Wednesday, 1 March 2007

Company Announcements ASX Limited

New drilling program to commence in the June Quarter following excellent gold results at WCP's Airport Project

Highlights:

  • RC drillhole WRC018 returns significant gold mineralisation of 3 metres at 6.93 g/t gold from a new structure interpreted to extend for over 200 metres along strike in the hangingwall to the existing gold resource at Whistler.
  • Assay results from the deeper diamond portion of WRC018 designed to test the extension of the Whistler resource at depth are pending and will be released thereafter.
  • An initial stage of extension drilling at Rosie has confirmed continuation of the gold mineralisation to depth with best results of 5 metres at 2.72 g/t gold and 1 metre at 12.65 g/t gold.

The Directors of WCP Resources Ltd ("WCP") (ASX Codes: WCP, WCPO) are pleased to announce the results of the recently completed drilling program at the Airport and Barrelmaker gold projects, Western Australia (Figure 1). The projects form part of a joint venture with Gateway Mining NL and are located within the Gum Creek Greenstone Belt that historically has produced in excess of 1.5 million ounces of gold.

WCP's Executive Director Levi Mochkin said "our strategy of drilling deeper into gold-bearing systems previously targeted for their shallow and oxidized potential has been successful. Not only has the drilling in the very least confirmed an existing resource at Whistler, it has discovered additional mineralization within its hangingwall. The results from detailed assaying of drilling at the nearby Rosie North Project are also encouraging and we intend to carry out a resource estimate to further increase the Company's resource inventory in this area. The close proximity of any resource defined within our tenement package to the Gidgee Gold Treatment Plant further enhances the value of undertaking this work.

WCP Resources Ltd ABN 50 002 664 495

Level 1, 161 Sussex Street Sydney NSW 2000

Ph: +61 2 9248 6900 Fax: +61 2 9262 1559 Email: [email protected]

www.wcpresources.com.au

This announcement summarises the results of individual 1 metre samples that were selected based on the results of an initial 5 metre composite sampling program. Note that all intercepts are downhole measurements and are not necessarily indicative of true width as the holes may have intercepted the mineralisation obliquely.

Whistler Pit - Airport Project

Two holes, comprising reverse circulation ("RC") pre-collars and diamond tails were drilled into (WRC017) and beneath (WRC018) an existing Inferred Resource (polygonal) of 106,000 tonnes @ 7.5 g/t gold (uncut) or approximately 25,600 ounces above a 3 g/t cut off at Whistler1. This resource lies beneath the Whistler Pit that was one of five shallow pits mined for near-surface oxidised gold ore by previous owners and from which approximately 100,000 ounces of gold was produced.

As announced previously, Hole WRC017 was drilled as an infill hole designed to validate the existing resource and intersected a broad zone of 22 metres at 14.94 g/t gold. Included within this intercept is a very high grade zone consisting of 9 metres at 33.82 g/t gold.

Hole WRC018 was drilled as a resource extension hole testing the downward continuation of the system and successfully traversed the target stratigraphy. While the assay results are pending for the deeper diamond portion of WRC018, a new zone of mineralisation comprising 3 metres at 6.93 g/t gold (previously reported as 10 metres at 1.44 g/t gold from the 5 metre composite samples) was detected within the metavolcanic rocks that form the hangingwall to the main zone (Table 1). This zone is interpreted to coincide with an existing intercept of 3 metres at 7.7 o/t gold from 134 metres downhole depth located some 200 metres further to the north, and warrants follow-up drilling to determine its potential to develop into a sub-parallel zone and potentially increase the resource inventory at Whistler.

All police in the required and the ground catolic.
Easting Northing Azimuth/dip Hole_id Depth_from Depth to Intercept Gold Sample
(m) (m) (dearees). (m) (m) (m) (q/t)
751635 6967960 2707-60 WRC018 96 97 2.69 RC.
WRC018 98 101 6.93 RC
WRC018 179.1 226.0 Assays pending Diamond

Table 1. Results of drilling undertaken by WCP Resources Ltd at Whistler Pit of the Airnort Droiact Composited at a 1 0 olt Au cutoff)

Rosie North - Airport Project

RC drilling comprising 6 holes for a combined 1.224 metres has been conducted to test the downward continuation of significant intercepts within the northern extension of the mineralised structure mined by others at Rosie Castle.

The drilling successfully traversed the target zones with the best results consisting of 5 metres at 2.72 g/t gold in WRC08 and 1 metre at 12.65 g/t gold in WRC011. Table 2 summarises all gold assay results composited above a 1.0 g/t cutoff. Work is underway assessing these results in the context of the earlier gold-mineralised intercepts with a view to determining whether there is sufficient data to estimate an Inferred Resource at Rosie North and its hanging wall structure. Further infill and extension drilling will be undertaken (if warranted) ahead of a estimating the Rosie North resource scheduled to be completed during the October Quarter 2007.

Easting Northing Azimuth/dip Hole_id Depth_from Depth_to Intercept Gold Sample
(m) (m) (degrees) (m) (m) (m) (g/t)
751350 6964850 270/-60 WRC08 70 75 5 2.72 RC
WRC08 90 95 5 1.07 RC
WRC08 140 145 5 1.34 RC
751350 6964950 $270/-60$ WRC09 63 64 1 1.66 RC
WRC09 94 95 Ĩ 1.33 RC.
WRC09 132 133 Ĩ 2.93 RC
WRC09 163 164 Ĩ 1.16 RC
751400 6964900 270/-60 WRC010 36 37 1 1.40 RC
WRC010 39 40 Ĩ 1.01 RC.
WRC010 181 182 T 3.99 RC
WRC010 215 216 Ĩ 1.11 RC
WRC011 17 18 Ĩ 1.48 RC.
751312 6965000 $270/-60$ WRC011 78 80 $\overline{2}$ 2.92 RC
WRC011 88 89 1 12.65 RC
WRC011 112 116 4 2.13 RC
WRC011 120 122 2 1.27 RC
751455 6965000 $270/-60$ WRC012 21 22 1 3.46 RC
WRC012 54 56 $\overline{2}$ 4.79 RC
WRC012 80 81 1 9.16 RC.
WRC012 130 131 Ĩ 1.20 RC
WRC012 135 136 Ĩ 1.26 RC
WRC012 142 143 1 3.13 RC
WRC012 144 145 Ĩ 1.12 RC
WRC012 158 159 Ĩ 1.75 RC
751400 6965100 270/-60 WRC013 78 79 1 1.02 RC
WRC013 216 217 1 5.41 RC.
WRC013 263 264 Ĩ 1.32 RC

Table 2. Results of drilling undertaken by WCP Resources Ltd at the Rosie north Prospect of the Airport Projects (composited at a 1.0 g/t Au cutoff).

Legendre Prospect - Barrelmaker Project

RC drilling comprising 7 holes for a combined 1,377 metres has been conducted to test the source of a large 600 metre by 600 metre surface gold anomaly that is coincident with the underlying Bolger Well shear zone at the Legendre Prospect. Shallow rotary air blast ("RAB") drilling undertaken by others has returned significant gold mineralisation including 20 metres at 1.75 g/t gold and 5 metres at 1.66 g/t gold.

The drilling successfully traversed the target zones with the best results consisting of 2 metres at 1.87 g/t gold in hole WRC02; 3 metres at 1.23 g/t gold in WRC03 and 1 metre at 5.70 g/t gold in WRC04 (see Table 3 for complete summary of results).

Further work is warranted to better understand the source of the significant surface geochemical anomaly that coincides with a prospective location along the regional Bolger Well shear zone.

rospect or and partemiaker i roject (composited at a riv gri ka caton).
Easting
(m)
Northing
(m).
Azimuth/dip Hole_id
(degrees)
Depth_from
(m)
Depth_to Intercept
(m)
(m) Gold
(g/t)
Sample
734600 6972800 360/-60 WRC02 $\overline{2}$ 4 $\overline{2}$ 1.87 RC.
WRC02 62 63 1.42 RC.
734600 6972700 360/-60 WRC03 3 6 3 1.23 RC.
WRC03 43 45 2 1.25 RC.
734600 6972600 360/-60 WRC04 41 42 3.22 RC.
WRC04 43 44 1 5.70 RC.
WRC04 46 47 Ĩ 1.05 RC.
WRC04 49 50. 1.98 RC.
WRC04 51 52 Ţ 1.56 RC.
WRC04 53 54 2.21 RC.
WRC04 98 99. 1.16 RC.
724700 6972650 360/-60 WRC06 124 125 Ĩ 2.25 RC.
WRC06 127 128. 1 1.51 RC.
724700 6972555 360/-60 WRC07 40 41 2.05 RC.
WRC07 67 68 1.53 RC.

Table 3. Results of drilling undertaken by WCP Resources Ltd at the Legendre Prospect of the Barrelmaker Project (composited at a 1.0 g/t Au cutoff)

For further information, contact: Mr Levi Mochkin

Executive Director. WCP Resources Ltd Telephone: +61 2 9248 6900

Competent Person Declaration

The information in this document that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Gavin Daneel, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Daneel has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Daneel, who is a full-time employee of the Company, consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Note: 1 Whistler Resource Source-Gateway 2005 Annual Report. The resource estimate for Whistler deposit has been undertaken by Mr Gary Brabham of Hellman & Schofield Pty Ltd. Mr Brabham is a corporate member of the AusIMM. He has sufficient experience relevant to the style on mineralisation and type of deposit under consideration and to the activity which he is undertaking. to qualify as a Competent Person as define in the 1999 release of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves".

Figure 1. Summary geological map showing drill hole locations and significant gold intercepts at the Airport Project, Gum Creek Greenstone Belt, Western Australia.