling the steep | ||
| widths and | | If it is not known and only the down hole lengths are reported, there should be a | dip of the mineralisation means that drill widths are exaggerated. These are | |
| intercept lengths | clear statement to this effect (eg ‘down hole length, true width not known’). | shown in the tables above. | ||
| The tables above show drill widths not true widths. In the case of Mt Stirling | ||||
| Well the drill widths are approximatelythe same as true widths. | ||||
| Diagrams | | Appropriate maps and sections (with scales) and tabulations of intercepts should be | | Details of geology, and selected cross sections are given elsewhere in this report. |
| included for any significant discovery being reported These should include, but not be | ||||
| limited to aplan view of drill hole collar locations and appropriate sectional views. | ||||
| Balanced | | Where comprehensive reporting of all Exploration Results is not practicable, | | Details of the results, drilling, etc are reported elsewhere in this report. |
| reporting | representative reporting of both low and high grades and/or widths should be | |||
| practiced to avoid misleading reporting of Exploration Results. | ||||
| Other | | Other exploration data, if meaningful and material, should be reported including | | Details of geology, and selected cross sections are given elsewhere in this report. |
| substantive | (but not limited to): geological observations; geophysical survey results; geochemical | |||
| exploration data | survey results; bulk samples – size and method of treatment; metallurgical test | |||
| results; bulk density, groundwater, geotechnical and rock characteristics; potential | ||||
| deleterious or contaminating substances. | ||||
| Further work | | The nature and scale of planned further work (eg tests for lateral extensions or depth | |
Proposed work included drilling of selected twin holes followed by infill and step out |
| extensions or large-scale step-out drilling). | RC drilling across all resources. The aim of such work is to increase confidence in | |||
| | Diagrams clearly highlighting the areas of possible extensions, including the main | the data and also to test for extensions to the known resources. Budgets are being | ||
| geological interpretations andfuture drilling areas, provided this information is not | prepared for this work atpresent. |
- 12 -
==> picture [104 x 40] intentionally omitted <==
-
Criteria JORC Code explanation Commentary commercially sensitive. In addition a significant number of additional prospects are known to exist within the projects as defined by previous RAB and RC drilling intersections. These will form the second phase of exploration.
-
Various maps and diagrams are presented elsewhere in this report to highlight possible extensions and new targets.
- 13 -