ASX: GPR 31 May 2018

==> picture [199 x 44] intentionally omitted <==

Definitive Feasibilty Study on time and budget

Geopacific Resources (Geopacific) is pleased to provide an update on the status of the Definitive Feasibility Study (DFS) that is currently underway on the Woodlark gold project (Woodlark). Woodlark is already permitted for mine development and operations, significantly reducing the risks typically associated with a project at this stage and shortening the timeline to development.

Work on the DFS began directly after the announcement of the initial million-ounce Reserve and PreFeasibility Study (PFS) (March 2018)[1] which highlighted the compelling economics of the Project that support development of a 100,000 ounce per annum operation.

Lycopodium Engineers were appointed to manage the DFS. They are working with a team of respected industry professionals and Geopacific’s own highly-qualified team to deliver the DFS which will be completed to the standard required by project financiers.

The study is now in the tenth week, progressing on-track and on-budget to achieve the scheduled completion in the third quarter.

The mine plan calls for an initial 2.4 million tonne per annum (mtpa) conventional crush, SAG and ball mill circuit that is typical of gold processing plants. An allowance for a 2.4 mtpa gravity upgrade circuit to be integrated from year 3 has been engineered into the design.

Managing director Ron Heeks commented

“The DFS is progressing well with high levels of engagement across the experienced team. We believe that Woodlark is the next build-ready gold project in the region. Reaching this stage demonstrates the significant body of work completed by the team in the 18 months since we took over the Project.

“The DFS process will provide a robust design, suitable for the operating environment and the Ore at Woodlark. The excellent logistics and flat terrain simplify the design requirements and support cost-effective construction and operations.

“We look forward to announcing the completion of the DFS in the third quarter. Project financing discussions are currently underway to enable a smooth transition from DFS through to financing.”

Work in progress under the DFS:

Tailings design Lycopodium, EBA Engineers
Relocation village design Hooke Architects
Mine camp design Hooke Architects
Wharf and roads Mincore Engineers
Project Financing Geopacific, advisor selection in progress

1 All material assumptions underpinning the production target and forecast financial information continue to apply and have not changed materially.

Geopacific Resources Limited

www.geopacific.com.au

==> picture [567 x 67] intentionally omitted <==

The following tasks have been completed:

Metallurgical testwork Independent Metallurgical Operations, ALS, Lycopodium Resource estimation MPR Geological Consultants Reserve estimation Mining Plus Engineers Mine Schedule Mining Plus Engineers Mining Costs Mining Plus Engineers, contractors, Geopacific Processing plant flow diagrams Lycopodium Crusher /SAG/Ball mill sizing Lycopodium Site layout Mincore engineers

Contact

For further information on this update or the Company generally, please visit our website at www.geopacific.com.au or contact:

www.geopacific.com.au or contact:
Mr. Ron Heeks
Managing Director
Ms. Philippa Leggat
Executive Director Corporate
Company details Board Projects
Geopacific Resources Limited Milan JerkovicChairman PAPUA NEW GUINEA
ACN 003 208 393 Ron HeeksManaging Director Woodlark Island Gold
ASX Code: GPR Philippa LeggatExecutive Director CAMBODIA
[email protected] Mark BojanjacNon-Exec Director Kou Sa Copper
http://www.geopacific.com.au
T +61 8 6143 1820
Ian ClyneNon-Exec Director
Matthew SmithCompany Secretary
FIJI
Nabila Gold, Rakiraki Gold, Sabeto Gold-
Copper, Vuda Gold-Copper, Cakaudrove
HEAD OFFICE Gold-Silver
Level 1, 278 Stirling Highway, Claremont WA 6010.
PO Box 439, Claremont WA 6910.

Competent Person’s Statement

The information in this announcement that relates to exploration results is based on information compiled by or under the supervision of James Kerr, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy and General Manager, Geology for Geopacific. Mr Kerr has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Kerr consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Woodlark Mineral Resources is based on information compiled and reviewed by Mr Nicholas Johnson, a Competent Person who is a Member of the Australian Institute of Geoscientists and a full-time employee of MPR Geological Consultants Pty Ltd. Mr Johnson has sufficient experience which is relevant to the style of mineralization and type of deposits under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the JORC Code 2012 and is a qualified person for the purposes of NI43-101. Mr Johnson has no economic, financial or pecuniary interest in the company and consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Woodlark Mineral Reserves is based on information compiled and reviewed by Mr John Battista, a Competent Person who is a Member and Chartered Professional of the Australian Institute of Mining and Metallurgy (AusIMM) and a full-time employee of Mining Plus Pty Ltd. Mr Battista has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the JORC Code 2012 and is

2

a qualified person for the purposes of NI43-101. Mr Battista has no economic, financial or pecuniary interest in the company and consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Geopacific Resources Limited are forward-looking statements. When used in this announcement, forward-looking statements can be identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expects’ or ‘intends’ and other similar words that involve risks and uncertainties.

These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the company, its directors and management of Geopacific Resources Ltd that could cause Geopacific Resources Limited’s actual results to differ materially from the results expressed or anticipated in these statements.

Geopacific Resources Ltd cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Geopacific Resources Ltd does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law and stock exchange listing requirements. Woodlark is permitted by the PNG Government, subject to meeting the conditions of the licence.

Woodlark Global Resources

Category Tonnes Grade Ounces
(>0.4g/t lower cut) (Mt) (g/t Au) (Koz)
Measured 21.24 1.10 754
Indicated 18.94 0.98 597
Inferred 6.80 1.00 222
Total 47.00 1.04 1,573

Woodlark Ore Reserves

Total by deposit Category
(>0.3g/t lower cut)
Tonnes
(Mt)
Grade
(g/t Au)
Ounces
(oz)
Busai Proven 11.0 0.92 326,100
Probable 5.2 0.78 131,200
Kulumadau Proven 8.6 1.23 338,500
Probable 6.4 1.02 209,500
Woodlark King Proven 2.4 0.92 70,400
Probable 1.1 0.71 25,900
Total Ore Reserve Proven 22.0 1.04 735,000
Probable 12.7 0.90 366,600
Total 34.7 0.99 1,101,600