Geological Presentation by James Patterson, Exploration Manager, Macedonia Annual General Meeting 25 November 2013
DISCLAIMER
All persons should seek appropriate professional investment advice in reviewing or considering this presentation and all other information with respect to Genesis Resources Limited ( Genesis or the Company ), its business, financial performance and operations. Neither the provision of this presentation nor the information contained therein, or any associated communication to any person should be taken as constituting financial advice regarding the purchase or dealing of shares in Genesis. This presentation does not purport to provide all information that might reasonably be required to complete a detailed assessment of Genesis. Individuals should conduct their own investigation of investment and financial parameters relevant to their personal requirements for investment purposes.
The presentation may contain forward looking statements regarding the intentions of the Company, and these will be affected by movements in share markets, commodity prices and many other factors beyond the control of the Company. Forward-looking statements include, but are not limited to, statements concerning Genesis’s planned exploration programs and other statements that are not historical facts. Although Genesis believes that its expectations reflected in these forwardlooking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements
The presentation must be considered in the light of these uncertainties and investments in Genesis should be considered as speculative in nature. The presentation is not a prospectus or similar disclosure document and does not constitute an invitation to apply for shares.
Statements relating to potential quantity and grades of exploration targets in this presentation are conceptual in nature as there has been insufficient exploration to define a mineral resource and it is uncertain whether further exploration will result in the determination of a Mineral Resource.
COMPETENT PERSON
The information in this report that relates to exploration activity and results was compiled by Mr James Patterson who is a Permanent Employee of Genesis Resources and is a Member of the Australasian Institute of Geoscientists. Mr Patterson has sufficient experience relevant to the styles of mineralisation and to the activities which are being reported to qualify as a Competent Person as defined by the JORC Code, 2004. Mr Patterson consents to the release of the information compiled in this report in the form and context in which it appears.
Plavica High Sulphidation Epithermal Gold (+ Ag + Cu) Project Update November 2013 Enargite - Pyrite James Patterson, Exploration Manager, Macedonia.
Laminated Ash Tuffs
Plavica Project November 2013
==> picture [472 x 292] intentionally omitted <==
13 Soil Anomalies 68 Rocks Collected
Stroimanci Silica ledges and breccia 5 holes drilled
Borovic. Large Alteration System. 4 holes drilled.
Plavica Resource Drill Out with 3 Rigs. 97 RC and 49 DD Holes FFS nearing completion
Pleshinci
==> picture [97 x 136] intentionally omitted <==
Native sulphur and Silica ledges 2 holes drilled
Zarapinci. 24 Streams and 36 rocks completed 3 holes drilled
Kitka Alteration zone 1 hole drilled
2013 Drilling.
RC 96 Holes for 18,376m @ USD $66/m = $1.21M DD 51 Holes for 17,870m @ USD $137/m = $2.49M Total for drilling and assays = USD $4.8M approx.
==> picture [720 x 435] intentionally omitted <==
----- Start of picture text -----
RC Surveys
Forecast.
No drillers Achieved with
only 1 rig
----- End of picture text -----
Plavica Development. State Holes 1980’s. Vertical, unreliable Au assays
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
ZB81, ZB80, ZB64
No Significant Results
Outline of Main
Ore Body
ZB65: 20m @
1.2 from 100m
ZB68: 10m @
0.4 from 10m
----- End of picture text -----
Plavica Project Nov 2013 Old State assays
State Assays
1 g/t Au 0.7 to 1 g/t Au 0.5 to 0.7 g/t Au 0.3 to 0.5 g/t Au 0.1 to 0.3 g/t Au < 0.1 g/t Au Rio Tinto check Assays
Plavica Development: Rio Tinto, 1998, 4 Core Holes
PLV002: 19m @ 0.6 g/t Au from 29m and 70m @ 1.2 g/t Au from 80m uncut
==> picture [134 x 126] intentionally omitted <==
==> picture [472 x 292] intentionally omitted <==
Plavica Development: EMC 2002, 5 Core Holes
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
PLV007: Not
assayed
PLV005: 13m @ 0.5 g/t Au
from 12m
21m @ 1.1 g/t Au from 67m
7m @ 1.0 g/t Au from 98m
32m @ 1.1 g/t Au from 140m
----- End of picture text -----
Plavica Devolpment: Genesis 2011: 13 Core Holes
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
PLV0011: 189m @ 0.6 g/t Au PLV0019: 84m @ 0.8 g/t Au
from 137m uncut from 18m uncut
----- End of picture text -----
Plavica Development: Genesis 2012: 3 DD, 23 RC Holes, many with Azi 150
DDP006: 7m @ 2.64 g/t Au from 190m 3m @ 26.40 g/t Au from 205m 5m @ 22.15 g/t Au from 214m (incl. 1m @ 76.5 g/t Au from 214m)
Plavica Development: Genesis 2013: 26 DD, 88 RC Holes (to Nov 2013)
New Zone. Deep. High in Ag and PNDD031: 22m @ 2.71 g/t base metals Au from 127m PNDD013: 12m @ 1.35 g/t Au from 40m 38m @ 1.07 g/t Au from 80m PNDD017: 9m @ 1.47 g/t Au from 148m 18m @ 1.71 g/t Au from 210m 15m @ 1.87 from 179m 17m @ 1.19 from 304m
==> picture [168 x 164] intentionally omitted <==
==> picture [179 x 94] intentionally omitted <==
----- Start of picture text -----
Maricanski Rid
PNRC068
Awaiting More
Assays
----- End of picture text -----
Plavica Development: Genesis 2013: Results Pending (orange collars)
==> picture [720 x 490] intentionally omitted <==
----- Start of picture text -----
Landowner issues
Currently Drilling.
Testing Au zone
from previous
State Drilling
Maricanski Rid
Awaiting More
Assays
----- End of picture text -----
Plavica. Increased understanding of controls on Mineralisation
Laminated Ash Tuff PNDD005
==> picture [363 x 274] intentionally omitted <==
Diatreme Breccias PNDD026
==> picture [720 x 540] intentionally omitted <==
----- Start of picture text -----
Plavica
Old U / G Workings
Old Surface Workings
Hole drilled 2013 Results Received
Hole drilled, results pending
Hole drilled, results reported 04.10.2013
2013 Planned Hole
PLV004
Old Hole Rio Tinto
Maricanski Rid
Vuggy Silica
Andesite
Fault
Creek
Section 7300E
Section 7400E
Section 7000E
----- End of picture text -----
==> picture [412 x 101] intentionally omitted <==
----- Start of picture text -----
PNDD004: 46m @ 0.97 g/t Au from
Section 7400E
0m, 31m @ 1.58 g/t Au from 50m
PNRC003
PNRC006
PNRC007
----- End of picture text -----
1 g/t Au 0.7 to 1 g/t Au Section 7400E 0.4 to 0.7 g/t Au PNRC003 0.2 to 0.4 g/t Au < 0.2 g/t Au >1 % Cu 0.5 to 1 % Cu 0.3 to 0.5% Cu < 0.3 % Cu
==> picture [157 x 152] intentionally omitted <==
PNRC003: 44m @ 2.67 g/t Au from 0m,
PNRC007: 20m @ 1.66 g/t Au from 187m
N
Currently drill testing
S
==> picture [291 x 187] intentionally omitted <==
----- Start of picture text -----
1 g/t Au
0.7 to 1 g/t Au Section 7300E
0.4 to 0.7 g/t Au
0.2 to 0.4 g/t Au
< 0.2 g/t Au
>1 % Cu
0.5 to 1 % Cu
0.3 to 0.5% Cu
< 0.3 % Cu
PNRC001A: 38m @
2.07 g/t Au, from 0m,
----- End of picture text -----
==> picture [77 x 12] intentionally omitted <==
----- Start of picture text -----
PNRC001A
----- End of picture text -----
==> picture [156 x 152] intentionally omitted <==
==> picture [245 x 70] intentionally omitted <==
----- Start of picture text -----
PNDD005: 21m @ 1.51 g/t Au from 58m,
22m @ 1.16 g/t Au from 152m
25m @ 0.72 g/t Au from 179m
----- End of picture text -----
PNRC012: 31m @ 1.69 g/t Au, 16 g/t Ag, 0.36 % Cu from 172m
N
S
N
1 g/t Au 0.7 to 1 g/t Au 0.4 to 0.7 g/t Au 0.2 to 0.4 g/t Au < 0.2 g/t Au >1 % Cu 0.5 to 1 % Cu 0.3 to 0.5% Cu < 0.3 % Cu
Section 7000E
==> picture [171 x 164] intentionally omitted <==
PNRC086: Results Pending
PNRC064: Terminated in bad ground. To be re-drilled.
PNDD013: 15m @ 1.17 g/t Au, 0.32 % Cu from 37m, 38m @ 1.02 g/t Au, 0.44% Cu from 80m, 18m @ 1.71 g/t Au, 0.46% Cu from 210m
S
Maricanski Rid First RC Hole
==> picture [720 x 508] intentionally omitted <==
----- Start of picture text -----
PNRC069: Results PNRC068: 46m @ 1.59
Pending g/t Au from 29m
State Hole S001: Rio
Rio Tinto PLV4: 101m @
Tinto Re-assays: 53.5m
0.7 g/t Au (un-cut)
@ 0.75 g/t Au
> 1 g/t Au
0.7 to 1 g/t Au
0.4 to 0.7 g/t Au
0.2 to 0.4 g/t Au
< 0.2 g/t Au
----- End of picture text -----
Gold. Gram-metres in Drilling. Nov 2013.
==> picture [720 x 486] intentionally omitted <==
----- Start of picture text -----
Outline of Main
Ore Body
Maricanski Rid
----- End of picture text -----
Copper. Percent-metres in Drilling. Nov 2013.
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
High Cu Area
----- End of picture text -----
Silver. Gram-metres in Drilling. Nov 2013.
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
Outline of Main
Ore Body
----- End of picture text -----
Lead + Zinc. Percent-Metres in Drilling. Nov 2013.
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
High Pb, Zn, Ag
Zone
----- End of picture text -----
Plavica Project November 2013 Opportunities – Porphyry Potential
-
Many HS Epithermal Systems are associated with underlying Porphyries
-
• Examples: Lepanto (Philippines, below), Tujuh Bukit (Indonesia), Bor (Serbia)
==> picture [610 x 415] intentionally omitted <==
Plavica Project November 2013 Porphyry Potential? – Magnetite veins
==> picture [360 x 478] intentionally omitted <==
==> picture [360 x 478] intentionally omitted <==
MRDD005: Sheeted veins
==> picture [472 x 292] intentionally omitted <==
Copper. Percent-metres in Drilling. Nov 2013.
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
High Cu Area
----- End of picture text -----
Molybdenum. PPM-metres in Drilling. Nov 2013.
==> picture [720 x 489] intentionally omitted <==
----- Start of picture text -----
High Moly Zone.
Corresponds with Cu.
Porphyry at Depth?
----- End of picture text -----
Bismuth. PPM-metres in Drilling. Nov 2013.
==> picture [720 x 487] intentionally omitted <==
----- Start of picture text -----
Bismuthinite? High S Ep?
High Bismuth. Corresponds
with Cu / Mo. Porphyry at
Depth?
----- End of picture text -----
FFS Progress.
Study |
October | October | **November ** | **November ** | December | December | January | January | February | February | March | March |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Geomechanics | ||||||||||||
| Hydrogeology | ||||||||||||
| Ore Mineralogy | ||||||||||||
| Environmental | ||||||||||||
| Geotechnical | ||||||||||||
| Oxide Metallurgy | ||||||||||||
| Sulphide Metallurgy | ||||||||||||
| Geology | ||||||||||||
| Block Modelling | ||||||||||||
| Land Use Survey | ||||||||||||
| Elaborate | ||||||||||||
| MiningPreFeasibility | ||||||||||||
| Dust Monitors | Piezometer | Free Au in Quartz- Limonite matrix |
PNDD004: 24.7m. Oxide Ore
==> picture [102 x 36] intentionally omitted <==
----- Start of picture text -----
Limonite
----- End of picture text -----
==> picture [142 x 45] intentionally omitted <==
----- Start of picture text -----
Goethite
----- End of picture text -----
==> picture [160 x 66] intentionally omitted <==
----- Start of picture text -----
Quartz
----- End of picture text -----
PNDD002: 97.5m. Primary Ore
Enargite
Gold
Pyrite
PNDD002: 411.4m. Primary Ore
==> picture [659 x 292] intentionally omitted <==
----- Start of picture text -----
Galena
Gold
----- End of picture text -----
Regional Drilling
==> picture [472 x 292] intentionally omitted <==
Stroimanci
Large alteration Area = Orange Colour 1 km grid
==> picture [616 x 497] intentionally omitted <==
Stroimanci
Diatreme Breccia Similar to Plavica
Red coloured creek due to presence of abundant sulphides
==> picture [405 x 540] intentionally omitted <==
Stroimanci STD002
==> picture [315 x 420] intentionally omitted <==
Pleshinci
Native sulphur along Major creek. 2 silica ledges discovered on recent field visit
==> picture [502 x 492] intentionally omitted <==
Pleshinci
2 Holes drilled. Abundant Si-Cy-Lim Alteration Results pending.
==> picture [375 x 499] intentionally omitted <==
==> picture [331 x 441] intentionally omitted <==
Silica Cap along ridge
Zarapinci 3 Holes Drilled Limonitic (after sulphides) breccia
==> picture [472 x 292] intentionally omitted <==
2014 Plan Moving Forward
==> picture [33 x 46] intentionally omitted <==
==> picture [33 x 46] intentionally omitted <==
-
Submit FFS
-
Earn 62% and get Plavica Exploitation Licence
-
Extend 5 other Exploration Licences by 2 years
-
• Extend Plavica Tenement to East
-
Re-do Inferred Resource using 2013 results
-
• Drill Out Plavica Resource to 50m X 50m
-
• Extend Plavica Resource
-
Further drilling at Maricanski Rid
-
• New office and coreshed in Probistip after April
-
• Large geophysical (IP) and geochemical surveys over southern and western tenements. Follow up drilling.
-
• Tender for other areas
-
Start work on Mining Study for Mak Govt.
-
• Employ Mining Engineer
-
• PFS / BFS
2014 Further Work
==> picture [720 x 483] intentionally omitted <==
----- Start of picture text -----
Hill to SE
Untested
----- End of picture text -----
Lehovo, SW Bulgaria
==> picture [720 x 483] intentionally omitted <==
----- Start of picture text -----
0.7m @ 17.35 g/t
Au & 23.0 g/t Ag
from 190m
----- End of picture text -----
2014 Proposed Budget incl wages = USD $7.4M
==> picture [720 x 485] intentionally omitted <==
----- Start of picture text -----
||||||
|---|---|---|---|---|
|Unit|
|Item|Units|Cost|Cost USD|
|Plavica Infill DD Drilling|(m)|14,000|140|1,960,000|
|Plavica Infill RC Drilling|(m)|10,000|66|660,000|
|Maricanski Rid DD Drilling|(m)|7,500|140|1,050,000|
|Regional Drilling|(m)|5,000|100|500,000|
|Assays|36,500|30|1,095,000|
|Geophysics (IP)|100,000|
|Geochemistry|4,000|30|120,000|
|Earthworks|300,000|
|Transport|15|3,000|45,000|
|Customs|4|25,000|100,000|
|Diesel (per week)|32|10,000|320,000|
|Total|6,250,000|
----- End of picture text -----
-ENDS-
==> picture [472 x 292] intentionally omitted <==