Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

GENESIS RESOURCES LIMITED Interim / Quarterly Report 2013

Jul 28, 2013

64980_rns_2013-07-28_112a13b0-ee79-40a4-ae3c-c9338019f74f.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [306 x 81] intentionally omitted <==

GENESIS RESOURCES LIMITED  Level 1  61 Spring Street  Melbourne  VIC 3000

T +61 3 9286 7500  F +61 3 9662 1472  www.genesisresourcesltd.com.au  ABN 22 114 787 469

Quarterly Activities Report – June 2013

HIGHLIGHTS

Plavica Au-Ag-Cu Project

  • 65 RC and 9 diamond drill holes drilled at Plavica for a total of 12,936.5m of RC and 2,851.4m of diamond core.

  • Many holes intersected ore grade mineralization and a new high grade zone was discovered in the Eastern Part of Plavica.

  • Highlights include 54m @ 3.9 g/t Au and 65m @ 3.1 g/t Au.

  • Financial Modeling by Mining Consultants Golders Ltd indicates positive economic viability for the Project.

  • Drilling is ongoing with 2 core rigs and 1 RC rig in operation.

Gladstone-Mount Miller Mn Project

  • The Board intends to carry out a diamond drilling program at Mount Miller in the near term, subject to execution of formal documentation relating to Mining Lease EA MIN201115110.

EXPLORATION & DEVELOPMENT PROGRESS DURING THE QUARTER

Republic Of Macedonia

PLAVICA GOLD-COPPER-SILVER PROJECT (GES earning 62%)

During the quarter 65 RC and 9 diamond core drill holes were drilled at Plavica for a total of 12,936.5m of RC and 2,851.4m of diamond core respectively. Drill hole locations are shown in Figure 2 whilst Tables 1 & 2 provide the details of drill hole coordinates, azimuths, inclinations and depths. Drilling commenced in the latter part of March and is ongoing.

Samples were assayed on a 1m basis and were sent to SGS Laboratories in Ankara. Results have been returned for the first 28 RC holes (PNRC001-028) and 3 core holes (PNDD001 and MRDD001-002). All other assays are still pending.

A number of holes intersected very encouraging results. Some of these holes have delineated a new zone on the north-eastern flank of the prospect. This zone is still open to the east and at depth. Best results (as reported to the ASX on 14 May 2013) include:

PNRC003: 44m @ 2.7 g/t Au from 0m PNRC008: 54m @ 3.9 g/t Au from 25m including 17m @ 7.4 g/t Au from 38m PNRC009: 24m @ 2.4 g/t Au from 171m PNRC011: 65m @ 3.1 g/t Au from 62m Including: 7m @ 9.1 g/t Au from 87m

In addition, a number of holes are from the western end of Plavica where previous drilling is sparse were encouraging. Some of these intercepts are also high in silver and base metals. Highlights include:

PNRC022: 9m @ 3.5 g/t Au, 313.8 g/t Ag, 1.42% Cu, 0.2% Zn from 204m PNRC026: 17m @ 1.5 g/t Au, 9.1 g/t Ag, 0.21% Cu, 0.8% Pb, 0.4% Zn from 143m and 18m @ 1.3 g/t Au, 37.6 g/t Ag, 0.60% Cu, 2.7% Pb, 0.2% Zn from 178m PNRC027: 32m @ 0.6 g/t Au, 83.8 g/t Ag, 0.1% Cu, 2.2% Pb, from 40m

The above results were reported to the ASX on 12 June 2013. All drilling composites for QTR 1 2013 above 0.4 g/t Au are shown in Table 3.

Genesis engaged Golder Associates to evaluate the economic potential of an Exploration Target of 150 million tonnes of 0.8 g/t Au, 11 g/t Ag and 0.2% Cu at Plavica. The potential quantity and grade is conceptual in nature, as there has been insufficient exploration to define a JORC Compliant Inferred Mineral Resource. However, results were encouraging and suggest the project is viable at current economic conditions and prices. The Exploration Target used did not contain the results mentioned here in the June 2013 Quarter. The results of this report were announced to the ASX on 24 May 2013.

==> picture [418 x 307] intentionally omitted <==

Figure 1A: Location of Plavica Gold-Copper-Silver Project, Republic of Macedonia.

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 2

==> picture [289 x 271] intentionally omitted <==

Figure 1B: Location of Plavica Gold-Copper-Silver Project, Republic of Macedonia, including RTP Magnetics.

==> picture [323 x 242] intentionally omitted <==

Figure 2: Location of Drill Collars, QTR1 2013, Plavica Gold-Copper-Silver Project. UTM WGS84.

Hole **Depth ** **Dip ** **Azm ** **East_UTM_Zone34 ** **North_UTM_Zone34 ** **RL_E50 ** **East_GK_MIG ** **North_GK_MIG ** Type
MRDD001 400.0 -60 350 596649 4655183 1090 7597112 4656067 DD
MRDD002 400.0 -60 170 596597 4655478 1073 7597060 4656362 DD
PNDD001 400.0 -60 360 595844 4656073 1002 7596307 4656957 DD
PNDD002 430.4 -60 360 597144 4656076 1210 7597607 4656960 DD
PNDD003A 402.0 -60 360 597044 4656176 1205 7597507 4657060 DD
PNDD004 410.5 -60 360 596944 4656226 1188 7597407 4657110 DD
PNDD005 401.5 -60 360 596844 4656176 1180 7597307 4657060 DD
PNDD006 364.0 -60 360 596844 4656076 1150 7597307 4656960 DD
PNDD007 443.0 -60 360 595944 4655973 1020 7596407 4656857 DD

Table 1 (above): Diamond Core Drill Collar Details, QTR1 2013, Plavica Gold-Copper-Silver Project.

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 3

Hole Hole **Depth ** **Dip ** **Azm ** **East_UTM_Zone34 ** **North_UTM_Zone34 ** **RL_E50 ** **East_GK_MIG ** **North_GK_MIG ** Type Table 2 (left):
RC Drill Collar
Details, QTR1 201
Plavica Gold-Copp
Silver Project.
PNRC001A 214.0 -60 360 596844 4656223 1195 7597308 4657107 RC
PNRC002 201.0 -60 360 596853 4656273 1180 7597317 4657156 RC
PNRC003 219.0 -60 360 596948 4656272 1190 7597411 4657155 RC
PNRC004 208.0 -60 360 597046 4656279 1200 7597510 4657162 RC
PNRC005 210.0 -60 360 597150 4656261 1200 7597614 4657145 RC
PNRC006 225.0 -60 360 596946 4656171 1188 7597409 4657055 RC
PNRC007 207.0 -60 360 596946 4656126 1176 7597409 4657010 RC
PNRC008 207.0 -60 360 597047 4656217 1207 7597510 4657101 RC
PNRC009 207.0 -60 360 597046 4656127 1200 7597510 4657011 RC
Hole
PNRC010
Depth
207.0
Dip
-60
Azm
360
East_UTM_Zone34
597150
North_UTM_Zone34
4656020
RL_E50
1194
East_GK_MIG
7597613
North_GK_MIG
4656903
Type
RC
PNRC011 201.0 -60 360 597150 4656120 1220 7597613 4657003 RC
PNRC012 203.0 -60 360 596842 4656126 1165 7597305 4657009 RC
PNRC013 201.0 -60 360 596933 4656080 1162 7597397 4656964 RC
PNRC014 201.0 -60 360 596849 4656080 1150 7597313 4656963 RC
PNRC015 201.0 -60 360 596857 4656039 1130 7597320 4656923 RC
PNRC016 200.0 -60 360 596941 4655985 1130 7597404 4656869 RC
PNRC017 165.0 -60 360 596956 4655937 1110 7597419 4656821 RC
PNRC018 201.0 -60 360 595945 4656215 1077 7596409 4657098 RC
PNRC019 200.0 -60 360 595943 4656178 1068 7596407 4657061 RC
PNRC020 179.0 -60 360 595944 4656123 1055 7596407 4657006 RC
PNRC021 200.0 -60 360 595942 4656076 1042 7596405 4656960 RC
PNRC022 213.0 -60 360 595942 4656033 1032 7596406 4656916 RC
PNRC023 200.0 -60 360 595739 4656029 975 7596203 4656913 RC
PNRC024 197.0 -60 360 595739 4656128 1007 7596202 4657012 RC
PNRC025 200.0 -60 360 595740 4656080 992 7596203 4656964 RC
PNRC026 200.0 -60 360 595840 4656025 990 7596304 4656909 RC
PNRC027 200.0 -60 360 595840 4656125 1011 7596303 4657008 RC
PNRC028 200.0 -60 360 595844 4656173 1025 7596307 4657057 RC
PNRC029 200.0 -60 360 595844 4656223 1044 7596307 4657107 RC
PNRC030 177.0 -60 360 595744 4656323 1055 7596207 4657207 RC
PNRC031 200.0 -60 360 595744 4656273 1054 7596207 4657157 RC
PNRC032 200.0 -60 360 595844 4656323 1065 7596307 4657207 RC
PNRC033 200.0 -60 360 595944 4656373 1068 7596407 4657257 RC
PNRC034 200.0 -60 360 595844 4656273 1060 7596307 4657157 RC
PNRC035 200.0 -60 360 595644 4656323 1060 7596107 4657207 RC
PNRC036 200.0 -60 360 595644 4656273 1058 7596107 4657157 RC
PNRC037 200.0 -60 360 595644 4656223 1048 7596107 4657107 RC
PNRC038 201.0 -60 360 595644 4656173 1034 7596107 4657057 RC
PNRC039 200.0 -60 360 595644 4656123 1018 7596107 4657007 RC
PNRC040 200.0 -60 360 595644 4656073 1002 7596107 4656957 RC
PNRC041 201.0 -60 360 595944 4656323 1080 7596407 4657207 RC
PNRC042 200.0 -60 360 596044 4656373 1072 7596507 4657257 RC
PNRC043 200.0 -60 360 596044 4656323 1088 7596507 4657207 RC
PNRC044 175.0 -60 360 595744 4656373 1042 7596207 4657257 RC
PNRC045 200.0 -60 360 595844 4656373 1055 7596307 4657257 RC
PNRC046 200.0 -60 360 595644 4656373 1050 7596107 4657257 RC
PNRC047 200.0 -60 360 595744 4656223 1045 7596207 4657107 RC
PNRC048 200.0 -60 360 595944 4656273 1083 7596407 4657157 RC
PNRC049 200.0 -60 360 596044 4656023 1068 7596507 4656907 RC
PNRC050 200.0 -60 360 596044 4656173 1095 7596507 4657057 RC
PNRC051A 200.0 -60 360 596044 4656123 1086 7596507 4657007 RC
PNRC052 207.0 -60 360 596044 4656223 1102 7596507 4657107 RC
PNRC053 200.0 -60 360 596044 4656273 1100 7596507 4657157 RC
PNRC054 200.0 -60 360 595744 4656173 1025 7596207 4657057 RC
PNRC055 201.0 -60 360 596144 4656023 1100 7596607 4656907 RC
PNRC056 202.0 -60 360 596244 4656023 1108 7596707 4656907 RC
PNRC057 198.5 -60 360 596244 4656073 1122 7596707 4656957 RC
PNRC058 200.0 -60 360 596144 4656073 1110 7596607 4656957 RC
PNRC059 200.0 -60 360 596344 4656073 1125 7596807 4656957 RC
PNRC060A 200.0 -60 360 596544 4656273 1205 7597007 4657157 RC
PNRC061 127.0 -60 360 596144 4656223 1127 7596607 4657107 RC
PNRC061A 129.0 -60 360 596144 4656223 1127 7596607 4657107 RC
PNRC062 200.0 -60 360 596444 4656073 1130 7596907 4656957 RC
P

~~NRC063~~

~~200.0 ~~

~~-60 ~~

~~360~~

~~596544~~

~~4656023~~

~~1105~~

~~7597007~~

~~4656907~~
~~RC~~ Page 4
~~Genesis~~
PNRC064
~~esour~~
51.0
~~ces~~
-60
~~imit~~
360
~~d Quarterly A~~
596544
~~ctivities Report ~~
4655973
~~pril 20~~
1083
~~3 – June 20~~
7597007
~~3~~
4656857
PNRC065 200.0 -60 360 596244 4656123 1140 7596707 4657007 RC

Table 2 (left): RC Drill Collar Details, QTR1 2013, Plavica Gold-CopperSilver Proje ct.

Hole From To Int **Aug/t ** **Aug x m ** **Ag g/t ** **Cu% ** Pb%
MRDD001 168 172 4 0.43 1.71 1.0 0.01 0.09
MRDD001 294 297 3 0.75 2.26 11.7 0.15 0.07
MRDD001 375 380 5 0.94 4.69 10.8 1.51 0.02
MRDD002 368 372 4 0.63 2.51 11.8 0.29 0.16
MRDD002 376 379 3 0.87 2.61 27.0 0.48 0.05
PNDD001 78 85 7 0.36 2.49 15.9 0.19 0.69
PNDD001 125 130 5 0.79 3.95 20.4 1.06 0.06
PNDD001 143 147 4 0.54 2.15 49.3 1.85 0.09
PNDD001 180 185 5 0.61 3.03 19.2 0.32 0.07
PNRC001A 0 38 38 2.07 78.74 4.9 0.01 0.13
PNRC001A 133 142 9 0.87 7.85 3.8 0.02 0.10
PNRC001A 150 167 17 0.99 16.84 7.8 0.03 0.05
PNRC001A 203 206 3 0.47 1.41 36.0 0.03 0.25
PNRC002 52 60 8 1.81 14.45 3.5 0.02 0.11
PNRC002 87 95 8 2.27 18.14 14.3 0.02 0.08
PNRC003 0 44 44 2.67 117.46 6.4 0.02 0.21
PNRC003 80 85 5 0.71 3.55 1.4 0.12 0.06
PNRC004 0 3 3 0.46 1.38 2.7 0.01 0.11
PNRC006 5 17 12 0.72 8.61 1.7 0.02 0.04
PNRC006 22 36 14 0.72 10.09 1.9 0.04 0.03
PNRC006 61 65 4 0.68 2.73 3.8 0.01 0.01
PNRC006 103 117 14 1.16 16.28 2.1 0.02 0.09
PNRC006 123 128 5 0.65 3.25 1.0 0.03 0.07
PNRC006 134 144 10 1.51 15.13 1.0 0.03 0.07
PNRC007 15 27 12 0.68 8.20 1.9 0.02 0.20
PNRC007 29 33 4 0.55 2.21 1.0 0.02 0.07
PNRC007 58 70 12 1.00 12.02 1.1 0.04 0.03
PNRC007 74 80 6 1.64 9.86 3.0 0.09 0.04
PNRC007 129 132 3 0.39 1.16 1.0 0.07 0.11
PNRC007 187 207 20 1.66 33.26 1.4 0.11 0.05
PNRC008 25 79 54 3.89 210.27 5.5 0.03 0.09
PNRC009 33 37 4 0.69 2.78 2.3 0.10 0.06
PNRC009 45 48 3 0.46 1.39 1.0 0.67 0.03
PNRC009 171 195 24 2.39 57.39 8.2 0.03 0.08
PNRC011 11 16 5 0.41 2.06 1.0 0.01 0.05
PNRC011 19 39 20 0.87 17.33 1.5 0.01 0.05
PNRC011 62 127 65 3.05 198.54 1.7 0.07 0.09
PNRC012 52 61 9 0.81 7.25 1.9 0.06 0.02
PNRC012 63 66 3 0.61 1.83 7.0 0.03 0.08
PNRC012 80 102 22 1.09 24.06 1.0 0.12 0.09
PNRC012 104 109 5 0.76 3.79 2.4 0.39 0.06
PNRC012 172 203 31 1.69 52.54 16.0 0.36 0.10
PNRC013 93 98 5 0.58 2.89 1.0 0.07 0.03
PNRC013 103 107 4 0.71 2.86 1.0 0.07 0.04
PNRC013 192 197 5 0.86 4.32 8.8 0.09 0.02
PNRC014 0 5 5 0.60 3.02 3.6 0.02 0.13
PNRC014 123 129 6 0.70 4.22 1.0 0.23 0.10
PNRC014 158 165 7 0.54 3.76 1.0 0.19 0.06
PNRC015 2 15 13 1.15 15.01 4.2 0.02 0.11
PNRC016 165 175 10 0.64 6.41 3.1 0.29 0.04
PNRC022 204 213 9 3.25 29.27 313.8 1.42 0.06
PNRC026 143 160 17 1.46 24.78 9.1 0.21 0.84
PNRC026 171 175 4 1.05 4.21 44.8 0.29 3.18
PNRC026 178 196 18 1.26 22.60 37.6 0.60 2.71
PNRC027 40 72 32 0.57 18.10 83.8 0.11 2.16
PNRC027 81 84 3 1.02 3.06 13.3 0.32 0.44
PNRC027 93 98 5 0.53 2.63 34.6 0.25 0.26
PNRC027 110 115 5 0.67 3.36 4.8 0.25 0.06
PNRC027 123 126 3 0.85 2.56 194.7 0.31 0.88

Table 3 (left):

Significant Drilling Results, QTR1 2013, Plavica GoldCopper-Silver Project. Compositing done with a 0.4 g/t Au cut-off, minimum 3m interval, maximum 1m internal waste. Results in red denote composites above 50 gram-metres.

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 5

EXPLORATION & DEVELOPMENT PROGRESS DURING THE QUARTER (continued)

Australia

==> picture [483 x 334] intentionally omitted <==

Figure 3

ARLTUNGA PROJECT: Copper, Gold, (GES 100%)

The Arltunga Gold Project consists of Exploration Licence EL25238 covering 95.2 square kilometres, is located approximately 110 kilometres northeast of Alice Springs (Figure 1) in the vicinity of the Arltunga Goldfield. Thirty three historical gold mines and prospects are known in the licence area.

The Licence Renewal was approved on the 6 June 2013 for a term of 2 years and will expire on 7 November 2014. All 31 sub-blocks were retained.

No work was carried out.

ALICE SPRINGS PROJECT: Copper, Gold, Iron (GES 100%)

The Alice Springs Project consists of Exploration Licence EL24817 covering 372.59 square kilometres, is located approximately 110-155 kilometres northeast from Alice Springs in the Northern Territory (Figure 3).

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 6

The Licence Renewal was approved on 4 February 2013 for a term of 2 years and will expire on 17 April 2014.

The 7[th] Annual Technical Report was submitted and a request for a variation of expenditure condition approved. The title area remains unchanged at 118 blocks.

No work was carried out.

GLADSTONE-MOUNT MILLER PROJECT: Manganese (GES 100%)

The Gladstone-Mount Miller Project consists of Exploration Licence (EPM15771) covering 63.93 square kilometres and Mining Lease Application (MLA80166) covering 32.24 Ha and is located approximately 15 kilometres by road from the port of Gladstone on the east coast of central Queensland (Figure 3).

The largest mine on the tenements controlled by Genesis was at Mount Miller. The mine opened in 1895 and operated intermittently until 1916 and then from 1958 to 1960. A total of 21,785 tonnes of ore was mined with a grade which ranged from 71% to 75% MnO2.

The Board intends to carry out a diamond drilling program at Mount Miller in the near term, subject to execution of formal documentation relating to Mining Lease EA MIN201115110.

The Licence Renewal was approved on 7 May 2013 for a term of 5 years and will expire on 18 June 2017. All 21 sub-blocks were retained.

The 6[th] Annual Technical Report was submitted.

No work was carried out.

PIONEER PROJECT: Gold (GES 100%)

The Pioneer Project consists of one granted Exploration Permit Mineral (EPM15619) covering 12.47 square kilometres approximately 70 kilometres by road from Bundaberg via the Bruce Highway in Queensland (Figure 3).

The project lies within the Gaeta Goldfield and has undergone previous exploration for gold, uranium and base metals, with numerous historical gold workings located throughout the area. Historical mining was primarily focused on the Pioneer Reef which was the largest producer, but mining activities also included several other reefs including Gympie, Lord Nelson, West Yorkshire and Happy Jack.

The Licence Renewal was approved on 22 August 2012 for a term of 3 years and will expire on 1 August 2014. All 4 sub-blocks were retained.

No work was carried out.

McARTHUR RIVER PROJECT: Manganese (GES 100%)

The McArthur River project consists of Exploration Licence EL24814 covering 380.88 square kilometres and is located approximately 850 kilometres south east of Darwin in the Northern Territory and 450 kilometres north-west of Mount Isa in Queensland (Figure 3).

The project area contains the Masterton No2 manganese occurrence.

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 7

The Licence Renewal was approved on 4 February 2013 for a term of 2 years and will expire on 17 April 2014. All 116 sub-blocks were retained.

The 7[th] Annual Technical Report was submitted and has been accepted as satisfactory.

No work was carried out.

LAURA RIVER Au-Pt PROJECT: (EMP15242)

The Laura River project consists of Exploration Licence EPM15242 covering 165.35 square kilometres is centered on the Cape York Peninsular township of Laura, 210km north-west of Cairns and 88km west of Cooktown in North Queensland . The area is prospective for gold. Several historical alluvial workings are found in the vicinity of the Laura River and affluents.

The Licence Renewal is still pending.

No work was carried out.

FENN GAP Mn-Fe PROJECT: (EMP24839)

The Fenn Gap project consists of one Exploration Licence EL24839 which covers a total area of 52.43 square kilometers, is located approximately 25 kilometres south west of Alice Springs in the Northern Territory (Figure 3). The project is 25 kilometres from major infrastructure such as the Stuart Highway and Alice to Adelaide Railway.

The Licence Renewal is not due until 5 May 2014.

The 5[th] Annual Technical Report was submitted and has been accepted as satisfactory. All 27 subblocks have been retained.

No work was carried out.

Tenements as at 30 June 2013

Project Tenement Number Area(sq km) Current Holder State
Alice Springs EL24817 372.59 Genesis Resources NT
Arltunga EL25238 95.2 Genesis Resources NT
Fenn Gap EL24839 52.43 Genesis Resources NT
Laura River EMP15242 165.35 Genesis Resources QLD
Pioneer EPM15619 12.47 Genesis Resources QLD
McArthur River EL24814 380.88 Genesis Resources NT
Gladstone EPM15771 63.93 Genesis Resources QLD
Mt Miller MLA MLA80166 32.24 Ha Genesis Resources QLD
Total Australia 1,422.92
Plavica (7 leases) 184.9 RIK Sileks AD Kratovo Macedonia
TOTAL 1,607.82

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 8

CORPORATE

Securities on issue as at 30 June 2013:

ITEM NO. OF SECURITIES
Total fully paid ordinary shares on issue 139,984,568
Total options to acquire fully paid ordinary shares on issue 26,535,376
Unlisted options exercisable at $0.10 on or before 4 May2014 19,424,424
Unlisted options exercisable at$0.10 on or before 11 May2014 7,110,952

Board and Management as at 30 June 2013

Mr Eddie Pang Chairman
Mr Peter Kong Managing Director
Mr John Karajas Non-Executive Director
Mr Alex Lim Non-Executive Director
Mr Kim Heng Lim Non-Executive Director
Mr Patrick Volpe Non-Executive Director
Mr Deric Wee Non-Executive Director
Mr John Zee Non-Executive Director
Ms Sophie Karzis Company Secretary
Ms Patricia Wong Chief Financial Officer

COMPETENT PERSON

Information in this report that relates to exploration activity and results was compiled under the guidance of John Karajas who is a Member of the Australasian Institute of Geoscientists. Mr Karajas has sufficient experience relevant to the styles of mineralisation and to the activities which are being reported to qualify as a Competent Person as defined by the JORC code, 2004. Mr Karajas consents to the release of the information compiled in this report in the form and context in which it appears.

About Genesis Resources Limited

Genesis Resources Limited is an Australian company with a portfolio of quality gold, iron, manganese, uranium and base metal (copper-zinc-silver) in the highly prospective Proterozoic and Phanerozoic metallogenic provinces of northern and central Australia.

Genesis has signed a Joint Venture over an advanced copper-gold project (Plavica) within the Former Yugoslav Republic of Macedonia. The Plavica Project lies within Carpathian Volcanic Arc, a major epithermal province running through Eastern Europe, which is highly prospective for gold, copper and silver mineralisation.

Genesis’ projects are close to established infrastructure including railways, shipping ports, highways, power stations and populated areas.

The Company’s objective is to provide rapid capital growth through mineral discoveries and development of economic deposits in Australia and overseas.

For more information please visit the Company’s website at: www.genesisresourcesltd.com.au

Genesis Resources Limited | Quarterly Activities Report | April 2013 – June 2013

Page 9

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10.

Name of entity

Genesis Resources Limited

ABN
22 114 787 469
Consolidated statement of cash flows
ABN
22 114 787 469
Consolidated statement of cash flows
Quarter ended (“current quarter”)
30 June 2013
Quarter ended (“current quarter”)
30 June 2013
30 June 2013
Cash flows related to operating
activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes (paid) /refund
1.7
Other (provide details if material)
Net Operating Cash Flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
(1,358)
-
-
(450)
-
37
-
(49)
-
-
(3,230)
-
-
(1,767)
-
95
-
(2)
(1,820) (4,904)
Cash flows related to investing activities
1.8
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other (provide details if material)
Loan to subsidiary
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
-
-
(48)
-
-
-
-
-
-
(7)
(234)
-
-
-
-
-
-
(48) (241)
(1,868) (5,145)
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Cash flows related to financing activities
1.14
Proceeds from issues of shares, options,
etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material)
- equity transaction cost
Net financing cash flows
-
-
-
-
-
-
5,969
-
-
-
-
(330)
- 5,639
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
(1,868)
3,078
(72)
494
751
(107)
1,138 1,138

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
37
-
1.25 Explanation necessaryforanunderstanding ofthe transactions
None

Non-cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows None

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

None

Financing facilities available

Add notes as necessary for an understanding of the position.

Amount available Amount used $A’000 $A’000 3.1 Loan facilities - -

  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

3.2 Credit standby arrangements - -

Estimated cash outflows for next quarter

4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
844
-
-
271
Total 1,115

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
therelateditemsinthe accountsis asfollows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (Term Deposit – bank guarantee)
1,138 478
- 2,600
- -
78 78
Total: cash at end of quarter(item 1.22) 1,216 3,156

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning of
quarter
Interest at
end of
quarter
- - - -
- - -

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number
quoted
Issue price
per security
(see note 3)
(cents)
Amount paid up
per security (see
note 3) (cents)
7.1
Preference
+securities
(description)
Nil
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs
139,984,568 139,984,568
- - - -
7.5
+Convertible debt
securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through securities
matured, converted
Nil
7.7
Options
(description and
conversion factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
7.10
Expired during
quarter
i) 19,424,424 options
(expiring 4/5/2014)
to acquire ordinary
shares (conversion
factor 1:1)
ii) 7,110,952 options
(expiring
11/5/2014) to
acquire ordinary
shares (conversion
factor 1:1)
i) Nil
ii) Nil
i) Exercise
price:10
cents
ii) Exercise
price:10
cents
- - - -
- - - -
- - - -
7.11
Debentures
(totals only)
Nil
7.12
Unsecured notes
(totals only)
Nil
  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does give a true and fair view of the matters disclosed.

Peter Kong Managing Director 29 July 2013

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities. The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001