AI assistant
FIN RESOURCES LIMITED — AGM Information 2009
Nov 18, 2009
64920_rns_2009-11-18_24fdc48f-432c-4cd4-910f-36f34952ff17.pdf
AGM Information
Open in viewerOpens in your device viewer
Annual General Meeting – November 2009 Monitor Energy Ltd
Legal Disclaimer
-
This document has been prepared by Monitor Energy Limited for the purpose of providing a
-
Any statements, opinions, projections, forecasts or other material contained in this document
-
This document includes certain statements, opinions, projections, forecasts and other
-
Monitor Energy Limited recommends that potential investors consult their professional
Company Capital Structure
-
Listed on the ASX (MHL) in 2004
-
3,115,391,408 shares on issue
-
Share Price: 0.3 cents (17 Nov 09)
-
Market Cap: $9,346,174
==> picture [333 x 280] intentionally omitted <==
----- Start of picture text -----
160 0.7
140
0.6
120
0.5
100
0.4
80
0.3
60
0.2
40
0.1
20
- 0.0
Daily Volume Closing Price
Volume Millions
A cents per share
----- End of picture text -----
Core Assets
Who We Are
- The company has taken steps to strengthen its financial and corporate governance requirements in line
The Corporate Highlights
-
Divested Kyrgyz Uranium – Raisama now has a 75% ownership in project with a free carry to MHL.
-
PEL 115 Deal 1 VPE – MHL – to earn 75% Fury PPL, 37.5 % PEL 115
-
PEL 115 Deal 2 - MHL – LION – to earn 42% of PEL115, PPL FURY and PPL Airacobra PPL. Currently drilling Fury-1.
-
Finalised Rights Issue raising A$3.1MM. Underwritten by Patersons Securities.
-
Farm-in to PEL 110 with Cooper Energy Ltd, Monitor will earn a 20% interest by paying 40% of one well.
-
Negotiations are continuing for a potential JV partner in Kyrgyz Oil & Gas.
-
Large amounts of opportunities for producing and near production assets reviewed in the last 12 months with a couple of these in their final stages.
Asset Locations
-
Australia – Cooper Basin
-
Prolific onshore producer of oil and gas
-
Permits surrounded by existing production assets (59 mmbls oil, 2.5 TCF gas per PIRSA) and contains leads targeting in excess of 50mmbbl oil and 450bcf gas
-
- Currently drilling at 650M on first well
-
called Fury - 1
Kyrgyz Petroleum & Uranium Assets
Kyrgyz Republic
-
Large potential in opportunity constrained exploration environment. Structures identified capable of 8-120mmbbls.
-
Proven uranium license with existing mine.
-
Currently conducting field operations in both Oil & Gas (close spaced gravity) and Uranium (currently drilling)
==> picture [247 x 14] intentionally omitted <==
----- Start of picture text -----
MHL Head Office Cooper Basin
----- End of picture text -----
Project Location – Cooper Basin PEL 115
Cooper Basin – PEL 115 (Monitor earning 42% Equity)
-
PEL 115: 65,000 acres of
-
Contains leads targeting in
-
Substantial infrastructure
-
VPE: A partner of choice.
-
The 1st of many deals!
Current Time – Depth Curve Fury - 1
Fury -1 Time to Depth curve shows a drill time of 11 days with testing and evaluation time of 7 days best estimate. Current Depth – 650m
Drilling outcomes before December 2009!
Well #1 - Fury (Currently Drilling)
-
Located 650m up-dip of Lightning-1, suspended oil well
-
Objective 1: Cretaceous/ Jurassic, potential 1.5mmbls
-
Objective 2: Permian, potential 0.46mmbls and 22.79bcf or oil**
** 27mbbls potential oil in the Permian depends on charge from the Patchawarra Trough. Fury lies directly on the migration path for oil encountered at the nearby Henley-1 well further southeast
Fury -1 Primary Objective Map
Fury -1 CretaceousJurassic Closure
Primary target is at the Murta Formation level and shows a robust Four way dip closed structure on 3D seismic data
Fury -1 Secondary Objective Map
==> picture [438 x 369] intentionally omitted <==
----- Start of picture text -----
Fury -1
Permian
Closure
----- End of picture text -----
Secondary target is at the Patchawarra Formation (Permian) and shows a robust four way dip structure
PEL 115 Fury - Leveraged to Success
The following leverage table provides an indicator of possible movements in share price in the event of discovery on an un-risked basis.
==> picture [522 x 165] intentionally omitted <==
----- Start of picture text -----
!"#$%&'%("#)+,%-+.%/01%''2%
!"#$%$&#' ()%$&'+"' 3&#'(0$' 8,&519$%:' =)$1%$>50'?$@' 3$9$%A$'
,&&-$' 4%,5$'67' ;0-$'<'()%$' ()%$'4%,5$'67'
./,00,1"&2' 67'
BCD ''''''''''EFGGH'' IJIIE ''''''''''IJIIE'' ''''''''''''''''''IJIIH'' CGGD' Fury-1 Oil
+,0'K$&$%9$&' IJL' /,00,1"'M%%$0&'
!"'N%1-"O';0-$' '7'''''''CPJQ''R$%'SS0'
8,&519$%:';*0-$' '7'''''''CBJT''/,00,1"'
----- End of picture text -----**
Fury-1 Gas
==> picture [382 x 157] intentionally omitted <==
----- Start of picture text -----
!"#$%&'%/3#4+)5%6)%/01%''2%
!"#$%$&#' ()%$&'+"' 3&#'(0$' 8,&519$%:' =)$1%$>50' 3$9$%A$'
,&&-$' 4%,5$'67' ;0-$'<' ?$@'()%$'
./,00,1"&2' ()%$'67' 4%,5$'67'
BCD ''''''''''EFGGH'' IJIIE ''''''''''IJIIQ' '''''''''''''''''IJIIT'' CPTD'
N&'K$&$%9$&' CC' M,00,1"'U-S,5'V$$#'
!"'N%1-"O';0-$' '7'''''''''GJT''R$%'WUV'
8,&519$%:';0-$' '7'''''''ELJH''/,00,1"'
----- End of picture text -----
Well # 2. Airacobra – 1 Section at location and Structure
Airacobra -1 Cretaceous Objective Map
==> picture [309 x 304] intentionally omitted <==
----- Start of picture text -----
PEL 115
Caroowinnie 3D
Toolachee 3D
No 3D
Narcoonowie Oil
Field
Note Airacobra location
is on paleo high not on
Namur Time high
----- End of picture text -----
==> picture [122 x 91] intentionally omitted <==
----- Start of picture text -----
Note Airacobra location
is on paleo high not on
Namur Time high
It is believed the depth
high is at the paleo
high and the time high
is a static error
----- End of picture text -----
==> picture [94 x 22] intentionally omitted <==
----- Start of picture text -----
5 msec contour
----- End of picture text -----
PEL 115 Airacobra - Leveraged to Success
7+#),89#)%&'%("#)+,%-+.%/01%''2% ~~!"#$%$&#' ()%$&'+"' 3&#'(0$' 8,&519$%:' =)$1%$>50'?$@' 3$9$%A$'~~ ,&&-$'./,00,1"&2' 4%,5$'67' ;0-$'<'()%$'6 ()%$'4%,5$'67' 7' BCD ''''''''''''EFGGH'' IJIIE ''''''''''''IJIIQ'' ''''''''''''''''IJIIT'' CQTD' N&'K$&$%9$&' GJE' /,00,1"'M%%$0&' !"'N%1-"O';0-$' '7'''''''CPJG''R$%'SS0' 8,&519$%:';0-$' '7'''''''EQJC''/,00,1"'
Airacobra-1 Oil
A commercial discovery at Airacobra could potentially more than double the share price of MHL.
PEL 115 Prospects & Leads
==> picture [39 x 31] intentionally omitted <==
----- Start of picture text -----
Oil
----- End of picture text -----
Gas
Project Location – Cooper Basin PEL 110
4 Way Dip Tinchoo Fm closure – up dip from hydrocarbon kitchen Keenia Prospect 1.5MBO
Paleochannels - Unconventional Plays
==> picture [683 x 432] intentionally omitted <==
----- Start of picture text -----
Channel
sands
Channel Channel
sands sands
=)$&$'#%A$#&'%$'&#%>A%R),5'"O'5"'S$'/RR$O'19$%'0%A$'501&$O'%$&'@,#)'$9$%:'$XR$5#>1"'
1Y'51"#,","A'):O%15%S1"&F'#)$:'%$/,"')1@$9$%'),A)$%'%,&Z'#)"'51"9$">1"0'B'@:'501&-%$&J''
----- End of picture text -----*
Project Location – Kyrgyzstan
Kyrgyz Exploration Oil & Gas
==> picture [704 x 490] intentionally omitted <==
----- Start of picture text -----
Land based
Gravity high
at oil seep
Aerial
Oil on Water
Magnetic Telluric
Anomaly at oil seep
----- End of picture text -----
Kyrgyz Uranium Exploration Operations Update
Camp Drill Rig
Current Operation: • Drilling on site • Target drill holes total 350m • Currently at 329m
Drill Pad
Kyrgyz Operations Uranium – Map & Section
Licence boundary
Known exposed mineralisation in folded sediments. Coals are shown in black
En – echelon folded sediments area with Old Drill hole of potential uranium 250m depth enrichment. Coals under sediment shown in black cover shown in yellow