GENESIS RESOURCES LTD
GENESIS RESOURCES 4/19 Ellingworth Parade Boxhill VIC 3128 T +61 3 9898 8518 www.genesisresourcesltd.com.au ABN 22 114 787 469
Quarterly Activities Report – March 2013
HIGHLIGHTS
Plavica Au-Ag-Cu Project
Genesis Resources Limited has been successful in intersecting high grade gold (silver) mineralisation from its drilling program at the Plavica Prospect in the Republic of Macedonia. The best intersections were encountered in the diamond drill hole DDP006 as follows:
-
DDP006 205.0-208.0m: 3m @ 26.4 g/t Au, 25.0 g/t Ag, 0.14% Cu =27.12 g/t AuEq
-
DDP006 214.0-216.0m: 2m @ 50.1 g/t Au, 75.5 g/t Ag, 0.33% Cu =52.14 g/t AuEq
-
-DDP006 218.0-219.0m: 1m @ 9.7 g/t Au, 69.0 g/t Ag, 1.16% Cu = 13.01 g/t AuEq
Analyses at 1m intervals of all the 2012-vintage diamond and reverse circulation (RC) holes have now been received from SGS Laboratory, Ankara, and other significant intervals are as follows:
-
DDP006 190.0-191.0m: 1m @ 8.36 g/t Au, 24.0 g/t Ag, 0.09% Cu = 8.99 g/t AuEq
-
-DDP006 195.0-197.0m: 2m @ 4.31 g/t Au, 4.0 g/t Ag, 0.03%Cu = 4.44 g/t AuEq -
-RP007 162.0-163.0m: 1m @ 1.02 g/t Au, 238.0 g/t Ag, 3.0% Cu = 10.58 g/t AuEq -
-RP007 182.0-183.0m: 1m @ 1.77 g/t Au, 189.0 g/t Ag, 2.49 % Cu = 9.53 g/t AuEq -
-RP009A 201.0-207.0m: 6m @ 2.85 g/t Au, 73.5 g/t Ag, 1.92% Cu = 7.39 g/t Au Eq -
-RP009A 245.0-246.0m: 1m @ 2.19g/t Au, 257.0 g/t Ag, 0.95% Cu = 8.84 g/t AuEq -
-RP010 137.0-139.0m: 2m @ 1.50 g.t Au, 23.5 g/t Ag, 2.18% Cu = 5.45 g/t AuEq -
-RP010 173.0-174.0m: 1m @ 1.57 g/t Au, 21.0 g/t Ag, 2.74% Cu = 6.37 g/t AuEq -
-RP011A 170.0-172.0m: 2m @ 2.65 g/t Au, 20.5 g/t Ag, 1.95% Cu =6.17 g/t AuEq -
-RP014A 115.0-116.0m: 1m @ 7.32 g/t Au, 55.0 g/t Ag, 0.08% Cu = 8.54 g/t AuEq -
-RP015 32.00-33.00m: 1m @ 2.21 g/t Au, 97.0 g/t Ag, 0.03% Cu = 4.19 g/t AuEq -
-RP015 34.00-36.00m: 2m @ 1.72 g/t Au, 177.5 g/t Ag, 0.02% Cu = 5.30 g/t AuEq -
-RP016 55.00-56.00m: 1m @ 1.03 g/t Au, 100.0 g/t Ag, 1.45% Cu = 5.35 g/t AuEq -
-RP017 27.00-28.00m: 1m @ 6.94 g/t Au, 39.0 g/t Ag, 0.03% Cu = 7.76 g/t AuEq
Location of the Plavica Prospect is given in Figure 1 and the locations of the 2012 drill holes are shown in Figure 2. Table 1 provides details of the drill hole coordinates, azimuths, inclinations and depths. More complete details of drill hole intersections are provided below.
Gladstone-Mount Miller Mn Project
- Mount Miller Mining Lease (EA MIN201115110): Agreement was reached and signed with both Queensland Main Roads and Queensland National Railways. The Board has decided to activate them while waiting for the granting of an exemption from Urban Restricted zoning around Gladstone. Once it has been approved, the Board plans to carry out the planned diamond drilling program.
EXPLORATION & DEVELOPMENT PROGRESS DURING THE QUARTER
Republic of Macedonia
Plavica Gold-Copper-Silver Project (Figure 1)
During the December quarter of 2012 23 Reverse Circulation (RC) and 3 Diamond Drill holes were drilled for totals of 4,695m of RC and 936m of diamond respectively. Drill hole locations are shown in Figure 2 whilst Table 1 provides details of drill hole coordinates, azimuths, inclinations and depths. Drilling commenced in the latter part of October and was terminated in mid-December with the onset of winter snow.
During the March quarter of 2013 1 metre samples from all the diamond drill and RC holes were despatched to the SGS Ankara laboratory for fire assay of gold content and ICP-OES analysis of silver, copper, lead, zinc and arsenic as well as 29 other elements. Analytical results from all these samples have now been received and the results are tabulated in Tables 2 to 5 below as follows:
-
-Table 2: Diamond drill holes – intersections >1g/t Au
-
-Table3: RC drill holes – intersections >1g/t Au
-
-Table 4: Diamond drill holes- intersections >0.1 g/t Au
-
-Table 5: RC drill holes – intersections >0.1 g/t Au
For Au equivalents: 5 g/t Ag = 0.1 g/t Au and 0.1% Cu = 0.16 g/t Au
The formula for Au ppm (g/t) equiv. =Au +(Agppm x0.02) + (Cuppm x 0.0016)
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 2
==> picture [449 x 270] intentionally omitted <==
Figure 1 Location of Plavica Gold-Copper-Silver Project, Republic of Macedonia.
==> picture [453 x 299] intentionally omitted <==
Figure 2 Plavica 2012 Drilling Plan
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 3
| Depth | |||||
|---|---|---|---|---|---|
| Drill Hole Number | Easting | Northing | Azimuth | Inclination | |
| RP-016 | 596400 | 4656300 | 50 | 60 | 210 |
| RP-018 | 596300 | 4656300 | 50 | 60 | 207 |
| RP-017 | 596350 | 4656350 | 50 | 60 | 225 |
| RP-015 | 596450 | 4656350 | 50 | 60 | 237 |
| RP-006 | 596300 | 4656400 | 50 | 60 | 182 |
| RP-007 | 596400 | 4656400 | 50 | 60 | 255 |
| RP-007A | 596400 | 4656400 | 320 | 60 | 260 |
| RP-008 | 596500 | 4656400 | 50 | 60 | 207 |
| RP-008A | 596500 | 4656400 | 150 | 60 | 202 |
| RP-009 | 596600 | 4656400 | 360/0 | 60 | 225 |
| RP-009A | 596600 | 4656400 | 150 | 60 | 250 |
| RP-010 | 596700 | 4656400 | 360/0 | 60 | 220 |
| RP-010A | 596700 | 4656400 | 150 | 60 | 183 |
| RP-011 | 596800 | 4656400 | 360/0 | 60 | 183 |
| RP-011A | 596800 | 4656400 | 150 | 60 | 183 |
| RP-012 | 596800 | 4656300 | 360/0 | 60 | 143 |
| RP-012A | 596800 | 4656300 | 150 | 60 | 144 |
| RP-013 | 596700 | 4656300 | 360/0 | 60 | 250 |
| RP-013A | 596700 | 4656300 | 150 | 60 | 140 |
| RP-036 | 596800 | 4656200 | 360/0 | 60 | 207 |
| RP-036A | 596800 | 4656200 | 150 | 60 | 201 |
| RP-014 | 596500 | 4656300 | 360/0 | 60 | 180 |
| RP-014A | 596500 | 4656300 | 150 | 60 | 201 |
| DDP-06 | 596610 | 4656280 | 230 | 50 | 227 |
| DDP-02 | 596242 | 4655830 | 360/0 | 50 | 389 |
| DDP-02A | 596242 | 4655830 | 150 | 70 | 320 |
Table 1 Plavica 2012 drilling details
Table 2: Diamond drilling->1g/t Au intersections
| Au | Au | Ag | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Hole | From | To | Int | equiv | ppm | ppm | Cu ppm | Pb ppm | Zn ppm |
| DDP002 | 115.00 | 116.00 | 1.00 | 2.93 | 2.41 | 3.0 | 2891.0 | 170.0 | 197.0 |
| DDP002 | 121.00 | 122.00 | 1.00 | 3.20 | 1.03 | 2.0 | 13300.0 | 99.0 | 508.0 |
| DDP006 | 21.00 | 22.00 | 1.00 | 3.89 | 2.53 | 68.0 | 24.1 | 1898.0 | 29.0 |
| DDP006 | 38.00 | 39.00 | 1.00 | 1.60 | 1.20 | 20.0 | 3.0 | 2145.0 | 9.0 |
| DDP006 | 48.00 | 49.00 | 1.00 | 2.22 | 1.44 | 39.0 | 18.3 | 3542.0 | 15.0 |
| DDP006 | 176.00 | 178.00 | 2.00 | 2.01 | 1.54 | 17.0 | 797.0 | 24950.0 | 2942.5 |
| DDP006 | 182.00 | 183.00 | 1.00 | 1.90 | 1.44 | 15.0 | 1010.0 | 16000.0 | 1504.0 |
| DDP006 | 190.00 | 191.00 | 1.00 | 8.99 | 8.36 | 24.0 | 948.0 | 36600.0 | 845.0 |
| DDP006 | 195.00 | 197.00 | 2.00 | 4.44 | 4.31 | 4.0 | 284.5 | 5596.5 | 2423.5 |
| DDP006 | 205.00 | 208.00 | 3.00 | 27.12 | 26.40 | 25.0 | 1367.0 | 3362.0 | 21766.7 |
| DDP006 | 214.00 | 216.00 | 2.00 | 52.14 | 50.10 | 75.5 | 3292.0 | 22135.0 | 10594.5 |
| DDP006 | 218.00 | 219.00 | 1.00 | 13.01 | 9.77 | 69.0 | 11600.0 | 7713.0 | 44100.0 |
| DDP006 | 225.00 | 226.00 | 1.00 | 1.17 | 1.04 | 2.0 | 566.0 | 1720.0 | 7179.0 |
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 4
Table 3: RC Drilling- Intersections >1g/t Au
| Au | Au | Ag | Cu Pb |
Zn |
||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Hole | From | To | Int | equiv | ppm | ppm | ppm ppm ppm |
|||
| RP006 | 40.00 | 42.00 | 2.00 | 2.33 |
2.20 |
4.5 |
236.9 |
1365.0 | 278.0 | |
| RP007 | 162.00 | 163.00 | 1.00 | 10.58 |
1.02 |
238.0 |
30000.0 | 444.0 | 1560.0 | |
| RP007 | 182.00 | 183.00 | 1.00 | 9.53 |
1.77 |
189.0 |
24900.0 | 1430.0 | 1320.0 | |
| RP007A | 64.00 | 65.00 | 1.00 | 1.93 |
1.56 |
15.0 |
421.0 |
4710.0 | 24.0 | |
| RP008 | 22.00 | 25.00 | 3.00 | 2.03 |
1.41 |
29.7 |
135.4 |
1280.0 | 16.3 | |
| RP008 | 27.00 | 28.00 | 1.00 | 1.44 |
1.10 |
15.0 |
252.0 |
1181.0 | 22.0 | |
| RP009A | 201.00 | 207.00 | 6.00 | 7.39 |
2.84 |
73.5 |
19175.8 | 354.5 | 2904.3 | |
| RP009A | 209.00 | 210.00 | 1.00 | 1.98 |
1.22 |
19.0 |
2402.0 |
114.0 | 352.0 | |
| RP009A | 240.00 | 243.00 | 3.00 | 3.17 |
2.24 |
45.3 |
136.1 |
375.3 | 61.0 | |
| RP009A | 245.00 | 246.00 | 1.00 | 8.84 |
2.19 |
257.0 |
9454.0 |
3521.0 | 1412.0 | |
| RP010 | 97.00 | 98.00 | 1.00 | 2.06 |
1.26 |
22.0 |
2272.0 |
8308.0 | 14100.0 | |
| RP010 | 137.00 | 139.00 | 2.00 | 5.45 |
1.49 |
23.5 |
21800.0 | 868.5 | 902.0 | |
| RP010 | 142.00 | 144.00 | 2.00 | 1.57 |
1.13 |
7.5 |
1829.5 |
600.0 | 15.0 | |
| RP010 | 145.00 | 148.00 | 3.00 | 1.53 |
1.22 |
7.0 |
1045.3 |
539.0 | 19.3 | |
| RP010 | 149.00 | 151.00 | 2.00 | 3.60 |
1.16 |
43.5 |
9781.5 |
464.5 | 54.0 | |
| RP010 | 156.00 | 158.00 | 2.00 | 1.61 |
1.13 |
16.5 |
941.5 |
351.0 | 16.5 | |
| RP010 | 173.00 | 174.00 | 1.00 | 6.37 |
1.57 |
21.0 |
27400.0 | 576.0 | 98.0 | |
| RP010A | 44.00 | 46.00 | 2.00 | 2.08 |
1.59 |
21.5 |
397.0 |
1185.0 | 181.0 | |
| RP011A | 150.00 | 151.00 | 1.00 | 5.30 |
1.64 |
15.0 |
21000.0 | 2048.0 | 127.0 | |
| RP011A | 162.00 | 166.00 | 4.00 | 5.02 |
1.82 |
29.3 |
16309.8 | 992.3 | 664.8 | |
| RP011A | 167.00 | 169.00 | 2.00 | 2.13 |
1.15 |
1.5 |
5902.0 |
732.0 | 30.5 | |
| RP011A | 170.00 | 172.00 | 2.00 | 6.17 |
2.64 |
20.5 |
19479.0 | 1559.0 | 740.0 | |
| RP012 | 114.00 | 115.00 | 1.00 | 2.48 |
1.01 |
65.0 |
1040.0 |
7940.0 | 163.0 | |
| RP012 | 126.00 | 127.00 | 1.00 | 1.64 |
1.01 |
13.0 |
2300.0 |
2730.0 | 63.0 | |
| RP014 | 58.00 | 59.00 | 1.00 | 1.34 |
1.19 |
7.0 |
66.1 |
205.0 | 18.0 | |
| RP014 | 154.00 | 155.00 | 1.00 | 4.59 |
1.09 |
48.0 |
15900.0 | 1856.0 | 460.0 | |
| RP014A | 47.00 | 49.00 | 2.00 | 5.38 |
1.77 |
179.5 |
107.5 |
39900.0 | 17.5 | |
| RP014A | 107.00 | 108.00 | 1.00 | 1.40 |
1.19 |
3.0 |
960.0 |
1397.0 | 319.0 | |
| RP014A | 110.00 | 111.00 | 1.00 | 3.85 |
3.51 |
11.0 |
768.0 |
3332.0 | 164.0 | |
| RP014A | 115.00 | 116.00 | 1.00 | 8.54 |
7.32 |
55.0 |
777.0 |
1190.0 | 80.0 | |
| RP014A | 134.00 | 135.00 | 1.00 | 1.55 |
1.24 |
2.0 |
1712.0 |
1311.0 | 95.0 | |
| RP014A | 172.00 | 173.00 | 1.00 | 1.59 |
1.06 |
7.0 |
2410.0 |
2428.0 | 599.0 | |
| RP014A | 175.00 | 176.00 | 1.00 | 4.74 |
1.33 |
168.0 |
334.0 |
4828.0 | 774.0 | |
| RP014A | 177.00 | 178.00 | 1.00 | 3.35 |
1.77 |
78.0 |
122.0 |
5981.0 | 170.0 | |
| RP015 | 32.00 | 33.00 | 1.00 | 4.19 |
2.21 |
97.0 |
252.0 |
6000.0 | 14.0 | |
| RP015 | 34.00 | 36.00 | 2.00 | 5.30 |
1.72 |
177.5 |
183.5 |
5745.0 | 17.5 | |
| RP016 | 55.00 | 56.00 | 1.00 | 5.35 |
1.03 |
100.0 |
14500.0 | 5420.0 | 1340.0 | |
| RP017 | 27.00 | 28.00 | 1.00 | 7.76 |
6.94 |
39.0 |
276.0 |
1490.0 | 1750.0 | |
| RP018 | 11.00 | 12.00 | 1.00 | 2.00 |
1.35 |
30.0 |
289.0 |
8420.0 | 21.0 | |
| RP018 | 17.00 | 19.00 | 2.00 | 1.64 |
1.24 |
18.5 |
188.5 |
6860.0 | 23.5 |
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 5
| RP018 | 20.00 | 23.00 | 3.00 | 1.83 | 1.25 | 27.7 | 152.0 | 6303.3 | 30.3 |
|---|---|---|---|---|---|---|---|---|---|
| RP018 | 34.00 | 35.00 | 1.00 | 1.29 | 1.14 | 7.0 | 42.5 | 644.0 | 10.0 |
| RP018 | 39.00 | 40.00 | 1.00 | 3.93 | 3.06 | 42.0 | 168.0 | 6640.0 | 9.0 |
| RP018 | 41.00 | 43.00 | 2.00 | 1.38 | 1.28 | 5.0 | 28.8 | 333.0 | 7.5 |
| RP018 | 88.00 | 89.00 | 1.00 | 1.60 | 1.28 | 7.0 | 1150.0 | 397.0 | 95.0 |
| RP036 | 159.00 | 160.00 | 1.00 | 3.55 | 1.71 | 46.0 | 5770.0 | 195.0 | 761.0 |
| RP036 | 162.00 | 163.00 | 1.00 | 1.34 | 1.04 | 11.0 | 519.0 | 433.0 | 84.0 |
| RP036 | 203.00 | 205.00 | 2.00 | 2.12 | 1.64 | 16.0 | 969.5 | 240.0 | 85.5 |
Table 4: Diamond drilling – intersections > 0.1 g/t Au
| Au | Au | Ag | Cu | Zn | |||||
|---|---|---|---|---|---|---|---|---|---|
| Hole | From | To | Int | equiv | ppm | ppm | ppm | Pb ppm | ppm |
| DDP002 | 82.00 | 86.00 | 4.00 | 0.21 | 0.15 | 1.0 | 257.6 | 165.5 | 136.8 |
| DDP002 | 289.00 | 293.00 | 4.00 | 0.26 | 0.16 | 4.5 | 68.3 | 7721.3 | 3182.0 |
| DDP002 | 294.00 | 297.00 | 3.00 | 0.23 | 0.13 | 4.3 | 94.2 | 9378.3 | 2648.7 |
| DDP002 | 308.00 | 312.00 | 4.00 | 0.43 | 0.18 | 10.5 | 268.5 | 2863.8 | 1088.8 |
| DDP002 | 331.00 | 335.00 | 4.00 | 0.73 | 0.21 | 17.3 | 1097.8 | 1232.8 | 971.0 |
| DDP002 | 366.00 | 371.00 | 5.00 | 0.52 | 0.24 | 6.0 | 1020.8 | 6176.4 | 814.2 |
| DDP002 | 382.00 | 389.00 | 7.00 | 0.52 | 0.23 | 1.6 | 1587.4 | 102.7 | 383.1 |
| DDP002A | 3.00 | 8.00 | 5.00 | 0.24 | 0.18 | 2.6 | 63.7 | 36.8 | 37.2 |
| DDP002A | 58.00 | 64.00 | 6.00 | 0.38 | 0.32 | 1.3 | 222.7 | 35.5 | 19.3 |
| DDP002A | 115.00 | 120.00 | 5.00 | 2.21 | 0.16 | 85.4 | 2153.2 | 11736.0 | 322.4 |
| DDP002A | 121.00 | 124.00 | 3.00 | 1.43 | 0.21 | 55.7 | 691.0 | 9161.7 | 381.3 |
| DDP002A | 132.00 | 135.00 | 3.00 | 3.27 | 0.24 | 139.3 | 1478.0 | 3847.0 | 308.0 |
| DDP002A | 150.00 | 154.00 | 4.00 | 0.19 | 0.15 | 1.5 | 52.3 | 283.5 | 27.0 |
| DDP006 | 0.00 | 10.00 | 10.00 | 0.41 | 0.31 | 5.0 | 15.5 | 2382.4 | 9.6 |
| DDP006 | 11.00 | 16.00 | 5.00 | 0.50 | 0.34 | 8.0 | 10.3 | 1112.6 | 9.0 |
| DDP006 | 18.00 | 23.00 | 5.00 | 1.29 | 0.84 | 22.6 | 14.0 | 1462.6 | 10.2 |
| DDP006 | 31.00 | 35.00 | 4.00 | 0.25 | 0.18 | 3.5 | 1.3 | 792.5 | 7.3 |
| DDP006 | 37.00 | 50.00 | 13.00 | 0.87 | 0.45 | 20.9 | 8.9 | 4686.6 | 20.2 |
| DDP006 | 51.00 | 56.00 | 5.00 | 0.52 | 0.18 | 16.8 | 19.1 | 4810.4 | 13.2 |
| DDP006 | 69.00 | 72.00 | 3.00 | 0.98 | 0.13 | 14.7 | 3521.3 | 17735.3 | 1388.3 |
| DDP006 | 117.00 | 123.00 | 6.00 | 1.54 | 0.26 | 45.5 | 2323.2 | 2379.5 | 339.7 |
| DDP006 | 124.00 | 128.00 | 4.00 | 0.35 | 0.15 | 5.8 | 491.8 | 7215.8 | 204.5 |
| DDP006 | 141.00 | 146.00 | 5.00 | 0.66 | 0.25 | 7.0 | 1656.2 | 7025.2 | 818.0 |
| DDP006 | 162.00 | 168.00 | 6.00 | 1.31 | 0.33 | 13.5 | 4448.3 | 15548.8 | 1376.7 |
| DDP006 | 175.00 | 184.00 | 9.00 | 1.16 | 0.74 | 15.2 | 756.4 | 20684.1 | 1802.3 |
| DDP006 | 185.00 | 200.00 | 15.00 | 1.48 | 1.31 | 4.3 | 542.4 | 5731.5 | 1507.3 |
| DDP006 | 201.00 | 222.00 | 21.00 | 9.80 | 9.30 | 15.5 | 1175.6 | 4620.2 | 8548.9 |
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 6
Table 5: RC Drilling – Intersections >0.1 g/t Au
| Au | Au | Ag | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Hole | From | To | Int | equiv | ppm | ppm | Cu ppm | Pb ppm | Zn ppm |
| RP006 | 22.00 | 30.00 | 8.00 | 0.24 | 0.16 | 2.0 | 272.9 | 695.0 | 435.1 |
| RP006 | 40.00 | 43.00 | 3.00 | 1.66 | 1.53 | 4.0 | 269.0 | 1383.3 | 275.3 |
| RP006 | 68.00 | 72.00 | 4.00 | 0.31 | 0.18 | 4.5 | 265.2 | 4600.0 | 175.0 |
| RP006 | 169.00 | 183.00 | 14.00 | 0.52 | 0.21 | 11.6 | 486.7 | 915.4 | 204.6 |
| RP007 | 161.00 | 169.00 | 8.00 | 3.63 | 0.38 | 83.6 | 9869.5 | 1088.4 | 585.1 |
| RP007 | 176.00 | 185.00 | 9.00 | 3.42 | 0.56 | 91.1 | 6496.1 | 1655.6 | 535.1 |
| RP007A | 11.00 | 19.00 | 8.00 | 0.34 | 0.19 | 6.9 | 77.4 | 3395.5 | 23.6 |
| RP007A | 20.00 | 24.00 | 4.00 | 0.21 | 0.15 | 2.3 | 129.1 | 3307.5 | 25.8 |
| RP007A | 56.00 | 60.00 | 4.00 | 0.43 | 0.19 | 5.0 | 808.3 | 6692.5 | 82.5 |
| RP007A | 61.00 | 66.00 | 5.00 | 0.81 | 0.44 | 9.6 | 1101.0 | 7150.0 | 50.6 |
| RP007A | 145.00 | 148.00 | 3.00 | 0.18 | 0.12 | 1.7 | 98.3 | 2146.7 | 112.3 |
| RP007A | 160.00 | 168.00 | 8.00 | 0.34 | 0.19 | 5.4 | 264.7 | 1442.5 | 283.8 |
| RP007A | 178.00 | 184.00 | 6.00 | 0.93 | 0.25 | 22.3 | 1477.7 | 4490.0 | 883.2 |
| RP007A | 185.00 | 200.00 | 15.00 | 0.51 | 0.18 | 9.4 | 899.7 | 1625.7 | 620.4 |
| RP008 | 13.00 | 31.00 | 18.00 | 0.89 | 0.58 | 14.4 | 165.8 | 915.2 | 16.3 |
| RP008 | 195.00 | 201.00 | 6.00 | 0.97 | 0.17 | 37.3 | 375.8 | 21386.0 | 2271.2 |
| RP008A | 1.00 | 9.00 | 8.00 | 0.33 | 0.20 | 5.6 | 127.1 | 1416.1 | 20.8 |
| RP008A | 89.00 | 97.00 | 8.00 | 0.63 | 0.42 | 8.4 | 258.2 | 282.5 | 26.9 |
| RP008A | 98.00 | 101.00 | 3.00 | 0.68 | 0.23 | 20.3 | 272.1 | 881.3 | 30.0 |
| RP009 | 3.00 | 21.00 | 18.00 | 0.48 | 0.28 | 8.0 | 210.7 | 743.0 | 23.2 |
| RP009 | 27.00 | 40.00 | 13.00 | 0.64 | 0.21 | 17.9 | 501.2 | 1570.2 | 62.0 |
| RP009 | 122.00 | 166.00 | 44.00 | 0.90 | 0.33 | 15.4 | 1636.2 | 456.3 | 36.3 |
| RP009A | 13.00 | 43.00 | 30.00 | 0.41 | 0.27 | 6.2 | 115.1 | 1938.6 | 18.4 |
| RP009A | 49.00 | 55.00 | 6.00 | 0.29 | 0.25 | 1.3 | 116.3 | 909.8 | 14.8 |
| RP009A | 58.00 | 62.00 | 4.00 | 0.44 | 0.36 | 4.0 | 48.5 | 1131.0 | 17.5 |
| RP009A | 200.00 | 211.00 | 11.00 | 4.53 | 1.77 | 45.5 | 11580.4 | 260.2 | 1722.0 |
| RP009A | 237.00 | 247.00 | 10.00 | 2.48 | 1.15 | 55.4 | 1363.6 | 1112.6 | 245.5 |
| RP010 | 83.00 | 86.00 | 3.00 | 0.29 | 0.21 | 4.0 | 38.7 | 2556.3 | 7028.3 |
| RP010 | 92.00 | 95.00 | 3.00 | 0.32 | 0.19 | 3.3 | 357.0 | 1676.7 | 687.7 |
| RP010 | 134.00 | 188.00 | 54.00 | 1.92 | 0.69 | 10.6 | 6359.0 | 591.8 | 70.5 |
| RP010A | 27.00 | 37.00 | 10.00 | 0.32 | 0.19 | 1.9 | 612.3 | 972.5 | 34.0 |
| RP010A | 40.00 | 49.00 | 9.00 | 0.87 | 0.58 | 9.0 | 733.6 | 1419.4 | 432.6 |
| RP010A | 112.00 | 127.00 | 15.00 | 0.35 | 0.21 | 1.3 | 710.4 | 56.6 | 33.6 |
| RP011A | 136.00 | 141.00 | 5.00 | 0.58 | 0.17 | 1.0 | 2466.8 | 244.2 | 12.0 |
| RP011A | 142.00 | 145.00 | 3.00 | 0.74 | 0.12 | 1.0 | 3711.0 | 270.0 | 24.7 |
| RP011A | 146.00 | 178.00 | 32.00 | 1.97 | 0.81 | 7.2 | 6343.7 | 949.1 | 155.6 |
| RP011A | 179.00 | 183.00 | 4.00 | 0.53 | 0.16 | 1.0 | 2180.3 | 337.3 | 10.8 |
| RP012 | 70.00 | 73.00 | 3.00 | 0.21 | 0.18 | 1.0 | 108.5 | 101.7 | 69.0 |
| RP012 | 75.00 | 108.00 | 33.00 | 0.63 | 0.34 | 2.5 | 1459.5 | 271.3 | 169.1 |
| RP012 | 111.00 | 115.00 | 4.00 | 0.89 | 0.44 | 17.8 | 620.8 | 2187.5 | 54.0 |
| RP012 | 116.00 | 120.00 | 4.00 | 1.07 | 0.16 | 1.0 | 5559.0 | 781.5 | 56.8 |
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 7
| RP012 | 121.00 | 134.00 | 13.00 | 0.53 | 0.31 | 2.2 | 1045.1 | 828.9 | 45.9 |
|---|---|---|---|---|---|---|---|---|---|
| RP012 | 137.00 | 140.00 | 3.00 | 0.45 | 0.32 | 1.0 | 672.3 | 753.3 | 62.0 |
| RP013A | 13.00 | 35.00 | 22.00 | 0.42 | 0.28 | 4.0 | 396.7 | 1980.0 | 64.6 |
| RP014 | 6.00 | 11.00 | 5.00 | 0.43 | 0.28 | 6.8 | 81.3 | 1095.8 | 34.0 |
| RP014 | 13.00 | 18.00 | 5.00 | 0.85 | 0.72 | 6.2 | 36.1 | 1132.2 | 14.8 |
| RP014 | 19.00 | 29.00 | 10.00 | 0.32 | 0.21 | 4.5 | 108.3 | 621.9 | 11.4 |
| RP014 | 30.00 | 70.00 | 40.00 | 0.46 | 0.33 | 5.6 | 113.0 | 300.5 | 14.1 |
| RP014 | 72.00 | 90.00 | 18.00 | 0.45 | 0.18 | 11.2 | 278.8 | 335.5 | 12.2 |
| RP014 | 149.00 | 155.00 | 6.00 | 3.86 | 0.56 | 77.8 | 10915.7 | 1697.2 | 868.2 |
| RP014A | 19.00 | 22.00 | 3.00 | 0.24 | 0.16 | 3.0 | 151.4 | 332.3 | 101.3 |
| RP014A | 23.00 | 28.00 | 5.00 | 0.42 | 0.19 | 11.8 | 8.9 | 759.6 | 7.4 |
| RP014A | 31.00 | 76.00 | 45.00 | 1.08 | 0.40 | 33.0 | 110.0 | 6524.0 | 32.2 |
| RP014A | 77.00 | 82.00 | 5.00 | 0.51 | 0.22 | 11.4 | 435.4 | 1752.8 | 82.4 |
| RP014A | 83.00 | 87.00 | 4.00 | 0.30 | 0.16 | 4.5 | 302.3 | 1391.0 | 53.0 |
| RP014A | 98.00 | 127.00 | 29.00 | 1.08 | 0.67 | 9.1 | 1423.5 | 2215.5 | 104.0 |
| RP014A | 133.00 | 136.00 | 3.00 | 0.67 | 0.51 | 1.3 | 889.0 | 1301.0 | 87.7 |
| RP014A | 143.00 | 152.00 | 9.00 | 0.58 | 0.26 | 3.0 | 1660.3 | 2885.0 | 3795.0 |
| RP014A | 153.00 | 161.00 | 8.00 | 0.69 | 0.18 | 5.5 | 2514.1 | 3519.0 | 1532.1 |
| RP014A | 164.00 | 170.00 | 6.00 | 1.18 | 0.25 | 5.2 | 5173.3 | 1761.0 | 1012.3 |
| RP014A | 171.00 | 196.00 | 25.00 | 1.06 | 0.47 | 21.4 | 978.7 | 8849.9 | 933.4 |
| RP015 | 0.00 | 60.00 | 60.00 | 0.82 | 0.38 | 20.9 | 102.2 | 1435.4 | 15.4 |
| RP015 | 229.00 | 235.00 | 6.00 | 0.61 | 0.18 | 12.2 | 1156.7 | 748.2 | 135.5 |
| RP016 | 11.00 | 15.00 | 4.00 | 0.16 | 0.13 | 1.8 | 17.1 | 507.0 | 13.3 |
| RP016 | 55.00 | 58.00 | 3.00 | 2.54 | 0.52 | 46.3 | 6820.0 | 3207.3 | 527.3 |
| RP016 | 87.00 | 96.00 | 9.00 | 0.27 | 0.14 | 1.0 | 661.4 | 154.3 | 21.6 |
| RP016 | 104.00 | 108.00 | 4.00 | 0.36 | 0.13 | 1.8 | 1261.5 | 133.0 | 45.8 |
| RP016 | 119.00 | 123.00 | 4.00 | 0.63 | 0.13 | 4.5 | 2536.8 | 182.5 | 23.3 |
| RP016 | 140.00 | 146.00 | 6.00 | 1.66 | 0.27 | 7.0 | 7820.0 | 400.3 | 61.0 |
| RP016 | 160.00 | 163.00 | 3.00 | 0.33 | 0.15 | 2.7 | 789.7 | 474.7 | 35.0 |
| RP017 | 26.00 | 32.00 | 6.00 | 1.80 | 1.42 | 16.5 | 320.7 | 1081.3 | 1263.3 |
| RP017 | 78.00 | 81.00 | 3.00 | 0.31 | 0.19 | 2.3 | 487.2 | 184.0 | 100.0 |
| RP017 | 149.00 | 152.00 | 3.00 | 0.49 | 0.12 | 1.3 | 2130.0 | 399.7 | 11.3 |
| RP017 | 176.00 | 179.00 | 3.00 | 1.08 | 0.13 | 1.7 | 5770.0 | 326.7 | 21.7 |
| RP017 | 211.00 | 219.00 | 8.00 | 0.47 | 0.18 | 3.9 | 1358.3 | 663.1 | 54.4 |
| RP018 | 0.00 | 35.00 | 35.00 | 1.08 | 0.71 | 17.5 | 141.5 | 6075.2 | 21.5 |
| RP018 | 36.00 | 54.00 | 18.00 | 0.82 | 0.59 | 11.3 | 36.6 | 783.7 | 9.5 |
| RP018 | 86.00 | 90.00 | 4.00 | 0.68 | 0.43 | 6.3 | 784.5 | 692.5 | 70.8 |
| RP018 | 140.00 | 148.00 | 8.00 | 0.20 | 0.13 | 2.9 | 81.0 | 193.3 | 47.6 |
| RP036 | 159.00 | 182.00 | 23.00 | 0.83 | 0.48 | 6.5 | 1343.5 | 892.8 | 116.4 |
| RP036 | 189.00 | 207.00 | 18.00 | 0.57 | 0.42 | 4.3 | 396.3 | 189.3 | 47.1 |
| RP036A | 66.00 | 69.00 | 3.00 | 0.52 | 0.17 | 10.7 | 873.3 | 11312.0 | 28551.3 |
| RP036A | 75.00 | 79.00 | 4.00 | 0.32 | 0.13 | 7.3 | 260.5 | 8502.5 | 16939.8 |
| RP036A | 85.00 | 88.00 | 3.00 | 2.26 | 0.16 | 23.0 | 10238.0 | 4934.3 | 9535.3 |
| RP036A | 96.00 | 100.00 | 4.00 | 0.68 | 0.15 | 10.8 | 1935.8 | 2197.8 | 7676.5 |
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 8
==> picture [482 x 334] intentionally omitted <==
Figure 1 Location of Arltunga Gold Project
AUSTRALIA
ARLTUNGA PROJECT: Copper, Gold, (GES 100%)
No work was carried out.
GLADSTONE-MOUNT MILLER PROJECT: Manganese (GES 100%)
The Gladstone-Mount Miller Project consists of Exploration Licence (EPM15771) and Mining Lease Application (MLA80166) and is located approximately 15 kilometres by road from the port of Gladstone on the east coast of central Queensland (Figure 1).
The largest mine on the tenements controlled by Genesis was at Mount Miller. The mine opened in 1895 and operated intermittently until 1916 and then from 1958 to 1960. A total of 21,785 tonnes of ore was mined with a grade which ranged from 71% to 75% MnO2.
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 9
On 21 April 2011, the Queensland Government Department of Environment and Resource Management granted an Environmental Authority (Mining Lease) Non Code Compliant Level 2 Mining Project (EA MIN201115110) for the Mount Miller Mine. The Agreements were signed with both Queensland Main Roads and Queensland National Railways. The Board has decided to activate them while waiting for the granting of an exemption from Urban Restricted zoning around Gladstone. Once it has been approved, the Board plans to carry out the planned diamond drilling program.
The Licence Renewal is pending.
PIONEER PROJECT: Gold (GES 100%)
No work was carried out.
McARTHUR RIVER PROJECT: Manganese (GES 100%)
No work was carried out.
LAURA RIVER Au-Pt PROJECT: (EMP15242)
No work was carried out. Annual Technical Report submitted and the Licence Renewal is still pending.
FENN GAP Mn-Fe PROJECT: (EMP24839)
No work was carried out.
Tenements as at 31 March 2013
| Project | Tenement Number | Area(sq km) | Current Holder | State |
|---|---|---|---|---|
| Alice Springs | EL24817 | 372.59 | Genesis Resources | NT |
| Arltunga | EL25238 | 95.2 | Genesis Resources | NT |
| Fenn Gap | EL24839 | 52.43 | Genesis Resources | NT |
| Laura River | EMP15242 | 165.35 | Genesis Resources | QLD |
| Pioneer | EPM15619 | 12.47 | Genesis Resources | QLD |
| McArthur River | EL24814 | 380.88 | Genesis Resources | NT |
| Gladstone | EPM15771 | 63.93 | Genesis Resources | QLD |
| Mt Miller MLA | MLA80166 | 32.24 Ha | Genesis Resources | QLD |
| Total Australia | 1,422.92 | |||
| Plavica(7 leases) | 184.9 | RIK Sileks AD Kratovo | Macedonia | |
| TOTAL | 1,607.82 |
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 10
About Genesis Resources Limited
Genesis Resources Limited is an Australian company with a portfolio of quality gold, iron, manganese, uranium and base metal (copper-zinc-silver) in the highly prospective Proterozoic and Phanerozoic metallogenic provinces of northern and central Australia.
Genesis has signed a Joint Venture over an advanced copper-gold project (Plavica) within the Former Yugoslav Republic of Macedonia. The Plavica Project lies within Carpathian Volcanic Arc, a major epithermal province running through Eastern Europe, which is highly prospective for gold, copper and silver mineralisation.
Genesis’ projects are close to established infrastructure including railways, shipping ports, highways, power stations and populated areas.
The Company’s objective is to provide rapid capital growth through mineral discoveries and development of economic deposits in Australia and overseas.
For more information please visit the Company website at: www.genesisresourcesltd.com.au
Information in this report that relates to exploration activity and results was compiled under the guidance of John Karajas who is a Member of the Australasian Institute of Geoscientists. Mr Karajas has sufficient experience relevant to the styles of mineralisation and to the activities which are being reported to qualify as a Competent Person as defined by the JORC code, 2004. Mr Karajas consents to the release of the information compiled in this report in the form and context in which it appears.
CORPORATE
Appointment of New Director
On 26 March 2013 the Company appointed Mr Kim Heng Lim as a Non-Executive Director of the Board.
Mr Lim is associated with the Company’s largest shareholder, S Active Holding Sdn Bhd, which holds 22,117,930 ordinary shares in the Company.
Capital raising
In January 2013, the Company sought and received shareholder approval for the issue of up to 50,000,000 shares under a placement facility (Proposed Placement Facility). At the time that approval was sought from shareholders, the Directors had not made a determination as to whether it would issue shares under the Proposed Placement Facility; but elected to seek prior approval regardless given the recent challenging environment for capital raising and in anticipation that ongoing funding of the Company’s projects would be required.
The Company did not utilise (and accordingly no shares were issued under) the Proposed Placement Facility, which lapsed on 16 April 2013 in accordance with the ASX Listing Rules.
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 11
Drilling Agreement with Spektra Jeotek Sanayi ve Ticaret A.S.
The Company entered into a further agreement with its Spektra to bolster the Company’s ongoing drilling program at the Plavica Project. Spektra had previously been contracted to undertake a minimum of 7,000 meters of reverse circulation drilling and 2,500 meters of diamond core drilling at the Plavica Project. Under the new agreement, the Company contracted Spektra to undertake a minimum of 22,000 metres of diamond core drilling and 44,000 metres of reverse circulation drilling in 2013.
This aggressive drilling program is designed to progress the Plavica Project towards a final feasibility study.
Securities on Issue as at 31 March 2013
Fully paid ordinary shares
| ITEM | NO. OF SECURITIES |
|---|---|
| Total fully paid ordinary shares on issue | 139,984,568 |
| Total options to acquire fully paid ordinary shares on issue | 26,535,376 |
| Unlisted options exercisable at$0.10 on or before 4 May2014 | 19,424,424 |
| Unlisted options exercisable at $0.10 on or before 11 May 2014 | 7,110,952 |
Board and Management as at 31 March 2013
Mr Eddie Pang Chairman 6 March 2009 – present Mr Peter Kong Managing Director 11 May 2012 – present Mr Alex Lim Non-executive Director 26 November – present Mr Kok Bin Wee Non-executive Director 11 December 2009 – 26 November 2012 16 January 2013 - present Mr Patrick Volpe Non-executive Director 11 May 2012 – 26 November 2012 16 January 2013 – present Mr John Zee Non-executive Director 11 May 2012 – 26 November 2012 16 January 2013 – present Mr John Karajas Non-executive Director 22 October 2012 – 26 November 2012 16 January 2013 – present Mr Kim Heng Lim Non-executive Director 26 March 2013 – present Ms Sophie Karzis Company Secretary 1 December 2010 - present Ms Patricia Wong Chief Financial Officer 1 December 2010 - present
Genesis Resources Limited | Quarterly Activities Report | January 2013 – March 2013
Page 12
Appendix 5B Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10.
Name of entity
Genesis Resources Limited
| ABN 22 114 787 469 Consolidated statement of cash flows |
ABN 22 114 787 469 Consolidated statement of cash flows |
Quarter ended (“current quarter”) 31 March 2013 |
Quarter ended (“current quarter”) 31 March 2013 |
|
|---|---|---|---|---|
| 31 March 2013 | ||||
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid/refund 1.7 Other (provide details if material) Net Operating Cash Flows |
Current quarter $A’000 |
Year to date (9 months) $A’000 |
||
| - (425) - - (500) - 36 - 25 - |
- (1,872) - - (1,317) - 58 - 47 |
|||
| (864) | (3,084) | |||
| Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Loan to subsidiary Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
- - (104) - - - - - |
- (7) (186) - - - - - - |
||
| (104) | (193) | |||
| (968) | (3,277) |
- See chapter 19 for defined terms.
Appendix 5B Page 1
30/9/2001
Appendix 5B Mining exploration entity quarterly report
| Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) - equity transaction cost Net financing cash flows |
- - - - - (93) |
5,969 - - - - (330) |
|---|---|---|
| (93) | 5,639 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end ofquarter |
(1,061) 4,167 (28) |
2,362 751 (35) |
| 3,078 | 3,078 |
Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities
| 1.23 1.24 |
1.23 1.24 |
Aggregate amount of payments to the parties included in item 1.2 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A'000 |
|---|---|---|---|
| 50 | |||
| - | |||
| 1.25 Explanation necessaryforanunderstanding ofthe transactions None Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets andliabilities but didnotinvolve cash flows None |
Explanation necessaryforanunderstanding ofthe transactions | ||
| None | |||
| None |
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest None
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available Amount used $A’000 $A’000 3.1 Loan facilities - -
- See chapter 19 for defined terms.
Appendix 5B Page 2
30/9/2001
Appendix 5B Mining exploration entity quarterly report
3.2 Credit standby arrangements - -
Estimated cash outflows for next quarter
| 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration |
$A’000 |
|---|---|
| 4,057 | |
| - | |
| - | |
| 365 | |
| Total | 4,422 |
Reconciliation of cash
| Reconciliation of cash | ||
|---|---|---|
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to therelateditemsinthe accountsis asfollows. |
Current quarter $A’000 |
Previous quarter $A’000 |
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (Term Deposit – bank guarantee) |
478 | 266 |
| 2,600 | 3,901 | |
| - | - | |
| 78 | 78 | |
| Total: cash at end of quarter(item 1.22) | 3,156 | 4,245 |
Changes in interests in mining tenements
| 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased |
Tenement reference |
Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| - | - | - | - | |
| - | - | - |
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted |
Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (description) |
Nil |
- See chapter 19 for defined terms.
Appendix 5B Page 3
30/9/2001
Appendix 5B Mining exploration entity quarterly report
| 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions |
||||
|---|---|---|---|---|
| 7.3 +Ordinary securities 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs |
139,984,568 | 139,984,568 | ||
| i) 5,000 | i) 5,000 | i) 10 cents | i) 10 cents | |
| 7.5 +Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
Nil | |||
| 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
i) 19,424,424 options (expiring 4/5/2014) to acquire ordinary shares (conversion factor 1:1) ii) 7,110,952 options (expiring 11/5/2014) to acquire ordinary shares (conversion factor 1:1) |
i) Nil ii) Nil |
i) Exercise price:10 cents ii) Exercise price:10 cents |
|
| - | - | - | - | |
| - | - | - | - | |
| 7.11 Debentures (totals only) |
Nil | |||
| 7.12 Unsecured notes (totals only) |
Nil |
- See chapter 19 for defined terms.
Appendix 5B Page 4
30/9/2001
Appendix 5B Mining exploration entity quarterly report
Compliance statement
-
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).
-
2 This statement does give a true and fair view of the matters disclosed.
Peter Kong
Managing Director 30 April 2013
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .
-
4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.
-
5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
== == == == ==
- See chapter 19 for defined terms.
Appendix 5B Page 5
30/9/2001