23 June 2014
Manager of Company Announcements ASX Limited Level 8 Exchange Plaza 2 The Esplanade PERTH WA 6000
By E-Lodgement
BOARD & MANAGEMENT
Mr Greg Bandy EXECUTIVE DIRECTOR
Mr Jason Bontempo NON-EXECUTIVE DIRECTOR
Mr Jeremy King NON-EXECUTIVE DIRECTOR
Operations Update
Highlights
-
Burruna-3 Well Online
-
Production from Burruna Oil Field in excess of 1,000 barrels per day
-
PEL 110 seismic survey identifies 7 “First Pass” leads
-
Two (2) priority prospects identified
-
ICE Brent Crude up 5% in past 2 weeks
Ms Rebecca Sandford Ms Sara Kelly JOINT COMPANY SECRETARY
REGISTERED OFFICE Ground Floor 1 Havelock Street West Perth WA 6005
POSTAL ADDRESS PO Box 1440 West Perth WA 6872
CONTACT DETAILS Tel: +61 8 9488 5220 Fax: +61 8 9324 2400
Burruna Oilfield
WEBSITE
Orca Energy Limited (“ Orca ” or the “ Company ”) is pleased to advise that its most recently drilled development well, Burruna-3, is now online and producing oil. Initial flow rates from Burruna-3 are still stabilising as the pump speed is being optimised, however the Burruna Oil Field has now regularly produced over 1,000 barrels of oil per day (200 barrels per day net to Orca) since Burruna-3 was brought online.
After the successful installation of an Electric Submersible Pump (ESP) at Burruna-2 in March, some piping changes were made recently to more efficiently flow the well. These changes, specifically “lowering the gun barrel”, has allowed increased flow rates from Burruna-2. Burruna-3 production from the Birkhead Formation is in-line with expectations and expected to produce clean oil with little to no water for an extended period.
SHARE REGISTRY Advanced Share Registry 150 Stirling Highway Nedlands WA 6009
ASX CODE OGY
The Burruna Oil Field last month produced its 100,000[th] barrel of oil, with Orca on average receiving in excess A$120/barrel due to the premium quality of the oil.
==> picture [62 x 51] intentionally omitted <==
PEL 110
The PEL 110 block is a 1,453km[2] exploration license in the Cooper Basin located north of the Keleary and Telopea oil and gas fields and west of the James oil field.
Last year, a 1,037km[2] seismic program over 10 exploration blocks (including PEL 110) was carried out by JV partner and Operator, Senex Energy Limited (ASX: SXY), with processing and interpretation now close to completion.
==> picture [349 x 248] intentionally omitted <==
Initial work has identified multiple first pass leads on PEL 110, all with potentially stacked horizons. Of these leads, two (2) are expected to be to be prioritized for drilling in the second half of 2014 with a work program and budget recently approved by the JV for the drilling of two wells.
It is important to note that all of the initial first pass leads identified from the 3D seismic program on PEL 110 exhibit 4-way structural closure. An initial review of the seismic data indicates there is additional potential for stratigraphic prospects in block PEL 110 that will be properly delineated once the detailed interpretation of the 3D is complete. The 3D seismic covers a large area, but one that is sparsely explored. Of the 26 wells drilled within the Dundinna 3D seismic area, those interpreted to have been drilled within a valid structural closure have produced oil on 67% of occasions.
| # ofWells | Wells withproduction | Wells withfluorescence | |
| All | 26 | 7 | 19 |
| Wells with closure | 9 | 6 (67%) | |
| Wells barelyclosed | 8 | 1 (12%) | 7 (88%) |
| Wells with noclosure | 9 | 0 (0%) | 9 (100%) |
Ground Floor, 1 Havelock Street, West Perth WA 6005 | Tel: +61 8 9488 5220 | Fax: +61 8 9324 2400 | www.orcaenergy.com.au ABN 25 009 121 644
==> picture [62 x 51] intentionally omitted <==
Texas - Seabiscuit Project
As previously announced, Orca’s Joint Venture partner and Operator, Dan A. Hughes Company (Hughes), has made a decision on the route to access the Seabiscuit well site location. This route, from the south, will involve dredging a channel to bring in equipment by barge. This decision was made after consultation with existing landowners to the north as well as with other JV partners and stakeholders in the well. It is seen as the most cost effective route available as well as being more efficient should more wells be required to be drilled in the future. Dredging approval has been received from the Texas Commission on Environmental Quality with approval from the Corporation of Engineers still pending. Orca still remains optimistic that drilling will begin after the Gulf Coast hurricane season, in Q4 2014.
For and on behalf of the Board
==> picture [114 x 49] intentionally omitted <==
Greg Bandy Executive Director