Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

FOCUS MINERALS LTD Capital/Financing Update 2010

Feb 15, 2010

64932_rns_2010-02-15_98e350e3-700c-4bb4-bf3c-1551b361ec07.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [576 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th] February 2010
----- End of picture text -----

==> picture [567 x 113] intentionally omitted <==

==> picture [171 x 739] intentionally omitted <==

MARKET UPDATE:

SIGNIFICANT HIGH-GRADE INTERCEPTS FROM RECENT UNDERGROUND AND SURFACE DRILLING

EXCELLENT START TO QUARTER WITH APPROXIMATELY 14,500 OUNCES PRODUCED TO-DATE

HIGHLIGHTS

  • Latest round of underground diamond drilling at Empress delivers high-grade intercepts outside of the reserve with best result of: o 13.52m @ 9.31g/t Au (including 0.50m @ 130g/t Au)

  • Maiden Focus Minerals Indicated and Inferred Resource completed for the Tindals deposit:

  • 182,000t @ 3.7g/t Au for 21,600 ounces

  • Recent exploration drilling results at the greater Tindals Mining Centre continue to reward the Company’s aggressive exploration strategy. Highlights from recent drilling included:

  • 2.28m @ 5.77g/t and 1.88m @ 10.94g/t at Cookes;

  • 16m @ 3.59g/t at Dreadnought; and

  • 7m @ 5.55g/t , 2m @ 17.29g/t and 2m @ 15.81g/t at Empress/Alicia.

Gold producer Focus Minerals (ASX: FML ) is pleased to provide an update on operations at the Company’s Coolgardie Gold Project, including significant high-grade gold intersections from the current round of drilling within the Tindal’s Mining Centre, Coolgardie.

Drilling continues both underground and at surface as part the Company’s aggressive resource definition, extensional and exploration programs aimed at defining new mineral deposits and extending existing resource and reserve inventories.

The most recent toll milling campaign (number 10) concluded at Greenfields on Sunday, 14 February, with approximately 9,000 ounces produced. In addition, Focus has also produced approximately 5,500 ounces from the Three Mile Hill mill, delivering total gold production for the 2010 calendar year to date of approximately 14,500 ounces.

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Underground Drilling - Empress

At Empress, underground drilling has returned excellent results including a high-grade down-hole intercept of 13.52m @ 9.31g/t ( including 0.55m at 130.00g/t) .

Importantly, the high-grade intersection is outside of the current Reserve and is over 50 metres below the current Empress workings. The ongoing success of drilling outside the current Empress Reserve points to a continual growth in the Resource and Reserve base at the Tindals Mining Centre.

Surface Drilling

While exploration drilling underground early in the year was focused at Empress, the Company also conducted Reverse Circulation (RC) surface drilling at the Empress/Alicia, Cookes and Dreadnought deposits with high grade intercepts including:

  • 2.28m @ 5.77g/t from 57.82m and

  • 1.88m @ 10.94g/t from 53.45m at Cookes;

  • 16m @ 3.59g/t from 26m at Dreadnought;

  • 7m @ 5.55g/t from 45m and

  • 2m @ 17.29g/t from 1m and

  • 2m @ 15.81g/t from 37m at Empress/Alicia.

Of particular note were the relatively shallow nature of the above intercepts, which will enhance the project economics of the deposits as they are converted to Reserves in the future. A full tabulation of the 33 holes drilled since mid December a provided in Appendix 1.

The intercept of 16m @ 3.59 from 26m from the Dreadnought deposit resulted from a hole planned to test metallurgy and is within the current pit design. This result compares very favourably to the current Reserve grade of 1.8g/t (recently released in the December 2009 Quarterly Report).

Tindals Resource

Work continues on the conversation of Resources to Reserves at the Tindals Mining Centre and during the month of January, Focus was able to complete a maiden Focus Minerals Resource for the actual Tindals deposit. A small amount of drilling has been ongoing at Tindals in conjunction with the drilling at Countess and Empress.

The Tindals ore body was historically mined as a series of underground shafts before being transformed into an open pit operation to a depth of 90 metres. The mine eventually returned to an underground operation, closing in 2005 with the last level producing over 80,000 tonnes at 3.24g/t for 9,100 contained ounces.

Validation of the historical data, combined with recent interpretations and compilation of historic survey information, has provided confidence in the historical data. This has resulted in an initial small resource estimate for the next 100 metres vertical and approximately 200 metres along strike ( Figure 1 ).

There remains significant upside below and along strike of this resource which will be tested by drilling and continual evaluation of existing and new data with access to the flooded levels nearly complete pending completion of current dewatering programme.

The new resource at Tindals is 182,000t @ 3.7g/t for approximately 21,600 contained ounces ( Table 1 ).

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Table 1 – Tindals Resource (Reported at a 2g/t lower cut-off)

Table 1– Ti ndals Resource(Reporte d at a 2g/t low er cut-off)
Lode Tonnes Au g/t Ounces
Indicated West 45,000 5.00 7,200
East 54,000 3.20 5,700
Sub-Total Indicated Resource 99,000 4.00 12,900
Inferred West 7,000 4.50 1,000
East 76,000 3.20 7,700
Sub-Total Inferred Resource 83,000 3.30 8,700
Total Resource 182,000 3.70 21,600

Tindals Reserve

A Maiden Probable Reserve for Focus Minerals of 68,000t @ 3.2g/t for 7,000 ounces has been generated for the Tindals ore body.

The Tindals ore body sits approximately 50m to the East of the Countess ore body and will be accessed by extending the Countess cross cut. The decline is already shared between Countess and Empress and the addition of Tindals will be achieved for little additional capital expenditure.

The Tindals orebody will be the fourth to be mined underground by Focus at the Tindals Mining Centre and will add further benefits of scale and flexibility to an already robust operation.

==> picture [365 x 315] intentionally omitted <==

Figure 1: Tindals Long Section

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Summary

 Focus Chief Executive Officer, Mr Campbell Baird, said the drilling results were immensely exciting particularly those coming from the surface drilling: “The drilling results to date have confirmed that our existing deposits have significant potential for additional Resources and Reserves,” said Mr Baird.

“The new Resource and Reserve update at the Tindals deposit at the Tindals Mining Centre is also very pleasing and shows that in many areas further drilling will unlock the wealth that is present here in Coolgardie” said Mr Baird.

Mr Baird also said it has also been very pleasing to get the year off to a running start with the milling campaign at Greenfields in combination with the first production from Three Mile Hill.

“This is a particularly exciting time for Focus Minerals and with more drilling planned and the recent commissioning of the Three Mile Hill Gold Plant earlier this month, 2010 is shaping up to be a very active year,” he added.

ENDS

On behalf of:
Released by:
Nicholas Read/Jason Cunningham Campbell Baird, CEO
Read Corporate Focus Minerals Ltd
Telephone: (+61-8) 9388-1474 Telephone: (+61-8) 9215-7888
www.readcorporate.com.au Web:www.focusminerals.com.au

COMPETENT PERSON’S STATEMENT

The information in this report relating to Resources is based on work supervised by Dr Garry Adams who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Dr Adams has the relevant experience as a “Competent Person” as defined in the 2004 edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves in relation to the mineralisation being reported. Dr Adams is Exploration Manager of Focus Minerals Ltd and consents to the inclusion of the material in the form and content in which it appears.

The information in this report that relates to Underground Ore Reserves is based on information compiled by Mr Bradley Valiukas, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Valiukas has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Valiukas consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

BACKGROUND INFORMATION – FOCUS MINERALS LTD

Focus Minerals Ltd (ASX: FML ) is an Australian-based exploration and development group whose focus is to become a significant gold and nickel producer in the Coolgardie-Kalgoorlie-Widgiemooltha region of Western Australia.

Focus Minerals is the largest landholder in the Coolgardie Gold Belt located in Western Australia, 560km east of Perth and 35km west of the ‘Super Pit’ in Kalgoorlie-Boulder. More than 2.6 million ounces of gold has been produced from

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

the Coolgardie gold belt alone since 1892. Focus holds the mineral rights to more than 210sq km of tenements including an extensive inventory of Measured, Indicated and Inferred gold resources as well as the 1.2mtpa Three Mile Hill processing plant.

Appendix 1

Table 1 – Empress Diamond Drill Results.

Table 1– Emp ress Diam ond Drill Resul ts.
Hole
Number
Northing Easting RL Azimuth Dip Total
Depth
From
(m)
To
(m)
Interval
(m)
Grade
g/t
EMXP0003 6570298 325413 124 341 -37 121.11 87 88 1 2.06
89.37 102.89 13.52 9.31
89.37 89.88 0.51 130
Table 2– Cookes RC and Diamond Drill Results.
Hole Number Northing Easting RL Azimuth Dip Total
Depth
From
(m)
To
(m)
Interval
(m)
Grade
g/t
TNDCD0136 6571240 326764 419 270 45 96.7 57.82 60.1 2.28 5.77
70.62 71 0.38 1.85
76.44 77.24 0.8 5.6
79.8 80.15 0.35 2.07
82.3 83.1 0.8 1.45
TNDC0139 6571320 326772 420 270 60 48 35 37 2 1.81
TNDCD0143 6571360 326780 423 270 60 99 53.45 55.33 1.88 10.94
56.29 56.77 0.48 2.56
60.52 61.94 1.42 6.9
TNDCD0147A 6571400 326720 422 270 50 50 61.8 62.22 0.42 3.75
63.04 63.46 0.42 1.76
65.29 65.98 0.69 2.05
73.79 74.61 0.82 1.33
76.15 77 0.85 2.41
78.55 79.55 1 1.05
82.86 83.33 0.47 1
86.05 86.53 0.48 1.6
TNDC0154 6571380 326711 422 270 60 60 No significant intercept

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Table 3 – Dreadnought RC Drill Results.

Table 3– Dre adnought R C Drill R esults.
Hole
Number
Northing Easting RL Azimuth Dip Total
Depth
From
(m)
To
(m)
Interval
(m)
Grade
g/t
TNDC0157 6569640 325275 417 90 -60 30 10 11 1 2.75
TNDC0158 6569663 325265 416 90 -50 50 No significant intercept
TNDC0159 6569720 325288 417 90 -60 40 11 12 1 1.01
31 32 1 1.97
TNDC0160 6569740 325285 417 90 -60 64 26 42 16 3.59

Table 4 – Empress/Alicia RC Drill Results.

Table 4– Emp ress/Alici a RC Drill Resul ts.
Hole
Number
Northing Easting RL Azimuth Dip Total
Depth
From
(m)
To(m) Interval
(m)
Grade
g/t
TNDC0077 6570068 325277 420 -50 90 60 14 18 4 2.22
20 21 1 1.21
37 39 2 6.29
TNDC0079 6570088 325292 419 -60 90 46 6 9 3 2.9
11 13 2 2.62
18 19 1 2.11
21 24 3 3.39
TNDC0080 6570088 325295 419 -45 90 45 1 3 2 17.29
6 10 4 1.93
24 25 1 1.63
TNDC0081 6570107 325282 420 -60 90 60 20 23 3 1.5
28 29 1 1.77
34 35 1 1.05
37 39 2 15.81
42 43 1 1.23
49 50 1 1.7
TNDC0082 6570107 325285 420 -45 90 28 21 25 4 1.56
TNDC0083 6570127 325272 421 -50 90 100 18 19 1 1
26 27 1 1.38
45 52 7 5.55
58 59 1 2.41
74 75 1 2.71
TNDC0084 6570126 325292 421 -50 90 34 0 2 2 1.28

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

14 23 9 1.05
TNDC0085 6570129 325343 424 -50 270 40 No significant intercept
TNDC0090 6570188 325340 423 -65 90 36 29 30 1 1.08
TNDC0091 6570208 325320 422 -60 90 30 0 1 1 1.29
6 7 1 8.77
11 12 1 2.26
26 27 1 1.18
TNDC0103 6570271 325489 430 -60 90 42 34 35 1 1.18
TNDC0104 6570290 325463 431 -60 90 45 4 5 1 1.17
31 38 7 2.25
TNDC0104A 6570290 325463 431 -60 90 66 0 1 1 1.36
33 40 7 3
TNDC0105 6570290 325476 430 -60 90 42 1 4 3 1.15
10 11 1 1.66
TNDC0106 6570290 325489 430 -60 90 30 2 3 1 1.41
5 6 1 3.47
27 28 1 1.04
TNDC0107 6570310 325482 429 -60 90 24 2 3 1 1.13
6 11 5 2.27
TNDC0108 6570044 325359 420 90 50 76 No significant intercept
TNDC0109 6570064 325360 421 90 50 80 39 43 4 2.03
76 77 1 1.12
TNDC0110 6570059 325400 420 90 50 55 31 33 2 11.53
TNDC0111 6570079 325399 420 90 50 55 34 36 2 3.61
38 39 1 1.73
41 42 4 1.47
49 50 1 1.08
52 53 1 3.51
TNDC0171 6570069 325388 420 -60 180 54 32 34 2 3.48
TNDC0172 6570081 325388 421 -60 180 56 24 25 1 13.4
30 33 3 5.17
TNDC0173 6570053 325409 419 -55 180 32 No significant intercept

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Appendix 2 – Resource Summary 31[st] January 2010

Prospect Classification Tonnes Grade
(g/t)
Contained
Ounces
OPEN PITS
Bi Bl Indicated 279,000 3.7 32,900
g ow Inferred 94,000 5.8 17,500
Billit Indicated 1,928,000 2.2 136,400
ran Inferred 1,146,000 2.9 106,800
Cookes Inferred 86,000 2.6 7,300
Ddh Indicated 3,024,000 2.0 196,400
reanougt Inferred 435,000 1.8 24,600
Empress/Alicia Inferred 875,000 1.8 49,800
Friendship Inferred 100,000 1.4 4,600
Gfild Indicated 1,386,000 1.9 86,500
reenes Inferred 138,000 3.0 13,300
Happy Jack Inferred 198,000 1.7 10,900
Hillside Inferred 672,000 3.1 65,900
Lord Bob Inferred 820,000 1.6 42,200
Lid Indicated 4,350,000 1.7 237,800
nsays Inferred 1,490,000 1.6 76,600
King Solomon/Queen Sheba Inferred 1,400,000 2.0 90,000
Norris - Grosmont Inferred 1,050,000 2.4 82,000
Total Indicated Resource - Open Pits 10,967,000 2.0 690,000
Total Inferred Resource - Open Pits 8,504,000 2.2 591,500
Total Resource - Open Pits 19,471,000 2.0 1,281,500
UNDERGROUND
Measured 80,000 4.5 11,500
Countess Indicated 320,000 4.5 45,800
Inferred 127,000 3.4 13,800
Cyanide Inferred 367,000 5.5 65,400
E Indicated 175,000 4.4 24,800
mpress Inferred 15,000 3.4 1,600
The Mount Inferred 2,090,000 5.5 369,600
P Indicated 349,000 6.3 70,700
erseverance Inferred 54,000 5.7 9,900
Tidl Indicated 99,000 4.0 12,900
nas Inferred 83,000 3.3 8,700
Total Measured Resource - Undeground 80,000 4.5 11,500
Total Indicated Resource - Underground 943,000 5.1 154,200
Total Inferred Resource - Underground 2,736,000 5.3 469,000
Total Resource - Underground 3,759,000 5.3 634,700
Total Measured & Indicated Resource 11,891,000 2.2 842,800
Total Inferred Resource 11,157,000 2.9 1,051,800
**Grand Total ** 23,048,000 2.6 1,894,600

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Appendix 3 – Reserve Summary as at 12th February 2010

Underground Reserves: Underground Reserves: Tonnes: Grade: Ounces:
Proven: Perseverance: 74,000 4.1 9,700
Sub Total: 74,000 4.1 9,700
Probable: Perseverance: 90,000 4.0 11,600
Countess: 287,000 3.7 33,700
Empress: 179,000 3.0 17,100
Tindals: 68,000 3.2 7,000
Sub Total: 623,000 3.5 69,500
Total: 698,000 3.5 79,200
Surface Reserves: Tonnes: Grade: Ounces:
Probable: Greenfields: 1,101,000 1.7 59,900
BigBlow: 63,000 2.2 4,500
Dreadnought North: 54,000 1.8 3,100
Total: 1,218,000 1.7 67,500
Total Reserves: Tonnes: Grade: Ounces:
1,915,000 2.4 146,600
Surface Stocks: Tonnes: Grade: Ounces:
104,018 2.8 9,500
Reserves and Stocks: Tonnes: Grade: Ounces:
2,019,000 2.4 156,000

Notes: Tindals Reserve is current with this release. Surface Stocks are at 31st January 2010 All other Reserves are as of 31st December 2009

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

Notes to accompany the Mineralised Resource Statements

The notes below are for the maiden Tindals Resource which has not been previously released to the ASX.

Tindals is hosted within tightly folded silica altered (“bleached”) diorite intrusions within an ultramafic sequence. The Tindals East and West Lodes are vertical and north-south striking. They start to bend around to the NNW in the northern extent of the resource. Width range of these two lodes is 2m to 12m. Down dip they are poorly defined by the current drilling and potential for down dip extension is good. In all lodes, mineralisation consists of quartz/sulphide micro-veinlets, disseminated pyrrhotite and albitic alteration of the diorites. No visible gold has been seen at Tindals in recent drill core.

The resource at Tindals is a result of drilling completed up to the December 2009 Quarter and a new geological interpretation beneath the historical Tindals workings after a review of the historical drilling which has also been intersected by new drilling.

The interpretation was then used to create the resource model for the deposit.

Drilling Information

The Tindals Resource was calculated from a total of 163 Diamond holes for a total of 21,641.15m. Drill spacing is generally 25m x 25m in the indicated resource area, which widens to 40m x 40m in the inferred resource areas. Grade control face and wall sampling and sludge drilling were only used to guide the creation of the ore wireframes and were not used as part of the estimation or statistical work.

The drill holes have either been down hole surveyed by Eastman single-shot camera, Reflex Ezi-shot, electronic multi-shot (EMS) or gyroscope methods. All drill holes that were surveyed at Tindals was done so in Tindals Mine Grid coordinates and have subsequently been converted to GDA94 co-ordinates.

All drilling has been logged (lithology, alteration, structure, veining and mineralisation) in detail and stored in electronic databases after being validated.

Diamond core is sampled to geological boundaries for the Focus drilling, and to a combination of geology or metre intervals for pre-Focus drilling. The core was cut in half, with only half submitted for assaying.

All samples (Focus and pre-Focus drilling) have been assayed using the Fire Assay method at Analabs, ALS Chemex or Kalgoorlie Assay Laboratory in Kalgoorlie. For drilling since 2006 a 30g Fire Assay with AAS finish was used at ALS Chemex, while a 40g Fire Assay with ICP-MS finish method at the Kalgoorlie Assay Laboratories. Check assaying of sample pulps and quarter core was conducted at Genalysis Laboratory in Perth for independent auditing of the assaying process.

Geological Model

The geological interpretation (geology and mineralisation) and the resource estimation were conducted internally. The mineralised interpretation at Tindals was digitised to either geological boundaries or a nominal 1g/t cut-off grade where the geological contact was obscure. No mining dilution has been incorporated into the resource interpretation, although some low grade zones (<1g/t) have been included to allow for continuity of the interpretation.

Samples within individual wireframes at were composited to 1m intervals. The composites were used to determine the necessary top cuts which were done by a combination of Skree Plot and Probability Plot analysis. For Tindals East and West Lodes the top cut value was 32g/t Au.

A Surpac block model was created in GDA grid co-ordinates. The estimation was completed using the Ordinary Kriging (OK) method.

A bulk density of 2.75t/m[3] was applied to all ore blocks. This is an average value based on values determined from test work conducted on recent Focus diamond drill core and is a value that is in line with diorite units elsewhere in the Coolgardie region.

==> picture [595 x 71] intentionally omitted <==

==> picture [595 x 20] intentionally omitted <==

----- Start of picture text -----

ASX Release 16 [th ] February2010
----- End of picture text -----

==> picture [113 x 78] intentionally omitted <==

The reported grades, tonnages and contained ounces are rounded to appropriate levels of precision in accordance with the recommendations of the JORC code.

The Countess – Tindals Resource has been reported at a 2g/t lower cut-off grade and is depleted by using the historical void models for Tindals underground and the more recent void shapes for Countess as mined by Focus.

Notes on Underground Ore Reserves

All reserves are a subset of the reported resources, that is; the resources are not in addition to the ore reserves. Tables are subject to rounding of significant figures.

Tindals

The estimated probable reserve is based on the resource model tabled in this ASX release.

The Tindals reserve has been considered as an ongoing extension of the current mine and has been assessed against existing cost structures.

Cut off grades were determined using variable unit costs for and a final cut off of 2g/t was used for inclusion or rejection of stoping blocks. Development has been included as required to access stoping blocks.

New development assumes 4.5m wide x 4.5m high ore drives with 11% dilution and 99% recovery (assumed mined result is 110% of tonnes at 90% of grade for 99% of metal).

Mining method has been assumed to be long hole open stoping as is currently occurring elsewhere in the mine and as occurred previously on the Tindals ore body. A planed dilution of one meter or greater has been applied to stoping blocks depending on the combination of interpreted ore shape and practical stoping shape. A further 5% of unplanned dilution has been applied subsequent to the design process and it assumed that 95% of stoped material is recovered (assumed mined result is 100% of tonnes at 95% of grade for 95% of metal).

==> picture [595 x 71] intentionally omitted <==