Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EVOLUTION MINING LIMITED Regulatory Filings 2023

Feb 15, 2023

64885_rns_2023-02-15_4a7b82e7-47db-4a0a-9ddd-907e18b17f7c.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

==> picture [110 x 78] intentionally omitted <==

ABN 74 084 669 036

Sydney Office P +61 2 9696 2900 F +61 2 9696 2901 Level 24 175 Liverpool Street Sydney NSW 2000

www.evolutionmining.com.au

ASX Announcement

16 February 2023

ANNUAL MINERAL RESOURCES AND ORE RESERVES STATEMENT as at 31 December 2022

Evolution Mining Limited (ASX: EVN) is pleased to release its annual Mineral Resources and Ore Reserves (MROR) estimates as at 31 December 2022. This statement reflects the quality of Evolution’s portfolio of low cost, high margin assets and underpins the exciting growth opportunities that are currently being delivered.

Key Highlights

  • Group Mineral Resources estimated to contain 30.3 million ounces of gold and 1.8 million tonnes of copperan increase of 724,000 ounces of gold (2%) and 322,000 tonnes of copper (22%) compared with the estimate as at 31 December 2021

  • Investment of $15 million in the Ernest Henry surface and underground drilling program during the 12 months following completion of the acquisition of 100% of the asset in January 2022 resulted in significant increases to the Mineral Resource – a 36% increase in contained copper to 1.2 million tonnes and 37% increase in contained gold to 2.3 million ounces achieved at a discovery cost of $5 per ounce gold equivalent[1]

  • Group Ore Reserves estimated to contain 10.0 million ounces of gold and 661,000 tonnes of coppera decrease of 360,000 ounces of gold (4%) and an increase of 21,000 tonnes of copper (3%) compared with the estimate as at 31 December 2021

  • Ernest Henry Ore Reserves are reported above the 1,125mRL and do not include the results of the Mine Extension Pre-Feasibility Study (PFS), which is expected to be completed in the June quarter 2023. The PFS will incorporate the larger mine footprint being defined by the successful, ongoing drilling program – expected to materially increase the reported Ernest Henry Ore Reserve

  • Ore Reserves are reported within designed pit shells or underground mining shapes, which have been optimised using a conservative long-term gold price of $1,600 (~US$1,073)[2] per ounce[3] . Mineral Resources are reported within optimised pit shells or underground mining shapes developed using a $2,200 (~US$1,475) per ounce price assumption[4]

  • Average portfolio mine life of ~14 years in Tier 1 jurisdictions

Commenting on the updated Mineral Resources and Ore Reserves estimate, Evolution Mining Limited’s (ASX:EVN) Chief Executive Officer, and Managing Director, Lawrie Conway, said:

“Our Mineral Resources and Ore Reserves update demonstrates the outstanding quality of our portfolio, with over 30 million ounces of contained gold within the reported Mineral Resources and 10 million ounces of contained gold within the reported Ore Reserves. In addition, we have a significant and growing copper endowment, with a material increase to the Ernest Henry Ore Reserves anticipated following completion of the Mine Extension PFS in the June 2023 quarter. We continue to report our Ore Reserves at a conservative longterm gold price assumption that reflects the true quality of our reserve base.”

1 Discovery gold equivalent cost calculated using gold price of $2,200/oz and copper price of $10,000/t 2 All US$ values in this release have been calculated using the average AUD:USD exchange rate for the FY23 half-year of $0.6705 3 Short-term gold price assumption for Paradigm and Castle Hill deposits is $2,200 per ounce. Cowal ‘Open Pit Continuation' (OPC) Ore Reserve commodity assumptions are declared as per the “Annual Mineral Resources and Ore Reserves Statement” dated 16 February 2022. The Cowal OPC Ore Reserves will be updated at the completion of the OPC Feasibility Study. For further details refer to the “Commodity Price Assumptions” section and Table 2 of this release 4 Except for the Ernest Henry Mineral Resource and Ore Reserve estimate which is reported within the interpreted 0.7% copper envelope

Evolution Mining Limited

==> picture [83 x 59] intentionally omitted <==

Group Mineral Resources are estimated to contain 678 million tonnes grading 1.39g/t for 30.3 million ounces of gold and 218 million tonnes grading 0.81% for 1.77 million tonnes of copper net of mining depletion of 877,000 ounces of gold and 80,000 tonnes of copper. This represents an increase of 724,000 ounces of gold (2%) and 322,000 tonnes of copper (22%) compared with the estimate as at 31 December 2021.

Group Ore Reserves are estimated to contain 277 million tonnes grading 1.12g/t gold for 10.0 million ounces of gold and 99 million tonnes grading 0.66% for 661,000 tonnes of copper net of mining depletion of 817,000 ounces of gold and 63,000 tonnes of copper. This represents a decrease of 360,000 ounces of gold (4%) and an increase of 21,000 tonnes of copper (3%) compared with the estimate as at 31 December 2021.

Key changes to the Mineral Resources and Ore Reserve estimates (net of mining depletion)

Ernest Henry

  • Mineral Resources increased to 94.8 million tonnes at 1.27% copper and 0.75g/t gold for 1.2 million tonnes of contained copper and 2.3 million ounces of contained gold compared to the December 2021 estimate of 71.4 million tonnes at 1.24% copper and 0.73g/t gold for 885,000 tonnes of copper and 1.7 million ounces gold

  • 618,000 ounce increase (37%) in contained gold ounces and 322,000 tonne increase (36%) in contained copper tonnes

    • Increases due to new drilling defining extensions to known mineralisation at depth and increases in thickness and grade within the PFS footprint

    • Significant growth targets exist beyond the currently modelled resource domains. These areas remain to be drilled down plunge of the Main Lens ore body at depth and in the untested region that separates the Main Lens from Ernie Junior. Recent underground drilling is confirming continuity of mineralised widths outside the Mineral Resource outlines

  • Ore Reserves increased to 34.3 million tonnes at 0.85% copper and 0.45g/t gold for 290,000 tonnes of contained copper and 495,000 ounces of contained gold compared to the December 2021 estimate of 29.0 million tonnes at 0.93% copper and 0.49g/t gold for 269,000 tonnes of copper and 459,000 ounces of gold

  • 36,000 ounce increase (8%) in contained gold ounces and 21,000 tonne increase (8%) in contained copper tonnes

    • Increases due to new geological information, design updates and a reduction in cut-off grade from 0.90% to 0.75% copper equivalent[5]
  • Ore Reserves are reported above the 1,125mRL which excludes the Mine Extension PFS study area (1,125mRL to 775mRL) which is planned to be completed in the June quarter 2023 and expected to deliver a material increase to the reported Ore Reserve

Red Lake

  • Mineral Resource estimate increased to 60.4 million tonnes at 6.35g/t gold for 12.3 million ounces of contained gold , an increase of 600,000 ounces (5%) compared to December 2021 estimate of 53.6 million tonnes at 6.82g/t gold for 11.7 million ounces

    • 600,000 ounce increase (5%) in contained gold ounces

      • Increases due to new drilling information and design changes driven largely by changes in price assumptions
  • Ore Reserves maintained at 13.0 million tonnes at 6.9g/t gold for 2.9 million ounces of contained gold compared to the December 2021 estimate of 13.1 million tonnes at 7.0g/t gold for 2.9 million ounces

  • Drilling continues to focus on converting the large Mineral Resource base to reported Ore Reserves

5 The cut-off grade of 0.75% CuEq applied in the cave flow model software is determined through an economic evaluation process. This process is considerate of the Net Smelter Return (NSR) and operating costs, with appropriate sensitivities conducted. The utlised copper equivalent equation is: CuEq = Cu + Au NSR/72.77 where; Au NSR = 41.71*Au - 0.04

Evolution Mining Limited

2

==> picture [83 x 59] intentionally omitted <==

Cowal

  • Mineral Resource estimate decreased to 273.3 million tonnes at 1.01g/t gold for 8.8 million ounces of contained gold, a decrease of 778,000 ounces (8%) compared to the December 2021 estimate of 305.3 million tonnes at 0.98g/t gold for 9.6 million ounces

  • Decrease due to mining depletion (-391koz), higher cost assumptions resulting in changes to pit design (-338koz), and new data (-136koz) partially offset by stockpile additions (86koz)

  • Ore Reserve estimate[6] decreased to 129.5 million tonnes at 1.04g/t gold for 4.33 million ounces of contained gold, a decrease of 260,000 ounces (6%) compared to the December 2021 estimate of 138.0 million tonnes 1.03g/t for 4.59 million ounces

  • Decrease due to mining depletion (-377koz), open pit design changes (-32koz), revised geological interpretation at E42 (-36koz), and reductions at Galway (-29koz) partially offset by additions due to design optimisation (142koz) and stockpile increases (72koz)

  • Increase of 5.4 million ounces in Mineral Resources and 2.8 million ounces in Ore Reserves since acquisition by Evolution in July 2015 (net of mining depletion of 2.4Moz)

  • Further growth opportunities include extensions to the GRE46 underground and expansion of the E42 pit and satellite pits

Mungari

  • Mineral Resources increased to 97.5 million tonnes at 1.70g/t gold for 5.34 million ounces of contained gold, an increase of 436,000 ounces (9%) compared to the December 2021 estimate of 76.1 million tonnes at 2.00g/t gold for 4.90 million ounces

  • Increase primarily due to design changes to open pits optimised to the new metal price and cost assumptions. New drilling and review of historical data also supported extensions to underground deposits at Kundana and delivered a maiden Mineral Resource at Star Trek on the East Kundana Joint Venture (107koz EVN share)

  • Ore Reserves maintained at 24.3 million tonnes at 1.58g/t gold for 1.24 million ounces of contained gold compared to the December 2021 estimate of 20.6 million tonnes at 1.86g/t for 1.23 million ounces, a slight increase of 4,000 ounces

  • Slight addition driven primarily by changes in price assumptions and subsequent design changes (+65koz) and new drilling (+78koz) offset by mine depletion (-165koz). Pit design changes driven by revised mining and processing costs

The Group Mineral Resource Statement as at 31 December 2022 is provided in Tables 1 and 3. Mineral Resources are reported inclusive of Ore Reserves but exclude mined areas and areas sterilised by mining activities. The Group Ore Reserve Statement as at 31 December 2022 is provided in Tables 2 and 4.

6 For further details refer to the “Commodity Price Assumptions” section and Table 2 of this release

Evolution Mining Limited

3

==> picture [83 x 59] intentionally omitted <==

==> picture [504 x 249] intentionally omitted <==

==> picture [494 x 293] intentionally omitted <==

Evolution Mining Limited 4

==> picture [83 x 59] intentionally omitted <==

==> picture [490 x 276] intentionally omitted <==

==> picture [490 x 254] intentionally omitted <==

Evolution Mining Limited 5

==> picture [83 x 59] intentionally omitted <==

Mineral Resources and Ore Reserve Growth since Evolution’s inception

Group Mineral Resources and Ore Reserves have grown by 336% (from 6.97Moz) and 186% (from 3.49Moz) respectively since Evolution’s formation in November 2011, excluding mining depletion from in situ Mineral Resources and Ore Reserves of 8.4 million ounces and 8.3 million ounces respectively. The Company has added 12 million ounces to the reported Mineral Resource predominantly by drilling, along with modelling and optimisation updates. The growth re-enforces the Company’s strategy of identifying and acquiring assets with strong mineral endowment where value can be unlocked by the Discovery team. Commodity price assumptions used to report cut-off grades for Mineral Resources and Ore Reserves remain conservative at $2,200 (~US$1,475) per ounce for Mineral Resources and a long-term price of $1,600 (~US$1,073) per ounce for Ore Reserves[7] which positions Evolution at the lower end of the peer group.

==> picture [396 x 242] intentionally omitted <==

----- Start of picture text -----

Divestments
Depletion
Growth
Acquisitions
Evolution
Evolution
Dec 2022
Nov 2011
----- End of picture text -----

==> picture [411 x 247] intentionally omitted <==

----- Start of picture text -----

Divestments
Depletion
Acquisitions
Growth
Evolution
Evolution
Dec 2022
Nov 2011
----- End of picture text -----

7 For further details refer to the “Commodity Price Assumptions” section and Table 2 of this release

Evolution Mining Limited

6

==> picture [83 x 59] intentionally omitted <==

Ernest Henry – opportunity for further growth beneath the PFS area

Ernest Henry continues to present the most significant opportunity for the Company to organically grow the Mineral Resource base as the drilling program advances in 2023. The surface drilling program is progressing with two rigs to complete infill drilling of the Main Lens ore body within the footprint of mine extension PFS. The Main Lens ore body remains open at depth. Underground drilling is targeting the area down plunge of Ernie Junior with the aim of further expanding the mineral resource and delivering additional metal for consideration in the PFS between the 1,125 and 775mRL. Priority will also be given in 2023 to delineating mineralised extensions of the Bert ore body (Figure 1) which received renewed focus late in 2022.

Bert is located stratigraphically below and adjacent to the mined portion of the Main ore body in the open pit (Figure 1). Positioned 60 metres north of the pit wall, underground drilling was completed to determine the continuity of grade and thickness down-plunge of the currently modelled mineralisation domains. A short drill program has intersected significant copper and gold grades in the first two drill holes with a higher-grade gold zone identified on the hangingwall. Results from this drill program are expected in late February. Encouragingly, Bert remains open down-plunge and has potential to follow the main mineralisation zone at depth unlocking significant potential to grow the mineral resource in future drilling programs.

==> picture [488 x 377] intentionally omitted <==

----- Start of picture text -----

Evolution
Dec 2022
----- End of picture text -----

==> picture [436 x 20] intentionally omitted <==

----- Start of picture text -----

Figure 1: North-south section looking west of the Ernest Henry orebody showing previous significant
intercepts and future growth areas [8]
----- End of picture text -----

8 This information is extracted from the ASX release titled “Continued Exploration Success at Ernest Henry” dated 24 January 2023 and available to view at www.evolutionmining.com.au. Evolution confirms that it is not aware of any new information or data that materially affects information included in that release. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original market announcement. Competent Person for Ernest Henry exploration results is Phil Micale

Evolution Mining Limited

7

==> picture [83 x 59] intentionally omitted <==

Commodity Price Assumptions

Evolution commodity price assumptions used to report the December 2022 Mineral Resources and Ore Reserves cut-off grades are provided below. An AUD:CAD exchange rate assumption of 0.9 has been used for Red Lake.

  • Gold: $1,600/oz for Ore Reserves, $2,200/oz for Mineral Resources

  • Silver: $20.00/oz for Ore Reserves, $26.00/oz for Mineral Resources

  • Copper: $7,000/t for Ore Reserves, $10,000/t for Mineral Resources

All open pit Mineral Resource estimates are reported within optimised pit shells which have been developed using a $2,200/oz price assumption and take into account forecast mining costs and metallurgical recoveries. All underground Mineral Resources (except Ernest Henry) are reported within underground mining shapes (MSOs) using a $2,200/oz price assumption and take into account forecast mining costs and metallurgical recoveries.

Ernest Henry Mineral Resource estimate is reported within the interpreted 0.7% copper envelope.

All open pit Ore Reserve estimates are reported within detailed pit designs and all underground Ore Reserves are reported within mineable underground shapes, inclusive of dilution. Pit designs and underground mining inventories have taken into account all applicable modifying factors, forecast mining costs and metallurgical recoveries and have been developed subject to an economic test to verify that economic extraction is justified. The economic test includes all applicable capital costs and is performed via a sensitivity analysis using a range of assumed gold prices from $1,600 to $2,200 per ounce and considers a range of financial metrics including AISC, NPV and FCF. Assets may use different assumptions within this range during optimisation or financial modelling stages, taking into account short-term gold price forecasts and other factors. The shortterm gold price assumption for Castle Hill and Paradigm deposits at Mungari is $2,200 per ounce. The Cowal ‘Open Pit Continuation' (OPC) Ore Reserve commodity price assumptions are declared as per the “Annual Mineral Resources and Ore Reserves Statement” dated 16 February 2022. The Cowal OPC Open Pit Ore Reserves and will be updated at the completion of the OPC Feasibility Study.

JORC 2012 and ASX Listing Rules Requirements

This annual statement of Mineral Resources and Ore Reserves has been prepared in accordance with the 2012 Edition of the ‘Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code 2012).

The Mineral Resource and Ore Reserve summaries are tabulated on the following pages. Material information summaries are provided for the Ernest Henry and Red Lake Mineral Resources and Ore Reserves pursuant to ASX Listing Rules 5.8 and 5.9 and the Assessment and Reporting Criteria in accordance with JORC Code 2012 requirements.

Approval

This release has been approved by the Evolution Board of Directors.

Forward looking statements

This report prepared by Evolution Mining Limited (or “the Company”) include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation. Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial, market,

Evolution Mining Limited

8

==> picture [83 x 59] intentionally omitted <==

regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control. Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

For further information please contact:

Investor Enquiries

Peter O’Connor General Manager Investor Relations Evolution Mining Limited Tel: +61 (0)2 9696 2900

Media Contact

Michael Vaughan Media Relations Fivemark Partners Tel: +61 (0)422 602 720

About Evolution Mining

Evolution Mining is a leading, globally relevant gold miner. Evolution operates five wholly-owned mines – Cowal in New South Wales, Ernest Henry and Mt Rawdon in Queensland, Mungari in Western Australia, and Red Lake in Ontario, Canada. Financial Year 2023 gold production guidance is 720,000 ounces (+/-5%) at a sector leading All-in Sustaining Cost of $1,240 per ounce (+/-5%).

Evolution Mining Limited

9

==> picture [83 x 59] intentionally omitted <==

Competent Persons’ Statement

The information in this statement that relates to the Mineral Resources and Ore Reserves listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is employed on a full-time basis by Evolution Mining Limited (except for Dean Basile who is employed by MiningOne) and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or Recognised Professional Organisation (RPO) and consents to the inclusion in this report of the matters based on their information in the form and context in which it appears. Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.

Evolution employees acting as a Competent Person may hold equity in Evolution Mining Limited and may be entitled to participate in Evolution’s executive equity long-term incentive plan, details of which are included in Evolution’s annual Remuneration Report. Annual replacement of depleted Ore Reserves is one of the performance measures of Evolution’s long-term incentive plans.

Deposit Competent Person Membership Status Member
number
Cowal Mineral Resource James Biggam AusIMM Member 112082
Cowal Open Pit Ore Reserve Dean Basile AusIMM Chartered
Professional
(Mining)
301633
Cowal Underground Ore Reserve Ryan Bettcher AusIMM Member 310517
Red Lake Mineral Resource Jason Krauss AIG Member 4711
Red Lake Ore Reserve Brad Armstrong Professional
Engineers-Ontario
Member 100152392
Mungari Mineral Resource Brad Daddow AIG Member 7736
Mungari Open Pit Ore Reserve Blake Callinan AusIMM Member 204346
Mungari Underground Ore
Reserve
Blake Callinan AusIMM Member 204346
Ernest Henry Mineral Resource Phillip Micale AusIMM Member 301942
Ernest Henry Ore Reserve Michael Corbett AusIMM Member 307897
Mt Rawdon Mineral Resource Matthew Graham-Ellison AusIMM Member 337100
Mt Rawdon Ore Reserve Ben Young AusIMM Member 309295
Marsden Mineral Resources James Biggam AusIMM Member 112082
Marsden Ore Reserve Anton Kruger AusIMM Fellow 221292

Evolution Mining Limited 10

Table 1: Group Mineral Resource Statement for contained Gold as at 31 December 2022

==> picture [83 x 59] intentionally omitted <==

Measured Measured Total Resource Total Resource Total Resource CP6 December 21
Resources
Gold Indicated Inferred
Project Type Cut-off
(g/t Au)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)

Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Gold Metal
(koz)
Cowal1 Open pit 0.35 29.5 0.46 440 182.9 0.86 5,033 26.5 0.80 682 238.9 0.80 6,155 1 6,852
Cowal UG 1.50 -
-

-

22.0
2.49 1,760 12.4 2.33 925 34.4 2.43 2,685 1 2,766
Cowal1 Total 29.5 0.46 440 204.9 1.03 6,793 38.8 1.29 1,607 273.3 1.01 8,840 1 9,618
Red Lake3 Total 2.5 - 3.3 -
-

-

35.7
6.66 7,639 24.8 5.90 4,702 60.4 6.35 12,342 2 11,742
Mungari4 Open pit 0.31 - 0.34 -
-

-

53.8
1.08 1,864 24.0 1.16 894 77.8 1.10 2,758 3 2,134
Mungari5 UG 1.46 - 2.44 1.4 4.66 205 9.7 4.28 1,332 8.7 3.74 1,043 19.7 4.07 2,580 3 2,767
Mungari1 Total 1.4 4.66 205 63.5 1.57 3,196 32.7 1.84 1,937 97.5 1.70 5,338 3 4,902
Mt Rawdon1 Total 0.23 5.5 0.30 54 21.0 0.58 389 2.3 0.48 35 28.8 0.52 478 4 630
Ernest
Henry2
Total 26.4 0.78 664 44.0 0.74 1,050 24.4 0.74 579 94.8 0.75 2,292 5 1,674
Marsden Total 0.20 -
-

-

119.8
0.27 1,031 3.1 0.22 22 123.0 0.27 1,053 1 1,053
Total 62.8 0.68 1,362 488.9 1.28 20,098 126.1 2.19 8,882 677.8 1.39 30,343 29,619

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding. “UG” denotes underground

Mineral Resources are reported inclusive of Ore Reserves

1. Includes stockpiles

  1. Ernest Henry Operations reported Mineral Resources are reported within an interpreted 0.7% Cu mineralised envelope

  2. Red Lake Mineral Resource cut-off varies from 2.5g/t Au to 3.3g/t Au and are dependent on deposit and location from surface and processing plant

  3. Mungari Open Pit Mineral Resource cut-offs vary from 0.31g/t Au to 0.34g/t Au are dependent on deposit and location from processing plant. The average open pit cut-off is 0.32g/t Au

  4. Mungari Underground Mineral Resource cut-offs vary from1.46g/t Au to 2.44g/t Au per deposit. The average underground cut-off is 1.96g/t Au

  5. Group Gold Mineral Resources Competent Person (CP) Notes refer to 1. James Biggam; 2. Jason Krauss; 3. Brad Daddow; 4. Matthew Graham-Ellison; 5. Phil Micale

Evolution Mining Limited

11

Table 2: Group Ore Reserve Statement for contained Gold as at 31 December 2022

==> picture [83 x 60] intentionally omitted <==

Gold Gold Gold Proved Proved Total Reserve Total Reserve Total Reserve CP8 December
21
Reserves
Probable
Project Type Cut-off
(g/t Au)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold Metal
k
Tonnes
M
Gold Grade
/
Gold
Metal
Tonnes
M
Gold
Grade
Gold
Metal
Gold
Metal
(koz)
(oz) (t) (gt) (koz) (t) (g/t) (koz)
Cowal1,2 Open pit 0.45 27.4 0.47 414 86.2 0.99 2,745 113.6 0.87 3,160 1 3,520
Cowal3 UG 0.55/1.80 - - - 15.9 2.29 1,169 15.9 2.29 1,169 2 1,069
Cowal Total 27.4 0.47 414 102.1 1.19 3,915 129.5 1.04 4,329 4,589
Red Lake4 Total 2.5-4.0 - - - 13.0 6.90 2,878 13.0 6.90 2,878 3 2,935
Mungari5 UG 2.2-3.8 0.4 5.47 78 3.2 4.41 457 3.7 4.54 535 4 498
Mungari1,6 Open pit 0.57-0.74 - - - 20.7 1.06 703 20.7 1.06 703 4 736
Mungari1 Total 0.4 5.47 78 23.9 1.51 1,160 24.3 1.58 1,238 1,234
Mt Rawdon1 Open pit 0.31 1.9 0.40 25 9.0 0.66 191 10.9 0.61 216 5 300
Ernest Henry7 UG 0.75%CuEq 18.2 0.57 336 16.1 0.31 159 34.3 0.45 495 6 459
Marsden Open pit 0.30 - - - 65.2 0.39 817 65.2 0.39 817 7 817
Total 47.9 0.55 852 229.2 1.24 9,120 277.1 1.12 9,973 10,333

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding. “UG” denotes underground

1. Includes stockpiles

  1. Ore Reserve has been updated for E42 Stage H Open Pit in line with 2022 corporate commodity price assumptions, updated modifying factors and allowing for depletion. All remaining ‘Open Pit Continuation’ Ore Reserves (OPC) are declared as per December 2021 Cowal Open Pit Ore Reserves. The OPC Ore Reserve will be updated at the completion of the OPC Feasibility Study (‘FS’). Modifying factors to be updated during the FS include Mineral Resource, geotechnical, metallurgical, revenue and cost assumptions. To date, no fatal flaws have been identified during the FS. A materiality test was conducted on the impact of the change between the December 2021 and December 2022 Mineral Resource model on the OPC Ore Reserve, the change is expected to be less than 10%

  2. 3.Cowal Underground Ore Reserve has been optimised using a $1,600/oz price assumption, economically tested at up to $2,200/oz and considers updated modifying factors and depletion. The Cowal Underground Ore Reserve includes development material at an incremental cut-off grade of 0.55g/t Au

  3. 4.Red Lake Ore Reserve cut-off is 4.0g/t Au except for HG Young (3.0g/t Au) and Upper Campbell (2.5g/t Au)

  4. Mungari Underground Ore Reserve cut-off varies from 2.2g/t Au to 3.8g/t Au and is dependent on specific deposits and varies between each underground mine taking into account location and costs

  5. Mungari Open Pit Ore Reserves were optimised using a $1,600/oz gold price assumption. The exceptions are the Paradigm and Castle Hill open pit operations which have been scheduled for production between 2023 and 2025 and have been optimised with a $2,200/oz gold price assumption. Cut-offs vary by deposit from 0.50g/t Au to 0.74g/t Au and take into account location and costs

  6. Ernest Henry Operations reported Ore Reserve estimate is based on the June 2022 Mineral Resource detailed in the 1 August 2022 ASX release titled “Material Increase in Ernest Henry Mineral Resource’. The applied cut-off grade of 0.75% copper equivalent ('CuEq') is determined through an economic evaluation process which considers the Net Smelter Return (NSR) and operating costs. The utilised copper equivalent equation is: CuEq = Cu + Au NSR/72.77 where; Au NSR = 41.71*Au - 0.04

  7. Group Gold Ore Reserve Competent Person (CP) Notes refer to 1. Dean Basile (Mining One); 2. Ryan Bettcher; 3. Brad Armstrong; 4. Blake Callinan; 5. Ben Young; 6. Michael Corbett; 7. Anton Kruger

Evolution Mining Limited

12

Table 3: Group Mineral Resource Statement for contained Copper as at 31 December 2022

==> picture [83 x 60] intentionally omitted <==

Copper Copper Copper Total Resource Total Resource Total Resource CP1

Dec 21
Resources
Measured Indicated Inferred
Project Type Cut-Off Tonnes
(Mt)
Copper
Grade
(%)
Copper Metal
(kt)
Copper
Copper Copper
Copper Copper

Copper
Copper

Metal
(kt)


Tonnes
(Mt)

Grade
(%)

Metal
(kt)

Tonnes
(Mt)

Grade
(%)

Metal
(kt)

Tonnes
(Mt)


Grade
(%)

Metal
(kt)
Marsden Total 0.2g/t Au - -
-
119.8 0.46 553 3.1 0.24 7 123.0 0.46 560 1 560
Ernest Henry Total 0.7% Cu 26.4 1.36 359 44.0 1.28
565
24.4 1.16 283 94.8 1.27 1,207 2 885
Total 26.4 1.36 359 163.8 0.68 1,118 27.5 1.06 291 217.7 0.81 1,767 1,445

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding Ernest Henry Operations reported Mineral Resources are within an interpreted 0.7% Cu mineralised envelope

  1. Group Mineral Resources Competent Person (CP) Notes refer to: 1. James Biggam; 2. Phillip Micale

Table 4: Group Copper Ore Reserve Statement for contained Copper as at 31 December 2022

Copper Copper Copper Total Reserve Total Reserve Total Reserve CP2 Dec 21
Reserves
Proved Probable
Project Type Cut-Off
(%)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Copper Metal
(kt)
Marsden Total 0.3g/t Au - - -
65.2
0.57 371 65.2 0.57 371 1 371
Ernest Henry1 Total 0.75% CuEq 18.2 1.07 196 16.1 0.59 94 34.3 0.85 290 2 269
Total 18.2 1.07 196 81.2 0.57 465 99.4 0.66 661 640

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding

  1. Ernest Henry Operation Ore Reserve is reported using $7,000/t Cu and $1,600/oz Au (AUD) Ore Reserve price assumptions. Ernest Henry Operations reported Ore Reserve estimate is based on the June 2022 Mineral Resource detailed in the 1 August 2022 ASX release titled “Material Increase in Ernest Henry Mineral Resource“. The cut-off grade applied of 0.75% copper equivalent ('CuEq') is determined through an economic evaluation process which considers the Net Smelter Return (NSR) and operating costs. The utilised copper equivalent equation is: CuEq = Cu + Au NSR/72.77 where; Au NSR = 41.71*Au - 0.04 2. Group Ore Reserve Competent Person (CP) Notes refer to: 1. Anton Kruger; 2. Michael Corbett

Evolution Mining Limited

13

==> picture [83 x 59] intentionally omitted <==

MATERIAL INFORMATION SUMMARIES

The Cowal, Red Lake, Ernest Henry, Mungari, Mt Rawdon and Marsden Mineral Resource and Ore Reserve estimates have been reported in accordance with the 2012 Edition of the “Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code 2012) and the ASX Listing Rules.

Material Information Summaries are provided for the Ernest Henry and Red Lake Mineral Resource and Ore Reserve estimates pursuant to ASX Listing Rules 5.8 and 5.9 and the Assessment and Reporting Criteria in accordance with JORC Code 2012 requirements. The Assessment and Reporting Criteria in accordance with JORC Code 2012 is presented in Appendix 1.

Overview - Ernest Henry Mineral Resource Statement

Full ownership of the Ernest Henry Operation (EHO) was acquired by Evolution Mining (EVN) from Glencore effective as of 1 January 2022.

The Ernest Henry December 31, 2022 Mineral Resource is estimated at 94.8 million tonnes at 1.27% copper and 0.75g/t gold (inclusive of Ore Reserves but excludes mined areas and areas sterilised by mining activities) (Table 5). The Mineral Resource has been reported within an interpreted 0.7% copper grade shell and includes any zones of internal waste or low-grade material which cannot be selectively mined by the chosen sub-level caving mining method used at the Ernest Henry mine. All material reported within the Mineral Resource is considered by the Competent Person (CP) to meet reasonable prospects for eventual economic extraction, taking into account the proposed mining technique and historical metallurgical recoveries. The Mineral Resource update is current as of 31 December 2022 and takes into account all mining activities undertaken to this date.

Table 5. Ernest Henry Mineral Resource as at 31 December 2022

Measured Indicated Inferred Dec 2022
Total Resource
Dec 2021
Resource
Tonnes (Mt) 26.4 44.0 24.4 94.8 71.4
Copper grade (%) 1.36 1.28 1.16 1.27 1.24
Copper tonnes (kt) 359 565 284 1,207 885
Gold grade (g/t) 0.78 0.74 0.73 0.75 0.73
Gold ounces (koz) 664 1,050 579 2,292 1,674

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding The Mineral Resource estimate is reported within an interpreted 0.7% Cu mineralised envelope Ernest Henry Mineral Resource Competent Person is Phil Micale

The December 31, 2022 reported Mineral Resource represents a net increase of 23.4 million tonnes (Figure 2.). Complimentary to this is an increase in estimated copper grade (from 1.24% to 1.27%) and estimated gold grade 0.73g/t to 0.75g/t. The increase in tonnes and grade has resulted in a net increase in the reported contained copper content by 36% or 322kt to 1,207kt (Figure 3) and an increase in the reported contained gold ounces by ~37% or 618koz to 2,292koz (Figure 4).

Changes in the reported Mineral Resource are due to new drilling at depth and laterally. Deeper drilling has improved the confidence in Mineral Resource classification and drilling laterally to the north and south has resulted in an increase in mineralisation volume through refined geological interpretation. Including sterilisation, a total of 5.2 million tonnes were depleted from the Mineral Resource through mining activities since December 2022 which resulted in depleting 145.5koz of gold and 89.7kt of copper.

Evolution Mining Limited

14

==> picture [83 x 59] intentionally omitted <==

Figure 2. Waterfall diagram illustrating change in tonnes (Mt) between the December 2021 and December 2022 Ernest Henry Mineral Resource estimates

==> picture [465 x 246] intentionally omitted <==

Figure 3. Waterfall diagram illustrating change in contained copper tonnes (kt) between the December 2021 and December 2022 Ernest Henry Mineral Resource estimates

==> picture [461 x 269] intentionally omitted <==

Evolution Mining Limited

15

==> picture [83 x 59] intentionally omitted <==

Figure 4. Waterfall diagram illustrating change in contained gold ounces (koz) between the December 2021 and December 2022 Ernest Henry Mineral Resource estimates

==> picture [488 x 293] intentionally omitted <==

Evolution Mining Limited

16

==> picture [83 x 59] intentionally omitted <==

Overview - Ernest Henry Ore Reserve Statement

The December 2022 Ernest Henry Ore Reserve estimate is 34.3Mt at 0.85% copper and 0.45g/t gold (Table 6) for 290kt of contained copper (Table 7) and 495koz of contained gold (Table 8). This represents an increase of and 21kt copper and 36koz gold compared to the December 2021 Ore Reserve estimate of 29.0Mt at 0.93% copper and 0.49g/t gold.

Increases to the Ore Reserve estimate are attributed to mine design updates and a reduction of cut-off grade from 0.90% CuEq to 0.75% CuEq. The provided waterfall charts (Figure 5, Figure 6 and Figure 7) illustrate the changes between the December 31, 2021 and December 31, 2022 Ore Reserve estimates.

Table 6 . Ernest Henry Ore Reserves as at 31 December 2022

Tonnes (Mt)
Copper grade (%)
Copper metal (kt)
Gold grade (g/t)
Gold metal (koz)
Proved Probable Dec 2022
Total Ore Reserve
Dec 2021 Ore Reserve
18.2 16.1 34.3 29.0
1.07 0.59 0.85 0.93
196 94 290 269
0.57 0.31 0.45 0.49
336 159 495 459

Table 7 . Ernest Henry Ore Reserves as at 31 December 2022 – contained copper

Copper Copper Proved Probable Total Ore Reserve Total Ore Reserve Total Ore Reserve
Project Type Cut-
off
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal (kt)
Ernest
Henry
UG 0.75
CuEq
18.2 1.07 196 16.1 0.59 94 34.3 0.85 290
Total 18.2 1.07 196 16.1 0.59 94 34.3 0.85 290

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding The Ore Reserve estimate is based on the June 2022 Mineral Resource detailed in the August 01, 2022 ASX release titled “Material Increase in Ernest Henry Mineral Resource" The cut-off grade of 0.75% CuEq applied in the cave flow model software is determined through an economic evaluation process. This process is considerate of the Net Smelter Return (NSR) and operating costs, with appropriate sensitivities conducted The utlised copper equivalent equation is: CuEq = Cu + Au NSR/72.77 where; Au NSR = 41.71*Au - 0.04 Ernest Henry Ore Reserve Competent Person is Michael Corbett

Evolution Mining Limited

17

==> picture [83 x 59] intentionally omitted <==

Table 8. Ernest Henry Ore Reserves as at 31 December 2022 – contained gold

Gold Gold Proved Probable Total Ore Reserve Total Ore Reserve Total Ore Reserve
Project Type Cut-
off
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold Metal
(koz)
Ernest
Henry
UG 0.75
CuEq
18.2 0.57 336 16.1 0.31 159 34.3 0.45 495
Total 18.2 0.57 336 16.1 0.31 159 34.3 0.45 495

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding The Ore Reserve estimate is based on the June 2022 Mineral Resource detailed in the August 01, 2022 ASX release titled “Material Increase in Ernest Henry Mineral Resource" The cut-off grade of 0.75% CuEq applied in the cave flow model software is determined through an economic evaluation process. This process is considerate of the Net Smelter Return (NSR) and operating costs, with appropriate sensitivities conducted The utlised copper equivalent equation is: CuEq = Cu + Au NSR/72.77 where; Au NSR = 41.71*Au - 0.04 Ernest Henry Ore Reserve Competent Person is Michael Corbett

Table 9. Comparison of December 2021 and December 2022 Ernest Henry Ore Reserve estimate – contained copper

Period Proved Probable Total Ore Reserve Total Ore Reserve Total Ore Reserve
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal
(kt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Metal (kt)
9.8 1.41 139 19.2 0.68 130 29.0 0.93 269
18.2 1.07 196 16.1 0.59 94 34.3 0.85 290
Absolute Change 8.4 -0.34 57 -3.1 -0.09 -36 5.3 -0.08 21
Relative Change 86% -24% 41% -16% -14% -28% 18% -9% 8%

Table 10. Comparison of December 2021 and December 2022 Ernest Henry Ore Reserve esti mate – contained gold

Period Proved Probable Total Ore Reserves Total Ore Reserves Total Ore Reserves
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold.
Metal
(koz)
9.8 0.77 241 19.2 0.35 217 29.0 0.49 459
18.2 0.57 336 16.1 0.31 159 34.3 0.45 495
Absolute Change 8.4 -0.19 94 -3.1 -0.04 -59 5.3 -0.04 36
Relative Change 86% -25% 39% -16% -12% -27% 18% -9% 8%

Evolution Mining Limited

18

==> picture [83 x 59] intentionally omitted <==

Figure 5. Waterfall diagram illustrating change in tonnes (Mt) between the December 2021 and December 2022 Ernest Henry Ore Reserve estimates

==> picture [488 x 271] intentionally omitted <==

Figure 6. Waterfall diagram illustrating change in contained copper metal (kt) between the December 2021 and December 2022 Ernest Henry Ore Reserve estimates

==> picture [488 x 272] intentionally omitted <==

Evolution Mining Limited

19

==> picture [83 x 59] intentionally omitted <==

Figure 7. Waterfall diagram illustrating change in contained gold ounces (koz) between the December 2021 and December 2022 Ernest Henry Ore Reserve estimates

==> picture [488 x 271] intentionally omitted <==

Evolution Mining Limited

20

==> picture [83 x 59] intentionally omitted <==

Ernest Henry Mineral Resource Material Information Summary

A Material Information Summary is provided for the Mineral Resource and Ore Reserve at Ernest Henry Operation (EHO) pursuant to ASX Listing Rules 5.8 and 5.9 and the Assessment and Reporting Criteria in accordance with JORC Code 2012 requirements. The Assessment and Reporting Criteria in accordance with JORC Code 2012 (Table 1) is presented in Appendix 1.

Geology and Geological Interpretation

The Ernest Henry copper-gold deposit is hosted in a hydrothermal breccia pipe plunging at roughly 45 degrees to the south, bounded between two shear zones. At depth, the orientation of shearing appears to be having a greater effect on the orebody and the primary mineralised lenses are becoming more elongate north-south, separating into discrete pods and lenses.

The Ernest Henry deposit is hosted entirely in felsic intermediate metavolcanic rocks, within a unit of the Mount Fort Constantine Volcanics, circa 1800 to 1750 million years. Regionally these lithologies lie adjacent to a large meta-diorite body which traverses the deposit from the south-west to the north-east. Timing of mineralisation at the Ernest Henry deposit is commonly accepted by many workers as occurring between regional D3 through to D4 deformation events circa 1530 to 1500 million years.

Mineralisation is associated with a matrix supported hydrothermal breccia that is enveloped by crackle veined potassium feldspar altered meta-volcanic rocks. The matrix is largely composed of magnetite, quartz, biotite, chalcopyrite, pyrite, fluorite, gold, molybdenite, uraniferous minerals and potassic feldspar. Other gangue minerals in the matrix consist of chlorite, calcite, dolomite, barite, apatite, muscovite, garnet, scapolite, sphene, rutile and tourmaline.

Chalcopyrite, the only copper mineral observed within the primary orebody, and pyrite are the only significant sulphide minerals within the orebody. Chalcopyrite is fine to medium grained, anhedral and commonly occurs as disseminated grains attached to magnetite and/or pyrite. Chalcopyrite and pyrite are contained mostly within the breccia matrix, comprising 1% to 20% of the matrix volume.

Gold occurs about 98% of the time in the form of native gold-electrum (65-95wt % Au), other minor contributions come from sylvanite, auriferous cobaltite, pyrite and chalcopyrite. It is believed that gold precipitation was closely associated with, but preceded some of the chalcopyrite deposition, as indicated by the lower gold and copper ratios of late-stage chalcopyrite rich veins. Although the Ernest Henry orebody contains arsenic, fluorine and uranium minerals, they typically fall below product thresholds, and aren’t considered deleterious.

Both clast and matrix supported breccias typically coincide with Cu grades above 0.7%. Felsic altered, clast supported hydrothermal breccia exists as a halo around the main +0.7% Cu zone which also typically hosts Au grades > 0.5g/t. Zones of elevated Au grades (>1g/t) are coincident with a magnetite / carbonate rich structure or structural zone logged as secondary generation breccia which are constrained predominantly within the interpreted 0.7% Cu zone.

A total of five Cu mineralisation domains and six Au mineralisation domains were developed for the Ernest Henry deposit.

Drilling and Survey Techniques

Drilling at Ernest Henry has been completed between 1980 and 2022. Diamond drill holes (HQ, NQ2 and NQ size) are the primary source of geological and grade data informing the grade estimate. Reverse Circulation (RC) and Air Core (AC) drilling was also used to delineate oxide areas of the resource which are now depleted. Core has been oriented using a variety of techniques in line with standard industry practice of the time. Core recovery through the deposit is excellent (>99.5%).

Collar coordinates were picked up by site surveyors using a Leica total station survey instrument and reported in MGA94 Zone 54 grid. A variety of downhole survey methods have been utilised in the underground resource, however 95% of the diamond drill holes have been surveyed using a recognised high quality gyroscopic instrument recording down hole survey data in 3m intervals.

Evolution Mining Limited

21

==> picture [83 x 59] intentionally omitted <==

Data, Data spacing and distribution

A total of 1,169 drill holes with 101,279 intervals containing assays were extracted from acQuire for the 2022 Mineral Resource estimate. Of these, 836 drill holes contain copper assays and 835 contain gold assays. This is an increase of 85 new drill holes used for geological interpretation and grade estimation in the December 2022 model compared to the June 2022 model. A total of 18 drill holes have been excluded from use in both domain generation and grade estimation in the 2022 resource model update due to issues associated with the quality of either assay or survey data.

A total of 85 new drill holes (38 with assays) totalling an additional 6,252 samples are included in the updated 31 December 2022 Mineral Resource estimate compared to the previous Mineral Resource estimate reported as at 30 June 2022. Of the 85 new drillholes, 26 were drilled inside the PFS area (below 1125mRL) and the remaining 59 holes were targeting the current ‘Life of Mine’ (LOM) area.

Initial resource definition drillhole programs are designed to achieve a nominal mineralisation intersection spacing of 60m centres. Drillholes are designed and drilled to intersect perpendicular to mineralisation and shear zones bounding mineralisation wherever possible. Subsequent to the initial phase of resource definition drilling, infill drilling is completed to nominal mineralisation intersection spacing of between 30m and 40m centres.

Sampling and Sub-sampling

Following logging to a standardised geological legend, each core sample is sawn in half with a diamond saw. One half is placed back in the core tray with the other submitted to ALS laboratory in Townsville.

Samples undergo further preparation and analysis by an external laboratory, involving crushing to 2 mm, riffle splitting and pulverising using an LM5 mill to 85% passing 75 microns. Crushing and grinding equipment are cleaned using compressed air and brushes between each sample and blanks are inserted at a rate of 1:15 samples in mineralised core and 1:30 samples in waste zones to ensure sample contamination is not occurring. Following the pulverisation of the sample a 0.4g sub-sample is prepared for base metal analysis via aqua regia digestion and a 50g sub-sample is taken for analysis via fire assay.

To ensure the drillhole assays can be used in grade estimation, EH1226_EXT_D6 was submitted to Onsite Laboratory Services (OSLS) in Bendigo. Samples sent to OSLS are crushed to 90% passing 2 mm, rotary split (if required to 3.5kg) and pulverised using an LM5 mill to 90% passing 75 microns. Crushing and grinding equipment are cleaned using compressed air and brushes between each sample and blanks are inserted at a rate of 1:21 samples to ensure sample contamination is not occurring. Duplicate samples are taken at a rate of 2:21 at this stage. Following the pulverisation of the sample a 0.5g sub-sample is prepared for base metal analysis via aqua regia digestion and determined by ICP. A 25g sub-sample is taken for analysis via fire assay. Replicate analysis is performed as required after internal QA/QC protocols. Ore grade analysis for copper is performed on all samples above 1.00% Cu and determined by AAS.

Sample Analysis Methods

Following sample preparation, a 50g sub-sample is analysed for gold using a fire assay method at ALS Geochemistry Townsville’s facility. Multi-element analysis for Cu, silver (Ag), cobalt (Co), iron (Fe), molybdenum (Mo), nickel (Ni), phosphorous (P), sulphur (S), uranium (U) and arsenic (As) is completed on a 0.4g sample using aqua regia digestion with an AES finish at ALS Brisbane’s laboratory. Drill core samples are not routinely analysed for fluorite. Concentrate samples however are analysed for all potentially deleterious elements.

Historic quality assurance (QA) procedures include the use of six certified standards as well as field duplicates inserted at 1:25 ratio for all sample batches sent to the ALS laboratory. Pulverised blank samples have been used by Ernest Henry for QA from 2017. A coarse crush blank sample has been used from April 2022.

Density

The method of density determination in the current model follows the same process outlined in the 2018/19, 2020 and 2021 models. Since the discovery of Ernest Henry, an extensive database of in-situ density measurements has been collected using the Archimedes water displacement principal formula from wet and dry sample weights.

Evolution Mining Limited

22

==> picture [83 x 59] intentionally omitted <==

Density measurements are used in conjunction with an elemental assay analysis to generate a stoichiometric regression formula that is applied to every sample and subsequently used in resource estimation.

Quality Assurance and Quality Control

EHO currently uses eight matrix matched CRMs and a pulverised blank and coarse crush blank sample to monitor preparation and assaying processes. CRMs were inserted at a rate of 1 in every 15 samples while blanks were inserted at 1 in every 15 samples within mineralised samples and 1 in every 30 samples in waste zones. Field duplicates inserted at 1 in every 15 samples and crush and pulp duplicates inserted at 1 in every 25 samples were used to monitor the deposit variability and analytical precision. Historic field duplicates were inserted at 1 in every 25 samples. ALS laboratory inserts QA samples during the analytical process in line with their internal protocols.

The Competent Person has completed a review of the QC results received between May 2022 and December 2022 and considers that the data utilised to complete this estimate is accurate and precise (subject to some concerns about recent Au results) and has been collected and stored using industry standard practices. The site also has a long history of production and reconciliation against Mineral Resource models provides further confidence in the quality of analytical data.

Estimation Methodology

Downhole composites are completed in Datamine within each of the interpreted domains. Samples are composited to a 2m sample length.

Variograms for copper, gold and silver and density were completed using Snowden’s Supervisor software and validated in 3D against the sample dataset.

Ordinary kriging (OK) was used to estimate Cu%, Aug/t, Agg/t and density (t/m[3] ) into 10mE by 10mN by 10mRL parent blocks. The block size was selected based on drillhole spacing, the geometry of the mineralisation and the selective mining method. Results of the Quantitative Kriging Neighbourhood Analysis (QKNA) completed for the June 2022 estimate were used for the December 2022 estimate. Parent blocks were reduced (sub-blocked) as low as 2mE by 2mN by 2mRL along domain boundaries to honour interpreted domain volumes.

Estimation Validation

The grade estimates were validated by comparing mean composited grades to mean estimated grades (pass 1 only), grade trends in easting, northing and elevation slices (swath plots), visual check of estimated grades against composited grades, and debugging the estimation process. Statistical comparisons between mean estimated grades and mean composited grades for each domain are within ±5%. Swath plots of mean estimated grades against mean composite grades within 20 m wide easting, northing and elevation slices shows composite grade trends have been closely replicated in the model. Mine to mill reconciliation data gathered over the past 10 years indicates the estimate to be accurate +/- 5%.

Resource Classification

The classifications have been made in accordance with the JORC 2012 guidelines and are based upon average distance to nearest samples, kriging output metrics (kriging efficiency and slope of regression), confidence in defined mineralisation boundaries, the number of holes used during interpolation, grade variations between holes and hole orientation. Robust Resource classification wireframes were constructed by the Competent Person to delineate the Mineral Resource Classification codes assigned to the block model. The Ernest Henry Mineral Resource has been classified using the following general criteria:

  • Measured: Drill data used for estimation not exceeding 30-40m spacing and including full drill coverage on adjacent sections to the north and south. Estimated with a full complement of composites selected in the kriging process (32)

  • Indicated: Drill data used for estimation between 40–60m, estimated with a full complement of composites selected in the kriging process (32)

  • Inferred: Drill data used for estimation between 60-100m

Evolution Mining Limited

23

==> picture [83 x 59] intentionally omitted <==

Other general conditions taken into consideration in the classification are as follows:

  • Kriging Efficiency (KE)

  • Continuity of grades between drill holes

  • Confidence in the geological interpretation of mineralisation boundary

  • Proximity of blocks to the edge of the domain boundaries

The Mineral Resource estimate and Mineral Resource categories appropriately reflect the views of the Competent Person and have been reported in accordance with the JORC Code (2012).

Mineral Resource Reporting and assigned Cut-off criteria

Whilst no cut-off grade has been explicitly applied for reporting the 2022 Mineral Resource, only blocks within the interpreted 0.7% Cu grade shell (Domain 7 and Domain 77) were reported. The sub-level caving mining method mines all material including any internal waste material within the designed sub-level cave boundary. This mining method does not allow blocks to be selectively mined. Consequently, all material within the interpreted 0.7% Cu grade shell including any zones of internal waste has been reported within the Mineral Resource estimate. This reporting process ensures all material reported within the Mineral Resource meets reasonable prospect of economic extraction and international reporting code standards. Prior to the reporting of the Mineral Resource, account was made for depletion and sterilisation as detailed below.

Depletion

Previously mined areas are omitted from the reported Mineral Resource. Underground development drives are accurately surveyed, with associated tonnes and grade removed from the reported Mineral Resource. In areas where accurate surveys have yet to be taken of underground development, the planned extraction is used to deplete the reported Mineral Resource. Depletion resulting from production activities is estimated using the calibrated cave flow model. The model includes actual cave extraction to the end of September 2022 and forecast production to the end of December 2022.

Sterilisation

With respect to Mineral Resource reporting, account is also made for sterilisation (ore loss whereby material is fired but not recovered). As sterilisation is not able to be directly calculated, the quantity of ‘external’ material (originating from outside of Domain 7) recovered through production activities is used as a proxy for sterilisation. The quantity of external material reporting to draw points is considered to have displaced (sterilised) a comparable quantity of the Mineral Resource from within Domain 7. The sterilised Domain 7 material is classified into Measured, Indicated and Inferred components by interrogating the blasted production volume and assigning the reported percentages to each resource category. This method is appropriate where the total drawn tonnes are comparable to the total blasted tonnes, as is the case for Ernest Henry to date.

The Mineral Resource has been reported within the 0.7%Cu grade shell after exclusion of depletion and accounting for sterilisation as described above. The 0.7%Cu grade is roughly aligned with a $50 net smelter return (NSR) value and meets the reasonable prospects for eventual economic extraction requirement for reporting a Mineral Resource in accordance with the JORC Code.

Audits or reviews

Evolution Mining has a standard validation process which includes internal technical peer review and external audits. Internal peer reviews of the reported Mineral Resource and Ore Reserve are undertaken annually by Evolution’s Transformation & Effectiveness / Technical Services team. Internal corporate governance systems and processes are in place to ensure all required supporting data and documentation is securely stored for future reference.

In addition to the internal peer review process undertaken by Evolution an external audit of the reported Mineral Resource & Ore Reserve is undertaken on a 3-year rolling basis across all of Evolution’s assets. The most recent review of the EHM Mineral Resource estimate was completed by CSA Global in July 2021. This review endorsed the estimate while also recommending minor potential improvements for the next estimate. The 31 December 2022 Mineral Resource is scheduled to be audited in early 2023.

Evolution Mining Limited

24

==> picture [83 x 59] intentionally omitted <==

Ernest Henry Underground Ore Reserve Material Information Summary

Material Assumptions for conversion to Ore Reserves

The Ore Reserve estimate is based on the June 2022 Mineral Resource, detailed in the August 01, 2022 Market Release titled ‘Material Increase in Ernest Henry Mineral Resource’. The June 2022 Mineral Resource has been used for reporting due to the majority of technical work relating to the Ore Reserve estimate having been completed prior to the December 2022 Mineral Resource being available. Note that a comparison of the in-situ physicals reported from the June 2022 and December 2022 Resource models has been conducted. The comparison shows a delta of less than 1 % for tonnes and grade within the Ore Reserve mining area. Notable differences between the June 2022 and December 2022 resources are apparent at depth and will be captured by an updated Ore Reserve estimate following completion of the Pre-Feasibility Study, scheduled for June 2023.

Cut-off parameters

Ernest Henry continues to apply a design cut-off of 0.7% copper for the sub-level cave (SLC) footprint. Though this value is comparable to the economic cut-off, it is primarily driven by the bounds of the mineralogical Domain 7 (D7). This domain has a relatively hard grade contact in most areas, meaning the extracted footprint would be similar within a range of design cut-off scenarios (+-30%).

The cut-off grade applied in the flow model software, Power Geotechnical Cellular Automata (PGCA), is determined through an economic evaluation process. This process is considerate of the Net Smelter Return (NSR) and operating costs, with appropriate sensitivities conducted.

Flow model cut-off grades between 0.55% and 0.90% copper equivalent (CuEq) were assessed, with a value of 0.75% CuEq being selected. The copper equivalent equation utilised for the flow modelling process is:

CuEq = Cu + Au NSR/72.77 where; Au NSR = 41.71*Au - 0.04

Mining factors or assumptions

Pre-feasibility (2006) and Feasibility (2008) studies in conjunction with periodic mine planning reviews have demonstrated that sub-level caving is the most appropriate mining method for the Ernest Henry underground operation. This method is well suited to the orebody geometry, grade and rock mass properties.

Geotechnical engineering assessments have shown that the rock mass is amenable to caving. Numerical modelling forecasts are reflected by cave propagation to date, with a strong correlation to the observed surface expression and seismic system data.

The mine design incorporates 25m sub-level spacing, 15m drive spacing (centre to centre), 6 m wide cross cuts and a standard 8-hole ring pattern with 2.6m burden. These design parameters are in line with benchmarked operations and assessed to be geotechnically stable within the bounds of the mine plan that supports the stated Ore Reserve.

Sub-level caving is a bulk mining method with limited selectivity, where dilution must be accepted in order to recover blasted ore. Dilution from production activities is quantified through cave flow modelling and is included in the reported Ore Reserve along with supporting economic evaluations. Recovery and dilution factors are not used as part of the Ore Reserve estimation process.

Unfired dilution is set to flow at 180% of the rate of blasted material when conducting flow simulations using PGCA. This value has been determined to be appropriate through the flow model calibration process and reflects fines generation within the cave and the relative mobility of different rock types.

A draw width of 10.0m, at 3,000 tonnes drawn, is applied in the cave flow modelling software. This value has been selected based on the findings of marker trials conducted on site and calibration of the flow model against reconciled actuals.

Blasted rock from development activities reports to the same materials handling system as production ore from the cave. The development material is included in the mine plan, classified by means of block model interrogation and converted to Ore Reserve in the same manner as production material.

Evolution Mining Limited

25

==> picture [83 x 59] intentionally omitted <==

All major infrastructure supporting the Ore Reserve has been constructed, including the underground crushing and conveying system, hoisting shaft, pumping and ventilation systems.

Access to the underground mine is via an in-pit portal and decline, with additional means of egress via a ladderway system and the hoisting shaft.

Metallurgical factors or assumptions

Processing has been conducted on site for more than 20 years, delivering consistent performance over that period. Comminution is achieved using both SAG and ball mills, with throughput tailored to mine output. Copper and gold are recovered using a floatation process and are contained within the resulting copper concentrate. This concentrate is transported by road to Glencore’s smelting facility in Mount Isa.

Bulk sampling is conducted on a routine basis to confirm plant performance.

The Ore Reserve estimate is reported ‘as mined’ and does not include metallurgical recovery factors. Metallurgical recovery is accounted for by the NSR calculations, which support the selected flow model cut-off grade (0.75 CuEq) and economic evaluation outcomes.

Infrastructure

The surface infrastructure required to support mining of the reported Ore Reserve is in place. This includes items such as sealed roads for site access, electrical supply, water supply, processing plant, tailings storage facility (TSF), offices, workshops and stores. Major underground infrastructure required to extract the Ore Reserve is in place, with mine construction having been completed in 2014.

Costs

Estimates for minor capital items that support the Ore Reserve have been informed by current industry benchmarks and previous site experience with similar projects.

Sustaining capital is forecast annually as part of the Budget and Life of Mine (LOM) planning cycle, reflecting actual performance and the mine schedule.

Operating costs are calculated using a first principles approach and reconciled with actual costs on a monthly basis and as part of annual financial reviews. The availability of reliable historic data for the site provides a robust basis for estimating the operating costs.

Transport, treatment, refining and royalty charges are included in financial models and are based on smelting at Glencore’s facilities in Mount Isa. A long-term offtake agreement is in place between Evolution and Glencore, supporting the applied cost assumptions.

Revenue

Net Smelter Return for the reported Ore Reserve has been derived using the site concentrate sales model. The model accounts for concentrate specification, transport cost, royalty payment, treatment and refining charges.

Through the economic evaluation process, a range of commodity price assumptions have been used to assess revenue generation of the Ernest Henry Ore Reserve. Evolution Ore Reserve pricing of $1,600/oz for gold, $7,000/t for copper and $20.00/oz for silver is used for cut-off grade assessment and as the lower bound for financial modelling. Multiple sensitivities are run between the Ore Reserve and the Mineral Resource price decks, with the latter being $2,200/oz for gold, $10,000/t for copper and $27.50/oz for silver. Evolution applies a range of pricing assumptions for Life of Mine (LOM) planning, guided by historical prices and consensus broker forecasts. The prices are assumed to be constant for the duration of mine plan associated with the Ore Reserve estimate.

Queensland Government Royalty payments of 4% for copper and 5% for gold and silver are included in revenue calculations.

Evolution Mining Limited

26

==> picture [83 x 59] intentionally omitted <==

Economic

Ernest Henry has produced at consistent rates for several years, allowing cost and revenue to be well understood. The mine plan from which the Ore Reserve is derived, including cut-off grade selection, is tailored to maximise Net Present Value (NPV) using Evolution pricing assumptions.

The Ore Reserve has been assessed using a financial model, with sensitivity to internal and external factors being included in the evaluation. The assessment process has demonstrated that extraction of the reported Ore Reserve can be reasonably justified.

Classification

An updated resource classification method has been developed and applied for the December 2022 Ore Reserve estimate. Previously, only material within Domain 7 (D7), which defines the Mineral Resource, received a Measured, Indicated or Inferred classification. Any material outside of D7 was classified as External, regardless of geological confidence. With dilution accounting for circa 20% of cave draw, this process resulted in a notable portion of the Ore Reserve estimate being derived from External material with variable geological confidence.

The upper portion of the orebody has been drilled extensively from surface, such that the External material in that region of the hanging wall is well understood and can reasonably be converted to Probable Reserve. As the mine progresses deeper there is less drilling in the hanging wall, making a blanket conversion of External Resource to Probable Ore Reserve inappropriate. The updated methodology sees both Domain 7 (0.7% copper grade shell) and Domain 1 (0.1% copper grade shell) being classified according to geological confidence. This approach provides a basis for the extracted metal to be appropriately classified and converted to Ore Reserve.

The Ore Reserve estimate includes all planned tonnes, which reflects the limited selectivity of SLC mining. The reported metal is derived from Measured and Indicated resource classes only. The methodology depicted below (Figure 8) is deemed by the Competent Person to be an appropriate means of accounting for both geological confidence and the mining method.

==> picture [445 x 168] intentionally omitted <==

----- Start of picture text -----

Tonnes
D7 D1 Other
Measured Indicated Inferred External Measured Indicated Inferred External Unclassified
Proved Probable Probable Probable Proved Probable Probable Probable Probable
Metal
D7 D1 Other
Measured Indicated Inferred External Measured Indicated Inferred External Unclassified
Proved Probable Proved Probable
----- End of picture text -----

Figure 8. Flow diagram illustrating the conversion of tonnes and contained metal from Ernest Henry Mineral Resource to Ore Reserve

Audits or reviews

Internal peer review of the mine planning process that supports the Ore Reserve estimate is conducted each year by personnel within the site technical and leadership teams. The review forms part of the LOM, Budget and Mineral Resource and Ore Reserve (MROR) planning cycles. Typical inclusions are the validation of key productivity assumptions, mine design, flow model output, mine schedule, financial inputs and outcomes.

External reviews are completed periodically to validate mine planning processes and ensure technical risks are managed appropriately. As the mine planning process has remained largely stable over time, reviews of this nature are typically conducted only when a notable change occurs. Most recently, SRK Consultants

Evolution Mining Limited

27

==> picture [83 x 59] intentionally omitted <==

completed a site visit and high-level review of the MROR processes in February 2020. External reviews of the mining footprint and draw strategy, which underpin the Ore Reserve, have been conducted at roughly annual intervals by Beck Engineering.

The Ore Reserve estimate has been reviewed internally by the Evolution Transformation and Effectiveness (T&E) team. T&E are an oversight group within Evolution that is independent of both the site and study teams. Additionally, an in-depth external audit of the Mineral Resource and Ore Reserve will be conducted by an independent consulting firm in the second quarter of 2023.

Discussion of relative accuracy / confidence

Both mine and mill processes are well proven, having greater than ten and twenty years of experience respectively. With continued use of the same methods there is high confidence in being able to extract the stated Ore Reserve.

The accuracy of the Ore Reserve estimate is largely dependent on the accuracy of key inputs, the Mineral Resource and cave flow model. These inputs are reviewed independently and then validated together through the flow model calibration process. Flow model calibration is conducted at six-month intervals and includes more than ten years of reconciled mine and mill data. To date, forecast metal outputs for the mine have been within 5% of the reconciled metal output on an annual basis.

Evolution Mining Limited

28

==> picture [83 x 59] intentionally omitted <==

Overview - Red Lake Mineral Resource Statement

The 31 December 2022 Red Lake Operation Mineral Resource has been estimated at 60.4Mt at 6.35g/t Au for 12,342koz gold. This represents a 13% (6.9Mt) increase in tonnes and 5% (600koz) increase in ounces compared with the December 2021 Mineral Resource reported at 53.6Mt at 6.82g/t gold. Mining depletion for the period accounts for a decrease of 131koz, offset by addition’s due to new drilling defining extensions to known mineralisation (263koz) and additions due to design changes (468koz) which took into account changes in price assumptions.

The Mineral Resource has been reported within optimised stopes which were developed using a $2,200 per ounce price assumption, it is inclusive of Ore Reserves but excludes mined areas and areas sterilised by mining activities. Table 11 summarises the Red Lake December 2022 reported Mineral Resource and a comparison to the December 2021 reported Mineral Resource is contained within Table 12.

Table 11. Red Lake Mineral Operation Mineral Resource at 31 December 2022

Gold Gold Measured Measured Indicated Indicated Total Mineral Resource Total Mineral Resource Total Mineral Resource
Inferred
Project Type Cut-
Off
(g/t)
Tonnes
(Mt)
Gold
Grade
(g/t)

Gold
Metal
(koz)

Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Lower
Campbell
UG 2.7 - - - 4.0 6.51 835 3.0 5.42 530 7.0 6.04 1,365
Upper
Campbell
UG 3.3 - - - 8.7 10.55 2,942 4.5 10.23 1,466 13.1 10.44 4,408
Lower Red
Lake
UG 2.7 - - - 13.5 5.09 2,204 5.4 5.07 883 18.9 5.08 3,086
Upper Red
Lake
UG 3.3 - - - 4.3 5.62 778 2.1 6.26 417 6.4 5.83 1,196
HG Young UG 2.5 - - - 1.4 5.06 224 1.5 4.63 219 2.9 4.84 443
Cochenour UG 2.5 - - - 1.7 6.19 339 6.5 4.63 967 8.2 4.93 1,306
McFinley UG 2.5 - - - 2.1 4.63 317 1.8 3.84 220 3.9 4.27 537
Stockpile - - - - 0.01 5.12 1 - - - 0.01 5.12 1
Total - - - 35.6 6.66 7,639 24.8 5.90 4,702 60.4 6.35 12,342

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding Mineral Resources are reported inclusive of Ore Reserves. UG denotes underground. Red Lake Mineral Resources Competent Person is Jason Krauss

Table 12. Comparison of December 2021 and December 2022 Total Red Lake Operation Mineral Resource Estimates

Period Measured Indicated Inferred Total Resource Total Resource Total Resource
Tonnes
(Mt)
Grade
Au (g/t)
Cont.
Metal
Au
(koz)
Tonnes
(Mt)
Grade
Au (g/t)
Cont.
Metal
Au
(koz)
Tonnes
(Mt)
Grade
Au (g/t)
Cont.
Metal
Au
(koz)
Tonnes
(Mt)
Grade
Au (g/t)
Cont.
Metal
Au
(koz)
Dec-21 0.03 4.20 4 31.8 7.14 7,303 21.7 6.34 4,435 53.6 6.82 11,742
Dec-22 0.00 0.00 0 35.7 6.66 7,639 24.8 5.90 4,702 60.4 6.35 12,342
Absolute
Change
-0.03 -4.20 -4 3.9 -0.48 336 3.0 -0.44 268 6.9 -0.47 600
Relative Change -100% -100% -100% 12% -7% 5% 14% -7% 6% 13% -7% 5%

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding

Evolution Mining Limited

29

==> picture [83 x 59] intentionally omitted <==

==> picture [490 x 321] intentionally omitted <==

Figure 9. Waterfall diagram illustrating areas of change in ounces in reported Red Lake Mineral Resource (Dec 2021 -Dec 2022)

Evolution Mining Limited

30

==> picture [83 x 59] intentionally omitted <==

Overview - Red Lake Ore Reserve Statement

The December 2022 Red Lake Operation Ore Reserve has been estimated at 13.0Mt at 6.90g/t gold for 2,878koz (Table 11). This represents a decrease of 57koz compared to the December 2021 Ore Reserve estimate of 13.1Mt at 7.00g/t gold for 2,935koz (Table 12). Mining depletion of -136koz and mining design changes of -16koz have been partially offset by addition’s due to new drilling defining extensions to known mineralisation of 91koz and additions from grade control activities of 5koz (Figure 10).

Table 11. Red Lake Operation Ore Reserve 31 December 2022

Gold Gold Proved Probable Total Ore Reserve Total Ore Reserve Total Ore Reserve
Project Type Cut-
off
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Lower
Campbell
UG 3.8 - - - 0.8 6.16 149 0.8 6.16 149
Upper
Campbell
UG 2.5 - - - 7.8 7.38 1,859 7.8 7.38 1,859
Lower Red
Lake
UG 4.0 - - - 2.5 6.30 510 2.5 6.30 510
Upper Red
Lake
UG - - - - - - - - - -
Cochenour UG 4.0 - - - 0.9 6.52 194 0.9 6.52 194
HG Young UG 3.0 - - - 0.4 5.06 67 0.4 5.06 67
McFinley UG 4.0 0.5 5.82 98 0.5 5.82 98
Inventory - - - - 0.01 5.12 1 0.01 5.12 1
Total - - - 13.0 6.90 2,878 13.0 6.90 2,878

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding Red Lake Operation Ore Reserve Competent Person is Brad Armstrong

Table 12. Comparison of December 2021 and December 2022 Red Lake Operation Ore Reserve

Period Total Ore Reserves Total Ore Reserves Total Ore Reserves
Proved Probable
Tonnes Gold
Gold
Tonnes Gold
Gold
Tonnes Gold
Gold.
Metal
(koz)
(Mt) Grade
(g/t)
metal
(koz)
(Mt) Grade
(g/t)
Metal
(koz)
(Mt) Grade
(g/t)
Dec-21 - - - 13.1 7.00 2,935 13.1 7.00 2,935
Dec-22 - - - 13.0 6.90 2,878 13.0 6.90 2,878
Absolute
Change
- - - -0.1 -0.10 -57 -0.1 -0.10 -57
Relative
Change
- - - -1% -1% -2% -1% -1% -2%

Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding

Evolution Mining Limited

31

==> picture [83 x 59] intentionally omitted <==

==> picture [490 x 272] intentionally omitted <==

Figure 10. Waterfall diagram illustrating areas of change in ounces for reported Red Lake Ore Reserve (Dec 2021 - Dec 2022)

Evolution Mining Limited

32

==> picture [83 x 59] intentionally omitted <==

Red Lake Mineral Resource Material Information Summary

Material Assumptions for Mineral Resources

The Red Lake Mineral Resource estimate is defined by an underground mining shape optimiser using an $2,200/oz gold price assumption. The Red Lake operation underground mines have assumed conventional mining techniques and parameters typical of current Evolution underground operations. Assigned mining and processing costs and metallurgical recoveries used in the development of underground Mineral Resource reporting shapes are supported by current mining data and metallurgical recoveries.

Property Description, Location and Tenement holding

Red Lake Operations is located near the municipality of Red Lake, approximately 180km north of the town of Dryden, Ontario, and 100km east of the Manitoba-Ontario border. Red Lake is accessed by car by the TransCanada Highway (#17) and north on Highway 105. The town is also accessible by air via the Red Lake airport located near the town of Cochenour (Figure 11).

==> picture [374 x 259] intentionally omitted <==

Figure 11. Surface map of the Red Lake Operations

Geology and Geological Interpretation

Red Lake mineralisation is hosted in the Red Lake greenstone belt. Mineralisation is associated with multiple episodes of volcanism, sedimentation, plutonism and deformation and is hosted in a variety of rock types within the Red Lake Greenstone belt. Economic zones of mineralisation are characterised by vein hosted gold systems accompanying sulphide replacement within sheared mafic to komatiitic basalts (Figure 12).

The Red Lake/Campbell, Cochenour, HG Young and McFinley deposits are hosted within significantly folded and sheared portions of the Balmer Assemblage dominated by tholeiitic basalt and komatiitic basalt intruded by felsic, mafic and lamprophyric intrusive rocks. Shear zones act as primary hydrothermal fluid corridors and host significant portions of the gold mineralisation in the area. Other significant mineralised structures occur within lower-strain areas of the stratigraphy, usually associated with brittle conjugate fracture systems proximal to rheologically contrasting lithology contacts.

Orebodies are generally steep dipping -50 to -60 degrees; lode geometry varies with relative position within the folded stratigraphy. Individual lenses of mineralisation vary considerably in thickness being mostly very narrow 0.3 – 1.0m but locally can contain multiple stacked lenses and stockworks and disseminations in

Evolution Mining Limited

33

==> picture [83 x 59] intentionally omitted <==

excess of 10m in width. Gold appears as free milling gold, gold associated with sulphides, with magnetite as well as refractory, arsenopyrite-associated gold. It is common for zones to have multiple styles of mineralisation within the same host lithology.

The Red Lake/Campbell system has been defined to date to extend approximately 3,000m along strike and has drilling intercepts over a vertical extent of 3,000m. The Cochenour mine as modelled in this report which excludes the historically mined upper zones, commences approximately 750m below surface and has been defined along a strike length of 600m and extends 700m vertically. The updated McFinley model has been defined over a 1,350m strike length, 1,750m vertical extent and 800m across strike.

==> picture [376 x 261] intentionally omitted <==

Figure 12. Surface Geology map of Red Lake Operation

Drilling Techniques

Multiple contractors have been used at the Red Lake operation over the project life. Drilling has been completed predominantly by surface and underground drill rigs using diamond drillcore drilling methods. Surface diamond drilling was completed to obtain NQ (47.6mm) drillcore. Underground diamond drillcore holes were typically BQ (36.5mm) and AQTK (30.5mm) sizes with a minor amount of NQ2 (50.5mm) holes. Underground definition and delineation (grade control) drilling has been completed to obtain AQTK (30.5mm) diameter drillcore. At the Bateman project drilling was completed predominantly using diamond drillcore methods to attain NQ (47.6mm) drillcore. In some instances in areas where a small drill rig was required, BQ sized drillcore was attained.

Data spacing and distribution

Drill programs within the Red Lake deposits are ongoing and staged; the drill spacing is designed to adequately delineate the lode and confirm geological and grade continuity of the mineralisation. An initial drill program is designed to penetrate target zones on a nominal even spaced grid pattern (40m by 40m), as perpendicular to the ore zone as practicable. This approach defines and demarcates economic mineralisation to a level which supports estimation of a global Mineral Resource, to an Inferred Resource classification (80m by 80m for McFinley). This initial phase of drilling is then followed by an infill 20m by 20m spaced program to define economic mineralisation to an Indicated Mineral Resource Classification (40m by 40m for McFinley) sufficient to support interim mine design and scheduling. A phase of less than 20m by 20m (typically between

Evolution Mining Limited

34

==> picture [83 x 59] intentionally omitted <==

6m by 6m to 10m by 10m) spaced grade control drilling, and/or underground face sampling may be completed to estimate a Measured Mineral Resource and inform accurate economic extraction of ore.

Sampling and Sub-sampling

The core (HQ, NQ, BQ and ATQ diameter) is collected in wooden core trays and delivered to the site core processing facilities. It is washed and photographed prior to logging and sampling. Holes drilled from 2015 have been oriented to capture structural and other geological information. Following logging to a standardised geological legend HQ, NQ and BQ core are sampled by cutting in half the drillcore with diamond saws prior to submission to commercial laboratories for analysis. ATQ core is not cut prior to sampling and entire sample is sent to laboratory for analysis. Core is sampled based on lithological contacts where the minimum sample size is 0.3m and the maximum is 1m.

Sample Analysis Methods

Multiple independent certified commercial laboratories have been utilised over the project life providing sample preparation and analytical services. Sample preparation includes drying, coarse crush to 2mm and pulverising to a grind size 90% passing 75um. A sub-sample is then collected for assaying with coarse and pulp reject material retained for an agreed period. Assaying was completed by fire assay on 30g and 50g subsamples with either gravimetric or AAS finish.

Quality Assurance and Quality Control

Single shot downhole surveys were used to monitor hole deviation during drilling. Geologists are contacted by the drillers if the single shot data is outside of the designated tolerances (3° on dip and azimuth). Downhole multi-shot surveys were also performed using a north-seeking gyro. Collar positions are surveyed and checked against the proposed collar position.

All core is metre marked and where orientation has been stipulated marked with a bottom of hole orientation line. Certified Reference Materials (CRM) and blanks are inserted 1 in 10 samples. The frequency of field duplicates is determined by drill area. Laboratory check samples (including laboratory repeat assays, crushed sample duplicates and pulp duplicates) are reviewed monthly. CRM and Blank performance are checked on a batch-by-batch basis during the assay import process and reviewed over time. Automated validation flags are in place within the database import process and are reviewed by the geologist and actioned. Re-assays are ordered for the sequence of samples around the failed sample up to and including the nearest passing check samples. The re-assay values are reviewed in the same way and if acceptable passed into the database. All assays are stored in the database, failed results are downgraded with a priority field.

Grind quality is audited during laboratory inspections and sieve test reviews. Any issues discovered during the lab audit are brought to the attention of the lab manager or proxy at that time. All findings from the laboratory are actioned and copies of the report are saved in the sites QA/QC documents on a secure server.

Density

Dry bulk density of drill core was measured on site by trained field assistants, using the water immersion method. Dry bulk density is calculated as:

𝑊𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑆𝑎𝑚𝑝𝑙𝑒 𝑖𝑛 𝐴𝑖𝑟

𝐷𝑟𝑦 𝑏𝑢𝑙𝑘 𝑑𝑒𝑛𝑠𝑖𝑡𝑦 𝑜𝑓 𝑐𝑜𝑟𝑒= (𝑊𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑆𝑎𝑚𝑝𝑙𝑒 𝑖𝑛 𝐴𝑖𝑟−𝑊𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑆𝑎𝑚𝑝𝑙𝑒 𝑖𝑛 𝑊𝑎𝑡𝑒𝑟)

Statistical analysis and review of dry bulk density results is completed per lithology. Table 15 summarises the dry bulk density results per lithology.

Evolution Mining Limited

35

==> picture [83 x 59] intentionally omitted <==

Table 15. Density values for HG Young (Red Lake)

Lithology Density
Mean
Density
Minimum
Density
Maximum
Basalt 2.86 2.00 4.50
Basalt-Komatiite 2.85 2.05 4.16
Diorite 2.82 2.71 2.94
Intermediate Intrusive 2.83 2.48 3.05
Lamprophyre Dyke 2.83 2.75 2.95
Mafic Dyke 2.83 2.76 2.98
Peridotite-Komatiite 2.88 2.77 2.98
Porphyry 2.71 2.68 2.91
Rhyolite 2.76 2.61 3.85
Seds (Chem) 2.98 2.70 3.56
Seds (Clastic) 2.88 2.72 3.36
Talc 2.90 2.77 3.04
Ultramafic Dyke 2.87 2.79 3.02

Estimation Methodology

Processes involved in the creation of the resource models are saved in Datamine macros (*.mac) on a secure Evolution SharePoint site.

In summary, validated drillhole samples are composited to 1m lengths using Datamine software and honour interpreted estimation domain boundaries. Estimation domains are developed taking into account geological logging and assay data from drillholes and underground grab samples, as well as geological mapping and structural information for underground development.

Following internal peer review of draft estimation domains, statistical analysis of coded composite data and if required refinement of estimation domains is undertaken. Once final estimation domains have been developed, statistical and spatial analysis is undertaken to model the spatial continuity of mineralisation for each of the modelled lenses.

Given the relative nuggety nature of gold mineralisation and the faulted and folded nature of the ore at Red Lake, a restrictive kriging, dynamic anisotropy (DA) estimation approach has been used to ensure robust local block estimates are obtained. The restrictive kriging methodology in conjunction with the application of appropriate search criteria and the application of appropriate top cuts help control the effect of extreme grades on the estimate. This process involves categorizing the composited data into a low-grade population and highgrade population based on a grade threshold decided based on the statistical analysis of each individual lode / estimation domain. Indicator variography is performed on the composite data using the chosen grade threshold and the resultant variography is used to estimate a probability of a block being in the high-grade core of the domain versus the surrounding lower grade mineralised portion of the domain using Ordinary Kriging.

The estimated probability is flagged back onto the composites and data is sorted into low grade and highgrade bins based on a 40% probability threshold that the block was in a high-grade area. Top cuts are established for the low and high-grade binned data. The low-grade top cut is decided based on the presence of high-grade data in the low-grade bin and the distribution of grade for the low-grade dataset. The high-grade top cut is established using all the data for the domain applying the disintegration method on a probability plot.

Spatial analysis and development of variogram models for use in grade estimation is completed using all coded composite data within each of the modelled lodes / estimation domains. In cases, where there is

Evolution Mining Limited

36

==> picture [83 x 59] intentionally omitted <==

insufficient data for the development of robust variogram models then a variogram model from a domain that has adequate samples and is of a similar mineralisation type and style will be used for estimation.

A multi-pass search strategy is used in the estimation process and search dimensions, sample selection and estimation criteria are optimised taking into account the modelled semi-variogram ranges for each domain, the drillhole spacing present and the results of kriging neighbourhood analysis (KNA) for each domain.

The final gold estimate involves running an ordinary kriging estimate taking into account the probability of the block being within the high-grade or low-grade portion of the domain and the associated estimates taking into account the application of different top cuts based on whether the block is coded as a low-grade or high-grade block.

As models are being updated with additional drilling information it is possible to accurately demarcate the high grade internal core of domains. Consequently it is then possible to develop separate estimation domains to demarcate the high grade cores from surrounding lower grade material and apply a hard boundary ordinary kriging estimation approach instead of the restrictive kriging approach used for region with wider spaced drilling.

Parent block sizes vary from 4m2m4m to 5m5m5m depending on model area where the latter parent size was implemented for Cochenour, HGY and McFinley. Block grades were compared with composite of cut data to ensure kriging grades were represented in block grades.

Inverse Distance squared (ID2) and Nearest Neighbour (NN) estimates are also run as a check estimate against the Ordinary Kriged estimate to compare global domain estimates and investigate differences between applied estimation techniques and approach.

No assumption of mining selectivity has been incorporated in the estimate.

Estimation Validation

Validation of the Mineral Resource comprised comparing block grades (OK, ID2 and NN) against the data used to inform the estimate on a domain by domain basis, visual comparison of the informing data against the estimate and the use of swath plots showing grade trends by easting northing and elevation of the input data against the estimate. The de-clustered top cut mean is also compared to the block grades for each domain. Changes between estimates (year on year) and changes in designed optimised underground mining shapes (MSO’s) are also investigated on a local level to ensure changes are appropriate and are supported by new and existing drilling.

Resource Classification

The Red Lake Mineral Resource has been classified using the guidelines set out in the JORC Code (2012). The Red Lake Mineral Resource comprises a mixture of Indicated and Inferred resource categories. No Measured Resource classification has been applied at Red Lake given the inherent grade variability and geological complexity present at the deposit.

Resource classification coding is applied to the block model using classification polylines developed by the Competent Person. The Competent Person considers the quality of data, quality of estimation, geological complexity and drill spacing present when developing the classification polylines.

In general the application of an Indicated classification is restricted to areas which have been drilled to a nominal 20m by 20m spacing that have observed grade continuity. The exception is McFinley, where a 40m by 40m drill spacing is considered appropriate for the application of an Indicated classification due to the greater spatial continuity present. The application of an Inferred Resource category occurs in regions which are covered by 40m by 40m spaced drilling. The exception is McFinley, where an 80m by 80m drill spacing is considered appropriate for the application of an Indicated classification due to the greater spatial continuity present. Poorly drilled regions (>40m spacing) or areas where controls on mineralisation are unknown and no grade continuity is observed are assigned an unclassified category.

Assigned resource classification coding and resource classification shapes are internally peer reviewed and validated.

Evolution Mining Limited

37

==> picture [83 x 59] intentionally omitted <==

Mineral Resource Reporting and assigned Cut-off criteria

The Red Lake Operation Mineral Resource estimate is constrained to material that only falls within optimised economically viable underground mining shapes (MSO’s) which were developed in Deswik software and take into account Mineral Resource reporting price assumptions ($2200/oz) and metallurgical recoveries. MSOs are developed with a minimum mining width in the range of 1.8 m to 2.4 m with a minimum footwall and hangingwall slope of 50 degrees. The minimum strike of the panels is 5.0m with a vertical extent ranging from 15m to 26m.

Conventional mechanised mining techniques and parameters typical of current Evolution underground operations were applied. Assigned mining costs, processing costs and metallurgical recoveries used in the development of underground Mineral Resource reporting shapes are supported by current mining data and metallurgical recoveries.

A cut-off grade of 2.65g/t Au was applied to deposits except for Upper Campbell and Upper Red Lake which remained at 3.3g/t Au cut-off and Cochenour, HG Young, and McFinley used 2.5g/t Au cut-off. The cut-off grades were estimated using projected site stoping costs, processing costs and site General & Administration (G&A) costs.

A metallurgical recovery of 82% has been assumed and a gold price of $2,200/oz with a AUD:CAD exchange rate of 0.9 has been used.

Audits or reviews

The resource models were reviewed by Evolution’s Transformation and Effectiveness (T&E) team. T&E are an oversight group within Evolution independent of the site team. The T&E team have identified the inherent risk present in accurately estimating grades on a local scale due to the inherent grade variability and complex geology present.

An external audit of the December 31, 2021 Mineral Resource and Ore Reserve was completed in September, 2022 by SRK. No fatal flaws or ‘High Risk’ findings were identified by SRK. SRK consider that the processes, controls and estimates for the December, 31 2021 Red Lake Mineral Resource & Ore Reserve were appropriate to support Public Reporting under the JORC Code (2012).

Red Lake Ore Reserve Material Information Summary

Material Assumptions for conversion to Ore Reserves

The Ore Reserve estimate is based on the current Mineral Resource estimate as described in the Red Lake overview. The Mineral Resource estimate is reported inclusive of the Ore Reserve estimate. The Ore Reserve has been declared at the point where ore is delivered to the processing facility.

Cut-off parameters

Ore Reserve stoping cut-off grades have been updated for each respective mine using the stoping, processing, general & administrative costs for the gold price of $1,600/oz and foreign exchange rate of AUD:CAD of 0.9. Stoping costs between the separate mines consider different constraints with respect to deposit access and material handling and movement constraints.

The Ore Reserve stopes have been assessed on an individual basis at the gold price of $1,600/oz considering the specific stoping costs, processing, and general & administrative costs. Groups of stopes have been assessed at a gold price of $1,600/oz on a level-by-level basis considering the associated operating and capital development costs. An economic sensitivity analysis has been performed using a range of gold prices from $1,600/oz to $2,200/oz

Evolution Mining Limited

38

==> picture [83 x 59] intentionally omitted <==

Mining factors or assumptions

Stopes are designed for either longitudinal open stoping with paste fill or waste fill using the Deswik Stope Optimizer tool (Deswik.SO) to generate the designs based on specified input parameters and optimised for grade.

Table 16: Red Lake Stope Parameters

Parameter Value
Section Interval 5m to 6m
Vertical Extent / Stope Height 20m to 26m
Minimum Hangingwall Dip 50°
Minimum Mining Width 1.8m to 2.4m

Internal geotechnical data analysis on rock quality, stope dimensions and past stope performance provides guidance on stope dimensions required to minimize unplanned dilution. Stope design shapes are grouped into nominal stope blocks on strike ranging between 12m to 24m. Unplanned mining dilution and recovery estimates have been established by analysis of historical stope performance for the various geological zones at the Red Lake Operation.

Unplanned dilution was included by applying a skin as an equivalent linear overbreak slough to the hanging wall and footwall between 0.6m to 1.2m. The grade of the unplanned dilution was assumed to be 0g/t Au except in cases where the geological model was intersected by the design shape. Mining recovery was assumed as 90% for down-hole stopes and 85% for up-hole stopes.

For Ore Reserves, Inferred Resources are excluded and treated as waste material.

Metallurgical factors or assumptions

Red Lake operation operates two processing plants, the Campbell, and Red Lake plant. The Campbell plant uses a traditional carbon-in-leach (CIL) and carbon-in-pulp (CIP) process. The Red Lake plant uses a traditional CIP process. Refractory gold is recovered by pressure oxidation. Sulphide concentrates produced by both the Campbell and Red Lake flotation circuits are processed at the Campbell plant autoclave.

Historical metallurgical process plant data have been used to develop a recovery model to estimate the metallurgical recovery in the process plants dependent upon the head grade of the mill feed.

2022 Ore Reserve Metallurgical Recovery Guidance:

𝑀𝑒𝑡𝑎𝑙𝑙𝑢𝑟𝑔𝑖𝑐𝑎𝑙 𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑦=[85.83177 + 0.925896 × 𝐻𝑒𝑎𝑑 𝐺𝑟𝑎𝑑𝑒] 100

There are no deleterious elements that are modelled.

Infrastructure

Red Lake operation is an established site, comprised of three separate operational mine sites. Major infrastructure e.g., road access, processing plant, electrical power, potable and process water etc. are available and adequate to support current and future mining operations. Excavations for underground infrastructure e.g., service bays, ventilation and dewatering etc. are accounted in the Ore Reserve development designs and operational costs are included in the mining cost.

Costs

Costs for Red Lake and Cochenour have been based on historical site costs with projected cost reduction initiatives, standardization of the mining fleet and consolidation of the mining production zones. Cost reduction initiatives are based on benchmarking studies carried out by the company and current plans or projects that are in the implementation phase.

Evolution Mining Limited

39

==> picture [83 x 59] intentionally omitted <==

Costs for the Upper Campbell region have been based on first principles using site labour and consumable costs. Costs reductions are justified by increased effectiveness and lowered indirect costs by way of the portal access and economies of scale for larger capacity mobile equipment.

Transportation and refinery treatment charges are based on current agreements.

Cochenour is subject to a 5% net profit and a 1% net smelter return royalty on less than 3% of the reported Ore Reserves. McFinley is subject to a 2% net smelter return and a 1% net smelter return royalty on 87% of the reported Ore Reserves. No additional royalties are payable on tenures that host the remaining current Ore Reserves.

Revenue

The gold price assumption used to estimate the December 2022 Ore Reserves revenue was $1,600/oz at and foreign exchange rate of AUD:CAD of 0.9.

Economic

Ore Reserves were calculated on an incremental cost basis with economic assessments completed on levelby-level basis. The Ore Reserves were subjected to an economic test that includes all applicable costs and is performed via a sensitivity analysis using a range of assumed gold prices from $1,600/oz to $2,200/oz and considers a range of financial metrics including AISC, NPV and FCF.

Classification

The Ore Reserves are derived from Indicated Resources. No Proved Reserves or Probable Reserves derived from Measured Resources have been reported. The reserve classification was based on the assessment of the metal content by each Resource category on the stope and development designs. Only Measured or Indicated Resources are assumed to contribute to revenue, Inferred Resources do not contribute to the grade or revenue. In the opinion of the Competent Person the Ore Reserve classification is appropriate.

Audits or reviews

The Ore Reserve design has been audited the Evolution Transformation & Effectiveness (T&E) team, that acts as an engineering and geology oversight group. External consultants have been used to evaluate Upper Campbell and complete the mine design, schedule, and economic evaluation.

An external audit of the December 31, 2021 Mineral Resource and Ore Reserve was completed in September, 2022 by SRK. No fatal flaws or ‘High Risk’ findings were identified by SRK. SRK consider that the processes, controls and estimates for the December, 31 2021 Red Lake Mineral Resource & Ore Reserve were appropriate to support Public Reporting under the JORC Code (2012).

Discussion of relative accuracy / confidence

The relative accuracy of the Mineral Resource estimate is in accordance with the guidelines of the 2012 JORC Code. The site has maintained an ongoing register of production reconciliations with varied short-term performance. It is expected that reconciliation will continue to confirm that the new Mineral Resources are suitable global estimates to be used as the basis to estimate Ore Reserves. The Competent Person is comfortable that these estimates are classified in accordance with the JORC 2012 guidelines and will be suitable for appropriate conversion to Ore Reserves where applicable and will form the basis of ongoing Mine Planning at Red Lake Operations.

The accuracy of the Ore Reserve estimate is dependent upon the accuracy of the Mineral Resource model and the long-term cost and revenue assumptions. Modifying factors have been developed from current mine performance data. In the opinion of the Competent Person the long-term assumptions and modifying factors are reasonable. Ore Reserves estimates are reconciled against actual mining performance, the results indicate that the results are within satisfactory levels and support a high level of confidence in the Ore Reserve estimate.

Evolution Mining Limited

40

==> picture [83 x 59] intentionally omitted <==

APPENDIX 1: JORC CODE 2012 ASSESMENT AND REPORTING CRITERIA

The following information is provided in accordance with Table 1 of Appendix 5A of the JORC Code 2012 - Section 1 (Sampling Techniques and Data), Section 2 (Reporting of Exploration Results), Section 3 (Estimation and Reporting of Mineral Resources) and Section 4 (Estimation and Reporting of Ore Reserves).

Ernest Henry

JORC Code 2012 Edition – Table 1

Section 1: Ernest Henry Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation Commentary
Sampling techniques Nature and quality of sampling (eg cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity
and
the
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of mineralisation that are Material
to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information

Diamond core drill holes are the primary source of geological and grade information for
the resource at Ernest Henry Mine. Drilling has been completed between 1980 and
2022.A total of 1,169 holes were extracted from the acQuire database and 836 drill holes
containing Cu assays and 835 holes containing Au assays were used in the Mineral
Resource estimate.

Reverse circulation (RC) drilling was completed to base of oxidation with some holes
hosting diamond tails.

The diamond core is routinely sampled to geological contacts and predominantly 2m
intervals from ½ core over the entire length of the drill hole, producing approximately 5kg
samples. Holes drilled from the surface and underground are oriented perpendicular to
orebody mineralisation where possible.

UG channel samples taken from chip sampling of development drives at 2m intervals are
also used to help define mineralogical domains. Whilst they are not used directly in
estimation, chip samples typically yield 4kg – 5kg masses.

Samples undergo further preparation and analysis by ALS laboratories (Townsville and
Brisbane), involving crushing to 2mm, riffle splitting and pulverising to 85% passing 75
microns. Of this material a 0.4g sample is prepared for analysis via aqua regia digestion
and 50g for analysis via fire assay.
Drilling techniques Drill type (eg core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
what method, etc).

Drill types utilised in grade estimation are diamond core including HQ, NQ2 & NQ sizes
yielding core diameters of 63.5mm, 50.6mm & 47.6mm respectively. Drill core is collected
with a 3m barrel and standard tubing.

Only selected drill holes have been oriented using an ezi mark orientation system for
structural and geotechnical requirements.
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed.

Current practice ensures all diamond core intervals are measured and recorded for rock
quality designation (RQD) and core loss.

Evolution Mining Limited

41

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.

Core recovery through the ore portion of the deposit is high (>99.5%).

No bias is observed due to core loss.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged.

All diamond core has been logged, geologically and geotechnically. The geologic and
geotechnical records are considered qualitative and quantitative with the following items
being captured

Lithology

Texture

Alteration

Mineralisation

Structures – including veining & faults

Weathering

RQD

Photography of diamond core has captured approximately 60% of the data set.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled

Drill core is cut in half to produce an approximate 5kg sample using an automatic core
saw, with one half submitted for assay, and the other half retained on site. Where core is
oriented, it is cut on the core orientation line.

Diamond core and channel samples are predominantly sampled at 2m intervals. Samples
are sent to ALS Townsville for crushing and pulverisation. Samples are crushed to 2mm,
split via a riffle or rotary splitter and then pulverised using an LM5 mill to a nominal 85%
passing 75 microns. A 0.4g sub-sample of pulverised material is taken for ICP analysis via
aqua regia digestion and a 50g sub-sample is taken for analysis via fire assay. The
remaining pulverised sample is returned to site and stored for future reference.

Samples submitted to OSLS are crushed to 90% passing 2 mm, rotary split to 3.5kg (if
required) and pulverised using an LM5 mill to 90% passing 75 microns. A 0.5g sub-
sample is taken for base metal analysis via aqua regia digestion and determined by ICP.
A 25g sub-sample is taken for analysis via fire assay.

Sub-sampling is performed during the sample preparation stage in line with ALS internal
protocol.

Field duplicates are collected for all diamond core at a rate of one in every 15 samples
and for channel sample at a rate of one in every 10 samples.

Comparison of field duplicates is performed routinely to ensure a representative sample is
being obtained and that the sample size captures an adequate sample volume to
represent the grain size and inherent mineralogical variability within the sampled material.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments, etc, the parameters used indetermining the

Samples are assayed at ALS Brisbane for a multi element suite using ME-ICP41, Cu-
OG46 & MEOG46 methods, which analyses a 0.4g sample in aqua-regia digestion with an
ICP-AES finish. Gold analysis is completed at ALS Townsville by fire assay on a 50g
sample with an AA instrument finish. Analytical methods are deemed appropriate for this
style of mineralisation.

Evolution Mining Limited

42

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
been established.

Historic quality control procedures include the use of six certified standards (CRMs) as
well as field duplicates inserted at 1:25 ratio for all sample batches sent to the ALS
laboratory.

The quality assurance program includes repeat and check assays from an independent
third-party laboratory as deemed necessary.

There have been no blanks used on the diamond core historic data set. The ALS
laboratory provides their own quality control data, which includes laboratory standards and
duplicates.

EHO currently uses five CRMs, pulverised and coarse blanks, field, crush and pulp
duplicates to monitor sample preparation and analytical processes. The rate or insertion
was 1:15 for CRMs, 1:15 for blanks within mineralised units and 1:30 in waste zones,
Field duplicates were inserted at 1:15 while crush and pulp duplicates were at 1:25
samples.

Analysis of quality control sample assays indicate the accuracy and precision is within
acceptable limits and suitable for inclusion in the underground resource estimate.
Verification of
sampling and
assaying
The verification of significant intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.

All diamond drill holes are logged remotely on a laptop utilising AcQuire software and
stored digitally in an AcQuire database on a network server.

Drill holes are visually logged for copper content prior to sampling and assay. This visual
assessment is used to verify assay data.

The strong correlation between copper and gold enables additional quality control checks
to be enacted on returned assays.

Procedures have been developed to ensure a repeatable process is in place for
transferring, maintaining & storing all drilling, logging and sampling data on the network
server, which has a live upload to a local device and daily back up to an offsite device.

Following review of the historical dataset for the underground Resource, no adjustments
have been made to any assay data. All files are reported digitally from ALS laboratories in
CSV format, which is then imported directly into the Acquire database. Checks of the
assay results in AcQuire and results returned from the laboratory are performed at the
completion of each drilling & sampling campaign. Laboratory certificates for returned
assays are stored for future reference and checks against values contained within the
AcQuire database.
Location of data
points
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.

Collar coordinates are picked up by EHO site surveyors using a Leica total station survey
instrument. All underground excavations are monitored using the same instrument.

The topography was generated from a LIDAR survey completed over EHM mining leases
in 2018 with outputs in GDA94 coordinate system.

A variety of downhole survey methods have been utilised in the underground resource,
however 93% of the diamond drill holes have been surveyed using a gyroscopic
instrument recording down hole survey data in 3m intervals.

All data points are reported in MGA94 zone 54.
Data spacing and Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to

Drill holes are variably spaced with the following broad resource classifications applied:
o
Between30m x30mand40m x 40m for Measured

Evolution Mining Limited

43

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary
distribution establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
o
60m x 60m for Indicated
o
100m x 100m Inferred.

This drill hole spacing is considered sufficient given the deposit grade and geological
continuity and Mineral Resource classification definitions as outlined in the 2012 JORC
Code, which is also supported by historic reconciliation data from the mill.

Samples are weighted by length and density when composited to 2m in length for use in
the estimation.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.

Holes drilled from the surface and underground are oriented perpendicular to orebody
mineralisation and orebody bounding shear zones wherever possible. UG channel
samples are oriented along the strike of orebody mineralisation and are conducted on a
lateral 25m spacing, in line with sub-level mine excavations.

There has been no orientation bias recognised within the data used for the underground
Resource estimate.
Sample security The measures taken to ensure sample security
Diamond core samples are securely stored onsite prior to being despatched to the ALS
laboratory in Townsville.
Audits or reviews The results of any audits or reviews of sampling techniques and
data.
▪ An external audit conducted in 2014 on the data management & QAQC procedures
including drilling & sampling. These were found to be in line with industry standards. CSA
Global completed a fatal flaw analysis of the Ernest Henry Mineral Resource estimate in
July2021and onlyminor issueswereidentified.

Evolution Mining Limited

44

==> picture [83 x 59] intentionally omitted <==

Section 2: Ernest Henry Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Criteria JORC Code Explanation Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.

The EHO is located 38km north-east of Cloncurry, 150km east of Mount Isa and 750km
west of Townsville, in north-west Queensland, Australia. The EHM operations extend
across 8 current mining leases all owned by Ernest Henry Mining Pty Ltd, the details of
these leases are summarized in the following table:
Lease
Ownership
Expiry
ML2671
Ernest Henry Mining Pty Ltd 100%
30/11/25
ML90041
Ernest Henry Mining Pty Ltd 100%
30/11/2037
ML90072
Ernest Henry Mining Pty Ltd 100%
30/11/2025
ML90085
Ernest Henry Mining Pty Ltd 100%
31/03/26
ML90100
Ernest Henry Mining Pty Ltd 100%
31/5/2026
ML90107
Ernest Henry Mining Pty Ltd 100%
31/08/2026
ML90116
Ernest Henry Mining Pty Ltd 100%
30/09/2026
ML90075
Ernest Henry Mining Pty Ltd 100%
30/11/2025

As of 06 January 2022, Evolution Mining Limited has 100% ownership of the EHO.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other parties.
The EHM orebody was discovered by Western Mining Corporation Limited in 1991. The
size and potential of the discovery became obvious with further drill definition following
soon after, leading to a Feasibility Study and subsequently the open pit mine and mill. In
2006 a deep drilling campaign was initiated to explore the down dip extension of the
deposit ultimately leading to the development of the current underground mining project.

Data used in the current estimate is a compilation of several phases of exploration
completed since the early 1990s. This data has been assessed for quality as outlined in
‘Section 1’ and deemed suitable for use as the basis of the Mineral Resource estimate.
Geology Deposit type, geological setting and style of mineralisation.
The Ernest Henry Deposit is an Iron Oxide Copper Gold (IOCG) hosted within a
sequence of moderately SSE-dipping, intensely altered Paleoproterozoic intermediate
metavolcanic and metasedimentary rocks of the Mt Isa group. Copper occurs as
chalcopyrite within the magnetite-biotite-calcite-pyrite matrix of a 250 x 300 m pipe like
breccia body. The breccia pipe dips approximately40 degrees to the Southandis

Evolution Mining Limited

45

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary Commentary
bounded on both the footwall and hanging wall by shear zones. The main orebody starts
to split from the 1575 level into a South-East lens, and from the 1275 level into the
South-West lens. Both lenses are separated from the main orebody by waste zones,
termed the Inter-lens and South-West Shear Zone, respectively. The orebody is open at
depth.
Drill hole Information A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should
clearly explain why this is the case.

No exploration has been reported in this release, therefore no drill hole information to
report. This section is not relevant to this report on Mineral Resources and Ore
Reserves
Data aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
_should be clearly stated. _

No exploration has been reported in this release, therefore no drill hole information to
report. This section is not relevant to this report on Mineral Resources and Ore
Reserves
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).

No exploration has been reported in this release, therefore no drill hole information to
report. This section is not relevant to this report on Mineral Resources and Ore
Reserves
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views

No exploration has been reported in this release, therefore no drill hole information to
report. This section is not relevant to this report on Mineral Resources and Ore
Reserves
Balanced reporting No exploration has been reported in this release, therefore no drill
hole information to report. This section is not relevant to this report

No exploration has been reported in this release, therefore no drill hole information to
report. This section is not relevant to this report on Mineral Resources and Ore

Evolution Mining Limited

46

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary
on Mineral Resources and Ore Reserves Reserves
Other substantive
exploration data
No exploration has been reported in this release, therefore no drill
hole information to report. This section is not relevant to this report
on Mineral Resources and Ore Reserves

No exploration has been reported in this release, therefore no drill hole information to
report. This section is not relevant to this report on Mineral Resources and Ore
Reserves
Further work Ernest Henry has significant potential to extend the resource at
depth. An underground drilling program is in progress to assist in
defining this potential.

The Ernest Henry deposit has significant potential to extend the resource at depth. An
underground drilling program is planned to assist in defining this potential.

Evolution Mining Limited

47

==> picture [83 x 59] intentionally omitted <==

Section 3: Ernest Henry Estimation and Reporting of Mineral Resources

(Criteria listed in Section 1, and where relevant in Section 2, also apply to this section)

Criteria JORC Code explanation Commentary Commentary
Database
integrity
Measures taken to ensure that data has not been corrupted by, for
example, transcription or keying errors, between its initial collection
and its use for Mineral Resource estimation purposes.
Data validation procedures used.

All drill hole data is securely stored and backed up daily in an AcQuire database on a single
server located on site at EHO. Assay data is quality controlled upon receipt and imported
directly into the database via import templates. User access to the database is controlled by
a hierarchy of permissions as defined by the database administrator.
Site visits Comment on any site visits undertaken by the Competent Person and
the outcome of those visits.
If no site visits have been undertaken indicate why this is the case.

The Competent Person has reviewed and observed data collection, sampling and
geological modelling practices and associated procedures which could impact the Mineral
Resource estimation process. It is the Competent Persons opinion that the collection,
quality and interpretation of data is of an appropriate standard for use in Mineral Resource
estimation and reporting.
Geological
interpretation
Confidence in (or conversely, the uncertainty of the geological
interpretation of the mineral deposit.
Nature of the data used and of any assumptions made.
The effect, if any, of alternative interpretations on Mineral Resource
estimation.
The use of geology in guiding and controlling Mineral Resource
estimation.
The factors affecting continuity both of grade and geology.

The distribution of copper and gold at Ernest Henry is directly proportional to the degree of
brecciation occurring, with chalcopyrite, magnetite and associated gold occupying the matrix
within the breccia. Deformation porosity is therefore considered the primary control on the
mineralisation. The domains used to constrain mineralisation for estimation are largely grade
driven, constructed using Seequent’s Leapfrog implicit modelling software. Statistically there
are two grade populations existing within the deposit; a high-grade core domain above 0.9%
Cu and a surrounding lower grade halo (>0.1% Cu) domain sharply in places and gradual in
other areas. Where the grade transition is gradual, a 0.7% Cu domain has been developed.
Contact analyses of each element between mineralised and unmineralised domains has
been completed with results indicating a hard boundary estimation approach is most
appropriate between the interpreted domains.
▪ Six high grade gold domains were developed internal to the 0.7% Cu domain. These gold
domains were developed taking into account geological logging and using a nominal lower
grade threshold of 1.0 g/t Au. The lower grade threshold was selected based on
observations of Au assays downhole and the inflection point on the log-probability plot of Au,
which indicates the grade at which a higher-grade population exists within the total Au
distribution.
Dimensions The extent and variability of the Mineral Resource expressed as
length (along strike or otherwise), plan width, and depth below surface
to the upper and lower limits of the Mineral Resource.

Looking east to west, the Ernest Henry deposit extends 1800m along strike (north-south)
and 1700m below the surface. The width of mineralisation varies as the deposit becomes
elongated below 1300mRL. Above 1300mRL, mineralisation is approximately 340m wide
(east to west) and approximately 250m wide below 1300mRL. The deposit dips at 40
degrees to the south, extending from 60m under a sedimentary blanket to beyond 1700m in
depth. Below 1575mRL a secondary lens is partitioned to the southeast appearing to be
strongly influenced by the shearing. The current EHM resource estimate reports blocks
below 1705mRL that form a contiguous mineable entity within the 0.7 % Cu grade shell.
Estimation and The nature and appropriateness of the estimation technique(s)
Grade estimations for copper (Cu), gold (Au), silver (Ag), arsenic (As), cobalt (Co), iron (Fe),

Evolution Mining Limited

48

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
modelling
techniques
applied and key assumptions, including treatment of extreme grade
values, domaining, interpolation parameters and maximum distance
of extrapolation from data points. If a computer assisted estimation
method was chosen include a description of computer software and
parameters used.
The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.
The assumptions made regarding recovery of by-products.
Estimation of deleterious elements or other non-grade variables of
economic
significance
(eg
sulphur
for
acid
mine
drainage
characterisation).
In the case of block model interpolation, the block size in relation to
the average sample spacing and the search employed.
Any assumptions behind modelling of selective mining units.
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to control
the resource estimates.
Discussion of basis for using or not using grade cutting or capping.
The process of validation, the checking process used, the comparison
of model data to drill hole data, and use of reconciliation data if
available
molybdenum (Mo), nickel (Ni), sulphur (S), uranium (U) and density were completed using
ordinary kriging in Datamine Studio RM software. Block dimensions (XYZ =10x10x10) used
are reflective of the selective mining unit and the geometry of the mineralisation. Sub-cells
of 2mE by 2mN by 2mRL were used to accurately reflect domain volumes. Samples were
composited to 2m in length within five Cu domains and six Au domains. No top cuts were
applied to density or any of the other elements within the mineralised domains. Top cuts to
Au and Cu were applied to the lower grade (Domain 1) and surrounding waste domain
(Domain 0) to minimise sampling smearing.

A multi-pass search strategy using dynamic anisotropy was utilised to adjust the search
ellipse orientation when estimating grades. True dip and dip direction was estimated into
each block using the structural trend surfaces developed during domain generation. A high
confidence 1stsearch pass used a minimum of 12 samples and maximum of 32 samples
with a minimum number of 3 octants required. The range of the search ellipse was
approximately one quarter of the range of the modelled Cu variogram. The search
neighbourhood criteria were selected based on test estimates using differing versions of
search criteria and supported by kriging neighbourhood analysis.

Most blocks have been estimated in the first estimation pass (~86% of blocks), which used
a 210m search. A second, lower confidence estimation pass, which used a 420m search
(approximately half the variogram range for Cu and Au) was used to incorporate samples
further from the block being estimated.

Copper and gold mineralisation are intimately associated throughout the deposit with a Cu
to Au ratio of 2:1 common. This ratio changes notably in the Au domains where an increase
in Au mineralisation exists and the Au to Cu ratio is ≥ 1.

Deleterious elements occurring in the deposit include Arsenic and Uranium. Both are in low
abundance and do not present an issue at the mill or in the concentrate. Sulfur is estimated
into the model and can be used to characterise waste rock. All production from underground
however is considered acid forming and is treated as such. All other deleterious elements
fall well below penalty thresholds.

Validation tools employed to scrutinize the model include:

Statistical summary of block values to check outlying values and confirm all blocks were
estimated.

Statistical comparisons between mean estimated grades and mean composited grades
for each domain are within ±5%.

Swath plots of mean estimated grades against mean composite grades within 20 m
wide easting, northing and elevation slices shows composite grade trends have been
closely replicated in the model.

Visual comparison in section between block grades and composite grades indicate the
estimated grades closely reflect the surrounding composite grades and grade smearing
has been controlled.

Visual comparison of estimated Cu and Au between the June 2022 and December 2022
models shows trends are consistently replicated.

Mine tomill reconciliationdata gathered overthe past10 yearsindicates the estimate to

Evolution Mining Limited

49

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
be accurate +/-5%.
Moisture Whether the tonnages are estimated on a dry basis or with natural
moisture, and the method of determination of the moisture content.

Tonnage estimates for the purpose of estimating in-situ ore resources are determined
based on dry bulk density.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters
applied.

The resource cut-off at EHO since 2018 has used a $50 Net Smelter Return (NSR), which
roughly aligned with the 0.7% Cu wireframe. The sub-level caving mining method precludes
the ability to selectively mine blocks below a given cut-off grade. Consequently, the Mineral
Resource has been reported within the interpreted 0.7% Cu grade shell without using a cut-
off grade. Approximately 0.1% of reported tonnes are below 0.7% Cu. This material is
considered by the Competent Person (CP) to meet reasonable prospects for eventual
economic extraction, considering the proposed mining technique and historical metallurgical
recoveries.
Mining factors
or
assumptions
Assumptions made regarding possible mining methods, minimum
mining dimensions and internal (or, if applicable, external) mining
dilution. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider
potential mining methods, but the assumptions made regarding
mining methods and parameters when estimating Mineral Resources
may not always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining assumptions
made.

The Ernest Henry deposit lends itself to a low-cost high production mass mining technique
such as sub level caving. It is anticipated the successful extraction of the deposit as
demonstrated through the underground mine since 2012 using the sub level caving
technique will continue.

Depletion and sterilization due to mining is estimated using a Power Geotechnical Cellular
Automata (PGCA) flow model. The flow model estimates the relative proportions of resource
category reporting to draw points for extraction with production actual tonnes and grade to
September 2022 used for calibration of the model
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding metallurgical
amenability. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to
consider potential metallurgical methods, but the assumptions
regarding metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with an explanation of
the basis of the metallurgical assumptions made.

The ore at Ernest Henry has been successfully milled since the open cut started in 1997.
Historical mill recoveries for copper and gold in the primary sulfide ore are approximately
95% and 83% respectively.

Metallurgical test work has been completed as part of the current PFS. Whilst the results
indicate minimal change in metallurgical assumptions, the metallurgical tests have
highlighted a minor increase in ore hardness for material within the PFS area.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process residue
disposal options. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to
consider the potential environmental impacts of the mining and
processing operation. While at this stage the determination of
potential environmental impacts, particularly for a greenfields project,
may not always be well advanced, the status of early consideration of
these potential environmental impacts should be reported. Where
these aspects have not been considered this should be reported with
an explanation of the environmental assumptions made.

All the relevant environmental licenses are in place for the current mining operation,
including tails storage facility capacity for all reserves. A number of the mining leases will
require renewal to extract all of the Ore Reserve.
Bulk density Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or dry, the
frequency
of
the
measurements,
the
nature,
size
and

An extensive database of Dry Bulk Density measurements has been collected since deposit
discovery using the Archimedes water displacement principal on core samples every 20m
downhole. These measurements are used in conjunction with an elemental assay analysis

Evolution Mining Limited

50

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
representativeness of the samples.
The bulk density for bulk material must have been measured by
methods that adequately account for void spaces (vugs, porosity, etc),
moisture and differences between rock and alteration zones within the
deposit.
Discuss assumptions for bulk density estimates used in the evaluation
process of the different materials.
to generate a stoichiometric regression formula that is applied to every sample. Dry bulk
density is then estimated into the block model using ordinary kriging.

Samples are dried in an oven prior to density measurements.

There are very few open voids in the EHO orebody and the crystal structure of the rock
exhibits minimal porosity. These factors are considered to have little influence on the
estimated global density.

The variability of density across the width of mineralisation is low.
Classification The basis for the classification of the Mineral Resources into varying
confidence categories.
Whether appropriate account has been taken of all relevant factors (ie
relative confidence in tonnage/grade estimations, reliability of input
data, confidence in continuity of geology and metal values, quality,
quantity and distribution of the data).
Whether the result appropriately reflects the Competent Person’s view
of the deposit

The EHO Mineral Resource has been classified using the following general criteria:

Measured: Drill data used for estimation not exceeding 30m-40m spacing and including
full drill coverage on adjacent sections to the north and south. Estimated with a full
compliment of composites selected in the kriging process (32).

Indicated: Drill data used for estimation between 40m–60m, estimated with a full
complement of composites selected in the kriging process (32).

Inferred: Drill data used for estimation between 60m-100m

Other general conditions taken into consideration in the classification are as follows;

Kriging Efficiency (KE);

Continuity of grades between drill holes;

Confidence in the geological interpretation of structures and interpretation of
mineralisation boundary;

The mining cut-off at EHO since 2018 has used a $50 Net Smelter Return (NSR), which
roughly aligned with the 0.7% Cu wireframe. Blocks outside this wireframe are
considered “External” for the purposes of the flow model. The Mineral Resource is
depleted through the flow modelling process, utilising PGCA software.
Audits or
reviews
The results of any audits or reviews of Mineral Resource estimates.
Resource estimates have been reviewed several times since the 2011 underground
feasibility study by external geostatistical consultants. The most recent review of the Mineral
resource estimate was completed by CSA Global in July 2021.

Each review has endorsed the estimate while also recommending minor potential
improvements for the next estimate.

The 31 December 2022 Mineral Resource has been internally peer reviewed by Evolution’s
Transformation & Effectiveness (T&E) team who undertake technical reviews and manage
corporate governance activities.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an approach
or procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative
discussion of the factors that could affect the relative accuracy and
confidence of the estimate.
The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which should be

The Mineral Resource accuracy is communicated through the classification assigned to this
Mineral Resource.

The Mineral Resource estimate has been classified in accordance with the JORC Code,
2012 Edition using a qualitative approach. All factors that have been considered have been
adequately communicated in Section 1 and Section 3 of this Table.

Reconciliation data from Mine to Mill since the beginning of the underground operation has
ultimately validated the global accuracy of the resource estimate with total received metal
within +/-5%.

The nature of a caving operation means there is a lag between reserves and ore delivered
to the mill over short time frames reflecting the challenges of accurately predicting flow

Evolution Mining Limited

51

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
relevant to technical and economic evaluation. Documentation should
include assumptions made and the procedures used.
These statements of relative accuracy and confidence of the estimate
should be compared with production data, where available.
within a cave.

Mine production for the life of mine is estimated using Power Geotechnical Cellular
automata (PGCA) flow modelling software. The 2022 resource model appears to enable a
satisfactory correlation with historical reconciled production data when calibrations are
applied to theflow model.

Evolution Mining Limited

52

==> picture [83 x 59] intentionally omitted <==

Section 4: Ernest Henry Estimation and Reporting of Ore Reserves

(Criteria listed in Section 1, and where relevant in Sections 2 and 3, also apply to this section)

Criteria JORC Code explanation Commentary
Mineral
Resource
estimate
for
conversion
to
Ore Reserves

Description of the Mineral Resource estimate used as a
basis for the conversion to ·

Clear statement as to whether the Mineral Resources are
reported additional to, or inclusive of, the Ore Reserves.an
Ore Reserve.

A detailed description of the Mineral Resource estimate is provided in the previous sections
of this Table.

Mineral Resources at Ernest Henry are reported within Domain 7 (0.7 % copper).

Recovered production ore, including dilution, is forecast using Power Geotechnical Cellular
Automata (PGCA) software. This software simulates cave flow and ore recovery based on
the current block model, mine design, Life of Mine (LOM) schedule and model input
parameters. The model is calibrated using mine to mill reconciliation data and recovery of
markers installed in the cave.

The block model is discretised into 1.25 m3particles within the PGCA model. Each block
retains the attributes of the respective parent block, including density, grade and resource
classification. These blocks flow within the cave model based on stochastic rules developed
from large scale recovery studies conducted in similar SLC operations. The model calculates
ore recovery based on the simulated mine schedule and planned production draw strategy.
The recovered tonnes, grade and resource classification is calculated by the proportion (of
tonnes and metal) of each resource category reporting to the individual rings. This method
enables Ore Reserves to be estimated using the Mineral Resource classification, accounting
for ore recovery and dilution.

ReportedMineral Resources areinclusive ofthe OreReserve
Site Visits

Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.

If no site visits have been undertaken indicate why this is
the case.

The Competent Person is a full-time employee of Evolution and conducts regular site visits
to the Ernest Henry Operation.
Study Status

The type and level of study undertaken to enable Mineral
Resources to be converted to Ore Reserves.

The Code requires that a study to at least Pre-Feasibility
Study level has been undertaken to convert Mineral
Resources to Ore Reserves. Such studies will have been
carried out and will have determined a mine plan that is
technically achievable and economically viable, and that
material Modifying Factors have been considered.

The Ernest Henry underground mine has been producing for ten years following Pre-
feasibility (2006) and Feasibility (2008) studies. A detailed mine design and schedule exists
for the planned life of the mine and is included in the cave flow model used to estimate the
Ore Reserve.

The economics of the operation are well understood and reviewed annually.

No modifying factors have been applied as part of conversion from Mineral Resource to Ore
Reserve.
Cut-off
parameters

The basis of the cut-off grade(s) or quality parameters
applied

The design cut-off for the sub-level cave (SLC) footprint is 0.7 % copper. This value aligns to
Domain 7 (D7), which defines the Mineral Resource. As the grade contact for this domain is
generally quite hard, the mining footprint would be very similar were a design cut-off of +-30
% to be used.

The economic cut-off grade applied in the cave flow model is 0.75 % CuEq. This value has
been selected following assessment of multiple scenarios and validated through an
economic evaluation process.

Evolution Mining Limited

53

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
Mining factors
or assumptions

The method and assumptions used as reported in the Pre-
Feasibility or Feasibility Study to convert the Mineral
Resource to an Ore Reserve (i.e. either by application of
appropriate factors by optimisation or by preliminary or
detailed design).

The choice, nature and appropriateness of the selected
mining method(s) and other mining parameters including
associated design issues such as pre-strip, access, etc.

The assumptions made regarding geotechnical parameters
(eg pit slopes, stope sizes, etc), grade control and pre-
production drilling.

The major assumptions made and Mineral Resource model
used for pit and stope optimisation (if appropriate).

The mining dilution factors used.

The mining recovery factors used.

Any minimum mining widths used.

The manner in which Inferred Mineral Resources are
utilised in mining studies and the sensitivity of the outcome
to their inclusion.

The infrastructure requirements of the selected mining
methods.

Not applicable as the mine is currently operational.

Pre-feasibility and Feasibility studies conducted in 2006 and 2008 (respectively) combined
with ongoing mine planning reviews have shown that sub-level caving is the most
appropriate mining method for the deposit. Assessments have considered the orebody
geometry, grade, geotechnical conditions and economics.

Geotechnical parameters and engineering assessments have determined that the rock mass
is amenable to sub/level caving. Empirical assessment and numerical modelling forecasts
are reflected by the cave propagation to date.

The mine design uses 25 m sub-level spacing, 15 m drive spacing (centre to centre), 6 m
wide cross cuts and a standard SLC drill and blast design. These design parameters are in
line with benchmarked mines and assessed to be geotechnically stable within the bounds of
the stated Ore Reserve mining area.

Unfired dilution is set to flow at 180 % of the rate of blasted material when conducting flow
simulations in PGCA. This value was determined to be appropriate through the model
calibration process and reflects fines generation within the cave.

No mining dilution factors are applied as dilution is included in the cave flow model
simulation. The tonnage attributed to dilution is included in the reported Ore Reserves due to
the non-selective nature of the mining method.

No mining recovery factors are applied as the recovery of blasted ore is an output of the
cave flow model simulation.

A minimum mining width for cave establishment and propagation is in the order of 140 m
based on empirical cavability assessments. A draw width of 10.0 m at 3,000 tonnes drawn is
applied in the cave flow model software. This value has been selected based on recovery of
markers installed inside the cave and calibration of the flow model against reconciled
actuals.

Sub-level caving is a bulk mining method with limited selectivity, where dilution must be
accepted in order to recover blasted ore. Dilution from production activities is quantified
through cave flow modelling and is included in the reported Ore Reserve along with
supporting economic evaluations. Recovery and dilution factors are not used as part of the
Ore Reserve estimation process.

Due to the non-selective nature of sub-level caving, Inferred and Unclassified tonnes are
included in the Ore Reserve estimate. Metal associated with the Inferred and Unclassified
tonnes is excluded from the Ore Reserve estimate.

All major infrastructure supporting the Ore Reserve has been constructed, including the
underground crushing and conveying system, hoisting shaft, pumping and ventilation
systems.

Access to the underground mine is via an in-pit portal and decline, with additional means of
egressvia aladderway systemand thehoisting shaft.

Evolution Mining Limited

54

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
Metallurgical
factors
or
assumptions

The
metallurgical
process
proposed
and
the
appropriateness
of
that
process
to
the
style
of
mineralisation.

Whether the metallurgical process is well-tested technology
or novel in nature.

The nature, amount and representativeness of metallurgical
test work undertaken, the nature of the metallurgical
domaining applied and the corresponding metallurgical
recovery factors applied.

Any assumptions or allowances made for deleterious
elements.

The existence of any bulk sample or pilot scale test work
and the degree to which such samples are considered
representative of the orebody as a whole.

For minerals that are defined by a specification, has the ore
reserve estimation been based on the appropriate
mineralogy tomeet the specifications?

Comminution is achieved using an underground gyratory crusher followed by SAG and Ball
mills in the processing plant. Copper and gold are recovered using a proven floatation circuit.
Recovered gold is contained within the copper concentrate.

The metallurgical process utilises well tested technology and has been conducted onsite for
approximately 20 years with consistent results.

Uranium contained within the ore is below deleterious limits. No other impurities have been
experienced in deleterious quantities. This is expected to be the case for the stated Ore
Reserve based on the drilling and sampling conducted to date.

Bulk sampling is conducted on a routine basis to confirm plant performance.

Not applicable as minerals are not defined by a specification.
Environmental
factors
or
assumptions

The status of studies of potential environmental impacts of
the mining and processing operation. Details of waste rock
characterisation and the consideration of potential sites,
status of design options considered and, where applicable,
the status of approvals for process residue storage and
waste dumps should be reported.

Environmental studies regarding flora and fauna, hydrogeological conditions, waste rock
characterisation and cultural heritage have been carried out for the mine.

An environmental authority (license) has been granted by the regulator.

The plan of operations has been approved by the regulator.

The mine has an Environmental Management Plan and has all required mining approvals
have been granted for mine production, waste dump and tailings storage facilities and site
clearing.

Acid forming material is contained in approved storage facilities and controlled using a waste
rock management plan.
Infrastructure

The existence of appropriate infrastructure: availability of
land for plant development, power, water, transportation
(particularly for bulk commodities), labour, accommodation;
or the ease with which the infrastructure can be provided, or
accessed.

All of the infrastructure required to extract the stated Ore Reserve is in place.

Access to the utilities that support mining activities has been secured.

Ernest Henry owns and operates a mining camp to house the Fly-in Fly-out (FIFO)
contingent of the workforce. The local workforce resides in the town of Cloncurry.
Costs

The derivation of, or assumptions made, regarding
projected capital costs in the study.

The methodology used to estimate operating costs.

Allowances made for the content of deleterious elements.

The source of exchange rates used in the study.

Derivation of transportation charges.

The basis for forecasting or source of treatment and refining
charges, penalties for failure to meet specification, etc.

The
allowances
made
for
royalties
payable,
both
Government and private.

Estimates for minor capital items that support the Ore Reserve have been informed by
current industry benchmarks and previous site experience with similar projects.

Sustaining capital is forecast annually as part of the Budget and Life of Mine (LOM) planning
cycle, reflecting actual performance, mining and equipment schedules.

Operating costs are calculated using a first principles approach and reconciled with actual
costs on a monthly basis and as part of annual financial reviews. The availability of reliable
historic data for the site provides a robust basis for estimating the operating costs.

No impurities are expected to occur in deleterious quantities. Concentrate sales model does
account for penalties should any be incurred.

The exchange rate for long term financial assessment is based on Evolution corporate

Evolution Mining Limited

55

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
assumptions.

Transport costs are based on the site concentrate sales model and assume concentrate is
transported by road to Mount Isa.

Treatment and refining charges are included in financial models with a base assumption of
smelting in Mt Isa and refining in Townsville at Glencore facilities.

Royalty payments of 4 % for copper and 5% for gold and silver to the Queensland
government are included in financial models.
Revenue
factors

The derivation of, or assumptions made regarding revenue
factors including head grade, metal or commodity price(s)
exchange rates, transportation and treatment charges,
penalties, net smelter returns, etc.

The derivation of assumptions made of metal or commodity
price(s), for the principal metals, minerals and co-products.

The projected head grade is an extract of the mine schedule, reflecting the reported Ore
Reserve inventory.

Economic assumptions applied in the cut-off grade determination process are:

Gold Price: $1,600/oz

Copper Price: $7,000/t

Silver Price: $20/oz

AUD:USD Exchange Rate: 0.75

Transport and treatment charges are based on the site concentrate sales model and
included in financial evaluations.

Credited value from silver is included in revenue calculations used to evaluate the Ore
Reserves, though the associated value is insignificant.
Market
assessment

The demand, supply and stock situation for the particular
commodity, consumption trends and factors likely to affect
supply and demand into the future.

A customer and competitor analysis along with the
identification of likely market windows for the product.

Price and volume forecasts and the basis for these
forecasts.

For industrial minerals the customer specification, testing
and acceptance requirements prior to a supply contract.

Copper and gold products are sold to Glencore.

Supply and demand of copper and gold is not a constraint used in the estimate of the Ore
Reserve at Ernest Henry.

Copper and gold volumes are forecast over the life of mine and included in the company’s
long term price forecasts.

Not applicable as Ernest Henry does not produce industrial minerals.
Economic

The inputs to the economic analysis to produce the net
present value (NPV) in the study, the source and confidence
of these economic inputs including estimated inflation,
discount rate, etc.

NPV ranges and sensitivity to variations in the significant
assumptions and inputs.

Mine revenue and NPV are calculated using reconciled cost models as previously described.
With ten years of comparable production the confidence for forecast economic outcomes is
high.

The Ore Reserve has been evaluated using a financial model, with sensitivity to internal and
external factors being included in the evaluation.
Social

The status of agreements with key stakeholders and
mattersleading to social licence to operate.

Deed and access agreement are in place with neighboring landholders.

Allotherpermitsforplannedmining operationshave beengranted.
Other

To the extent relevant, the impact of the following on the
project and/or on the estimation and classification of the Ore
Reserves:

Any identified material naturally occurring risks.

The status of material legal agreements and marketing
arrangements.

Events such as cyclones and high rainfall events present a risk to short term production
targets and are managed through site risk mitigation processes. These events have not been
included in the estimation of the Ore Reserves.

Long term sales agreement with Glencore is in place.

Mining operations at the site have been conducted for 20 years. There are no outstanding
approvals required for planned mining.

Evolution Mining Limited

56

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary

The status of governmental agreements and approvals
critical to the viability of the project, such as mineral
tenement status, and government and statutory approvals.
There must be reasonable grounds to expect that all
necessary Government approvals will be received within the
timeframes anticipated in the Pre-Feasibility or Feasibility
study. Highlight and discuss the materiality of any
unresolved matter that is dependent on a third party on
whichextractionofthereserveis contingent

ML90075 and ML26710 are due for renewal in November 2025, which is approximately 12
months before the planned mining completion date. The necessary steps required to renew
these leases are being undertaken by Evolution Mining.
Classification

The basis for the classification of the Ore Reserves into
varying confidence categories.

Whether the result appropriately reflects the Competent
Person’s view of the deposit.

The proportion of Probable Ore Reserves that have been
derived from Measured Mineral Resources (if any).

Measured Resources recovered through development and production activities are
converted to Proved Reserve.

Indicated Resources recovered through development and production activities are converted
to Probable Reserve.

Inferred Resource tonnes recovered through development and production activities are
converted to Probable Reserve.

Inferred Resource metal recovered through development and production activities are
excluded from the Ore Reserve.

External and Unclassified Resource tonnes recovered through development and production
activities are converted to Probable Reserve.

External and Unclassified Resource metal recovered through development and production
activities are excluded from the Ore Reserve.

The conversion process appropriately reflects selectivity of the mining method and
confidence in the geological, geotechnical, metallurgical and mine planning processes.

The result of the process used to convert the Mineral Resource into the Ore Reserve is
deemed appropriate by the Competent Person.
Other
Measured Indicated
Inferred
External
Measured Indicated
Inferred
External
Unclassified
Proved
Probable
Probable
Probable
Proved
Probable
Probable
Probable
Probable
D7
D1
Tonnes
Other
Measured Indicated
Inferred
External
Measured Indicated
Inferred
External
Unclassified
Proved
Probable
Proved
Probable
Metal
D7
D1

Evolution Mining Limited

57

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
Audits
or
reviews

The results of any audits or reviews of Ore Reserve
estimates

Internal review of the methodology used to produce the Ore Reserve estimate has been
conducted routinely by site technical and leadership teams as part of the MROR and LOM
planning cycles.

External reviews are completed periodically to review the mine and ensure technical risks
are managed appropriately. Feedback from these reviews has been positive to date.

Evolution’s Transformation & Effectiveness (T&E) team undertake an internal but
independent review of the Mineral Resource and Ore Reserve.
Discussion
of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and
confidence level in the Ore Reserve estimate using an
approach or procedure deemed appropriate by the
Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the relative
accuracy of the reserve within stated confidence limits, or, if
such an approach is not deemed appropriate, a qualitative
discussion of the factors which could affect the relative
accuracy and confidence of the estimate.

The statement should specify whether it relates to global or
local estimates, and, if local, state the relevant tonnages,
which should be relevant to technical and economic
evaluation. Documentation should include assumptions
made and the procedures used.

Accuracy and confidence discussions should extend to
specific discussions of any applied Modifying Factors that
may have a material impact on Ore Reserve viability, or for
which there are remaining areas of uncertainty at the
current study stage.

It is recognised that this may not be possible or appropriate
in all circumstances. These statements of relative accuracy
and confidence of the estimate should be compared with
production data, where available.

The accuracy of the Ore Reserve estimate is largely dependent on the accuracy of the
Mineral Resource and the cave flow model.

The geological model has undergone a detailed internal review to validate the inputs and
technical approach. The model is further validated through the End of Month (EOM)
reconciliation process, which shows a consistent alignment of forecast and actual metal
content.

Calibration of the flow model is conducted at six-month intervals and now includes more than
ten years of reconciliation data. The modelled grade is consistently within 5 % of the
reconciled metal output on an annual basis.

The mining and processing practices that have demonstrated reliable performance to date
will be applied to the stated Ore Reserve, with comparable performance expected.

All assumptions used in financial models are subject to internal review.

Evolution Mining Limited

58

==> picture [83 x 59] intentionally omitted <==

APPENDIX 1: JORC CODE 2012 ASSESMENT AND REPORTING CRITERIA (con’t)

The following information is provided in accordance with Table 1 of Appendix 5A of the JORC Code 2012 - Section 1 (Sampling Techniques and Data), Section 2 (Reporting of Exploration Results), Section 3 (Estimation and Reporting of Mineral Resources) and Section 4 (Estimation and Reporting of Ore Reserves).

Red Lake

JORC Code 2012 Edition – Table 1

Section 1: Red Lake Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation JORC Code Explanation Commentary
Nature and quality of sampling (eg cut channels, random
chips,
or
specific
specialised
industry
standard
measurement tools appropriate to the minerals under Sampling of gold mineralisation at Red Lake Operation that constitutes this Mineral Resource
investigation, such as down hole gamma sondes, or estimate was undertaken using diamond drill core (surface and underground).
Sampling
techniques


handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g., ‘reverse circulation
All drill core was photographed and logged prior to sampling. Diamond drill core was sampled to
lithological, alteration and mineralisation related contacts. Sampling was carried out according to
Red Lake Operations protocols and QAQC procedures.
All drill-hole collars were surveyed using a total station theodolite or differential GPS.
The sampling and assaying methods are appropriate for the orogenic mineralised system and are
representative for the mineralisation style. The sampling and assaying suitability was validated
using Red Lake Operations QAQC protocol and no instruments or tools requiring calibration were
used as part of the sampling process.
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
Diamond drill core sample intervals were based on geology to ensure a representative
sample, with lengths ranging from 0.3m to 1m. Diamond drilling was half core sampled if
drilled for Exploration or Resource Definition, whereas grade control drilling is not cut prior to
sampling. All diamond core samples were dried, crushed and pulverised (total preparation) to
produce a 50g charge for fire assay of Au.
detailed information
Drilling techniques Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Drilling incorporated in the Mineral Resource estimate has been collected using diamond drill
rigs. The core is extracted using a standard tube and core diameter is either AQTK (30.5mm)
BQTK (40.7mm) or NQ2 (50.6mm) in size. Prior to 2015 very little exploration core was
oriented. Post 2015, all exploration drill core is oriented using the Tru-Core device. In addition
a portion of critical Resource Definition and production drill core is also oriented as deemed
necessary to support interpretation in areas of complex geology. Face Samples (Chips) have

Evolution Mining Limited

59

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation JORC Code Explanation
Method of recording and assessing core and chip sample
Drill sample
recovery

recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
Logging
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For
all
sample
types,
the
nature,
quality
and
Sub-sampling
techniques and
sample
preparation


appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled
Quality of assay
data and laboratory
tests

The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading

Commentary

been routinely collected during the history of mining on site for all deposits. Representative chip samples have been utilised to estimate grades for this Mineral Resource for newly updated models but are not used in models from MR 2020. Drill core recovery is excellent at the Red Lake operation (RLO) and consequently drill core recovery is not recorded at this time on site. All drill core post 2015 is oriented and marked up at 1-metre intervals. Measurement checks per core tray are completed and compared to drillers depth markers.

All logging is both qualitative and quantitative in nature recording features such as structural data, lithology, mineralogy, alteration, mineralisation types, vein density, colour etc. All holes are photographed wet. All diamond holes were logged entirely from collar to end of hole. All drill core once logged is digitally photographed. The photographs capture all data presented on the core.

Diamond core drilled (HQ, NQ, BQ) intervals ranging from 0.15m to 1.0m in length was half core sampled and the remaining half was retained. Core is cut to preserve the bottom of hole orientation line. In some instance core may be quarter cut and sent for analysis. ATQ core was whole core sampled. Sample preparation of diamond samples was undertaken by external laboratories according to the sample preparation and assaying protocol established to maximise the representation of the Red Lake Operations mineralisation. Laboratories performance was monitored as part of Red Lake Operations QAQC procedure. Laboratory inspections were undertaken to monitor the laboratories compliance to the Red Lake Operations sampling and sample preparation protocol. The sample preparation has been conducted by commercial laboratories. All drill core samples (weight range 0.8kg – 4.0kg) are oven dried for 12 hours (60°C), jaw crushed to 90% passing <2mm and riffle split to a maximum sample weight of 0.5kg or if they are under 0.5kg then they are pulverised as is. This sub sample is then pulverised in a one stage process, using a LM2 pulveriser, to a particle size of >90% passing 75um. Approximately 250g of the pulverised sample is extracted by spatula to a numbered paper pulp bag that is used for a 30g or 50g fire assay charge. The pulp is retained, and the bulk residue is disposed of after four months.

The sampling preparation and assaying protocol used at Red Lake Operations was developed to ensure the quality and suitability of the assaying and laboratory procedures relative to the mineralisation types. No geophysical tools or other remote sensing instruments were utilised for reporting or interpretation of gold mineralisation.

Assaying has been completed by fire assay on 30g or 50g subsamples with either gravimetric or

Evolution Mining Limited

60

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation JORC Code Explanation Commentary
times, calibrations factors applied and their derivation, AAS finish. Limited screen fire assay have also been used to validate the fire assay techniques.
etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of
bias) and precision have been established.
Certified reference material (1:20) and Blanks (1:20) are routinely inserted into the sampling
sequence and also inserted at the discretion of the geologist either inside or around the expected
zones of mineralisation. The intent of the procedure for reviewing the performance of certified
standard reference material is to examine for any erroneous results (a result outside of the
expected statistically derived tolerance limits) and to validate if required; the acceptable levels of
accuracy and precision for all stages of the sampling and analytical process. Batches which fail
quality control checks are re-analysed.
A suite of multi elements are determined using four-acid digest with ICP/MS and/or an
ICP/AES finish for some sample intervals.
Sample check assays are sent to Umpire laboratories at a ratio of 1:50 samples.
The quality control / quality assurance (QAQC) process ensures the intercepts are representative
for the orogenic gold systems. Half core and sample pulps are retained at Red Lake Operations
for two years if further verification is required.
The twinning of holes is not a common practice undertaken at Red Lake Operations. The face
The verification of significant intersections by either sample and drill hole data with the mill reconciliation data is of sufficient density to validate
Verification of independent or alternative company personnel.
The use of twinned holes.
neighbouring samples. Data which is inconsistent with the known geology undergoes further
verification to ensure its quality.
sampling and
assaying

Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
All sample and assay information are stored utilising the acQuire database software system. Data
undergoes QAQC validation prior to being accepted and loaded into the database. Assay results
are merged when received electronically from the laboratory. The geologist reviews the database
checking for the correct merging of results and that all data has been received and entered. Any
adjustments to this data are recorded permanently in the database. Historical paper records
(where available) are retained in the exploration and mining offices. Original laboratory digital
assay files are stored in the site data system.
No adjustments or calibrations have been made to the final assay data reported by the
laboratory.
Drill hole collar positions are surveyed by the site-based survey department or contract surveyors
Location of data
points

Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
(utilising a differential GPS or conventional surveying techniques, with reference to a known base
station) with a precision of less than 0.1m variability.
All drill holes at Red Lake Operations have been surveyed for easting, northing and reduced
level. All data has been translated to NAD83 from the previously used Red Lake Operations Mine
Quality and adequacy of topographic control. Grid. All work at Red Lake Operations collects and stores all information in NAD83.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
Topographic control was generated from aerial surveys and detailed Lidar surveys.
Drill spacing varies considerably throughout the deposit from close spaced <6 m by 6 m to
greater than 50m by 50m spacing. Drill programs within the Red Lake deposits are ongoing and
the final spacing is dictated by the level of understanding required to determine geological and

Evolution Mining Limited

61

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation JORC Code Explanation Commentary
estimation procedure(s) and classifications applied. grade continuity of the mineralisation for Mineral Resource estimation and to ensure that
Whether sample compositing has been applied. Underground ore development can be appropriately positioned to effectively mine the ore.
Areas of limited drilling will be classified accordingly during the Mineral Resource classification
process. The resource classification process will use the drill spacing as a guide but will also take
into account factors such as quality of drillhole surveys and assays and the risk associated with
geological interpretation and estimation. In general, resource classification categories relative to
drillhole spacing can be summarised as:
◼ Unclassified (>40m spacing).
◼ Inferred Resource – General spacing 20m by 20m to 40m by 40m
◼ Indicated Resource – General spacing 6m by 6m to 20m by 20m
◼ Measured Resource – Not currently quoted for Red Lake deposits given the highly variable
local grade distribution and complex geology. As Evolution Mining’s understanding of the
reconciliation of block models to Mill production is developed this may change within certain
deposits.
Sample compositing has been applied and compositing methods will be discussed in later
Resource Estimation sections.
Orientation of data
in relation to
geological
structure

Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be
assessed and reported if material.
The mineralised structures or zones are generally narrow in width < 5.0m and are extensive along
strike and up and down dip for more than 100m and in some cases for > 1000m. Higher grade or
economic shoots exist inside these mineralised zones. Drilling is planned where possible to
intersect the various mineralised zones at as close to right angles as possible and at a drill
spacing that will enable definition of the economic portions.
The Competent Person considers that the relationship between the drilling orientation and the
orientation of key mineralised structures at Red Lake is not considered to have introduced a
sampling bias and is not considered to be material.
Chain of custody protocols to ensure the security of samples are followed. Prior to submission
samples are retained on site and access to the samples is restricted. Collected samples are
Sample security The measures taken to ensure sample security dropped off at the respective commercial laboratories in North Western Ontario. Access into
the laboratory is restricted and movements of personnel and the samples are tracked under
supervision of the laboratory staff. During some drill campaigns some samples are collected
directly from site by the commercial laboratory. While various laboratories have been used, the
chain of custody and sample security protocols have remained similar.
Evolution mining purchased the Project in April 2019 and the previous Competent Person has
audited the database integrity with the site data manager and site geological team. In addition
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
data has been supplied to two independent parties as CSV text files and incorporated into
modelling software with no integrity issues identified.
External audit of the database was initiated by Evolution Mining in 2022. No fatal flaws were
observed.

Evolution Mining Limited

62

==> picture [83 x 59] intentionally omitted <==

Section 2: Red Lake Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Criteria JORC Code Explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.

The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
Resource Definition drilling was undertaken on the following mining claims: Cochenour & Red
Lake Claims: PAT-8059, PAT-8064, PAT-6850, PAT-6836, MLO-3508.
All mining claims are in good standing. Tenure consists of patents, subject to annual Mining
Land Taxes issued in January. Title registered on land tenure is 100% owned.
There are currently no paying royalties. Of the five known royalties within the Mine Closure
Plan, two are proximal to the current Cochenour workings, TVX (Kinross) and Inco (Vale),
and one is proximal to the Red Lake workings (Hill). The shapes are recorded in Engineering
work files for future reference and mine planning.
Historical sites have been rehabilitated and are monitored by the Environmental Dept.
Exploration done
by other parties

Acknowledgment and appraisal of exploration by other
parties.
Red Lake and Campbell were first staked during the Red Lake Gold Rush in 1926.
Subsequently, there was a period of claim cancellations and re-staking of the area. Both
mines opened in the late 1940s. Red Lake and Campbell Mines were combined in 2006 when
Goldcorp purchased the Campbell Mine.
The earliest known exploration on the Cochenour–Willans property was in 1925. Cochenour–
Willans Gold Mines Ltd. was incorporated in 1936 and production began in 1939 at a rate of
136–181 t/d. Operations ran for 32 years, from 1939–1971. It was acquired by Goldcorp in
2008.
Aside from the Red Lake gold mines and Cochenour mine, Evolution also holds past
producing operations that include the HG Young, Abino, McMarmac, Gold Eagle Mine,
McKenzie Red Lake mines and Bateman/McFinley.
Geology
Deposit type, geological setting and style of mineralisation.
The mineralisation within the Red Lake Operations can be classified as an Archean
greenstone belt-hosted gold deposit.
The Red Lake Operations are hosted in the Red Lake greenstone belt within the Uchi Domain
on the southern margin of the North Caribou Terrane of the Superior Province, Canada.
Red Lake Operations is underlain mainly by tholeiitic basalt and locally by komatiitic basalt of
the Balmer Assemblage. The mine sequence also includes felsic, peridotitic and other mafic
to lamprophyric intrusive rocks of various younger ages. Both Red Lake - Campbell and
Cochenour deposits are hosted within significantly folded and sheared portions of the Balmer
Assemblage. Shear zones act as primary hydrothermal fluid corridors and host significant
portions of the gold mineralisation in the area. Other significant mineralised structures occur
within lower-strain areas of the stratigraphy, usually associated with brittle conjugate fracture
systems in close proximity to lithological boundaries possessing high competency contrasts.
Gold mineralisation is hosted in a variety of rock types within the Red Lake Greenstone belt,

Evolution Mining Limited

63

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary
although the majority of the productive zones occur as vein systems accompanying sulphide
replacement within sheared mafic to komatiitic basalts of the Balmer Assemblage.
Gold bearing zones in the Red Lake-Campbell, HGY, Cochenour and McFinley deposit are
distinguished first by spatial orientation relative to structural corridors and second by the
style of mineralisation. It is common for zones to have multiple styles of mineralisation
within the same host lithology. There are four styles of mineralisation common in the Red
Lake-Campbell and Cochenour deposit; vein style, vein and sulphide style, disseminated
sulphide (replacement) style and free gold style.
Drill hole
Information

A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.

No Exploration Results have been reported in this release
Data aggregation
methods

In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be
shown in detail.

The assumptions used for any reporting of metal equivalent
values should be clearly stated.

No Exploration Results have been reported in this release
Relationship
between
mineralisation
widths and
intercept lengths

These relationships are particularly important in the reporting
of Exploration Results.

If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect (eg
‘down hole length, true width not known’).

No Exploration Results have been reported in this release

Evolution Mining Limited

64

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Diagrams
Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views

No Exploration Results have been reported in this release
Balanced
reporting

Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.

No Exploration Results have been reported in this release
Other substantive
exploration data

Other exploration data, if meaningful and material, should be
reported
including
(but
not
limited
to):
geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment;
metallurgical
test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.

No Exploration Results have been reported in this release
Further work
The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale step-out
drilling).

Diagrams
clearly
highlighting
the
areas
of
possible
extensions, including the main geological interpretations and
future drilling areas, provided this information is not
commerciallysensitive.
Further exploration, near mine exploration and Resource Definition work on the Red Lake
Operations is planned for the remainder of FY23.
Drilling is planned to improve the confidence of the Mineral Resource estimate and to test for
extensions to known mineralisation
Further refinements to the geological models are planned with the aim of ensuring the
models appropriately reflect the geology and provide for confident mine planning

Evolution Mining Limited

65

==> picture [83 x 59] intentionally omitted <==

Section 3: Red Lake Estimation and Reporting of Mineral Resources

(Criteria listed in Section 1, and where relevant in Section 2, also apply to this section)

Criteria JORC Code explanation Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted
by, for example, transcription or keying errors, between its
initial collection and its use for Mineral Resource estimation
purposes.

Data validation procedures used.
The Red Lake database is stored within an acQuire SQL based system and is managed on site by
appropriately experienced personnel. Management systems are in place to directly import data
from the core logging and sampling and with digital matching of sample numbers and QA/QC data
directly to digital files from the assay laboratories.
Merging of historical information from prior operating companies of projects that have become the
current Red Lake Operation have been managed by the same competent database managers that
maintain the current system.
Site visits
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.

If no site visits have been undertaken indicate why this is the
case.
The Competent Person is a full-time employee of Evolution Mining
The Competent Person is a Senior Resource Geologist at Red Lake Operations with responsibility
for compiling this Mineral Resource estimate.
The Competent Person is involved in detailed reviews of the geology in underground, outcrop and
diamond drill core and detailed discussions with the site geological teams to maintain familiarity
with the information and processes used to compile this Mineral Resource estimate.
Geological
interpretation

Confidence in (or conversely, the uncertainty of the geological
interpretation of the mineral deposit.

Nature of the data used and of any assumptions made.

The effect, if any, of alternative interpretations on Mineral
Resource estimation.

The use of geology in guiding and controlling Mineral
Resource estimation.

The factors affecting continuity both of grade and geology.
The geology of the Red Lake Operation including satellite deposits; Cochenour, HG Young and
McFinley that comprise this report is well known.
There is in excess of 70 years of mining in the Red Lake district and as such a vast amount of
geological information has been collated for the deposits in this estimate. This information includes
geological logging and assay information for over 50,000 drillholes comprising 7,500,000 metres of
core. Mapping of development drives has been completed in detail and utilised to construct
lithological and mineralisation models in 2D and 3D.
This geology information has formed the basis for controlling the development of wireframes to
constrain the Mineral Resource estimate.
Wireframes were constructed using this information as the primary basis to constrain
mineralisation. In prior estimates high grade cut-offs have been a primary control on the extent of
the mineralisation domains both across and along strike.
Modelling for this estimate has focused more on structural and lithological controls as well and
incorporating lower grade mineralisation adjacent to and along strike of high-grade intercepts to
create more continuous mineralised lenses.
The Campbell and Red Lake deposits themselves comprise a significant number of mineralised
structures or lenses that have been modelled and estimated separately. These lenses can each
have differing mineralisation styles and grade distribution. This has been considered when
establishing the wireframes used to constrain the estimates.
Criteria JORC Code explanation Commentary
Database
integrity

Measures taken to ensure that data has not been corrupted
by, for example, transcription or keying errors, between its
initial collection and its use for Mineral Resource estimation
purposes.

Data validation procedures used.
The Red Lake database is stored within an acQuire SQL based system and is managed on site by
appropriately experienced personnel. Management systems are in place to directly import data
from the core logging and sampling and with digital matching of sample numbers and QA/QC data
directly to digital files from the assay laboratories.
Merging of historical information from prior operating companies of projects that have become the
current Red Lake Operation have been managed by the same competent database managers that
maintain the current system.
Site visits
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.

If no site visits have been undertaken indicate why this is the
case.
The Competent Person is a full-time employee of Evolution Mining
The Competent Person is a Senior Resource Geologist at Red Lake Operations with responsibility
for compiling this Mineral Resource estimate.
The Competent Person is involved in detailed reviews of the geology in underground, outcrop and
diamond drill core and detailed discussions with the site geological teams to maintain familiarity
with the information and processes used to compile this Mineral Resource estimate.
Geological
interpretation

Confidence in (or conversely, the uncertainty of the geological
interpretation of the mineral deposit.

Nature of the data used and of any assumptions made.

The effect, if any, of alternative interpretations on Mineral
Resource estimation.

The use of geology in guiding and controlling Mineral
Resource estimation.

The factors affecting continuity both of grade and geology.
The geology of the Red Lake Operation including satellite deposits; Cochenour, HG Young and
McFinley that comprise this report is well known.
There is in excess of 70 years of mining in the Red Lake district and as such a vast amount of
geological information has been collated for the deposits in this estimate. This information includes
geological logging and assay information for over 50,000 drillholes comprising 7,500,000 metres of
core. Mapping of development drives has been completed in detail and utilised to construct
lithological and mineralisation models in 2D and 3D.
This geology information has formed the basis for controlling the development of wireframes to
constrain the Mineral Resource estimate.
Wireframes were constructed using this information as the primary basis to constrain
mineralisation. In prior estimates high grade cut-offs have been a primary control on the extent of
the mineralisation domains both across and along strike.
Modelling for this estimate has focused more on structural and lithological controls as well and
incorporating lower grade mineralisation adjacent to and along strike of high-grade intercepts to
create more continuous mineralised lenses.
The Campbell and Red Lake deposits themselves comprise a significant number of mineralised
structures or lenses that have been modelled and estimated separately. These lenses can each
have differing mineralisation styles and grade distribution. This has been considered when
establishing the wireframes used to constrain the estimates.

Evolution Mining Limited

66

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary The Cochenour deposit has similar mineralisation styles to the Campbell/Red Lake deposits. However, mineralisation outside of the Main zone (UMZ) is less continuous and better represented by a lower grade envelope at a cut-off of 0.5g/t Au. Shells have been constructed using Leapfrog models at 0.5g/t to form the basis of the outer low-grade halos where geological confidence is lacking.

HG Young mineralisation also has similar styles of mineralisation as Campbell/Red Lake and has been modelled using wireframes that constrain readily interpretable vein and mineralisation arrays. There is further opportunity to capture additional mineralisation in the HG Young Mineral Resource by adopting other modelling methodologies that will be incorporated into future estimates.

McFinley mineralisation occurs within the East Bay Deformation Zone and is comprised of boudinaged basalt lenses hosted in sheared ultramafic and intruded by porphyry. The approximate dimensions of the Red Lake Operations Mineral Resource deposits are:

  • The extent and variability of the Mineral Resource expressed

  • Dimensions as length (along strike or otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral Resource.

  • The nature and appropriateness of the estimation technique(s) applied and key assumptions, including treatment of extreme grade values, domaining, interpolation parameters and maximum distance of extrapolation from data points. If a computer assisted estimation method was chosen include a description of computer software and parameters used.

  • ▪ The availability of check estimates, previous estimates and/or

  • Estimation and mine production records and whether the Mineral Resource modelling estimate takes appropriate account of such data. techniques ▪ The assumptions made regarding recovery of by-products. ▪ Estimation of deleterious elements or other non-grade variables of economic significance (eg sulphur for acid mine drainage characterisation).

  • ▪ In the case of block model interpolation, the block size in relation to the average sample spacing and the search employed.

  • ▪ Any assumptions behind modelling of selective mining units. ▪ Any assumptions about correlation between variables.

  • Red Lake deposit: 3,000m strike, 3,000m vertical extent, 750m across strike of mineralisation package

  • Cochenour deposit: 600 m strike, 700m vertical extent, 250m across strike of mineralisation package

  • HG Young (HGY) deposit: 400m strike, 750m vertical extent, 150m across strike of mineralisation package

  • McFinley deposit: 1350 strike, 1750m vertical extent, 800m across strike of mineralisation package

  • A conventional block modelling approach was adopted with wireframes generated in Leapfrog Geo, and block models completed in Datamine Studio RM.

The general workflow adopted for all deposits is very similar and involved;

  • 1 fixed length compositing to 1m honouring interpreted domain boundaries

  • 2 indicator estimation, where applicable, at a range of cut-off grades to enable the application of a grade capping and high-grade restrictions for the high-grade sample population for the subsequent estimate.

  • 3 data analysis to determine appropriate grade caps for applying to the composite dataset 4 Interpolation / estimation of Au g/t grades using Ordinary Kriging (OK)

  • 5 classification of blocks as Indicated and Inferred Mineral Resources using distance based and qualitative criterion.

  • For this Mineral Resource estimate the following units of measure were applicable;

  • 5.1 Drill hole information, wireframes, mined-out, and blocks are in metres. 5.2 Densities are measured in tonnes per cubic metre, block densities are assigned as tonnes per cubic metre.

  • 5.3 Gold grades are expressed as grams per metric tonne.

Evolution Mining Limited

67

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary

Description of how the geological interpretation was used to
control the resource estimates.

Discussion of basis for using or not using grade cutting or
capping.

The process of validation, the checking process used, the
comparison of model data to drill hole data, and use of
reconciliation data if available
5.4 Mineral Resource results are reported as metric tonnes, grams per metric tonne, and troy
ounces.
Block dimensions (X, Y and Z) for all zones except the High Grade Zone (HGZ), HGY, Cochenour
and McFinley were 4m along strike by 2m across strike by 4m in height. The blocks are oriented
45 degrees to approximate the strike of the mineralized structures. Cochenour HGY and McFinley
are not rotated. Blocks for these deposits were sub celled to a chosen size to ensure interpreted
volumes were honoured, with parent cell grade estimation.
Given the very skewed populations and abundance of extreme values in the dataset probability
thresholds were estimated for blocks at grades that represented low, medium and high-grade
sub-domains for each of the structures. This enables capping to be applied for each of these
domains. Metal reduction due to capping or top cutting results in between 5% and 25% metal
reduction depending on the zone being estimated. This approach is supported by reconciliation
results.
Spatial data analysis or variography was completed using Snowden’s Supervisor software.
Interpolation strategies were applied to suit the data for each zone with the aim of keeping the
estimates relatively local, honouring the drilling data without excessive smoothing that could
result in smearing of high grades.
Variable search orientations were applied to each of the search ellipse by utilising Dynamic
Anisotropy functions in the estimation software.
Check estimates were completed using Inverse Distance and Nearest Neighbor methods to
ensure repeatability and validity on a local and global scale.
Estimates were validated using industry standard techniques and were peer reviewed at each
step in the process by site and external groups and prior to finalisation.
The estimates are for gold only. Other elements whilst of significance to optimising processing
and blend strategies are not considered to be material to the overall Mineral Resource estimate.
Moisture
Whether the tonnages are estimated on a dry basis or with
natural moisture, and the method of determination of the
moisture content.

All estimates of tonnages are reported on a dry basis.
Cut-off
parameters

The basis of the adopted cut-off grade(s) or quality
parameters applied.
The cut-off grades applied to the deposit areas are as follows

Cochenour – 2.46g/t

Upper Red Lake – 3.3g/t

Lower Red Lake – 2.65g/t

Upper Campbell – 3.3g/t

Lower Campbell – 2.65g/t

HG Young – 2.5g/t

McFinley – 2.5g/t
The cut-offgradeswere estimated using projected site stoping costs, processing costs and site

Evolution Mining Limited

68

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
general administration costs
A metallurgical recovery of 82% has been assumed and a gold price of $2,200/oz with an
exchange rate of AUD:CAD of 0.9.
Mining factors
or
assumptions

Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if applicable,
external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential mining methods, but
the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not
always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining
assumptions made.
The Mineral Resource estimate has been reported within Mining Shape Optimiser objects (MSOs)
calculated in Deswik software. These shapes assume a minimum mining width in the range of 1.8m
to 2.4m with a minimum footwall and hangingwall slope of 50 degrees.
The minimum strike of the panels is 5.0m and a vertical extent ranging from 15 – 26m.
No external dilution has been applied to the shapes however internal dilution has been applied
where required (no estimated grade or sub Inferred Mineral Resource blocks) at 0.0g/t.
All Mineral Resources have been depleted by prior mining. The prior mining is represented by
detailed surveys completed over the life of the project. These surveys are represented by 3D
models which have been used to flag blocks as mined or not.
In the upper levels of the Campbell Mine, which has the most extensive existing workings, a
2.0m skin has been applied to the outer limits of the workings and all material inside this skin
has also been flagged as mined out.
Metallurgical
factors or
assumptions

The
basis
for
assumptions
or
predictions
regarding
metallurgical amenability. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential metallurgical
methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting
Mineral Resources may not always be rigorous. Where this is
the case, this should be reported with an explanation of the
basis of the metallurgical assumptions made.
Red Lake Operations operate two process plants, the Campbell plant and Red Lake plant and
Campbell plant.
The Campbell plant uses a traditional carbon-in-leach (CIL) and carbon-in-pulp (CIP) process. The
Red Lake plant uses a traditional CIP process.
Refractory gold is recovered by the pressure oxidation. Sulphide concentrates produced by both
Campbell and Red Lake flotation circuits are processed in the Campbell plant autoclave.
Historical metallurgical and process plant data have been used to develop a recovery model to
estimate the mineral recovery in the process plants dependent upon the head grade.
Mineral Resources cut-off grades are determined using an average recovery of 88%.
𝑀𝑒𝑡𝑎𝑙𝑙𝑢𝑟𝑔𝑖𝑐𝑎𝑙 𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑦=85.83177 + 0.925896 × 𝐻𝑒𝑎𝑑 𝐺𝑟𝑎𝑑𝑒
100
Environmental
factors or

Assumptions made regarding possible waste and process
residue disposal options. It is always necessary as part of the
process ofdeterminingreasonable prospectsforeventual
Red Lake Operations has a long history of mining operations and has in place all permits and
approvals to continue operations. There are approvals inplace to establish an underground

Evolution Mining Limited

69

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
assumptions economic extraction to consider the potential environmental
impacts of the mining and processing operation. While at this
stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential
environmental impacts should be reported. Where these
aspects have not been considered this should be reported
with an explanation of the environmental assumptions made.
operation at HG Young which is the only Mineral Resource that is not currently being mined.
Active tailings facilities for the operations were designed by third-party consultants. Annual
geotechnical and facility inspections are conducted by these firms. In addition, engineering
assessments and investigations to enhance tails storage strategies are performed as required.
Water treatment processes are in place at the Red Lake, Campbell and Cochenour tailings areas to
treat metals within solution. Cyanide destruction circuits are incorporated into the treatment facilities
at the Red Lake and Campbell Complexes where process plants / mills are in operation. All
operations utilize passive wetland treatment technologies to assist with the reduction of ammonia
from mining and milling processes. All effluent discharges to the environment are in compliance
with all applicable laws
A site Environmental team monitors ongoing compliance with approvals and maintains the site
in good standing with regulators.
Bulk density
Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or
dry, the frequency of the measurements, the nature, size and
representativeness of the samples.

The bulk density for bulk material must have been measured
by methods that adequately account for void spaces (vugs,
porosity, etc), moisture and differences between rock and
alteration zones within the deposit.

Discuss assumptions for bulk density estimates used in the
evaluationprocess ofthe differentmaterials.
Bulk density measurements have been made using a site-based water immersion method.
The measurements are stored in the site acQuire database on a dry density basis
Analysis was made of the bulk density by lithology and mineralised domains. Whilst there is
some variation by lithology the main mineralised domains have very similar bulk densities. They
range from 2.65t/m3to 3.0t/m3.
Classification
The basis for the classification of the Mineral Resources into
varying confidence categories.

Whether appropriate account has been taken of all relevant
factors (ie relative confidence in tonnage/grade estimations,
reliability of input data, confidence in continuity of geology and
metal values, quality, quantity and distribution of the data).

Whether the result appropriately reflects the Competent
Person’s view of the deposit
Classification of the Mineral Resource estimate was completed by Evolution Mining in conjunction
with the respective consultants that were involved in the reports.
The classifications have been made in accordance with the JORC 2012 guidelines and are
based upon distance and qualitative criterion, with consideration for the number of holes used
during interpolation, sampled/unsampled data, grade variations between holes, drill spacing,
hole orientation, interpolation pass, and geological confidence.
Audits or
reviews

The results of any audits or reviews of Mineral Resource
estimates.
Internal technical peer reviews of the Mineral Resource process and results have been
undertaken by the Evolution Transformation and Effectiveness team (T&E). T&E are an
oversight and governance group within Evolution, independent of the resource site study team.
In addition an external audit of the December 31, 2021 Mineral Resource and Ore Reserve was
completed in September, 2022 by SRK. No fatal flaws or ‘High Risk’ findings were identified by
SRK. SRK consider that the processes, controls and estimates for the December, 31 2021 RLO
Mineral Resource & OreReservewere appropriate to supportPublicReporting underthe JORC

Evolution Mining Limited

70

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
Code (2012).
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an
approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or
geostatistical procedures to quantify the relative accuracy of
the resource within stated confidence limits, or, if such an
approach is not deemed appropriate, a qualitative discussion
of the factors that could affect the relative accuracy and
confidence of the estimate.

The statement should specify whether it relates to global or
local estimates, and, if local, state the relevant tonnages,
which should be relevant to technical and economic
evaluation. Documentation should include assumptions made
and the procedures used.

These statements of relative accuracy and confidence of the
estimate should be compared with production data, where
available.
The relative accuracy of the Mineral Resource estimate is in accordance with the guidelines of the
2012 JORC Code.
The site has maintained an ongoing register of production reconciliations over time which shows
varied performance on a monthly basis which highlights the inherent risk present in accurately
estimating and mining a high grade, geologically complex structurally controlled deposit.
Reconciliation over longer periods (annually) is good with predicted tonnes, grade and ounces
within 10%. Reconciliation results confirm that the reported Mineral Resources are suitable global
estimates to be used as the basis to estimate Ore Reserves.
The Competent Person is comfortable that these estimates and that they are classified in
accordance with the JORC 2012 guidelines and will be suitable for appropriate conversion to
Ore Reserves where applicable and will support ongoing Mine Planning at the Red Lake
Operations.

Evolution Mining Limited

71

==> picture [83 x 59] intentionally omitted <==

Section 4: Red Lake Estimation and Reporting of Ore Reserves

(Criteria listed in Section 1, and where relevant in Sections 2 and 3, also apply to this section)

Criteria JORC Code explanation Commentary
Mineral
Resource
estimate for
conversion to
Ore Reserves

Description of the Mineral Resource estimate used as a basis
for the conversion to ·

Clear statement as to whether the Mineral Resources are
reported additional to, or inclusive of, the Ore Reserves.an Ore
Reserve.

The Ore Reserve estimate was based on the current Mineral Resource estimate as
described in Section 3.

The Mineral Resources are reported inclusive of the Ore Reserve estimate.
Site Visits
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.

If no site visits have been undertaken indicate why this is the
case.

The Competent Person is registered with a Recognized Professional Organisation and is
a full-time employee of Evolution Mining Limited in the role of Principal Long-term
Planning Engineer at the Red Lake Operation, with ten years in practice at the site.
Study Status
The type and level of study undertaken to enable Mineral
Resources to be converted to Ore Reserves.

The Code requires that a study to at least Pre-Feasibility Study
level has been undertaken to convert Mineral Resources to Ore
Reserves. Such studies will have been carried out and will have
determined a mine plan that is technically achievable and
economically viable, and that material Modifying Factors have
been considered.
▪ The Red Lake Operation is comprised of the Red Lake, Upper Campbell, Cochenour
and McFinley deposits. The Red Lake Operation is an established operation with over
70 years of mining. The updated Ore Reserve estimate was based upon historical
costs, first principle labour and consumable costs and projected cost reduction initiatives
for standardization of mining fleet and consolidation of mining production zones.
▪ Production zones within the deposits are at varying levels of study detail from Pre-
Feasibility to greater than Feasibility based on the stage of development and production
from conceptual, forecasted to execution.
Cut-off
parameters

The basis of the cut-off grade(s) or quality parameters applied

The cut-off grade estimation for Red Lake Operation used mining, processing and
general & administrative (G&A) costs. The gold price of $1,600/oz and foreign exchange
rate assumptions of 0.9 A$:C$ have been used based on guidance provided by Evolution
corporate. The assumed metallurgical recovery was based off a variable metallurgical
recovery model dependent upon the head grade of the processed material. Mining
considerations for access, material handling, fill type and width of mineralization affected
the stoping cost assumptions between Red Lake, Cochenour, Upper Campbell, HG
Young and McFinley. Cut-off grades by area: Red Lake between 4.0g/t to 4.2g/t,
Cochenour 4.0g/t, Upper Campbell 2.5g/t, HG Young 3.0g/t and McFinley 4.0g/t.
Mining factors
or assumptions

The method and assumptions used as reported in the Pre-
Feasibility or Feasibility Study to convert the Mineral Resource
to an Ore Reserve (i.e. either by application of appropriate
factors by optimisation or by preliminary or detailed design).

The choice, nature and appropriateness of the selected mining
method(s) and other mining parameters including associated
design issues such as pre-strip, access, etc.

Stopes are designed for either longitudinal open stoping with paste fill or waste fill (AVOCA).
Stope shapes have been generated using the Deswik Stope Optimizer tool (Deswik.SO)
using their respective cut-off grade assumptions for the production zone and optimised for
grade.

The SO stope designs have been generated on section intervals between 5m to 6m on a
vertical extent 20m to 26m with a minimum hanging wall and footwall slope of 50⁰. The
minimum mining width was between 1.8m to 2.4m, dependent upon the respective

Evolution Mining Limited

72

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary

The assumptions made regarding geotechnical parameters (eg
pit slopes, stope sizes, etc), grade control and pre-production
drilling.

The major assumptions made and Mineral Resource model
used for pit and stope optimisation (if appropriate).

The mining dilution factors used.

The mining recovery factors used.

Any minimum mining widths used.

The manner in which Inferred Mineral Resources are utilised in
mining studies and the sensitivity of the outcome to their
inclusion.

The infrastructure requirements of the selected mining methods.
geological zone.

Internal geotechnical data analysis on rock quality, stope dimensions and past stope
performance provides guidance on stope dimensions required to minimize unplanned
dilution. Stope design shapes are grouped into nominal stope blocks on strike ranging
between 12m to 24m.

Unplanned mining dilution and recovery estimates have been established by analysis of
historical stope performance for the various geological zones at the Red Lake Operation.
Unplanned dilution was included by applying a skin as an equivalent linear overbreak/slough
to the hanging wall and footwall between 0.6m to 1.2m. The grade of the unplanned dilution
was assumed to be 0g/t except in cases where the geological model was intersected by the
design shape. Mining recovery was assumed as 90% for down-hole stopes and 85% for up-
hole stopes.

For Ore Reserves, Inferred Resources are excluded and treated as waste material.
Metallurgical
factors or
assumptions

The metallurgical process proposed and the appropriateness of
that process to the style of mineralisation.

Whether the metallurgical process is well-tested technology or
novel in nature.

The nature, amount and representativeness of metallurgical test
work undertaken, the nature of the metallurgical domaining
applied and the corresponding metallurgical recovery factors
applied.

Any assumptions or allowances made for deleterious elements.

The existence of any bulk sample or pilot scale test work and
the
degree
to
which
such
samples
are
considered
representative of the orebody as a whole.

For minerals that are defined by a specification, has the ore
reserve estimation been based on the appropriate mineralogy to
meet the specifications?

Red Lake Operation operates two process plants, the Campbell plant, and Red Lake
plant.

The Campbell plant uses a traditional carbon-in-leach (CIL) and carbon-in-pulp (CIP)
process. The Red Lake plant uses a traditional CIP process.

Refractory gold is recovered by pressure oxidation. Sulphide concentrates produced by
both Campbell and Red Lake flotation circuits are processed in the Campbell plant
autoclave.

Historical metallurgical and process plant data has been used to develop a recovery
model to estimate the metallurgical recovery in the process plants dependent upon the
head grade.

There are no deleterious elements that are modelled.
𝑀𝑒𝑡𝑎𝑙𝑙𝑢𝑟𝑔𝑖𝑐𝑎𝑙 𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑦=85.83177 + 0.925896 × 𝐻𝑒𝑎𝑑 𝐺𝑟𝑎𝑑𝑒
100
Environmental
factors or
assumptions

The status of studies of potential environmental impacts of the
mining and processing operation. Details of waste rock
characterisation and the consideration of potential sites, status
of design options considered and, where applicable, the status
of approvals for process residue storage and waste dumps
should be reported.

Evolution has sufficiently addressed the environmental impact of the Red Lake
Operation and has obtained all material permits to operate the mine, processing plants,
and tailings storage facilities through the life of mine. Any new or amended permits
required to mine the Ore Reserves will be obtained within a timeframe that will not
disrupt the mine plan. The Red Lake Operation is subject to Evolution’s sustainability
policy, which commits the operation to a defined standard of environmental stewardship
and social responsibility.

Arsenic remains a focus in most environmental programs for all Project operations.
Arsenopyrite is a main element in the local geology, contained in ore and waste rock and

Evolution Mining Limited

73

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
requires specific management in environmental programs.

Waste rock and ore are routinely sampled for acid rock drainage (ARD) potential as per
the internal programs for ARD and metal leaching. Since there are no significant ARD
issues related to the waste and ore at the RLO site, waste rock materials can be used
for construction purposes.

Waste rock is stored in designated areas at the Red Lake, Campbell, and Cochenour
sites. The waste dumps are in a historical tailings area east of the site at the Red Lake
site, on the northeast side of the main tailings pond at the Campbell site, and on the
northwest side of the Cochenour tailings area.
▪ Water discharge is managed by the water treatment facilities and polishing ponds.
Infrastructure
The existence of appropriate infrastructure: availability of land
for plant development, power, water, transportation (particularly
for bulk commodities), labour, accommodation; or the ease with
which the infrastructure can be provided, or accessed.

The Red Lake Operation mining activities are conducted in and around the municipality of
Red Lake, located 180km north of the town of Dryden, District of Kenora, northwestern
Ontario. The Red Lake area is accessible by Highway 105, which joins the Trans-Canada
Highway at Vermilion Bay, 175km south and 100km east of Kenora, Ontario. Commercial
air services operate to Red Lake from Thunder Bay and Winnipeg.

Power is supplied to the Red Lake Operation through the Hydro One transmission
network via a radial line that taps into the 230kV grid at the Dryden transformer station
where it is stepped down to 115kV, the line continues up to the Ear Falls transformer
station. Red Lake, and Campbell are connected to the Balmer transformer station, which
is directly fed from the 115KV line from Ear Falls, with an approximate load of 26MW.
Cochenour remains on a separate feeder with a load of approximately 2MW. McFinley
remains on a separate feeder with a load of <10MW. Diesel-powered generators provide
emergency power to critical areas within the Red Lake Operation in the event of a major
electrical disruption.

Potable water is supplied by the municipality and paid for on a usage basis. Process
water for the mills is predominantly reclaimed from the tailings areas or underground
mine. Additional fresh water is taken from Balmer Lake as required. Process water for
underground operations is taken from Sandy Bay–Red Lake for Red Lake and Cochenour
and from East Bay-Red Lake for McFinley.

Over 85% of the workforce is local, Red Lake Operation runs a camp facility for the
remaining rotational personnel.
▪ In the opinion of the Competent person the current infrastructure is adequate to support
current and future mining operations.
Costs
The derivation of, or assumptions made, regarding projected
capital costs in the study.

The methodology used to estimate operating costs.

Allowances made for the content of deleterious elements.

The source of exchange rates used in the study.

Derivation of transportation charges.

The basisfor forecasting orsource oftreatment andrefining

Lateral and vertical capital development costs for the Red Lake Operation have been
derived from the Ore Reserve development physicals quantities and the respective
direct mining costs for development.

Sustaining capital and mobile equipment capital costs for the Red Lake and Cochenour
have been derived from the 2023 fiscal year life-of-mine plan.

Upper Campbell capital estimates for establishing surface and underground services
andfacilities,mobile equipment and sustaining capital have beendetermined through

Evolution Mining Limited

74

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
charges, penalties for failure to meet specification, etc.

The allowances made for royalties payable, both Government
and private.
first principles and benchmarking to similar operations of similar size and scope.

Operating costs for Red Lake and Cochenour have been based on historical site costs,
first principle labour and consumable costs and projected cost reduction initiatives from
the standardization of the mining fleet and consolidation of the mining production zones.

Operating costs for the Upper Campbell have been based on first principles using site
labour and consumable costs. Cost reductions are justified by increased effectiveness
and lowered indirect costs by way of the portal access and economies of scale for larger
capacity mobile equipment.

The foreign exchange rate of 0.9 A$:C$ was used as per guidance from Evolution
Corporate Finance.

Transportation and refinery treatment charges are based on current agreements.

Cochenour is subject to a 5% net profit and a 1% net smelter return royalty on less than
3% of the reported Ore Reserves. McFinley is subject to a 2% net smelter return and a
1% net smelter return royalty on 87% of the reported Ore Reserves. No additional
royalties are payable on tenures that host the remaining current Ore Reserves.
Revenue factors
The derivation of, or assumptions made regarding revenue
factors including head grade, metal or commodity price(s)
exchange
rates,
transportation
and
treatment
charges,
penalties, net smelter returns, etc.

The derivation of assumptions made of metal or commodity
price(s),forthe principal metals,minerals and co-products.

At Evolution assets, the gold price assumption used to estimate the December 2022 Ore
Reserves was $1,600/oz and an A$:C$ exchange rate of 0.9.
Market
assessment

The demand, supply and stock situation for the particular
commodity, consumption trends and factors likely to affect
supply and demand into the future.

A customer and competitor analysis along with the identification
of likely market windows for the product.

Price and volume forecasts and the basis for these forecasts.

For industrial minerals the customer specification, testing and
acceptance requirements prior to a supply contract.

Bullion is sold as the spot market price with a small portion of the gold sold at the hedge
price with hedging managed by the Evolution Corporate Treasury Department.
Economic
The inputs to the economic analysis to produce the net present
value (NPV) in the study, the source and confidence of these
economic inputs including estimated inflation, discount rate, etc.

NPV ranges and sensitivity to variations in the significant
assumptions and inputs.

Ore Reserves were calculated on an incremental cost basis with economic assessments
completed on level-by-level basis. The Ore Reserves were subjected to an economic
test that includes all applicable costs and is performed via a sensitivity analysis using a
range of assumed gold prices from $1,600 to $2,200 per ounce and considers a range of
financial metrics including AISC, NPV and FCF.
Social
The status of agreements with key stakeholders and matters
leading to social licence to operate.

The mining operation is situated on the edges of the Red Lake district communities
which make them a part of the community landscapes. Given these proximities,
operational and environmental considerations are paramount, as are Evolution’s
commitments to social, cultural, and community support. RLO currently has
representation on various local organizations such as the local municipal planning

Evolution Mining Limited

75

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
boards, economic development board, and maintains an open dialogue with the
community.

RLO has collaboration agreements with two First Nations that are signatory to Treaty
No. 3 and have treaty rights which they assert within the operations area of the Red
Lake Mines region:
▪ The Obishikokaang Collaboration Agreement with Lac Seul First Nation (LSFN)
and Evolution.
▪ A second Collaboration Agreement with Wabauskang First Nation (WFN) and
Evolution.

The LSFN is located to the southeast of Red Lake with a band membership of 3,200 and
the WFN is located to the south of Red Lake with a band membership of 315.

These agreements provide a framework for strengthened collaboration in the
development and operations of Red Lake and outline tangible benefits for the individual
First Nations, including skills training and employment, opportunities for business
development and contracting, and a framework for issues resolution, regulatory
permitting and Evolution’s future financial contributions.

RLO is not aware of any significant environmental, social or permitting issues that would
prevent continued development of the Project deposits under the current mine plan.
Other
To the extent relevant, the impact of the following on the project
and/or on the estimation and classification of the Ore Reserves:

Any identified material naturally occurring risks.

The status of material legal agreements and marketing
arrangements.

The status of governmental agreements and approvals critical to
the viability of the project, such as mineral tenement status, and
government and statutory approvals. There must be reasonable
grounds to expect that all necessary Government approvals will
be received within the timeframes anticipated in the Pre-
Feasibility or Feasibility study. Highlight and discuss the
materiality of any unresolved matter that is dependent on a third
party on which extraction of the reserve is contingent

Environmental permits are required by various Federal, Provincial, and municipal
agencies, and are in place for the Operation. The Red Lake Operation maintains a list of
active environmental permits covering operation of the Campbell, Red Lake, Balmer,
Cochenour, and McFinely sites. The Operation also has a certified Closure Plan filed
with the Provincial Government that covers all activities outlined in the current mine plan,
including the economical extraction of the ore reserves. No new permits are currently
required, but existing permit amendments are required from time to time, and in 2022,
applications for amendments may be made for tailings management area upgrades (i.e.,
dam raises), air/noise permit amendments, permit to take water renewals, exploration
permitting, and updates to the site closure plan.
Classification
The basis for the classification of the Ore Reserves into varying
confidence categories.

Whether the result appropriately reflects the Competent
Person’s view of the deposit.

The proportion of Probable Ore Reserves that have been
derived from Measured Mineral Resources (if any).

The Ore Reserves are derived from Indicated Resources. No Proved Reserves or
Probable Reserves derived from Measured Resources have been reported.

In the opinion of the Competent Person the Ore Reserve classification is appropriate.

The reserve classification was based on the assessment of the metal content by
each Resource category on the stope and development designs. Only Measured or
Indicated Resources are assumed to contribute to revenue, Inferred Resources do
not contribute to the grade or revenue.

Evolution Mining Limited

76

==> picture [83 x 59] intentionally omitted <==

Criteria JORC Code explanation Commentary
Audits or
reviews

The results of any audits or reviews of Ore Reserve estimates

The Ore Reserve design has been audited the Evolution Transformation & Effectiveness
(T&E) team. Competent external consultants have been used to evaluate Upper
Campbell and complete mine design, scheduling, and economic evaluation.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and
confidence level in the Ore Reserve estimate using an approach
or procedure deemed appropriate by the Competent Person.
For example, the application of statistical or geostatistical
procedures to quantify the relative accuracy of the reserve
within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors
which could affect the relative accuracy and confidence of the
estimate.

The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which
should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the
procedures used.

Accuracy and confidence discussions should extend to specific
discussions of any applied Modifying Factors that may have a
material impact on Ore Reserve viability, or for which there are
remaining areas of uncertainty at the current study stage.

It is recognised that this may not be possible or appropriate in all
circumstances. These statements of relative accuracy and
confidence of the estimate should be compared with production
data,where available.
▪ The accuracy of the Ore Reserve estimate is dependent upon the accuracy of the
Mineral Resource model and the long-term cost and revenue assumptions. Modifying
factors have been developed from current mine performance data. In the opinion of the
Competent Person the long-term assumptions and modifying factors are reasonable.
▪ On an ongoing basis the Ore Reserves are reconciled against actual performance, the
results indicate that the results are within satisfactory levels and support a high level of
confidence in the Ore Reserve estimate.

Evolution Mining Limited

77