FREDONIA MINING INC.
Management’s Discussion & Analysis For the Year ended September 30, 2022
This Management Discussion and Analysis (“MD&A”) provides relevant information on the operations and financial condition of Fredonia Mining Inc. (“Fredonia” or the “Company”) for the year ended September 30, 2022. This MD&A should be read in conjunction with the audited consolidated financial statements for the years ended September 30, 2022 and 2021 prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board. All dollar values are expressed in US dollars, unless otherwise indicated. The Fredonia Board of Directors approved both this MD&A and the audited consolidated financial statements for the years ended September 30, 2022 and 2021 on January 12, 2023.
This MD&A provides information that the management of Fredonia believes is important to assess and understand the results of operations and financial condition of the Company. Our objective is to present readers with a view of Fredonia from management’s perspective by interpreting the material trends and activities that affect the operating results, liquidity, and financial position of Fredonia. All monetary amounts unless otherwise specified are expressed in US dollars. This discussion contains forward looking information that is qualified by reference to, and should be read in conjunction, with the “Caution Regarding Forward Looking Statements” below.
Caution Regarding Forward Looking Statements
Readers are cautioned that actual results may differ materially from the results projected in any “forward-looking” statements included in the foregoing report, which involve a number of risks or uncertainties. This MD&A contains “forward-looking statements” and “forward-looking information” within the meaning of the applicable Canadian securities legislation. Forward-looking statements are not historical facts and include statements regarding the Company’s planned development activities, anticipated future profitability, losses, revenues, expected future expenditures, the Company’s intention to raise new financing, sufficiency of working capital for continued operations and other statements regarding anticipated future events and the Company’s anticipated future performance.
Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “continue”, “anticipates” or “does not anticipate”, or “believes” or a variation of such words and phrases that state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. All forward-looking statements are based on our beliefs and assumptions based on information available at the time the assumption was made. While Fredonia considers its assumptions to be reasonable and appropriate based on the current information available, there is a risk that they may not be accurate. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievement of Fredonia to be materially different from those expressed or implied by such forwardlooking statements, including but not limited to risks related to the integration of acquisitions, foreign exchange controls, government regulations, metal prices, title disputes, environmental matters and all risks generally associated with the exploration and exploitation of mineral resources.
Although management has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Fredonia does not undertake to update any forward-looking statements that are incorporated by reference herein, except as required by law.
Business Overview
Fredonia Mining Inc. (the “Company”) is a mining extraction company incorporated under the Business Corporations Act (Alberta) on September 19, 2012, under the name Richmond Road Capital Corporation (“RRCC”). On June 24, 2021, the Company completed a transaction (the “Transaction”) whereby RRCC acquired all of the outstanding shares of Fredonia Management Limited, a private corporation registered under the laws of the territory of the British Virgin Islands with mining assets in the country of Argentina. The Transaction constituted a reverse asset acquisition in accordance with IFRS, whereby the shareholders of Fredonia Management Limited took control of RRCC. Following the completion of the Transaction, the Company changed its name from Richmond Road Capital Corporation to Fredonia Mining Inc. References within this MD&A to the “Company” for periods, dates and/or transactions prior to the Transaction are in reference to Fredonia Management Limited, as the corporate entity of interest pre‐Transaction.
2
Alternatively, references within this MD&A to the “Company” for periods, dates and/or transactions subsequent to the Transaction are in reference to Fredonia Mining Inc., as the corporate entity of interest post‐Transaction. The comparative periods reflected in this MD&A are those of Fredonia Management Limited. The Company is a publiclytraded company with its shares listed on the TSX Venture Exchange (“TSXV”). The Company operates from its primary office in Toronto, Ontario, Canada. Its registered head office is located at 350 Bay St. # 700, Toronto, Ontario, M5H 2S6.
The Company, directly or indirectly, owns a 100% interest in certain license areas, all within the Deseado Massif geological region in the Province of Santa Cruz, Argentina. The Company’s only material property is the advanced El Dorado-Monserrat Project. The Company also owns the El Aguila, Hornía (Petrificados), and Anita properties.
The Company has not yet established whether its mineral properties contain resources or reserves that are economically recoverable. The recovery of amounts capitalized as mineral properties is dependent upon the discovery of economically recoverable resources or reserves, the ability of the Company to arrange appropriate financing to complete the development of properties, and upon future profitable production, or alternatively, upon the Company's ability to dispose of its interests on an advantageous basis, all of which are uncertain.
The Company’s future performance depends on, among other things, its ability to discover and develop ore reserves at commercially recoverable quantities, the prevailing market price of commodities it produces, the Company’s ability to secure required financing, and in the event ore reserves are found in economically recoverable quantities, the Company’s ability to secure operating and environmental permits to commence and maintain mining operations.
Mineral Properties
El Dorado-Monserrat Project:
The El Dorado-Monserrat Project is located in an area of low rolling hills in the Deseado Massif of Santa Cruz Province, close to a number of known mines and prospects. Santa Cruz Province is part of the region of Patagonia which has the Andes Mountains to the west and the Atlantic coast to the east. In general, the area is very sparsely populated, and a large proportion of employment is in sheep farming which is managed from widely scattered ranches called “estancias” .
The nearest major centres to the Fredonia licences are Puerto Deseado (population 10,000), Puerto San Julian (population 6,000), Caleta Olivia (population 36,000) and Comodoro Rivadavia (population 140,000) to the northeast, Gobernador Gregores in the southwest. Río Gallegos (population 79,000), the capital of Santa Cruz Province, lies to the south of the project areas. These major centres can provide basic goods and services, and the national power grid serves these centres. Comodoro Rivadavia and Río Gallegos are serviced with national airports. A well-maintained concrete airstrip is located at Puerto Deseado, serviced via small to mid-size charter aircraft. Workers are readily available from the surrounding area.
The drilling data collected by the Company and the historical drilling, trenching and other data collected by previous operators has been reviewed by competent geological advisory professionals (“Qualified Persons”) who have concluded that the El Dorado-Monserrat Project is a Property of Merit with clear potential for low sulphidation epithermal vein style gold-silver mineralisation. The El Dorado-Monserrat Project is strategically located near to the major Cerro Vanguardia gold mine and is underlain by significant amounts of Chon Aike Formation rhyolitic volcanic rocks and by Bajo Pobre Formation. These formations are the principal host to mineralisation in the Deseado Massif.
There is significant potential and the drilling, trenching and surface exploration conducted on the other prospects by prior operators are adequate to demonstrate the overall potential of the El Dorado-Monserrat Project. Additional exploration, including surface sampling, trenching, re-assaying of available drill core and additional drilling will be required to fully assess the potential of the prospects in the area. In addition, a thorough review of historical data is recommended.
Main Veins: The Exploration Target for the Main Vein area shows possible tonnages of mineralisation in this area with reasonable prospects of economic extraction are in the range of 3.5 to 6.5 million tonnes, with possible average
3
gold grades above a 0.5 g/t cut off of 0.6-1 g/t and silver grades of 20 to 35 g/t. Based on this, possible contained metal is in the region of 100,000-200,000 Oz of gold (Au) and 3-6 MOz of silver (Ag), (ounces are troy ounces).
Within the Main Vein area, the Camila C area has higher grade gold and silver mineralisation than other parts of the project area. The Exploration Target of approximately 300,000 to 500,000 tonnes of mineralisation, from surface to 100 meters (“m”) depth, has a grade of 1.5 to 3 g/t Au and 40 to 80 ppm Ag. This presents a potential opportunity for the extraction of shallow, higher grade mineralised zones.
These Exploration target tonnages and grades are conceptual in nature and have been estimated from limited data, some of which has not been verified by the Qualified Persons. There has been insufficient exploration and QA/QC to define a mineral resource and as a result the tonnages and grades presented do not represent an estimation of mineral resource as defined by NI 43-101, Canadian Institute of Mining, Metallurgy and Petroleum (CIM) or a similar Committee for Minerals Reserves International Reporting Standards (CRIRSCO) aligned reporting code. It is uncertain that additional exploration work will result in any part of the exploration target being converted to a mineral resource, and grade and tonnage may increase or decrease as additional information becomes available.
Further south, in the Abanico area, major conjugate splays occur off the north-south system, with strong veining trending in a southeasternly direction. Between the splays and the main system, dilatant structures have been developed and extensive breccia zones occur, with potential for large tonnage, low grade mineralisation.
Outside the Main Vein area, there is also considerable potential for additional mineralised zones to be identified. Follow-up exploration at Monserrat Oeste, Abanico, La Herradura and Beethoven will enable an improved understanding of the geometry and extent of the mineralised zones in these areas. Further to this, additional exploration of the Monserrat Este and Bajo Pedernal areas will determine the potential for significant mineralised zones.
Further exploration outside of the Main Vein area in 2021/2022 included the completion of two phases of drilling on the La Herradura project as well as 6 drill holes at Monserrat Oeste for 1,841m and one drill hole at Gladys.
During the reporting period over 4,289 samples (including standards, blanks and duplicates) were submitted for gold fire assays and multi-element inductively coupled plasma (ICP) to an independent certified laboratory, these were predominantly (3,991) comprised of drill core samples.
La Herradura : low sulphidation deposit located in a mar-diatreme complex, just in the contact between andesitic volcanic rocks and dacitic dikes and domes inside a transtensive tectonic environment. The outcropping area of the diatreme is 400mx200m and its depth is unknown. This body is a dacitic matrix breccia, with chalcedonic veins fragments, andesitic bombs, juvenile dacitic magma fragments and xenoliths from the host volcanic rock. The maar is inferred base on the surge deposits and the lapilli tuff ring.
Gold mineralization is located in veins, hydrothermal breccias and stockworks of uncertain azimuth. These structures are syngenetic and epigenetic
Mineralized hydrothermal breccias and veins were formed during and after the maar-diatreme stages, related to volcanic activity at La Herradura. Explosive phreatic breccias were followed by in-situ hydraulic breccias, and then by major veins as the system returned to steady-state geothermal conditions.
The drill statistics for the drilling at La Herradura is tabulated below.
| Drill hole | Coord. East | Coord. North |
Elevation | Azimuth | Dip | Length |
|---|---|---|---|---|---|---|
| HDDH029 | 2532502 | 4632911 | 193 | 188 | -60 | 221.00 |
| HDDH030 | 2532450 | 4633063 | 178 | 188 | -60 | 344.50 |
| HDDH031 | 2532231 | 4632990 | 189 | 188 | -60 | 246.50 |
| HDDH032 | 2531732 | 4632994 | 194 | 188 | -60 | 302.50 |
| HDDH033 | 2532201 | 4632873 | 213 | 188 | -60 | 230.50 |
4
| HDDH034 | 2532105 | 4632877 | 213 | 188 | -60 | 238.50 |
|---|---|---|---|---|---|---|
| HDDH035 | 2532104 | 4632889 | 202 | 8 | -45 | 175.00 |
| HDDH036 | 2532272 | 4632780 | 217 | 10 | -45 | 250.00 |
| HDDH037 | 2532089 | 4632829 | 200 | 10 | -45 | 278.50 |
| HDDH038 | 2532252 | 4632729 | 209 | 10 | -50 | 338.50 |
| HDDH039 | 2532252 | 4632728 | 209 | 190 | -70 | 200.00 |
| HDDH040 | 2532380 | 4632820 | 226 | 10 | -60 | 305.00 |
| HDDH041 | 2532468 | 4632796 | 201 | 8 | -60 | 292.80 |
| HDDH042 | 2531906 | 4632716 | 171 | 180 | -60 | 152.00 |
| HDDH043 | 2532583 | 4632833 | 181 | 8 | -50 | 212.50 |
| HDDH044 | 2531871 | 4632640 | 177 | 0 | -45 | 68.50 |
| Total | 3,856.30 | |||||
Significant drill intersections for the reporting period are tabulated below
| Hole ID | From | To | Interval | Au Eq g/t | Au g/t | Ag g/t |
|---|---|---|---|---|---|---|
| HDDH029 | 53 | 74 | 21 | 0.73 | 0.61 | 9.39 |
| Incl. | 64 | 66 | 2 | 2.36 | 2.11 | 18.83 |
| HDDH029 | 125 | 132 | 7 | 0.63 | 0.61 | 1.18 |
| incl. | 125 | 127 | 2 | 1.36 | 1.34 | 1.65 |
| HDDH031 | 161 | 198 | 37 | 1.01 | 0.74 | 20.00 |
| incl. | 161.5 | 162 | 0.5 | 4.86 | 4.38 | 35.68 |
| incl. | 188 | 189 | 1 | 2.56 | 2.38 | 13.77 |
| HDDH033 | 59 | 109 | 50 | 0.40 | 0.31 | 6.89 |
| incl. | 74 | 75 | 1 | 1.73 | 1.55 | 13.53 |
| incl. | 79 | 80 | 1 | 3.40 | 3.35 | 3.67 |
| incl. | 83 | 90 | 7 | 0.80 | 0.63 | 12.65 |
| HDDH034 | 83 | 90.5 | 7.5 | 0.58 | 0.52 | 4.82 |
| incl. | 84 | 84.5 | 0.5 | 6.17 | 5.90 | 19.91 |
| HDDH035 | 99.7 | 101 | 1.3 | 2.11 | 1.93 | 13.62 |
| HDDH035 | 120 | 120.5 | 0.5 | 3.78 | 3.28 | 37.59 |
| HDDH036 | 66.8 | 105 | 38.2 | 0.43 | 0.34 | 6.76 |
| incl. | 77.7 | 78.2 | 0.5 | 3.81 | 3.55 | 19.81 |
| HDDH036 | 180.6 | 181.2 | 0.6 | 2.33 | 1.65 | 50.99 |
| HDDH036 | 220.4 | 221.5 | 1.1 | 3.39 | 2.52 | 65.37 |
| HDDH036 | 224 | 225 | 1 | 5.47 | 4.89 | 43.40 |
| incl. | 224 | 224.5 | 0.5 | 9.55 | 8.54 | 75.61 |
| HDDH037 | 162 | 176.5 | 14.5 | 1.08 | 0.91 | 12.69 |
| incl. | 163.1 | 164.2 | 1.1 | 2.35 | 1.91 | 33.16 |
| and | 166 | 166.5 | 0.5 | 8.45 | 7.57 | 66.19 |
| and | 176 | 176.5 | 0.5 | 7.05 | 6.26 | 59.39 |
5
| HDDH037 | 189 | 190 | 1 | 2.02 | 1.73 | 21.59 | |
|---|---|---|---|---|---|---|---|
| HDDH038 | 34 | 55 | 21 | 1.01 | 0.91 | 7.43 | |
| incl. | 42 | 42.6 | 0.6 | 4.72 | 4.53 | 14.53 | |
| and | 51.5 | 54 | 2.5 | 3.02 | 2.91 | 8.42 | |
| HDDH038 | 92 | 124.15 | 32.15 | 0.93 | 0.81 | 8.83 | |
| incl. | 101 | 102 | 1 | 2.30 | 2.10 | 14.70 | |
| and | 114 | 114.5 | 0.5 | 7.36 | 6.49 | 65.29 | |
| and | 116 | 116.64 | 0.64 | 13.74 | 12.83 | 68.39 | |
| and | 123.6 | 124.15 | 0.55 | 2.24 | 2.12 | 9.04 | |
| HDDH038 | 216 | 260 | 44 | 0.87 | 0.73 | 10.62 | |
| incl. | 234.5 | 235.1 | 0.6 | 6.42 | 5.85 | 42.88 | |
| and | 244.8 | 246.5 | 1.7 | 5.42 | 4.35 | 79.95 | |
| and | 248 | 249.3 | 1.3 | 2.99 | 2.93 | 4.76 | |
| HDDH038 | 251 | 251.5 | 0.5 | 4.94 | 4.87 | 5.33 | |
| HDDH039 | 107.5 | 108 | 0.5 | 1.59 | 1.52 | 5.61 | |
| HDDH040 | 99 | 104.5 | 5.5 | 0.92 | 0.59 | 24.53 | |
| HDDH040 | 131.5 | 164.6 | 33.1 | 0.47 | 0.35 | 9.21 | |
| incl. | 157 | 157.5 | 0.5 | 4.29 | 3.68 | 45.49 | |
| HDDH040 | 168.8 | 191 | 22.2 | 1.78 | 1.58 | 14.72 | |
| incl. | 174 | 175 | 1 | 9.83 | 9.53 | 22.39 | |
| and | 177.3 | 178 | 0.7 | 9.26 | 8.75 | 38.14 | |
| and | 180 | 180.65 | 0.65 | 5.72 | 4.69 | 77.30 | |
| and | 184 | 187 | 3 | 3.86 | 3.43 | 32.60 | |
| HDDH040 | 198 | 200 | 2 | 3.92 | 2.72 | 90.36 | |
| HDDH040 | 207 | 212 | 5 | 0.78 | 0.75 | 2.65 | |
| incl. | 209 | 210 | 1 | 3.06 | 2.96 | 7.16 | |
| HDDH040 | 219.5 | 227 | 7.5 | 0.49 | 0.45 | 3.23 | |
| incl. | 226 | 227 | 1 | 2.56 | 2.44 | 8.66 | |
| HDDH040 | 255 | 262 | 7 | 1.91 | 1.88 | 2.57 | |
| incl. | 255.5 | 255.9 | 0.4 | 26.74 | 26.47 | 20.16 | |
| HDDH041 | 40.5 | 63.7 | 23.2 | 0.36 | 0.29 | 5.18 | |
| incl. | 59.9 | 60.8 | 0.9 | 1.64 | 1.52 | 9.01 | |
| HDDH041 | 98.5 | 99.2 | 0.7 | 3.29 | 3.01 | 20.70 | |
| HDDH041 | 103.4 | 110.6 | 7.2 | 0.42 | 0.37 | 3.80 | |
| incl. | 110 | 110.6 | 0.6 | 2.72 | 2.57 | 11.11 | |
| HDDH041 | 116.8 | 121 | 4.2 | 0.76 | 0.70 | 3.99 | |
| HDDH043 | 161.6 | 163.4 | 1.8 | 0.38 | 0.30 | 5.83 | |
| HDDH044 | 60.5 | 62.5 | 2 | 0.54 | 0.49 | 3.28 | |
The anomalous, potentially ore grade, gold-silver intersections confirm and expand the area of interest identified by historic drilling and demonstrate wide low-grade Au-Ag intersections and ‘included’ higher grade zones.
6
The drill holes at La Herradura were drilled to target both the roughly east west mineralised trend including the central diatreme at La Herradura ‘hill’ and to expand the gold anomalism identified in the historic drilling which extends over 1,100m to depths of >200m. The current drill programmes have added potentially 300m of strike to the mineralised complex.
The recent drilling, while of limited meters, has enhanced the project’s potential and confirmed the presence of wide intersections of 1g/t AuEqv. material with higher grade inclusions. The system remains open in all directions and Fredonia believes more drilling is warranted.
Monserrat Oeste is located 1 km west of the Main Vein area, in a shear corridor with a general NNE strike, whose mineralized zones are related to veining and breccia along 1.6 km, and dip 55° to 75 ° east. The structure is open at depth and in both directions. The outcrop shows a layer of silica, secondary oxidation, leaching, breccia, and residual quartz textures, however much of the structure is not exposed.
Historical drilling suggests that the mineralized zones are hosted by mafic lava flows, agglomerates and breccias of andesitic composition, belonging to the Bajo Pobre formation; veins of barite and calcite predominate, and hydrothermal breccias of drusy gray quartz silica, with mineralization of native Au, Argentite-Pyrargyrite, Acanthite, black Sphalerite and ruby Sphalerite, Galena, Hematite, Arsenopyrite and Pyrite scarce. Intermediate argillic Alteration (Kao + ill + Smc + Py), and distal propylitic (Chl + CO3 + Py), oxidation at superficial levels and related to structures at depth.
In the central sector of Monserrat Oeste, drill holes outline a main mineralized feeder approximately 200 meters long x 200 meters deep, dipping 65° to the south. Average intercepts range between 0.5 and 5.00 m (apparent width), with grades up to 13.50 g/t Au and 7,000 ppm Ag plus base metals.
The recent drilling program evaluated the southern sector of Monserrat Oeste, intersecting 6m of hydrothermal breccias with light/dark gray quartz with abundant sulfides.
Table of drill-hole statistics
| Drill hole | Coord. East | Coord. North |
Elevation | Azimuth | Dip | Length |
|---|---|---|---|---|---|---|
| MODDH001 | 2528490 | 4638590 | 220 | 270 | -55 | 347.50 |
| MODDH002 | 2528484 | 4638163 | 218 | 270 | -55 | 323.50 |
| MODDH003 | 2528458 | 4638065 | 202 | 270 | -50 | 296.50 |
| MODDH004 | 2528600 | 4637900 | 206 | 275 | -55 | 281.30 |
| MODDH005 | 2528534 | 4638595 | 194 | 270 | -55 | 311.00 |
| MODDH006 | 2528414 | 4637989 | 219 | 270 | -55 | 281.00 |
| Total | 1,840.80 |
7
Table of best intersections
| Hole ID | From | To | Interval | Au Eq g/t | Au g/t | Ag g/t | |
|---|---|---|---|---|---|---|---|
| MODDH001 | 168 | 169 | 1 | 5.51 | 4.81 | 52.70 | |
| MODDH001 | 174.3 | 176.7 | 2.4 | 20.06 | 0.18 | 1490.98 | |
| incl. | 176.2 | 176.7 | 0.5 | 94.21 | 0.38 | 7037.43 | |
| MODDH002 | 60.25 | 72.45 | 4.7 | 0.75 | 0.04 | 53.64 | |
| incl | 72.1 | 72.45 | 0.35 | 3.01 | 0.08 | 219.91 | |
| MODDH002 | 275 | 303.4 | 9.65 | 0.52 | 0.40 | 9.10 | |
| incl. | 296.08 | 303.4 | 7.32 | 0.61 | 0.51 | 7.66 | |
| incl. | 302 | 303.4 | 1.4 | 1.71 | 1.38 | 25.38 | |
| MODDH004 | 87 | 91 | 4 | 2.68 | 0.51 | 163.04 | |
| incl. | 87 | 87.5 | 0.5 | 10.96 | 2.15 | 660.42 | |
| MODDH005 | 91 | 92 | 1 | 2.76 | 0.01 | 206.09 | |
| MODDH005 | 253 | 266 | 13 | 0.30 | 0.13 | 13.00 | |
| MODDH006 | 236 | 252 | 16 | 0.50 | 0.30 | 15.12 | |
Monserrat Este: Located 3km at the East of Main Veins, the structure is emplaced in a right-hand NW structural corridor as shown by friction mirrors and veinlet distribution, with two preferential structures (N300° to N330° and N350° to N20°) and dipping from -90° to 65° to the east. In the north, the predominant host rock corresponds to lavas and agglomerates mafic units, with a general trend N80°/15° to the south. In the centre-south, it changes to dacitic tuffs with sub-horizontal lamination. In the southern sector, the host rock is a subvolcanic dacitic dome. The hydrothermal fills have thicknesses from a few cm to 40 cm, accompanied by silicification up to 10m, with argillic alteration extending up to 30 meters towards both walls. The pervasive silicification is intense while the filling of the breccias and veins is opal-chalcedony, translucent quartz and grey silica veins and veinlets with scarce mineralization in pyrite boxworks, filling to jarosite and patches of copper colour. Changes in azimuth and host rock control the size of the veins and the extent of pervasive alteration; while changes in the erosive level, control the phases of hydrothermal filling and mineralization.
Beethoven: this prospect is in the southeastern part of the project area, where a series of at least 5 major subvertical quartz vein zones trend in a south-southeasterly direction along a strike length of at least 4 km within a zone about 2 km wide. Smaller veins occur between the major structures. The veins appear to have developed in response to dextral shearing and extend across the extreme southwestern corner of the project licence. They are hosted in ignimbrites and exhibit areas of focused hydrothermal alteration. The vein zones comprise multiple quartz structures up to 3 m wide containing chalcedonic and crystalline quartz, occasionally exhibiting well developed colloform banding and carbonate replacement textures. Barite is also present, together with small amounts of pyrite, arsenopyrite, jarosite and sericite.
8
Anita: the eastern part of Abanico sector. It is a quartz vein of 600m length and 1.5-2 m of thickness (N330°/85°), which contains abundant colloform and brecciated textures. Sulphides and oxides present are pyrite, acanthite, hematite and iron oxides. This structure is hosted in volcaniclastic rocks from Bajo Pobre Formation.
Abanico (South): at the southern end of the Abanico, as a continuation of the Mónica and Emilia-Alicia veins, two structures are located: 1- a horsetail structure develops off a main vein that strikes N20° and dips from subvertical to 65°E. The NW vein splay shows strikes from N330° to N300° with dips from subvertical to 70° to the NE. 2- a fault jog develops from the main structure with a N350° strike, and NW-WNW sigmoid veins. The host rock is an andesite belonging to Bajo Pobre Formation, exhibiting argillic alteration in the footwall (to the west), and strong oxidation towards the hanging wall (to the east). The N-S veins are mainly composed of barite, while the NW-WNW veins vary from microcrystalline to coarse quartz, with sulphides: pyrite + chalcopyrite + acanthite + hematite + iron oxide + manganese oxide. The horsetail and the fault jogs are configured from a NW dextral shear, with a NE-SW maximum stress.
Gladys: a structure dominated by a quartz vein located 1.5km at southeast of Main Veins. It is controlled by a Dacitic Dyke, intruded on the andesitic lavas. The strike is N300/80°SW and the thickness is up to 2.4m. three pulses are identified: hydrothermal breccia with hematite cement, barite vein, and black vein of sulphides. One drill hole of 210m depth was drilled in Q3 of 2022.
Pamela: group of structures located 3 km at the west of La Herradura. Two outcropping structures of up to 40 m length, and less than 0.5 m in thickness. Both structures are hosted in Chon Aike Formation and are composed of a fine, massive, light to dark grey quartz, with iron oxides (limonites and hematite) accompanied by minor barite, with main orientations N 60° E and EW. No fresh sulphides have been observed on surface however the intense oxidation observed may indicate the occurrence of sulphides at depth. Quartz floats are aligned along strike approximately 100m arranged in the same orientation of the outcrops.
Tiburón: located 1.2km to the East of Main Veins consists in a fault structure N20° dipping to the east, has been identified. This structure can be followed continuously for 500 meters and discontinuously up to 1km. The host rock corresponds to andesites of the Bajo Pobre Formation. The fault (1.5m thickness) is composed of a fault gouged with hematite and manganese and andesite clasts breccia. An intense pervasive silicification develops in the hanging wall. Veinlets forming flexures filled with chalcedonic quartz, translucent quartz and kaolinite are observed along the fault, trending NW (330°), which become more frequent in football. A 5-metre thickness and N330° vein separates from the fault and is a continuous 50 meters long, in an opening zone produced by the left-hand shear of the fault.
Vanina Oeste: located 2.5km at southwest of Main Veins, shows a hydrothermal breccia and quartz+sericite vein controlled by N320° structure along 800m host in a lithic tuff from the Chon Aike Formation. The Fredonia license covers only part of the structure. It shows a crystalline to microcrystalline quartz vein of 0.5 to 1.5m in thickness and continuous extension of 200m in length. Predominant textures are crustiform and minor colloform. The dip is between subvertical (N320° strike) to 62° NE (N290° strike). In the inflexion zone, it is present a huge hydrothermal breccia with quartz-crustiform clast, and chalcedonic-limonitic cement. Mineralization consists in pyrite (jarosite) + argentite/acanthite + (hematite + goethite).
El Aguila Project:
On September 15, 2016 an Arm’s length purchase agreement (the “Winki Agreement”) between the Company and Winki Sociedad Anonima wherein the Company agrees to acquire the following properties - Winki: “Winki II”, “Petrificados”, “Aguila I” and “Aguila II”, in the Province of Santa Cruz, Argentina (collectively, the “El Aguila Project”) for the sum of $1,400,000.00, and 1% of the net profit interest of the Company during the production/exploitation phases of the project (the “Royalty”).
On November 11, 2016, the Company and an arm’s length party who is a 50% participant under the Winki Agreement (the “Partner”) reached an agreement to jointly participate in the development of Fredonia Management on the basis of a partnership in equal parts. Under this agreement, the Company provided its structure and know-how in the mining industry, as well as access to the capital market and the Partner agreed to accept 50% of the share capital of the Company in exchange for their rights under the Winki Agreement to receive half of the purchase proceeds and half of the Royalty from the purchase and sale of the Aguila Project.
9
On January 24, 2022, Fredonia Mining paid US$150,000 in cash and issued 2,200,000 common shares to the other participant at Winki to satisfy the outstanding portion of the Purchase The vendor retained 0.5% Net Profit Interest.
El Aguila is currently owned 100% by Fredonia Mining Inc or its subsidiaries.
The El Aguila project is located in the eastern sector of the Deseado Massif and comprises three licence blocks that cover 9,124ha. The project is located 70 kilometres northeast of Cerro Vanguardia mine and 45 kilometres west of Cerro Moro.
The geological interpretation of the Aguila project area is a ‘failed’ caldera environment. Structures define both ring fractures at the margins of the caldera striking as well as radial fractures hosting gold silver mineralisation within the ring structure. The North-west orientation is strike-slip faults with dextral movements, and North-south fractures are tensional. Post-mineral event East-north-east striking fault system displaces part of the vein-like mineralized structures.
El Aguila has distinct styles of mineralisation from classic low sulphidation epithermal quartz veining hosting goldsilver as well as stockwork and breccias (draped around a felsic dome complex) and a new exploration target represented by veins in sandstone.
Drilling on the project is scout exploration style and is neither advanced nor grid style systematic. However, based on the geochemical data generated to date and the interpretation of geology hosting the identified mineralisation, of the five main sectors identified to date, Aguila Main is considered the most prospective. The Company conducted a limited diamond drilling programme of 2,428 meters for 11 holes throughout the project, focusing on Aguila Main.
Hornía Project (previously Petrificados):
The oldest rocks in the property are andesitic flows, volcanic breccias and tuffs from the Bajo Pobre Formation, exposed in the southern part of the area. This unit is overlaid and partially in fault contact with coarse grained-partially welded rhyolitic crystal tuff, from the Chon Aike Formation exposed along the western side of the property. This unit is covered and partially inter-fingered with layered fine-grained ash fall tuffs and volcanoclastic sediments assigned to La Matilde Formation (both belonging to Bahía Laura Group), largely exposed in the western and northern portions of the property. These are the three most prospective formations in the Deseado.
Alteration and mineralization coincides primarily with strongly silicified N°30-N°60 west-trending tabular structures. The silicified zones contain veins, veinlets, stockworks and hydrothermal breccias hosted in welded rhyolitic tuffs. Veins and breccias show a variety of textures indicatives of multiple episodes of brecciation and silica deposition, including carbonate replacement textures and massive to banded veins with chalcedony, jasper and fine grained saccharoidal white to grey silica, interpreted as being formed at shallow depths within the hydrothermal system.
Gold mineralisation is associated with anomalous values of ‘pathfinder’ elements. Arsenic (As), mercury (Hg), antimony (Sb), these are typical vectors to epithermal gold mineralisation.
The Company intends to undertake a thorough review of the historical data before embarking on a project wide exploration programme of surface reconnaissance and geophysics prior to an anticipated scout exploration drill programme.
10
Review of Financial Results
The following tables set forth selected financial information with respect to the Company’s audited consolidated financial statements for the year ended September 30, 2022 and 2021. The following should be read in conjunction with the said financial statements and related notes that are included elsewhere in this Filing Statement.
Selected Financial Information
| Other Comprehensive Income Net income/(loss) Basic and Diluted income/(loss) per share |
Year ended Year ended September 30, 2022 September 30, 2021 (Audited) (Audited) $ $ (125,651) 721 763,305 (3,122,411) 0.005 (0.026) |
|---|---|
Statement of Financial Position
| Assets Current assets Exploration and evaluation assets Property, plant and equipment Total Assets Liabililties Current liabilities Shareholders' equity Total liabilities and shareholders' equity |
As at September 30, As at September 30, 2022 2021 2,775,697 3,562,837 5,859,211 1,748,697 5,430 2,318 8,640,338 5,313,852 454,040 1,280,048 8,186,298 4,033,804 8,640,338 5,313,852 |
|---|---|
Results of Operations
The Company reported a net income of $763,305 during the year ended September 30, 2022, compared to net loss of $3,122,411 during the year ended September 30, 2021. The net income for the fiscal year was primarily on account of gains realized on the exchange of US dollar contributions to the Argentine subsidiaries for Argentine pesos through third-party financial markets in contrast to the Argentina national posted currency rates. The difference between the official bank rate and the market rate obtained resulted in significant gains of $1,949,055 for the year ended September 30, 2022. This was partially offset by $1,068,436 of general and administrative expenses incurred in the year primarily consisting of salaries and wages, professional fees and administrative and office expenses.
11
Summary of Quarterly Results
The following table sets out selected quarterly financial information of the Company and is derived from unaudited quarterly financial data prepared by management in accordance with IFRS:
| Q4 2022 | Q3 2022 | Q2 2022 | Q1 2022 | |
|---|---|---|---|---|
| Net income (loss) | 353,807 | (8,351) | 91,664 | 326,185 |
| Comprehensive income (loss) | 234,661 | (13,461) | 91,802 | 324,652 |
| Net income (loss) per share | ||||
| (basic & diluted): | ||||
| Net income (loss) | 0.001 | (0.000) | 0.001 | 0.002 |
| Q4 2021 | Q3 2021 | Q2 2021 | Q1 2021 | |
| Net income (loss) | (1,136,862) | (1,653,324) | (319,638) | (12,587) |
| Comprehensive income (loss) | (1,136,141) | (1,653,324) | (319,638) | (12,587) |
| Net income (loss) per share | ||||
| (basic & diluted): | ||||
| Net income (loss) | (0.026) | (0.006) | (0.003) | (0.000) |
Over the past eight quarters, fluctuations in net income (losses) on a quarter-over-quarter basis have been impacted by factors such as G&A expenses, finance expenses, share-based compensation expense, gains on currency exchange and fluctuations in exchange rates.
The results of the Company consist primarily of G&A expenses which over the 2022 fiscal year, have seen a steady decrease quarter over quarter. The reduction in these expenses have been offset by significant gains on currency exchange (see Results of Operations section above for details) for the year ended September 30, 2022. This has resulted in the Company having net income or lower net losses quarter over quarter. In 2021, the most significant contributing factors in the losses incurred was the listing expense in conjunction with the Qualifying transaction that took place in the third quarter (see Restructuring transaction and funding section below) as well as share-based compensation expenses incurred in the fourth quarter.
Financing Activities
The Company completed the Concurrent Financing in connection with the Qualifying Transaction on February 24, 2021. Each subscription receipt was sold at a price of C$0.17 per subscription receipt, with each subscription receipt entitling the holders to receive one common share and one-half of one common share purchase warrant. Funds raised under the private placement were held in escrow pending the satisfaction or waiver of certain escrow release conditions. The Concurrent Financing was completed on both a brokered and non-brokered basis for an aggregate of 37,445,310 subscription receipts for gross escrowed proceeds of approximately C$6,365,703.
On June 24, 2021, the Transaction was fully approved, funds released the escrow and subscription receipts converted into shares and warrants.
On July 27, 2021, the Company granted 9,750,000 stock options pursuant under its Stock Option Plan to certain directors, officers, and consultants of the Company. The options vested immediately, are exercisable at a price of C$0.17 per share and have a term of five years from the grant date. The fair value of the options was estimated at C$1,192,427 using the Black-Scholes option pricing model with the following assumptions: expected volatility of 95.39%; risk-free interest rate of 0.77% and an expected life of 5 years.
On April 27, 2022, the Company announced the closing of a brokered private placement (the “Offering”), consisting of a total of 22,606,779 units of the Company at a price of C$0.18 per unit for aggregate gross proceeds to the Company of approximately C$4,069,220, which included the exercise of an option to increase the size of the Offering from the
12
proposed base size. Each unit consisted of one common share of the Company and one common share purchase warrant. Each warrant entitles the holder to acquire one common share at a price of C$0.28 per common share for a period of five years from the closing date of the Offering. The agent received compensation consisting of 1,485,213 units (“Broker Units”) in lieu of cash. Each Broker Unit consists of one common share and one warrant. The Company also granted the agent 1,582,475 broker warrants entitling the agent to acquire one common share at a price of C$0.18 per common share for a period of 24 months from the closing date of the Offering.
For the purchase warrants issued, the Black-Scholes option pricing model was used to estimate their fair value based on the assumptions of expected stock price volatility of 95%, risk-free interest rate of 2.64%, expected dividend yield of 0%, and an expected warrant life of 5 years, resulting in an assessed fair value per warrant of C$0.18.
The broker warrants issued, the Black-Scholes option pricing model was used to estimate their fair value based on the assumptions of expected stock price volatility of 95%, risk-free interest rate of 2.50%, expected dividend yield of 0%, and an expected warrant life of 2 years, resulting in an assessed fair value per warrant of C$0.15.
Restructuring transaction and Funding
Reverse Take Over:
The Qualifying Transaction was completed pursuant to a business combination agreement (the “Agreement”) dated June 24, 2021, between the Company, formerly RRCC, and a corporation existing under the laws of the British Virgin Islands, Fredonia Management Limited (the “Target”). As an initial step to be taken in connection with the Qualifying Transaction, the issued and outstanding RRCC shares and RRCC stock options were consolidated by a factor of 0.73529 (the “Consolidation”), resulting in 4,411,764 post-Consolidation RRCC shares and 441,176 postConsolidation RRCC stock options. Following the Consolidation of RRCC shares, the Qualifying Transaction was effected by way of a “three-cornered” amalgamation, in which: (a) the BVI subsidiary of RRCC was amalgamated with the Target to form an amalgamated company (“Amalco”); (b) all issued and outstanding shares of the Target were exchanged for 109,006,378 post Consolidation RRCC shares; and (c) Amalco became a wholly-owned subsidiary of the Company and was renamed as Fredonia Management Ltd. Following the completion of the Transaction, the Company changed its name to “Fredonia Mining Inc.” and carried on the business previously carried on by the Target.
The Qualifying Transaction constituted a reverse take over and did not constitute a business combination in accordance with IFRS 3. The consolidated financial statements are presented as a continuation of the Target but are issued in the name of the Company as a legal parent. The Qualifying Transaction has been measured at the fair value of the shares and options that are deemed to have been issued to the Company’s historical shareholders. Accordingly, the Qualifying Transaction has been recorded in these consolidated financial statements using a basis of accounting as summarized below:
-
a) The historical equity of the Company has been eliminated and the excess of the fair value of deemed issuance of the equity instruments over the fair value of the net assets acquired has been recorded as listing expense in net loss for the year;
-
b) The accumulated deficit and other equity balances presented in these consolidated financial statements are those of the Target;
-
c) The assets and liabilities of the Target are included in these consolidated financial statements on a pre-transaction basis of accounting;
-
d) The net assets of RRCC were measured at their estimated fair value on the date of the Qualifying Transaction; and
-
e) Comparative information presented in these consolidated financial statements is that of the Target. The following summarizes the basis of accounting for the reverse takeover described above.
13
Under this basis of accounting, as consideration for 100% of the outstanding shares of RRCC by way of reverse acquisition, Target issued 4,411,764 shares on a one for one basis to the shareholders of RRCC, and 441,176 stock option to replace RRCC stock options. The shares were assigned a value of $0.20 (C$0.25) per share, the value of the recent financing realized through concurrent financing, and the stock options were assigned a value of $0.14 (C$0.17) based on a Black-Scholes valuation, for total consideration of $950,412 (C$1,177,941) before transaction costs, which has been allocated first to the fair value of the net assets acquired, with any excess to a non‐cash cost of acquisition as follows:
| Consideration | ||
|---|---|---|
| 4,411,764 shares at a value of $0.20 (C$0.25) per share | 889,899 |
|
| 441,176 stock options at a value of $0.14 (C$0.17) per share | 60,513 | |
| Transactioncosts | 277,236 | |
| TotalConsideration | 1,227,648 | |
| Net assets (liabilities) of RRCC | ||
| Accounts payable | (171,573) | |
| Total net assets (liabilities) acquired at fairvalue | (171,573) | |
| Listing Expense | 1,399,221 | . |
Arm’s Length Qualifying Transaction
The Qualifying Transaction was considered an Arm’s Length Transaction in accordance with the policies of the TSXV. No Non-Arm’s Length Parties to RRCC had any interest in Fredonia or in the Properties or were insiders of Fredonia, nor was there any relationship between or among the Non-Arm’s Length Parties to the Issuer and the NonArm’s Length Parties to the Qualifying Transaction, whether or not the proposed Qualifying Transaction constitutes a Non-Arm’s Length Qualifying Transaction.
The completion of the Qualifying Transaction was not subject to the approval of RRCC’s Shareholders, however, the Name Change and the Consolidation were approved by RRCC Shareholders at the RRCC Meeting.
No finder’s fee or commission was paid in relation to the Qualifying Transaction.
Liquidity and Capital Resources
As of September 30, 2022, the Company had cash of $2,632,609 and a working capital surplus of $2,321,657. During the year ended September 30, 2022, net cash received from operating activities was $414,738, net cash used in investing activities was $4,114,570 related primarily to exploration and evaluation costs incurred as well as the lump sum cash payment to the seller of the El Aguilar property, and net cash received from financing activities was $2,943,463 relating primarily to the net proceeds from the private placement.
The Company’s objectives when managing capital are to safeguard its ability to continue as a going concern in order to provide returns for shareholders and to maintain a flexible capital structure that optimizes the costs of capital within a framework of acceptable risk. In the management of capital, the Company includes the components of shareholders’ equity as well as cash. The Company manages the capital structure and makes adjustments to it in light of changes in economic conditions and the risk characteristics of the underlying assets. To maintain or adjust its capital structure, the Company may issue new shares, issue debt, acquire or dispose of assets or adjust the amount of cash. The Company is dependent on the capital markets as its primary source of operating working capital and the Company’s capital resources are largely determined by its ability to compete for investor support of its projects.
The consolidated financial statements have been prepared assuming the Company will continue as a going concern, which contemplates the realization of assets and satisfaction of liabilities in the normal course of business. At September 30, 2022, the Company had accumulated losses of $6,400,738 and expects to incur further losses in the development of its business. The continuation of the Company is dependent upon obtaining necessary financing to
14
meet its ongoing operational levels of exploration and corporate overhead. The ongoing impact of COVID-19 on the Company’s operations and future financial performance is uncertain. The continued impact of COVID-19 will depend on future developments that are uncertain and unpredictable, its continued impact on capital and financial markets on a macro-scale and any new information that may emerge COVID-19 continues to present uncertainty and risk with respect to the Company, its performance, and estimates and assumptions used by management in the preparation of its financial results. These events and conditions indicate a material uncertainty that may cast significant doubt upon the Company’s ability to continue as a going concern. Additional funds will be required to enable the Company to continue its operations and there can be no assurance that financing will be available on terms which are acceptable to the Company.
Related Party Transactions
During the years ended September 30, 2022 and 2021, the Company incurred the following related party transactions:
i) Transactions:
-
a) Interest expense incurred for the year ended September 30, 2022 from a loan payable to a director and shareholder were $0 (2021: $4,596).
-
b) Rent expense incurred for the year ended September 30, 2022 charged by a company controlled by Directors of the company were $18,000 (2021: $18,000).
ii) Year-end balances:
-
a) As at September 30, 2022, trade and other receivables included $nil (September 30, 2021 – $110,223) receivable from a director of the Company.
-
b) As at September 30, 2022, trade and other payables included $20,000 (September 30, 2021 - $20,000) payable to a company related to a director for payments made on behalf of the Company.
-
c) As at September 30, 2022, trade and other payables included $5,063 (September 30, 2021 - $3,552) payable to a company related to a director in relation to the rent of the administrative office.
-
d) As at September 30, 2022, trade and other payables included $nil (September 30, 2020 - $78,620) payable to directors and key management.
All related party transactions were in the normal course of operations.
Compensation of Key Management
The Company has determined that key management personnel consist of its managers, officers and directors. In addition to salaries and fees paid to key management personnel, these groups also participate in the stock option plan. The total compensation expense, including salaries, fees and stock-based compensation relating to key management personnel for the years ended September 30, 2022 and 2021, was as follows:
| Salary, fees and other benefits Share-based compensation |
2022 2021 600,586 376,202 15,269 948,026 615,855 1,324,228 |
|---|---|
15
Financial Instruments
The Company’s financial instruments consist of cash, accounts payable and accrued liabilities, and loans from related parties. Unless otherwise noted, management’ is of the opinion that the Company is not exposed to significant interest, currency or credit risks arising from these financial instruments. The Company’s cash is recorded at its fair value, and the fair values of these accounts payable and accrued liabilities, and loans from related parties approximate their carrying values due to their short-term nature.
Critical Judgments and Estimates
The following are the critical judgments that management has made in the process of applying the Company’s accounting policies and that have the most significant effect on the amounts recognized in these consolidated financial statements:
i) Impairment of property, plant and equipment and exploration and evaluation assets
Judgments are required to assess when impairment indicators, or reversal indicators, exist and impairment testing is required. In determining the recoverable amount of assets, in the absence of quoted market prices, impairment tests are based on estimates of reserves, production rates, future precious metals prices, future costs, discount rates, market value of land and other relevant assumptions.
ii) Exploration and evaluation assets
The application of the Company’s accounting policy for exploration and evaluation assets requires management to make certain judgments as to future events and circumstances as to whether economic quantities of reserves have been found in assessing economic and technical feasibility.
iii) Income taxes
Judgments are made by management to determine the likelihood of whether deferred income tax assets at the end of the reporting period will be realized from future taxable earnings. To the extent that assumptions regarding future profitability change, there can be an increase or decrease in the amounts recognized in respect of deferred tax assets as well as the amounts recognized in profit or loss in the period in which the change occurs.
Key sources of estimation uncertainty
The following are the key assumptions concerning the sources of estimation uncertainty at the end of the reporting period, that have a significant risk of causing adjustments to the carrying amounts of assets and liabilities.
i) Share-based payments
All equity-settled, share-based awards issued by the Company are recorded at fair value using the Black-Scholes option-pricing model. In assessing the fair value of equity-based compensation, estimates have to be made regarding the expected volatility in share price, option life, dividend yield, risk-free rate and estimated forfeitures at the initial grant date.
ii) Tax provisions
Tax provisions are based on enacted or substantively enacted laws. Changes in those laws could affect amounts recognized in profit or loss both in the period of change, which would include any impact on cumulative provisions, and in future periods. Deferred tax assets (if any) are recognized only to the extent it is considered probable that those assets will be recoverable. This involves an assessment of when those deferred tax assets are likely to reverse.
iii) Determination of functional currency
As the Company has entities in multiple jurisdictions, the determination of functional currency involves certain judgements in establishing the primary economic environment in which these entities operate. In Argentina, the transactions may be denominated in Argentine pesos or USD. The functional currency is determined by the currency, being presently USD, wherein management’s judgement the majority of the operating expenditures are denominated in.
16
Determination of fair values
A number of the Company’s accounting policies and disclosures require the determination of fair value for financial and non-financial assets and liabilities. Fair values have been determined for measurement and/or disclosure purposes based on the methods below. When applicable, further information about the assumptions made in determining fair values is disclosed in the notes specific to that asset or liability.
Property, plant and equipment and exploration and evaluation assets
The fair value of property, plant and equipment and exploration and evaluation assets recognized in a business combination and in assessing the recoverable value for impairment testing, is based on market values. The market value of property, plant and equipment and exploration and evaluation assets is the estimated amount for which the assets could be exchanged on the acquisition date between a willing buyer and a willing seller in an arm’s length transaction after proper marketing wherein the parties had each acted knowledgeably, prudently and without compulsion. The market value of precious metals interests included in property, plant and equipment is estimated with reference to the discounted cash flows expected to be derived from precious metals production based on externally prepared reserve reports. The risk-adjusted discount rate is specific to the asset with reference to general market conditions. The market value for exploration and evaluation assets is determined based on quoted market prices for similar assets, if available, or discounted cash flows expected to be derived from precious metals production based on available resource reports. The discount rate is specific to the exploration and evaluation asset with reference to general market conditions.
Financial assets and liabilities
The fair value of financial assets and liabilities is estimated as the present value of future cash flows, discounted at the market rate of interest at the reporting date, except for marketable securities which are fair valued based on quoted trading prices.
Stock options
The fair value of employee stock options is measured using a Black-Scholes option pricing model. Measurement inputs include share price on measurement date, exercise price of the instrument, expected volatility (based on weighted average historic volatility), weighted average expected life of the instruments (based on historical experience and general option and warrant behaviour), expected dividends, expected forfeiture rate and the risk-free interest rate (based on government bonds).
Off-Balance Sheet Arrangements
The Company has not entered into any off-balance sheet arrangements such as guarantee contracts, contingent interests in assets transferred to unconsolidated entities or derivative financial obligations.
Management’s Report on Internal Control over Financial Reporting
In connection with National Instrument 52-109 - Certification of Disclosure in Issuer’s Annual and Interim Filings (“NI 52-109”) adopted by each of the securities commissions across Canada, the Chief Executive Officer and Chief Financial Officer of the Company are required to file a Venture Issuer Basic Certificate with respect to the financial information contained in the unaudited interim financial statements and the audited annual financial statements and respective accompanying Management’s Discussion and Analysis. The Venture Issuer Basic Certificate does not include representations relating to the establishment and maintenance of disclosure controls and procedures and internal control over financial reporting, as defined in NI 52- 109.
Company Outlook
Other than as disclosed in this MD&A, the Company does not anticipate incurring any other material capital expenditures.
17
Assuming that the Company has expended its exploration expenses in accordance with the recommendations of the technical report on the El Dorado-Monserrat Project, the Company will have achieved one of its material stated business objectives which is to determine whether El Dorado-Monserrat Project contains mineralized deposits and whether the results warrant the Company carrying out further work on the El Dorado-Monserrat Project.
If a further work program is recommended on the El Dorado-Monserrat Project, the Company may be required to raise additional funding to carry out additional exploration programs on its El Dorado-Monserrat project. In addition, should the opportunity to acquire other mineral exploration properties be presented to the Company, whether located in Argentina or elsewhere, then the Company would have to determine the appropriate method of acquiring those properties. In the event that common shares could not be used to acquire the said properties, then the Company may have to look to raise further capital.
Outstanding Securities
The Company has one class of shares outstanding, being ordinary shares. As of the date of this MD&A, 177,155,544 common shares were issued and outstanding.
The following options are outstanding at September 30, 2022:
| Number of Options | Exercise Price C$ | Expiry Date |
|---|---|---|
| 441,176 | 0.14 | November 16, 2022 |
| 9,750,000 | 0.17 | July 27, 2026 |
| 250,000 | 0.11 | September 16,2027 |
| 10,441,176 |
The following warrants are outstanding at September 30, 2022:
| Number of Warrants | Exercise Price C$ | Exercise Price C$ | Expiry Date |
|---|---|---|---|
| 2,274,124 | 0.17 | February 24, 2023 | |
| 1,582,475 | 0.18 | April 27, 2024 | |
| 18,722,655 | 0.25 | June 24, 2024 | |
| 24,091,992 | 0.28 | April 27,2027 | |
| 46,671,246 |
Shares for Debt Agreement
On September 15, 2016, Fredonia acquired the El Aguila Project, from Winki S.A., which subsequently assigned its rights to the Purchase Price to its two shareholders in equal parts (the “Sellers”). One of the shareholders agreed to accept shares of Fredonia Management Limited in exchange for the cash debt owing prior to completion of the qualifying transaction.
The obligation to pay the remaining cash portion of the Purchase Price to one of the Sellers vested in annual instalments, with the final tranche becoming due September 15, 2021. As at the date of the agreement, $50,000 had been repaid and the remainder of the cash portion of the Purchase Price represented a cash debt to the Company of $650,000.
Under the terms of the Shares for Debt Agreement, the Company and one of the Sellers have agreed that the Company may satisfy the outstanding portion of the Purchase Price by issuing 2,200,000 Common Shares and making a lumpsum cash payment of $150,000. The issuance of 2,200,000 Common Shares in exchange for $500,000 of debt represents an approximate implied price per Common Share of $0.2886, using an exchange rate of approximately $1.00 to C$1.27, being the average daily exchange rate for United States dollars in terms of Canadian dollars presented by the Bank of Canada on September 16, 2021. The implied price per Common Share represents a 15.44% surplus to
18
the closing trading price of the Common Shares on the TSXV on September 16, 2021, the trading date immediately prior to the Shares for Debt Agreement date.
On October 13, 2021, TSX Venture Exchange accepted for filing the Company's proposal to issue 2,200,000 shares to the one Seller at a deemed price of $0.2886 in consideration of the Shares for Debt Agreement dated September 15, 2021, pursuant to the El Aguila Project Agreement dated September 16, 2016. On January 24, 2022, the Company issued the 2,200,000 shares and made the lump-sum cash payment of $150,000, satisfying the terms of the agreement.
19