Inspired people creating a premier global gold company

DENVER GOLD FORUM
Lawrie Conway – Managing Director and Chief Executive Officer
18-20 September 2023
PRODUCTION TARGET
Mungari Production Target and relevant proportions of Mineral Resources and Ore Reserves underpinning the Production Target
The Mungari Production Target of 1.9Moz to 2.7Moz between FY24 and FY38 comprises 3% Proved Ore Reserves, 49% Probable Ore Reserves, 19% Indicated Mineral Resources, 18% Inferred Mineral Resources and 11% Exploration Targets. 1
Cautionary statement concerning the proportion of Inferred Mineral Resources
There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.
Cautionary statement concerning the proportion of Exploration Targets
Of Mungari's 1.9Moz to 2.7Moz production target, 11% is comprised of an Exploration Target. The potential quantity and grade of this Exploration Target is conceptual in nature and there has been insufficient exploration to determine a Mineral Resource and there is no certainty that further exploration work will result in the determination of Mineral Resources or that Production Target itself will be realised. See ASX release titled "Mungari Mine Life Extended to 15 Years at 18 to 20% Lower AISC", released 5 June 2023 and available to view at www.evolutionmining.com.au for further information on the Exploration Target.
Material Assumptions
The material assumptions on which the Mungari Production Target is based are presented in the ASX release titled "Mungari Mine Life Extended to 15 Years at 18 to 20% Lower AISC" dated 5 June 2023 and available to view at www.evolutionmining.com.au
Production Target Competent Persons' Statement
The Estimated Mineral Resources and Ore Reserves underpinning the Mungari Production Target have been prepared by Competent Persons in accordance with the requirements in Appendix 5A (JORC Code).
The Company confirms that all material assumptions underpinning the production targets and forecast financial information derived from the production targets in the 5 June 2023 release continue to apply and have not materially changed.
- Proportions quoted are based on the material classifications of the entire Production Target and is inclusive of material attributable to the East Kundana Joint Venture


FORWARD LOOKING STATEMENT
These materials prepared by Evolution Mining Limited ("Evolution" or "the Company") include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company's business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the Company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company's control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
NON-IFRS FINANCIAL INFORMATION
The Company results are reported under International Financial Reporting Standards (IFRS). This presentation also includes non-IFRS information including EBITDA and Underlying Profit. The non-IFRS information has not been subject to audit or review by the Company's external auditor and should be used in addition to IFRS information.
This presentation has been approved for release by Jake Klein, Executive Chair.
All amounts are expressed in US dollars using an AUD:USD exchange rate assumption of 0.64 unless stated otherwise.

EVOLUTION SNAPSHOT
| MARKET CAPITALISATION1 | A\$6.9B / US\$4.5B | ||
|---|---|---|---|
| MINERAL RESOURCES2 | 30Moz gold, 1.8Mt copper | ||
| ORE RESERVES2 | 11Moz gold, 1Mt copper | ||
| FY24 PRODUCTION GUIDANCE3 |
~770koz +/- 5% (+18% vs FY23) |
||
| FY24 AISC GUIDANCE3,4 | US\$880/oz +/- 5% |
||
| DIVIDENDS | 21 consecutive dividends paid over US\$640M in total |
||
| FY23 OPERATING MINE CASH FLOW5 |
Ernest Henry | ||
| US\$975/oz | Mungari | Cowal | |
| 1. 2. See the Appendix for information on Evolution's Mineral Resources and Ore Reserves 3. 4. FY24 AISC Guidance is based on gold price of US\$1695/oz (A\$2,650/oz – |
Based on share price of \$3.78 per share on 14 September 2023 and RBA AUD:USD exchange rate of A\$0.6437 on 13 September 2023 See ASX announcement titled 'FY23 Financial Results Presentation' dated 17 August 2023 available to view at www.evolutionmining.com.au. Guidance provided +/-5% royalties) and copper price of US\$8,000/t (A\$12,500/t - |
by-product credits) |
- Calculated using the average AUD:USD exchange rate for FY23 of 0.6734
Mt Rawdon
Red Lake
SUSTAINABILITY
Integrated into everything we do
- Keeping our people healthy and safe ▪ Ongoing TRIF1 improvement, FY23 reduced by 19%
- Enhancing our social licence to operate
- Listening and partnering with the communities in which we operate on matters important to them
- 2023 NSW Mining Community Excellence Award
- Committed to our Net Zero target2
- Estimated ~9% reduction in absolute emissions in FY23 (compared to FY20 baseline)3
- Mt Rawdon Pumped Hydro a strategic asset



-
Total Recordable Injury Frequency (TRIF): The frequency of total recordable injuries per million hours worked. 19% reduction relative to FY22 30th June data
-
- Net Zero future commitment of 30% emissions reduction by 2030 and Net Zero emissions by 2050 relative to the FY20 baseline, excluding future growth projects. Emissions targets are related to Scope 1 and Scope 2 only using location-based method
-
- Data is subject to external audit validation due in September FY24

CLEAR AND CONSISTENT STRATEGY
A business that prospers through the cycle

Create sustainable value for stakeholders in an environmentally and socially responsible way

High performing culture with values and reputation as non-negotiables
Willing to take appropriate geological, operational and financial risks

A portfolio of up to 8 assets in Tier 1 jurisdictions generating superior returns

Financial discipline centred around margin and appropriate capital returns






-
Ernest Henry production at acquisition is Evolution's share of production (100% of gold production and 30% of copper production)
-
Ernest Henry production includes copper production converted to gold equivalent using the formula [Cu (t) * Cu spot price (A\$12,895/t) / Au spot price (A\$2,970/oz) as at 13 September, 2023 and an AUD:USD exchange rate of 0.64 sourced from Bloomberg. All other site production values are gold ounces only
STRONG PIPELINE OF ORGANIC GROWTH PROJECTS
Mt Rawdon Cowal (2040) Ernest Henry (2040) • Extension Feasibility Study outcome due March 2025 • PFS: US\$442M NPV and IRR of 28%1 • Further upside potential from current drilling program ramp-up phase • Innovative option on transition to renewable energy source • Investment decision ~ Dec 2024 • Lowest risk and cost of pumped hydro capacity in Australia
Red Lake (2038)
- Focused on stable and consistent production
- Targeting 200koz pa (FY24: guidance 170koz ±5%)
- Future growth options exist to increase production by ~30-60% when capex justified
Mungari (2038)
- Mine life extended to ~2038 via mill expansion
- ~200kozpa (FY27-32) targeting 200kozpa for LOM3
- Reduces LOM AISC to ~US\$1,120/oz
- Incremental NPV of US\$166M and IRR 19%2
- Commissioning planned for Mar 2026

- Production ↑ ~16% in FY24 after record FY23
- Underground commissioned early and in
- Open pit continuation (OPC) Feasibility Study extends OP by ~10 years and LOM by ~2 years to 2042

- 1. Gold at US\$1,536/oz (A\$2,400/oz) and Copper at US\$7,680/t (A\$12,000/t)
- 2. Gold at US\$1,536/oz (A\$2,400/oz)
- 3. See slide 2 for information on the Mungari Production Target
DELIVERING RETURNS AND DELEVERAGING
▪ Margin over ounces priority
- FY24 production guidance 770koz +/-5% at US\$880/oz
- FY25-26 targeting ~800koz pa
- Cost discipline to optimise margin and manage inflation
▪ Capital Allocation
- Reducing capital intensity
- Approved FY24-26 capital lower by ~US\$150M pa (average vs FY23)
- Projects will progress to execution when needed and justified
▪ Balance Sheet
- Deleveraging remains a priority
- No change in gross debt
- Restructure frees up ~US\$285M cash over next 3 years
- Benefits of higher metal prices will be banked


1Calculated using the average AUD:USD exchange rate for FY23 of 0.6734 and AUD:USD exchange rate assumption of 0.64 for FY24 Guidance 2Cash benefit is before tax in comparison to FY23 and against the old debt profile 3Gold price assumptions are A\$2,650/oz (plan and consensus) and A\$2,965/oz (spot)
DIVIDENDS AND DEBT
FY23 Final Dividend
- Fully franked 2 cents per share (~A\$38M)
- Supported by expected FY24 improved cash generation
- Over A\$1.1B returned to shareholders
- Payment date: 6 October 2023
- Record date: 31 August 2023
Strong Balance Sheet
- Investment grade rating reconfirmed in July
- Debt maturity aligned with extended mine life
- Average tenor of 7½ years
- No debt due until Q2 FY25
- Low cost of debt ~ 4.7%, 82% fixed at 4.5%
- Over 95% production unhedged




SUMMARY
Focus on safe and reliable operational delivery – margin over ounces
Organic growth options to deliver long term returns
Capital discipline – investing when needed and justified
Cash generation benefit – upside at spot prices
APPENDIX 1: FY24 GUIDANCE AND FY23 RESULTS
FY24 GUIDANCE: AUD
| FY24 Guidance | Gold (oz) (+/-5%) |
AISC (A\$/oz) (+/-5%) |
Sustaining Capital (A\$M) |
Major Project Capital (A\$M) |
Major Mine Development (A\$M) |
|---|---|---|---|---|---|
| Group | 770,000 | 1,370 | 190 – 230 |
325 – 350 |
125 – 140 |
| Cowal | 320,000 | 1,250 | 40 – 50 |
85 – 90 |
~5 |
| Ernest Henry | 80,000 | (2,000) | 55 – 62.5 |
45 – 50 |
45 – 50 |
| Red Lake | 170,000 | 2,000 | 45 – 55 |
85 – 90 |
60 – 65 |
| Mungari | 130,000 | 1,930 | 45 – 52.5 |
110 – 120 |
15 – 20 |
| Mt Rawdon | 70,000 | 1,850 | 5 – 7.5 |
||
| Corporate | 0 – 2.5 |
| FY24 Guidance | Copper (t) (+/-5%) |
|---|---|
| Ernest Henry | 50,000 |
| FY24 Guidance | Depreciation & Amortisation (\$A/oz) (+/- 5%) |
|
|---|---|---|
| Group | 730 | |
| Cowal | 430 | |
| Ernest Henry | 2,000 | |
| Red Lake | 400 | |
| Mungari | 840 | |
| Mt Rawdon | 1,190 | |
| Corporate | 5 |

FY24 GUIDANCE: USD
| FY24 Guidance | Gold (oz) (+/-5%) |
AISC1 (US\$/oz) (+/-5%) |
Sustaining Capital1 (US\$M) |
Major Project Capital1 (US\$M) |
Major Mine Development1 (US\$M) |
|---|---|---|---|---|---|
| Group | 770,000 | 880 | 120 – 150 |
210 – 225 |
80 – 90 |
| Cowal | 320,000 | 800 | 25 – 30 |
55 – 57.5 |
~3 |
| Ernest Henry | 80,000 | (1,280) | 35 – 40 |
30 – 35 |
30 – 35 |
| Red Lake | 170,000 | 1,280 | 27.5 – 35 |
55 – 57.5 |
35 – 40 |
| Mungari | 130,000 | 1,235 | 27.5 – 35 |
70 – 75 |
10 – 12.5 |
| Mt Rawdon | 70,000 | 1,185 | 3 – 5 |
||
| Corporate | ~2 | ||||
| FY24 Guidance | Copper (t) (+/-5%) |
FY24 Guidance | Depreciation & Amortisation1 (US\$/oz) (+/- 5%) |
||
| Ernest Henry | 50,000 | Group | |||
| 470 | |||||
| Cowal | 275 |
Ernest Henry 1,280
Red Lake 255
Mungari 540
Mt Rawdon 760
Corporate 5

FY23 FINANCIAL HIGHLIGHTS
| Financials | Units | FY232 | FY22 | Change |
|---|---|---|---|---|
| Statutory Profit After Tax | A\$M | 163.5 | 323.3 | (49%) |
| Underlying Profit After Tax | A\$M | 205.0 | 274.7 | (25%) |
| EBITDA | A\$M | 844.5 | 898.8 | (6%) |
| EBITDA Margin | % | 38% | 44% | (14%) |
| Operating Mine Cash Flow | A\$M | 944.1 | 893.3 | 6% |
| Capital Investment | A\$M | 798.7 | 606.4 | 32% |
| Group Cash Flow1 | A\$M | (115.9) | 110.6 | (205%) |
| Earnings Per Share | cps | 8.9 | 17.7 | (50%) |
| Final Dividend (fully franked) | cps | 2.0 | 3.0 | (33%) |
1. Cash flow before dividends, debt repayments, equity raises and any acquisitions or divestments
2. Includes the estimated impact of \$150M revenue loss from Ernest Henry weather event compared to FY22
APPENDIX 2: PROJECT UPDATES
PROJECTS APPROPRIATELY TIMED


Total capital over next 3 years ~A\$150M per year lower than FY23 Maintaining operation flexibility and financial strength in the portfolio
ERNEST HENRY – SIGNIFICANT GROWTH POTENTIAL
Feasibility study scheduled for completion in Q3 FY25
Outcomes of Pre-feasibility study:
- Mine life extended by 11 years out to 2040
- Compelling economics with high NPV and short payback
- A\$690M NPV and IRR of 28% at A\$2,400/oz & A\$12,000/t
- A\$1,010M NPV and IRR of 38% at spot prices
- Payback of approximately one year1
Further increase to 30 June Mineral Resource estimate: 2
• 101.5Mt at 1.25% Cu and 0.73 g/t Au for 1.3Mt of contained copper and 2.4Moz of contained gold (net of mining depletion)


18
June 2023 Mineral Resource model (orange)
Encouraged by the potential Life of Mine and production scale at this key asset
-
Payback period is for the mine extension from first ore 30 June 2023
-
Refer to ASX release titled "Further Increase in Ernest Henry Mineral Resource" dated 17 August 2023 available to view at www.evolutionmining.com.au and see the Appendix of this presentation for information on the Ernest Henry Mineral Resource estimate at
-
Refer to ASX releases titled "Annual Mineral Resources and Ore Reserves Statement" dated 16 February 2022, "Material Increase in Ernest Henry Mineral Resource" dated 1 August 2022 and "Annual Mineral Resources and Ore Reserves Statement" titled 16 February 2023 for information on Ernest Henry Mineral Resource estimates
COWAL – DELIVERING GROWTH

Current operations – E42 Pit (Stage H)
- Increasing ore tonnes and grade
- Strip ratio of <1:1
- Contributes significant proportion of mill feed until FY26
- Generates low grade stockpiles which provides mine plan flexibility

See the Appendix of this presentation for further information on Cowal's Mineral Resources and Ore Reserves as at December 2022 19
Underground mine development
- First stope ore delivered in Q3 FY23, 10,000+ development metres completed in FY23
- Paste plant commissioning commenced, full production expected Q1 FY24
- Village completed for occupancy
- Increasing production rates to >2.4Mtpa in early FY26
Study to extend open pit operations by ~10 years and total mine life by approximately two years to 2042

MUNGARI – CORNERSTONE ASSET
- Consolidated regional ownership
- Track record of stable and consistent operations
- Expansion is a logical evolution of the region
- Unlocking long term potential
- Life of Mine (LOM) to ~2038
- Targeting ~200kozpa
- Mill expansion simple, typical WA goldfields kit
- Discovery multiple opportunities to add resources
- Mining focus on three mining centres for at least 5 years
Mungari Mill expansion – key enabler for region
- Conventional crush and grind circuit, with conventional technologies
- Metallurgical testing completed outcomes favourable
- Mill capacity to double, processing unit cost reduced ~30%
Expansion key metrics1 :
- Extends life to 15 years at average production of ~155kozpa
- Average AISC A\$1,750/oz with A\$1,215/oz margin at spot
- Incremental NPV of A\$260M at A\$2,400/oz and A\$600M at spot
- Incremental IRR 19% at A\$2,400/oz and 28% at spot price
- Short payback of 3 years and 1½ years at spot price

High-return, low-cost, longer Life of Mine = cornerstone asset
- See slide 2 for information on the Mungari Production Target and see ASX release titled "Mungari Mine Life Extended 15 years at 18% lower AISC and higher production" dated 5 June 2023 for information on the Future Growth Project Feasibility Study available to view at www.evolutionmining.com.au
RED LAKE FOCUSING ON INCREASING MARGIN
Consistent and stable operations Cultural alignment Margin and cash driven Financially self funding ▪ Operational flexibility sufficient contingency ▪ Operational excellence reliable delivery ▪ Safety and people focus ▪ Capacity to pivot the plan for value based on drill results ▪ Competing for capital ▪ Improving rates of return

FY24 production will ramp up and AISC will trend down from Q1 September production planned at ~15-19% of FY24 Guidance
MT RAWDON PUMPED HYDRO – A STRATEGIC ASSET


Lowest risk and cost of capacity pumped hydro project in Australia
APPENDIX 3: MINERAL RESOURCE AND ORE RESERVE
GROUP GOLD MINERAL RESOURCES AT 31 DECEMBER 2022
( W I T H E R N E S T H E N RY J U N E 2 0 2 3 M I N E R AL R E S O U R C E U P D AT E )
| Gold | Measured | Indicated | Inferred | Total Resource | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-off (g/t Au) |
Tonnes (Mt) | Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
CP7 |
| Cowal1 | Open pit | 0.35 | 29.5 | 0.46 | 440 | 182.9 | 0.86 | 5,033 | 26.5 | 0.80 | 682 | 238.9 | 0.80 | 6,155 | 1 |
| Cowal | UG | 1.50 | - | - | - | 22.0 | 2.49 | 1,760 | 12.4 | 2.33 | 925 | 34.4 | 2.43 | 2,685 | 1 |
| Cowal1 | Total | 29.5 | 0.46 | 440 | 204.9 | 1.03 | 6,793 | 38.8 | 1.29 | 1,607 | 273.3 | 1.01 | 8,840 | 1 | |
| Red Lake2 | Total | 2.5-3.3 | - | - | - | 35.7 | 6.66 | 7,639 | 24.8 | 5.90 | 4,702 | 60.4 | 6.35 | 12,342 | 2 |
| Mungari1,3 | Open pit | 0.31-0.34 | - | - | - | 53.8 | 1.08 | 1,864 | 24.0 | 1.16 | 894 | 77.8 | 1.10 | 2,758 | 3 |
| Mungari1,4 | UG | 1.46-2.44 | 1.4 | 4.66 | 205 | 9.7 | 4.28 | 1,332 | 8.7 | 3.74 | 1,043 | 19.7 | 4.07 | 2,580 | 3 |
| Mungari1 | Total | 1.4 | 4.66 | 205 | 63.5 | 1.57 | 3,196 | 32.7 | 1.84 | 1,937 | 97.5 | 1.70 | 5,338 | 3 | |
| Mt Rawdon1 | Total | 0.23 | 5.5 | 0.30 | 54 | 21.0 | 0.58 | 389 | 2.3 | 0.48 | 35 | 28.8 | 0.52 | 478 | 4 |
| Ernest Henry5,6 | Total | N/A2 | 35.0 | 0.75 | 847 | 35.0 | 0.76 | 852 | 31.5 | 0.66 | 668 | 101.5 | 0.73 | 2,368 | 5 |
| Marsden | Total | 0.20 | - | - | - | 119.8 | 0.27 | 1,031 | 3.1 | 0.22 | 22 | 123.0 | 0.27 | 1,053 | 1 |
| Total | 71.4 | 0.67 | 1,546 | 479.9 | 1.29 | 19,901 | 133.2 | 2.09 | 8,972 | 684.5 | 1.38 | 30,419 |
Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding. "UG" denotes underground
Mineral Resources are reported inclusive of Ore Reserves
-
Includes stockpiles
-
Red Lake Mineral Resource cut-off varies from 2.5g/t Au to 3.3g/t Au and is dependent on deposit and location from surface and processing plant
-
Mungari Open Pit Mineral Resource cut-offs vary from 0.31g/t Au to 0.34g/t Au. The average open pit cut-off is 0.32g/t Au
-
Mungari Underground Mineral Resource cut-offs vary from 1.46g/t Au to 2.44g/t Au per deposit. The average underground cut-off is 1.96g/t Au
-
Ernest Henry Operations reported Mineral Resources are reported within an interpreted 0.7% Cu mineralised envelope
-
Ernest Henry reported Mineral Resource estimate is depleted to 30 June 2023
-
Group Gold Mineral Resources Competent Person (CP) Notes refer to 1. James Biggam; 2. Jason Krauss; 3. Brad Daddow; 4. Matthew Graham-Ellison; 5. Phil Micale
This information is extracted from the releases titled 'Annual Mineral Resources and Ore Reserves Statement' dated 16 February 2023, "Mungari Mine Life Extended to 15 Years at 10 to 20% lower AISC" dated 5 June 2023 and "Further Increase in Ernest Henry Mineral Resource" dated 17 August 2023 available to view at www.evolutionmining.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the release and that all material assumptions and parameters underpinning the estimates in the release continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Reports

GROUP GOLD ORE RESERVES AT 31 DECEMBER 2022
( W I T H E R N E S T H E N RY J U N E 2 0 2 3 O R E R E S E R V E U P D AT E )
| Gold | Proved | Probable | Total Reserve | Competent | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-off (g/t Au) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Person8 |
| Cowal1,2 | Open pit | 0.45 | 27.4 | 0.47 | 414 | 86.2 | 0.99 | 2,745 | 113.6 | 0.87 | 3,160 | 1 |
| Cowal3 | UG | 0.55/1.80 | - | - | - | 15.9 | 2.29 | 1,169 | 15.9 | 2.29 | 1,169 | 2 |
| Cowal | Total | 27.4 | 0.47 | 414 | 102.1 | 1.19 | 3,915 | 129.5 | 1.04 | 4,329 | ||
| Red Lake4 | Total | 2.5-4.0 | - | - | - | 13.0 | 6.90 | 2,878 | 13.0 | 6.90 | 2,878 | 3 |
| Mungari5 | UG | 2.2-3.8 | 0.4 | 5.47 | 78 | 3.2 | 4.41 | 457 | 3.7 | 4.54 | 535 | 4 |
| Mungari1,6 | Open pit | 0.57-0.74 | - | - | - | 20.7 | 1.06 | 703 | 20.7 | 1.06 | 703 | 4 |
| Mungari1 | Total | 0.4 | 5.47 | 78 | 23.9 | 1.51 | 1,160 | 24.3 | 1.58 | 1,238 | ||
| Mt Rawdon1 | Open pit | 0.31 | 1.9 | 0.40 | 25 | 9.0 | 0.66 | 191 | 10.9 | 0.61 | 216 | 5 |
| Ernest Henry7,8 | UG | 0.50-0.75% CuEq | 26.5 | 0.62 | 527 | 50.9 | 0.36 | 582 | 77.4 | 0.45 | 1,109 | 6 |
| Marsden | Open pit | 0.30 | - | - | - | 65.2 | 0.39 | 817 | 65.2 | 0.39 | 817 | 7 |
| Total | 56.2 | 0.58 | 1043 | 264.0 | 1.12 | 9,544 | 320.3 | 1.03 | 10,587 |
Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding. "UG" denotes underground
-
Includes stockpiles
-
Ore Reserve has been updated for E42 Stage H Open Pit in line with 2022 corporate commodity price assumptions, updated modifying factors and allowing for depletion. All remaining 'Open Pit Continuation' Ore Reserves (OPC) are declared as per December 2021 Cowal Open Pit Ore Reserves. The OPC Ore Reserve will be updated at the completion of the OPC Feasibility Study ('FS'). Modifying factors to be updated during the FS include Mineral Resource, geotechnical, metallurgical, revenue and cost assumptions. To date, no fatal flaws have been identified during the FS. A materiality test was conducted on the impact of the change between the December 2021 and December 2022 Mineral Resource model on the OPC Ore Reserve, the change is expected to be less than 10%
-
- Cowal Underground Ore Reserve has been optimised using a \$1,600/oz price assumption, economically tested at up to \$2,200/oz and considers updated modifying factors and depletion. The Cowal Underground Ore Reserve includes development material at an incremental cut-off grade of 0.55g/t Au
-
- Red Lake Ore Reserve cut-off is 4.0g/t Au except for HG Young (3.0g/t Au) and Upper Campbell (2.5g/t Au)
-
- Mungari Underground Ore Reserve cut-off varies from 2.2g/t Au to 3.8g/t Au and is dependent on specific deposits and varies between each underground mine taking into account location and costs
-
- Mungari Open Pit Ore Reserves were optimised using a \$1,600/oz gold price assumption. The exceptions are the Paradigm and Castle Hill open pit operations which have been scheduled for production between 2023 and 2025 and have been optimised with a \$2,200/oz gold price assumption. Cut-offs vary by deposit from 0.57g/t Au to 0.74g/t Au and take into account location and costs
-
- Ernest Henry reported Ore Reserve estimate is based on the December 2022 Mineral Resource detailed in the ASX Release titled "Annual Mineral Resources and Ore Reserves Statement" dated 16 Feb 2023 and available to view at www.evolutionmining.com.au. The applied flow model cutoff grades of 0.50 % and 0.75% copper equivalent ('CuEq') are determined through an economic evaluation process which considers the Net Smelter Return (NSR) and operating costs. The utlised copper equivalent equation is: CuEq = Cu + Au NSR/56.4 where; Au NSR = 38.5 * Au - 0.04
-
- Ernest Henry reported Ore Reserve estimate is depleted to 30 June 2023
-
- Group Gold Ore Reserve Competent Person (CP) Notes refer to 1. Dean Basile (Mining One); 2. Ryan Bettcher; 3. Brad Armstrong; 4. Blake Callinan; 5. Ben Young; 6. Michael Corbett; 7. Anton Kruger
This information is extracted from the releases titled 'Annual Mineral Resources and Ore Reserves Statement' dated 16 February 2023, "Mungari Mine Life Extended to 15 Years at 10 to 20% lower AISC" dated 5 June 2023 and "Ernest Henry Mine Life Extended to 2040 and Ore Reserves Doubled" dated 5 June 2023 available to view at www.evolutionmining.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the release and that all material assumptions and parameters underpinning the estimates in the release continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Reports

GROUP RESOURCES & RESERVES AT 31 DECEMBER 2022
( W I T H E R N E S T H E N RY J U N E 2 0 2 3 O R E R E S E R V E AN D M I N E R AL R E S O U R C E U P D AT E S )
Group Mineral Resource – contained copper
| Copper | Measured | Indicated | Inferred | Total Resource | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-off | Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
CP3 |
| Marsden | Total | 0.2g/t Au | - | - | - | 119.8 | 0.46 | 553 | 3.1 | 0.24 | 7 | 123.0 | 0.46 | 560 | 1 |
| Ernest Henry1,2 | Total | 0.7% Cu | 35.0 | 1.31 | 458 | 35.0 | 1.29 | 450 | 31.5 | 1.15 | 363 | 101.5 | 1.25 | 1,271 | 2 |
| Total | 35.0 | 1.31 | 458 | 154.8 | 0.65 | 1,003 | 34.6 | 1.07 | 370 | 224.4 | 0.82 | 1,831 |
Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding
-
Ernest Henry Operations reported Mineral Resources are reported within an interpreted 0.7% Cu mineralised envelope
-
Ernest Henry reported Mineral Resource estimate is depleted to 30 June 2023
-
Group Mineral Resources Competent Person (CP) Notes refer to: 1. James Biggam; 2. Phil Micale
Group Ore Reserve – contained copper
| Copper | Proved | Probable | Total Reserve | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off | Tonnes (Mt) | Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) | Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) | Copper Grade (%) |
Copper Metal (kt) |
CP5 |
| Marsden | Total | 0.3g/t Au | - | - | - | 65.2 | 0.57 | 371 | 65.2 | 0.57 | 371 | 1 |
| Ernest Henry3,4 | Total | 0.50-0.75% CuEq | 26.5 | 1.08 | 287 | 50.9 | 0.59 | 302 | 77.4 | 0.76 | 589 | 2 |
| Total | 26.5 | 1.08 | 287 | 116.1 | 0.58 | 673 | 142.6 | 0.67 | 960 |
Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding
- Ernest Henry reported Ore Reserve estimate is based on the December 2022 Mineral Resource detailed in the ASX Release titled "Annual Mineral Resources and Ore Reserves Statement" dated 16 Feb 2023 and available to view at
www.evolutionmining.com.au. The applied flow model cut-off grades of 0.50 % and 0.75% copper equivalent ('CuEq') are determined through an economic evaluation process which considers the Net Smelter Return (NSR) and operating costs. The utilised copper equivalent equation is: CuEq = Cu + Au NSR/56.4 where; Au NSR = 38.5 * Au - 0.04
-
Ernest Henry reported Ore Reserve estimate is depleted to 30 June 2023
-
Group Ore Reserve Competent Person (CP) Notes refer to: 1. Anton Kruger; 2. Michael Corbett
This information is extracted from the releases titled 'Annual Mineral Resources and Ore Reserves Statement' dated 16 February 2023,, "Ernest Henry Mine Life Extended to 2040 and Ore Reserves Doubled" dated 5 June 2023 and "Further Increase in Ernest Henry Mineral Resource" dated 17 August 2023 available to view at www.evolutionmining.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the release and that all material assumptions and parameters underpinning the estimates in the release continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Reports