Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

FORRESTANIA RESOURCES LIMITED Capital/Financing Update 2021

Dec 1, 2021

64945_rns_2021-12-01_b8d7eca8-bf34-47f4-826e-39eee3c18bf4.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

2 December 2021 ASX Announcement

==> picture [138 x 13] intentionally omitted <==

==> picture [138 x 14] intentionally omitted <==

==> picture [131 x 131] intentionally omitted <==

LCT PEGMATITE, HISTORICAL DATA REVIEW AT 100% OWNED MT HOLLAND/BOUNTY EAST

Highlights:

  • Review of previous drilling shows that significant Caesium, Beryllium, Rubidium, Tin, Tantalum and Niobium anomalies were encountered

  • These elements are characteristic of “LCT” pegmatites which are prospective for lithium

  • Caesium values in drilling up to 198ppm, Beryllium up to 104.5ppm, Rubidium up to 1830ppm, Sn up to 86.4ppm, Tantalum up to 100ppm and Niobium up to 108.5ppm

  • Historical results at Mt Holland/Bounty East suggest a gently dipping pegmatite, interpreted to be analogous with other major lithium bearing pegmatite deposits in the region – Earl Grey Lithium Deposit, (located 5.9km to the NW) and Bounty Lithium Deposit (located 2.5km to the NW)

Forrestania Resources Limited (ASX: FRS) ( Forrestania or the Company ), is pleased to provide an update on its lithium program at its 100% owned Forrestania Lithium, Gold, Nickel Project. After a review of previous exploration work on the Company’s tenements, a number of significant geochemical anomalies at the ‘ Bounty East ’ prospect (historically also referred to as the Mt Holland prospect) – located on E77/2345, indicate the presence of specialised “ LCT ” (lithium, caesium, tantalum) pegmatites which have been assessed to have the potential for follow up at the Mt Holland/Bounty East prospect.

Whilst the Company remains fully focused on the strong lithium mineralisation seen at the Company’s Gem prospect (which includes 33m @ 3.2% Li2O from 69m, including 13m @ 4% Li2O), as well as the recent LCT geochemical anomalies (ASX:FRS announcement 17[th] November), environmental and government approvals are still awaited, in order to commence further work, which will include the Company’s maiden Gem drilling program.

Previous owner of the project, Marindi Metals/Firefly Resources (ASX:FFR) completed a reconnaissance aircore (AC) and follow up reverse circulation (RC) drill program over a number of geochemical soil anomalies at the “ Tillerson ” soil anomaly (Marindi Metals/Firefly Resources ASX:FFR, June 2018 - Seven outcropping lithium bearing pegmatites now identified at Forrestania, ahead of key drill program ) at the Mt Holland/Bounty East prospect in 2018 (Marindi Metals/Firefly Resources ASX:FFR - September 2018 quarterly announcement). This drilling focused on the LCT geochemical anomalies located ~5.9km south-east of the Earl Grey lithium deposit (Covalent Lithium Pty Ltd is the manager of the Earl Grey Lithium Project, appointed by a joint venture between subsidiaries of Sociedad Química y Minera de Chile S.A. (SQM) and Wesfarmers Limited) and ~2.5km south-east of the Bounty lithium deposit, as set out in Figure 1.

Forrestania Resources Limited (ABN 41 647 899 698) Suite 2 38 Colin St West Perth 6005 Australia P: +61 (0)8 6245 9890 E: [email protected] W: forrestaniaresources.com.au

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 7] intentionally omitted <==

With input from specialist pegmatite consultant Dr Leigh Bettenay, a review of this previous lithium focused exploration data has generated a number of potential drill targets for the Company.

Whilst no significantly thick pegmatites were intersected in the Marindi Metals/Firefly Resources (ASX:FFR) drilling at the Mt Holland/Bounty East prospect, several small but geochemically specialized pegmatites were discovered. These have the potential to become more significant at depth or to be accompanied by other flat-lying or gently dipping pegmatite sills.

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 7] intentionally omitted <==

Figure 1. Historic drilling in proximity to the Earl Grey and Bounty lithium deposits with Li Aster overlay over the historic drilling and proximal areas

The drilling program undertaken by Marindi Metals/Firefly Resources in 2018, tested a number of the Be, Cs, Ta geochemical soil anomalies at the Mt Holland/Bounty East prospect. The available data from the historic drilling indicates that there were multiple narrow pegmatites intersected, with some up to 16m in thickness (MHAC0092). These narrow, gently dipping pegmatites are seen on drill lines throughout the historic Marindi Metals/Firefly Resources drilling program. Although none of the pegmatites show high lithium values (the max value was 220ppm), the values for Caesium, Beryllium, Rubidium, Tin, Tantalum and Niobium within the pegmatites are highly anomalous.

Forrestania believes that the historic results suggest the possibility of gently dipping structures similar to those seen at the Earl Grey lithium deposit and the Bounty lithium deposit; both of

FRS:ASX Announcement 2

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 7] intentionally omitted <==

these deposits show gently dipping pegmatites with a number of shallow, thin pegmatite sills near the surface and the more substantial lithium grades at depth, in excess of 150m. Despite the large number of drill holes completed during the Marindi Metals/Firefly Resources campaign, only two holes at a depth greater than 150m were completed, with the majority of the holes <50m deep (refer Figure 2 and 3).

==> picture [451 x 222] intentionally omitted <==

==> picture [451 x 4] intentionally omitted <==

Figure 2: Anomalous Caesium (>20ppm), on a historic Marindi Metals/Firefly drilling section, looking north (6444008mN)

==> picture [451 x 226] intentionally omitted <==

Figure 3: Anomalous Rubidium (>400ppm), on a historic Marindi Metals/Firefly drilling section, looking north (6444008mN)

Chairman John Hannaford commented “ We are pleased to see the indications that the drilling has revealed mineralisation that is structurally similar to the gently dipping pegmatites at major deposits situated very near to this area. With this enhanced understanding of the previous exploration work, we are going to increase our focus on the area.

FRS:ASX Announcement 3

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 7] intentionally omitted <==

As seen from a cross section of the Earl Grey lithium deposit (Figure 4) and the Bounty Lithium Deposit (Figure 5), the pegmatites are gently dipping stacked structures, with lithium grades and widths being much more elevated at depths of >100m.

==> picture [451 x 5] intentionally omitted <==

==> picture [451 x 135] intentionally omitted <==

Figure 4: Section from the Earl Grey lithium deposit (759500mE), taken from Kidman Resources’ ASX Release: Substantial increase in Earl Grey Lithium Mineral Resource Estimate 19 March 2018

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

==> picture [451 x 11] intentionally omitted <==

==> picture [451 x 10] intentionally omitted <==

Figure 5: Section from the Earl Grey lithium deposit (762300mE), taken from Kidman Resources’ ASX Release: Substantial increase in Earl Grey Lithium Mineral Resource Estimate - 19 March 2018

The Company has recently completed environmental surveys at E77/2345 and is awaiting government approvals for a more targeted drilling campaign, to test the extent and mineralisation of the Mt Holland/Bounty East pegmatites.

It is not possible to comment on the accuracy or quality of the assays from historical drilling. However, it is part of the Company’s overall work program to attempt to verify significant intersections and validate historical assay accuracy by further drilling programs and resampling any, and all, existing historical drill chips that may be found during the exploration activities.

FRS:ASX Announcement 4

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 8] intentionally omitted <==

==> picture [63 x 7] intentionally omitted <==

This announcement is authorised for release by the Board.

For further information, please contact: John Hannaford Simon Adams Chairman Company Secretary Forrestania Resources Limited Forrestania Resources Limited T: +61 (0) 419 042 769 T: +61 (0)439 845 435 E: [email protected] E: [email protected]

About Forrestania Resources Limited

Forrestania Resources Limited is an exploration company searching for gold, lithium, and nickel in the Forrestania, Southern Cross and Leonora regions of Western Australia. The Forrestania Project is prospective for gold, lithium and nickel and is currently the only project, within the tenement portfolio that holds a gold Mineral Resource. The Southern Cross Project is prospective for gold and lithium and the Leonora Project is prospective for gold.

The Forrestania Project is situated in the well-endowed southern Forrestania Greenstone Belt, with a tenement footprint spanning approximately 100km, north-to-south of variously metamorphosed mafic/ultramafic/volcano-sedimentary rocks host to the historic 1Moz Bounty gold deposit, emerging Kat Gap gold deposit, the operating Flying Fox, and Spotted Quoll nickel mines, and the more recently discovered Earl Grey lithium deposit.

The Southern Cross Project tenements are scattered within proximity to the town of Southern Cross and located in and around the Southern Cross Greenstone Belt, which extends along strike for approximately 300km from Mt Jackson to Hatters Hill in the south. It is the Company’s opinion that the potential for economic gold mineralisation at the Southern Cross Project has not been fully evaluated. In addition to greenstone shear-hosted gold deposits, Forrestania is targeting granite-hosted deposits.

==> picture [277 x 15] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 15] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 15] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 15] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 15] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 16] intentionally omitted <==

==> picture [277 x 15] intentionally omitted <==

New geological models for late Archean granite-controlled shear zone/fault hosted mineralisation theorise that gold forming fluids, formed at deep crustal levels do not discriminate between lithologies when emplaced in the upper crust. Applying this theory, Forrestania has defined seven new targets.

The Leonora Project tenements are located within the Norseman-Wiluna Greenstone Belt of the Yilgarn Craton. The Project includes one Exploration Licence and five Exploration Licence Applications, covering a total of 856.7km[2] . The tenements are predominately noncontiguous and scattered over 200km length of the greenstone belt. The southernmost tenement is approximately 15 km southeast of the town of Menzies, and the northernmost tenement is located approximately 70 km northeast of Leonora. Prior exploration over the

project area has focussed on gold, diamonds, and uranium. Tenements in the Project have been variably subjected to soil sampling, stream sampling, drilling, mapping, rock chip sampling and geophysical surveys.

FRS:ASX Announcement 5

Priority drilling targets have been identified in both project areas and the Company is well funded to undertake effective exploration programs.

The Company has an experienced Board and management team which is focused on discovery to increase value for Shareholders.

Competent Person’s Statement

The information in this report that relates to Exploration Results is based on and fairly represents information compiled by Mr Ashley Bennett. Mr Bennett is the Exploration Manager of Forrestania Resources Limited and is a member of the Australian Institute of Geoscientists. Mr Bennett has sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bennett consents to the inclusion in this report of the matters based on information in the form and context in which they appear.

Disclosure

The information in this announcement is based on the following publicly available ASX announcements and Forrestania Resources IPO, which is available from https://www2.asx.com.au/

The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcements and that all material assumptions and technical parameters underpinning the relevant ASX announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are represented have not been materially modified from the original ASX announcements.

FRS:ASX Announcement

6

Appendix 1 – JORC TABLE 1

Section 1 Sampling Techniques and Data

Criteria JORC Code Explanation Commentary
Sampling techniques • Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down-hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g.
submarine nodules) may warrant disclosure of detailed
information.
Due to the historic nature of the sampling, it is not possible to comment on
the accuracy or quality of the assays from the drilling. However, it is part of
the Company’s overall work program to attempt to verify significant
intersections and validate historical assay accuracy by drilling programs and
resampling any, and all, existing historical drill chips that may be found
during the exploration activities.
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
Two samples are taken for each metre drilled using Reverse Circulation
method. A bulk sample is collected in a 600x900mm plastic bag and a 4%
split using a cone splitter is also taken in a calico bag.
Sample intervals are then determined by geology and geochemistry
(portable XRF). If a single 1m sample is required then a single 4% split is
assayed, or if composite samples are required then 1m splits are combined
and assayed.
If a composite sample is greater 3kg, then a 25% riffle split is taken to
composite. If further sampling is required spear samples can be taken from
the bulk samples.
Selective sampling of the AC assays was taken, the details of the selection
criteria are unavailable to FRS.
Drilling techniques Drill type (e.g. core, reverse circulation, open- hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if
so, by what method, etc.).
Historic drilling being reported.
The data being referred to in this announcement was drilled by Marindi
Metals (now Firefly Resources) was completed in August 2018: 8816m of
reverse circulation and 6257m of reverse circulation (RC) during a drilling
program at Mt Holland/Bounty East and Cosmic Boy East (the drilling at
_Cosmic Boy East is not referred to inthis announcement). _
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
The historic drilling reported in this announcement was by Aircore (AC) and
reverse circulation (RC).
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
An experienced RC driller from a reputable drilling contractor using suitable
drilling equipment has been used for this drill program. The contractor and
Marindi Metals staff are using industry standard techniques to maximise
sample recoveries and produce representative sample intervals during RC

FRS:ASX Announcement

7

Criteria JORC Code Explanation Commentary
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential
loss/gain of fine/coarse material.
drilling. The cyclone and splitter are levelled and cleaned regularly, or if
there is significant movement noticed, then it is levelled after every 1m to
ensure a representative split.
Sample recovery is recorded for every 1m by Marindi geologists and
geotechnicians. Where sample recovery is less than 100% and the sample is
to be assayed, any recovery loss is noted in the assay ledger.
Drilling to date by Marindi has had very good sample recovery.

No apparent bias has occurred during sampling.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography. The total length and
percentage of the relevant intersections logged.
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
Every metre drilled has geology and XRF analysis. Geology logs record
geological units, alteration, veining and percentage of relevant minerals.
All RC samples are analysed once using a Thermo Scientific Niton Portable
XRF.
All data is validated before entry into the Marindi Metals Ltd database.
Sub-sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all
core taken. If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all sub- sampling
stages to maximise representivity of samples. Measures taken
to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field
duplicate/second-half sampling. Whether sample sizes are
appropriate to the grain size of the material
being sampled.
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
Sample intervals are determined by a Marindi Metals Ltd geologist.
All intervals are documented digitally.
Sample intervals are determined by geological intervals.
Two samples are taken for each metre drilled using Reverse Circulation
method. A bulk sample is collected in a 600x900mm plastic bag and a 4%
split using a cone splitter is also taken in a calico bag.
Sample intervals are then determined by geology and geochemistry
(portable XRF). If a single 1m sample is required then a single 4% split is
assayed, or if composite samples are required then 1m splits are combined
and assayed.
If a composite sample is greater 3kg, then a 25% riffle split is taken to
composite. If further sampling is required spear samples can be taken from
the bulk samples.
Selective sampling of the AC assays was taken, the details of the selection
_criteria are unavailable to FRS. _
Quality of assay data and
laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
Samples are analysed via a 4 acid digest with an ICP-MS finish. This method
is considered to be a total analysis of the sample with 48 elements assayed
for. For Li samples greater than 10000ppm, a new analysis is done using
Na2O2 fusion with a ICP-AES finish.

_The analysis is completed by an industry- leading laboratory. _

FRS:ASX Announcement

8

Criteria JORC Code Explanation Commentary
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
Each batch of samples analysed has several standards, blanks and
duplicates included.
No geophysical tools are used.
An XRF instrument is used to aid geological logging and determination of
sample intervals. No XRF data has been reported by Marindi Metals Ltd.
Verification of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
Intersections have been verified by Marindi Metals Ltd personnel and
contract professionals.
None of the drill-holes in this report are twinned.
All data is recorded on paper logs and then entered into a database. Data is
then checked before being moved into a primary database. Data is backed
up on a remote server in two locations.
Adjusting Li to Li2O is achieved by multiplying by 2.15 and adjusting Fe to
Fe2O3 is achieving by multiplying by 1.43. These being the relevant atomic
_weight ratios. _
Location of data points Accuracy and quality of surveys used to locate drill holes
(collar and down- hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
All collar co-ordinates of drill holes in this release have been located via a
Garmin hand held GPS. Locations are averaged for a minimum of 15 GPS
readings.
Accuracy is assumed to be within +- 4m.
Drill hole locations are recorded in MGA94_Zone50 coordinate system.

_Topographic control is considered adequate. _
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
The drill spacing in this program has been variable, however, where specific
lines have been drilled across the greenstone/granite contact 100m to 50m
spacing is used.
Where intersections of interest have been made, a “scissor”-hole has been
drilled at 180 degrees to the first to confirm width of original intercept.
Exploration drilling at the Cosmic Boy East prospect is preliminary and
spacing and distribution of exploration results is not sufficient to support
Mineral Resources or Ore Reserves.
Each reported assay in this release is a 1m
composite. Composites are 4% cyclone splits.

The drillspacing for the AC program is variable.

FRS:ASX Announcement

9

Criteria JORC Code Explanation Commentary
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
No significant orientation-based sampling bias is known at this time.
The drill holes may not necessarily be perpendicular to the orientation of the
intersected mineralisation.
All reported intervals are downhole intervals, not true widths.
Scissor holes have been drilled at regular intervals and in areas of interest to
ensure widths and orientations are refined.
Exact true widths and specific orientation of mineralised bodies could be
_established with additional drilling. _
Sample security The measures taken to ensure sample security. From the Marindi Metals (ASX:FFR) announcement (27th August 2018):
Appropriate security measures are taken to dispatch samples to the
laboratory.
Chain of custody of samples are managed by Marindi Metals Ltd.
Samples are stored onsite and transported to the laboratory by Marindi
Metals Ltd personnel or a licenced transport company.
The laboratory issues a receipt and a reconciliation of delivered samples
against the laboratory analysis submission form from Marindi Metals Ltd.
Audits or reviews The sampling methods being used are industry standard
practice.
Forrestania Resources have not completed any external audits or reviews of
the sampling techniques and data.

Section 2 Reporting of Exploration Results (Criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.

E77/2345 is owned 100% by Forrestania Resources or subsidiaries of
Forrestania Resources.

FRS:ASX Announcement

10

Criteria JORC Code Explanation Commentary
Exploration by other
parties
Acknowledgment and appraisal of exploration by other
parties.

All of the data referred to in this announcement is historic data, the
drilling, soil sampling and assaying were completed by Marindi Metals
(ASX:FFR) in 2018.
Geology Deposit type, geological setting and style of mineralisation.
The mineralization style related to this release are specialty metals
related to LCT-pegmatite intrusives. These types of pegmatite are known
to occur in various rock types throughout the Forrestania Greenstone
Belt.

The Forrestania greenstone belt is located within the Southern Cross
Domain of the Archean Youanmi Terrane, one of several major crustal
blocks that form the Archean Yilgarn Craton of southwestern Australia.

The Forrestania greenstone belt and its northern extension, the Southern
Cross greenstone belt, form a narrow 5-30km wide curvilinear belt that
rends north-south over a distance of 250km.

The greenstone comprises a lower mafic-ultramafic volcanic succession,
and an upper sedimentary succession intruded and bounded by
granitoid batholiths.
Drill hole Information A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
dip and azimuth of the hole, down hole length and
interception depth
hole length
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.

Historic drilling information is referred to in this announcement; all of the
drilling referred to was completed by Marindi Metals (ASX:FFR) in 2018.

FRS:ASX Announcement

11

Criteria JORC Code Explanation Commentary
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent
_values should be clearly stated. _

No individual, specific geochemical anomalies from soil sampling
programs are reported in this announcement.
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill-
hole angle is known, its nature should be reported. If it is not
known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole
_length, true width not known’). _

All intersections reported in this release are downhole intervals.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate sectional
_views. _

Appropriate maps with scale are included within the body of the
accompanying document.
Balanced reporting Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
_reporting of Exploration Results. _

The accompanying document is considered to represent a balanced
report.
Other substantive
exploration data
Other exploration data, if meaningful and material, should be
reported
including
(but
not
limited
to):
geological
observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious
or contaminating substances.
ASTER: Dr. Neil Pendock through his company Dirt Exploration, conducted
Aster visible/near infrared [VNIR], shortwave infrared [SWIR] and longwave
infrared [LWIR] imaging at Forrestania on behalf of FRS in August 2021.
o The mineral abundances for 83 Au occurrences in the Minedex database
which fall within the project area were extracted, and a multivariate
statistical classifier was designed to separate the radiance signals over
the Au, Ni and Li occurrences and these signals were applied across the
FRS tenements. FRS were provided with “temperature scale”
georeferenced images based on these signals.

FRS:ASX Announcement

12

Criteria JORC Code Explanation Commentary

The relatively coarse spatial and spectral resolution (of especially Aster
thermal), means that fieldwork for confirmation of any remote sensing
interpretation is essential.
Further work
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale stepout
drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future
drilling areas, provided this information is not commercially
_sensitive. _
Geochemical assessment and investigative geological mapping of the
tenements is ongoing
Further exploration is planned once governmental approval has been granted.