Corporate Update GES AGM Nov 19 2018 James Patterson Exploration Manager
DISCLAIMER
The material in this presentation has been prepared by Genesis Resources Limited ACN 114 787 469 ( Genesis ) and is general background information about Genesis’s activities current at the date of this presentation. The information is given in summary form and does not purport to be complete. Information in this presentation, including forecast financial information should not be considered as advice or a recommendation to investors or potential investors and does not take into account investment objectives, financial situation or needs of any particular investor. These should be considered, with or without professional advice when deciding if an investment is appropriate. Persons needing advice should consult their stockbroker, solicitor, accountant or other independent financial advisor.
The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe such restrictions.
This presentation does not constitute, or form part of, an offer to sell or the solicitation of an offer to subscribe for or buy any securities, nor the solicitation of any vote or approval in any jurisdiction, nor shall there be any sale, issue or transfer of the securities referred to in this presentation in any jurisdiction in contravention of applicable law.
Certain statements made in this presentation are forward-looking statements. These forward-looking statements are not historical facts but rather are based on Genesis’s current expectations, estimates and projections about the industry in which Genesis operates, and beliefs and assumptions. Words such as "anticipates”, "expects”, "intends,", "plans”, "believes”, "seeks”, "estimates”, and similar expressions are intended to identify forward-looking statements. These statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties and other factors, some of which are beyond the control of Genesis, are difficult to predict and could cause actual results to differ materially from those expressed or forecasted in the forward- looking statements. Genesis cautions investors and potential investors not to place undue reliance on these forward-looking statements, which reflect the view of Genesis only as of the date of this presentation. The forward-looking statements made in this presentation relate only to events as of the date on which the statements are made. Genesis will not undertake any obligation to release publicly any revisions or updates to these forward-looking statements to reflect events, circumstances or unanticipated events occurring after the date of this presentation except as required by law or by any appropriate regulatory authority.
Plavica Project Location - within the Western Tethyan Belt which hosts numerous world class deposits.
==> picture [472 x 292] intentionally omitted <==
Plavica Project Location
==> picture [486 x 84] intentionally omitted <==
----- Start of picture text -----
Plavica
Potential Plant Site
----- End of picture text -----
==> picture [472 x 292] intentionally omitted <==
----- Start of picture text -----
Maricanski Rid
----- End of picture text -----
Genesis Resources 2018 Highlights - Macedonia
-
Work conducted in the past 12 months includes:
-
Geotechnical studies
-
Metallurgical studies
-
ESIA studies
-
Reporting of Resources to the Govt of Macedonia
-
Preparation for a Mining Study for the Govt of Macedonia due in 2019.
-
Continual monitoring of water sampling points and household surveys.
==> picture [472 x 292] intentionally omitted <==
Genesis Resources 2018 Highlights – Geotechnical Studies – Golders Ltd
==> picture [470 x 231] intentionally omitted <==
==> picture [472 x 292] intentionally omitted <==
Genesis Resources 2018 Highlights – Metallurgical Studies – AMEC FW Ltd Testwork by Wardell International (UK)
==> picture [674 x 441] intentionally omitted <==
Genesis Resources 2018 Highlights – Metallurgical Studies – AMEC FW Ltd Testwork by Wardell Armstrong International (UK)
| Maricanski LG 6.296 30.2 62.2 106 10.54 0.238 2.71 |
||||||
|---|---|---|---|---|---|---|
| Parameter | Unit | Plavica LAT |
Plavica CRY |
Maricanski SVG |
Maricanski LG |
|
| Crushing Work Index | ||||||
| Value | kWh/t | 9.134 | 6.686 | 7.178 | 6.296 | |
| Uniaxial Compressive Strength | ||||||
| Average | MPa | 45.8 | 39.8 | 61.2 | 30.2 | |
| Maximum | MPa | 147.0 | 89.1 | 130.0 | 62.2 | |
| Bond Ball Mill Work Index | ||||||
| Closingscreen size | µm | 106 | 106 | 106 | 106 | |
| BWI | kWh/t | 12.89 | 12.96 | 12.55 | 10.54 | |
| Abrasion Index | ||||||
| Value | 0.495 | 0.226 | 0.676 | 0.238 | ||
| Ore Specific Gravity | ||||||
| Average | 2.72 | 2.70 | 2.80 | 2.71 | ||
Genesis Resources 2018 Highlights – ESIA Studies – Guidance by Golders UK Water Monitoring of:
-
Plavica and Maricanski Rid Drill holes
-
Old Wells - Surface Points
==> picture [375 x 441] intentionally omitted <==
==> picture [368 x 242] intentionally omitted <==
Genesis Resources 2018 Highlights – ESIA Studies – Guidance by Golders UK Household Surveys. Overall, very positive response from the Community.
==> picture [345 x 258] intentionally omitted <==
==> picture [417 x 313] intentionally omitted <==
Genesis Resources 2019 Planned Work
-
Complete Mining Study for Macedonian Government.
-
Publish results of Feasibility Studies (ASX)
-
Continue collection of base-line climatic and social / community data. ESIA.