AI assistant
FRONTIER LITHIUM INC. — Capital/Financing Update 2023
Sep 25, 2023
44269_rns_2023-09-25_0b1a2769-f046-46c0-8d7b-0bd42552cc4a.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [87 x 32] intentionally omitted <==
FRONTIER LITHIUM INTERSECTS 108.4M OF 2.12% Li2O ON THE SPARK PEGMATITE AND ISSUE STOCK OPTIONS
SUDBURY, ON, Sept. 25, 2023 /CNW/ - Frontier Lithium Inc. (TSXV: FL) (FRA: HL2) (OTCQX: LITOF) ("Frontier" or "the Company"), one of Ontario's leading lithium exploration companies, is pleased to announce results from the 4 holes drilled on the Spark pegmatite in 2023, in addition to channel sampling results on what may be a potential western extension of the Spark deposit, situated 1 km away.
Highlights
-
DDH PL-133-23 extends a high-grade NW zone of the Spark pegmatite 90 metres ("m") west, intersecting 108.4m of continuous pegmatite averaging 2.12% Li2O.
-
Including 7.6m from 408.9 to 416.5m averaging 3.58% Li2O
-
Including 6.1m from 482.5 to 488.5m averaging 3.16% Li2O
-
Including 4.2m from 498.0 to 502.2m averaging 3.36% Li2O
-
DDH PL-100-23 intersects 134.3m of continuous pegmatite, averaging 1.27% Li2O. Including 16.6m from 65.8 to 82.4m averaging 2.09% Li2O
-
Including 49.2m from 96.3 to 145.5m averaging 2.25% Li2O
-
Channel samples CH-52 and CH-53 located on an outcrop 1 km west along strike of the Spark deposit returned a combined 18.0m of pegmatite averaging 2.16% Li2O
-
Including 6m averaging 3.27% Li2O
"The most recent findings consistently indicate the possibility of expanding the Spark resource both at greater depths and along the geological strike." says Garth Drever, VP Exploration of the Company. "We are excited about delving deeper into the newly discovered Spark Extension, which has yielded high-grade channel sample values. Although its early stage, there are strong similarities with the high-grade intersection in hole PL-133-23 and the Spark extension channels. Exploring potential connection to the primary Spark deposit is one of our objectives for 2024."
During the spring season, PL-100-23, PL-101-23, and PL-102-23 were drilled on the SW pod of the main Spark pegmatite with the objective of upgrading material near surface to the indicated category. The results suggest that the pod primarily consists of aplite with varying lithium grade throughout. Unfortunately, drilling of PL-102-23 had to be halted as it approached the higher-grade zone due to warming weather conditions. There are plans to resume drilling in this hole during the upcoming winter season.
Additionally, PL-133-23 was stepped out 90m to intersect the Spark pegmatite at greater depth, confirming a steep NW plunge and expanding the high-grade lithium zone. This zone with elevated assay values give hope that it may be approaching a more evolved section of the pegmatite representing a higher level of fractionation and the potential for a tier 1 technical grade zone similar to the PAK deposit.
Figure 1 is a plan-view map highlighting the Spark deposit and nearby Spark Extension to the west. Drillhole traces are displaying major lithological features for all holes and surface channels plus lithium assay results that have been released. Figure 2 is a 3D rendering from the Pre-Feasibility
Study Spark model with transparency showing drill hole traces and details on the 4 holes being reported.
==> picture [156 x 241] intentionally omitted <==
Figure 1: Planview map highlighting the four 2023 holes drilled at Spark and the two channels cut at the Spark Extension to the west. (CNW Group/Frontier Lithium Inc.)
==> picture [241 x 238] intentionally omitted <==
Figure 2: Spark model showing drill hole and channel traces and detail for the 4 holes reported. (CNW Group/Frontier Lithium Inc.)
Table 1 details the drill holes and channels with mineralized intersections from the Spark area while Tables 2 and 3 respectively summarize all drill holes completed at Bolt and Spark and the channels completed at the Spark Extension in 2023.
Table 1: Summary of 2023 Drill Hole and Channel Intersections at Spark
| DDH PL-100-23 | Collared in between PL-055-22 and PL-056-22, hole was stepped back 10m to convert material from inferred to indicated on the SW pod of the Spark pegmatite; results were as expected |
|---|---|
| Zone | From (m) To (m) Width (m) Li2O (%) Cs2O (%) Ta2O5 (ppm) Nb2O5 (ppm) SnO2 (ppm) Rb2O (%) Unit |
| Li-Enriched | 27.2 | 161.5 | 134.3 | 1.27 | 0.012 | 59 | 106 | 50 | **0.21 ** | Aplite |
|---|---|---|---|---|---|---|---|---|---|---|
| including | 65.8 | 82.4 | 16.6 | 2.09 | 0.009 | 51 | 87 | 51 | 0.11 | Aplite |
| including | 96.3 | 145.5 | 49.2 | 2.25 | 0.009 | 37 | 71 | 36 | 0.15 | Aplite |
DDH PL-101-23 Collared 46m W of PL-100-22, hole was designed to convert material from inferred to indicated on the SW pod of the Spark pegmatite; results were as expected
| DDH PL-101-23 | Collared 46m W of PL-100-22,hole was designed to convert material from inferred to indicated on the SWpod of the Sparkpegmatite;results were as expected | Collared 46m W of PL-100-22,hole was designed to convert material from inferred to indicated on the SWpod of the Sparkpegmatite;results were as expected |
|---|---|---|
| Zone From (m) To (m) Width (m) Li2O (%) Cs2O (%) Ta2O5 (ppm) Nb2O5 (ppm) SnO2 (ppm) Rb2O (%) Unit |
||
| Li-Enriched 9.9 54.4 44.5 1.79 0.011 56 75 39 0.14 Aplite including 18.0 52.6 34.6 2.24 0.009 49 59 32 0.12 Aplite Aplite Zone 68.3 90.3 22.0 0.21 0.012 80 91 48 0.14 Aplite Li-Enriched 106.0 170.9 64.9 1.08 0.013 76 123 52 0.27 Aplite including 111.2 144.6 33.4 1.80 0.011 68 110 49 0.20 Aplite |
||
| Total Pegmatite | 131.3 1.18 0.012 70 101 47 0.20 Aplite |
Collared 60m west of PL-101-22, hole was stepped out along strike to test the extension of the SW Spark pegmatite pod. Results show that the pegmatite is still DDH PL-102-23 open, although the spodumene content is starting to diminish. The hole had to be stopped prematurely due warming weather and thawing conditions, with plans to re-enter the hole next drill program. The last 4m of the hole hit 3.04% LiO2.
| DDH PL-102-23 | Collared 60m west of PL-101-22, hole was stepped out along strike to test the extension of the SW Spark pegmatite pod. Results show that the pegmatite is still open, although the spodumene content is starting to diminish. The hole had to be stopped prematurely due warming weather and thawing conditions, with plans to re-enter the hole next drillprogram. The last 4m of the hole hit 3.04% LiO2. |
|---|---|
| Zone From (m) To (m) Width (m) Li2O (%) Cs2O (%) Ta2O5 (ppm) Nb2O5 (ppm) SnO2 (ppm) Rb2O (%) Unit |
|
| Pegmatite zone 23.1 26.0 2.9 0.22 0.017 57 128 212 0.41 Pegmatite Pegmatite zone 55.1 61.4 6.3 0.08 0.008 99 103 80 0.13 Pegmatite Aplite zone 64.5 105.0 40.5 0.25 0.011 89 152 68 0.26 Aplite-Pegmatite Aplite zone 127.6 174.0 46.4 0.70 0.012 65 105 77 0.30 Aplite including 170.0 174.0 4.0 3.04 0.005 31 51 25 0.15 Aplite |
Collared 90m west of PL-099-23, PL-133-23 was stepped out to test the strike extent of the recently discovered NW portion of the Spark pegmatite which DDH PL-133-23 appears to be plunging steeply in the NW direction. Results have extended the zone westward and have confirmed that it contains elevated levels of Li relative to the rest of the deposit. These elevated assay values indicate that this zone may represent the footwall of the pegmatite
| DDH PL-133-23 | DDH PL-133-23 | Collared 90m west of PL-099-23, PL-133-23 was stepped out to test the strike extent of the recently discovered NW portion of the Spark pegmatite which appears to be plunging steeply in the NW direction. Results have extended the zone westward and have confirmed that it contains elevated levels of Li relative to the rest of the deposit. These elevated assayvalues indicate that this zone mayrepresent the footwall of thepegmatite |
Collared 90m west of PL-099-23, PL-133-23 was stepped out to test the strike extent of the recently discovered NW portion of the Spark pegmatite which appears to be plunging steeply in the NW direction. Results have extended the zone westward and have confirmed that it contains elevated levels of Li relative to the rest of the deposit. These elevated assayvalues indicate that this zone mayrepresent the footwall of thepegmatite |
|---|---|---|---|
| Zone From (m) To (m) Width (m) Li2O (%) Cs2O (%) Ta2O5 (ppm) Nb2O5 (ppm) SnO2 (ppm) Rb2O (%) Unit |
|||
| Pegmatite Zone Including Including Including Including Including |
399.6 508.0 108.4 2.12 0.030 107 79 123 0.44 Pegmatite-Aplite 408.9 416.5 7.6 3.58 0.014 31 20 35 0.13 Pegmatite-Aplite 425.6 433.1 7.5 2.31 0.030 95 77 212 0.49 Pegmatite-Aplite 451.7 454.6 2.9 3.04 0.023 147 85 70 0.25 Pegmatite-Aplite 482.5 488.5 6.1 3.16 0.015 99 34 69 0.17 Pegmatite-Aplite 498.0 502.2 4.2 3.36 0.024 46 16 47 0.28 Pegmatite-Aplite |
||
| CH-52 | Located 1km NW of the Spark deposit, CH-52 was channeled on an LCT pegmatite outcrop to confirm the grade and texture. The 10x15m sized outcrop is thought to bepart of apotential extension of the Sparkpegmatite. Assayresults are encouraging. |
||
| Site | Zone | From (m) To (m) Width (m) Li2O (%) Cs2O (%) Ta2O5 (ppm) Nb2O5 (ppm) SnO2 (ppm) Rb2O (%) Unit |
|
| Spark **Extension ** |
LI-Enriched 0.0 8.0 8.0 2.38 0.004 91 96 72 0.13 Pegmatite-Aplite |
| CH-53 | CH-53 | Channeled on the same outcrop as CH-52 approximately 7m to the west, CH-53 was cut to confirm the grade and texture of the outcrop. Assay results are encouraging |
|---|---|---|
| Site | Zone | From (m) To (m) Width (m) Li2O (%) Cs2O (%) Ta2O5 (ppm) Nb2O5 (ppm) SnO2 (ppm) Rb2O (%) Unit |
| Spark Extension |
LI-Enriched 0.0 10.0 10.0 1.98 0.001 77 83 15 0.02 Aplite including 0.0 6.0 6.0 3.27 0.002 76 87 22 0.04 Aplite |
Table 2: Summary of 2023 Drilling at Bolt and Spark
| DDHNo | DDHNo | Date | Drilled | UTM Zone 15N (NAD83) | UTM Zone 15N (NAD83) | UTM Zone 15N (NAD83) | **Collar Orient ** | **Collar Orient ** | Metres Drilled | Metres Drilled |
|---|---|---|---|---|---|---|---|---|---|---|
| Start | End | Easting | **Northing ** | (mASL) | Azim | Dip | Start | End | ||
| Spark - Phase XIII | PL-100-23 | 2023-03-24 | 2023-03-26 | 472,612 | 5,829,280 | 326.0 | 345 | -60 | 0 | 174.1 |
| PL-101-23 | 2023-03-26 | 2023-03-28 | 472,567 | 5,829,280 | 326.5 | 346 | -60 | 0 | 181.5 | |
PL-102-23 |
2023-03-28 | 2023-03-30 | 472,512 | 5,829,260 | 327.0 | 347 | -63 | 0 | 174.0 | |
| PL-133-23 | 2023-07-05 | 2023-07-14 | 472,443 | 5,829,345 | 327.0 | 346 | -64 | 0 | 550.5 | |
| Total | 1080.1 | |||||||||
| Bolt - Phase XIII | PL-103-231 | 2023-03-31 | 2023-04-02 | 473,126 | 5,829,159 | 344.0 | 41 | -43 | 0 | 203.5 |
| PL-104-231 | 2023-04-02 | 2023-04-03 | 473,096 | 5,829,215 | 340.6 | 45 | -45 | 0 | 163.5 | |
| PL-105-233 | 2023-04-03 | 2023-04-04 | 473,101 | 5,829,230 | 340.0 | 45 | 45 | 0 | 135.0 | |
| PL-106-233 | 2023-04-04 | 2023-04-07 | 473,101 | 5,829,234 | 338.3 | 354 | -44 | 0 | 360.0 | |
| PL-107-233 | 2023-04-08 | 2023-04-15 | 473,094 | 5,829,225 | 339.2 | 260 | -43 | 0 | 282.0 | |
| PL-108-233 | 2023-04-11 | 2023-04-13 | 473,095 | 5,829,228 | 338.6 | 300 | -45 | 0 | 246.0 | |
| PL-109-232 | 2023-04-16 | 2023-04-17 | 473,153 | 5,829,108 | 349.7 | 45 | -45 | 0 | 213.0 | |
| PL-110-232 | 2023-04-18 | 2023-04-19 | 473,204 | 5,829,033 | 350.0 | 48 | -45 | 0 | 211.5 | |
| PL-111-232 | 2023-04-20 | 2023-04-23 | 473,221 | 5,828,937 | 352.4 | 45 | -45 | 0 | 330.0 | |
| PL-112-232 | 2023-04-23 | 2023-04-25 | 473,284 | 5,828,901 | 357.3 | 45 | -46 | 0 | 248.0 | |
| PL-113-233 | 2023-04-25 | 2023-04-28 | 473,308 | 5,828,840 | 363.4 | 50 | -45 | 0 | 270.0 | |
| PL-114-233 | 2023-04-28 | 2023-05-02 | 473,390 | 5,828,822 | 368.2 | 44 | -46 | 0 | 320.0 | |
| PL-115-233 | 2023-05-02 | 2023-05-04 | 473,447 | 5,828,750 | 369.6 | 44 | -45 | 0 | 255.0 | |
| PL-117-233 | 2023-05-08 | 2023-05-11 | 473,487 | 5,828,685 | 373.0 | 46 | -44 | 0 | 250.4 | |
| PL-122-233 | 2023-05-26 | 2023-05-30 | 473,202 | 5,828,869 | 353.8 | 43 | -49 | 0 | 317.7 | |
| Total | 3805.6 |
Note 1: Results released in Press Release May 8th 2023 Note 2: Results released in Press Release August 10th 2023
Note 3: Results released in Press Release September 7th 2023
Table 3: Summary of 2023 Channeling on Spark Extension
| Channel | Channel | Date Samples | Date Samples | UTM Zone 15N(NAD83) | UTM Zone 15N(NAD83) | UTM Zone 15N(NAD83) | Orientation | Orientation | Metres Cut Start End |
Metres Cut Start End |
Smp |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Start Date | End Date | Easting | **Northing ** | (mASL) | Azim | Dip | Start | ||||
| Spark Extension | CH-52 | 2023-05-21 | 2023-05-21 | 471,355 | 5,829,922 | 333.0 | 154 | 0 | 0 | 8 | 8 |
| CH-53 | 2023-05-21 | 2023-05-22 | 471,348 | 5,829,923 | 332.1 | 170 | 2 | 0 | 10 | 13 | |
| Totals | 18 | 21 |
Issuance of Stock Options
The Company also announces that pursuant to its Stock Option Plan, which was approved by shareholders at the Company's annual general meeting of shareholders on September 13, 2023, 422,500 stock options have been granted to certain employees, officers, directors, and strategic advisors of the Company. The options are set for a period of five years, expiring on September 25, 2028, have an exercise price of $1.10, and are subject to regulatory and TSX Venture Exchange approval.
Due Diligence
All scientific and technical information in this release has been reviewed and approved by Garth Drever, P.Geo., the qualified person ("QP") under the definitions established by National Instrument 43-101 - Standards of Disclosure for Mineral Projects . Under Frontier's QA/QC procedures, all drilling was completed by Chenier Drilling Ltd. of Val Caron, Ontario using thin walled BTW drill rods (4.2 cm core diameter) and a Reflex ACT III oriented core system. Using the Reflex system, the drill core was oriented and marked as it was retrieved at the drill. A Reflex GYRO Sprint-IQ survey instrument was used every 50m downhole and again at the end of each hole when rods were pulled out. A Reflex North Finder APS unit was utilized to complete accurate positioning and orientation of the drill collar upon setup. The core was boxed and delivered to the Frontier core shack where it was examined, geologically logged, and marked for sampling. The core was photographed prior to sampling. Using a rock saw, the marked sample intervals were halved with one-half bagged for analysis. Sample blanks along with lithium, rubidium and cesium certified reference material was routinely inserted into the sample stream in accordance with industry recommended practices. Field duplicate samples were also taken in accordance with industry
recommended practices. The samples were placed in poly sample bags and transported to Red Lake, Ontario by float plane and then shipped to AGAT Laboratories Ltd. (AGAT) in Thunder Bay, Ontario for sample preparation and to Mississauga, Ontario for processing and quantitative multielement analysis. AGAT is an ISO accredited laboratory. The core is stored on site at the Company's Pakeagama Lake exploration camp.
About Frontier Lithium
Frontier Lithium Inc. (TSX-V: FL) (FRA: HL2) (OTCQX: LITOF) is a preproduction business with an objective to become an integrated strategic domestic supplier of spodumene concentrates for industrial users as well as battery-grade lithium hydroxide and other chemicals to the growing electric vehicle and energy storage markets in North America. The Company's sole project maintains the largest land position and resource in a premium lithium mineral district located in Ontario's Great Lakes region.
About the PAK Lithium Project
The PAK lithium project contains North America's highest-grade lithium resource and is the second largest in North America by size. The project encompasses close to 27,000 hectares and remains largely unexplored; however, since 2013, the company has delineated two premium spodumenebearing lithium deposits (PAK and Spark), located 2.3 kilometres apart. Exploration is continuing on the project through two other spodumene- bearing discoveries: the Bolt pegmatite (located between the PAK and Spark deposits), as well as the Pennock pegmatite (25 kilometres northwest of PAK deposit within the project claims). A 2023 Pre-Feasibility Study "National Instrument 43-101 Technical Report PFS PAK Lithium Project" by BBA E&C Inc., delivered a 24- year project life, delivering a post-tax NPV(8%) of US$1.74 billion and IRR of 24.1% as per the press release disseminated on May 31, 2023, and was filed on Sedar.com.
Cautionary Note Regarding Forward-Looking Statements
This press release contains statements that constitute "forward-statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Company's mineral properties, the mineralization and development of the Company's mineral properties, the Company's exploration program and other mining projects and prospects thereof. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change.
Readers are cautioned that any such forward-looking statements are not guarantees of future performance and those actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, please review the Company's public filings available on SEDAR+ at www.sedarplus.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
SOURCE Frontier Lithium Inc.
View original content to download multimedia: http://www.newswire.ca/en/releases/archive/September2023/25/c4246.html
%SEDAR: 00008434E
For further information: Company Contact Information: Bora Ugurgel, Senior Manager, Investor Relations, 2736 Belisle Drive Val Caron, ON. P3N 1B3 CANADA, T. +001 705.897.7622, F. +001 705.897.7618
CO: Frontier Lithium Inc.
CNW 13:00e 25-SEP-23