June 2012 Resources and Reserves Statement
Evolution Mining Limited (ASX: EVN) is pleased to report that it has completed an update to its Mineral Resource and Ore Reserve estimates as at 30 June 2012.
Group Mineral Resources are now estimated at 7.0 million ounces gold equivalent, a slight increase of 0.4% compared to the June 2011 estimate of 6.97 million ounces. Resources depleted by mining have effectively been replaced by newly defined mineralisation at Pajingo and an increase to the Edna May underground resource. Mineral Resources are reported inclusive of Ore Reserves.
Group Ore Reserves are now estimated at 3.33 million ounces gold equivalent, a decrease of 4.6% compared to the June 2011 estimate of 3.49 million ounces. This change is largely due to depletion by mining of approximately 400koz predominantly offset by significant reserve increases at Pajingo and Cracow. The Mineral Resources and Ore Reserves have been prepared according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).
This resource and reserve update only includes exploration and resource definition drilling information up to 31 December 2011 but has been depleted for mining to 30 June 2012. This discrepancy in timing is a consequence of the large task of compiling the disparate databases for projects that were previously owned by three different companies and then using similar estimation practices across the projects for the first time under Evolution ownership. Recent exploration success at Cracow (Coronation discovery) and at Pajingo (Moonlight prospect), in particular, have not been included in this resource and reserve update as information was unavailable at the cut-off date.
Evolution has made a strong commitment to exploration and resource definition drilling at each of its mines. The Company has budgeted A$28 million for exploration and A$12 million for resource definition drilling in the current financial year. It has an extensive and highly prospective exploration portfolio in Queensland and Western Australia and expects to increase resources and reserves in excess of mining depletion over the next 12 months.
1
==> picture [478 x 136] intentionally omitted <==
Evolution Mining
Mineral Resource Statement- June 2012
| Gold Resources | Gold Resources | Gold Resources | Measured | Measured | Indicated | Indicated | Inferred | Inferred | Total Resour | Total Resour | ces | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off | Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
| Cracow1 Edna May1 Edna May Mt Carlton Mt Rawdon1 Pajingo Pajingo1 Twin Hills Twin Hills |
Underground Open-pit Underground Open-pit Open-pit Open-pit Underground Open-pit Underground |
2.3 0.4 3.0 0.4 0.2 0.7 2.4 0.5 2.0 |
0.203 17.8 - 9.02 0.614 - 0.274 - 0.54 |
8.9 1.0 - 2.0 0.5 - 6.6 - 4.1 |
58 549 - 586 10 - 58 - 71 |
1.06 18.9 0.63 14.7 44.7 0.221 2.11 2.42 0.32 |
7.3 0.9 7.2 1.5 0.7 3.7 5.5 2.2 3.5 |
248 526 146 695 1,058 26 375 170 36 |
2.83 7.87 0.576 1.41 7.17 0.01 2.78 0.64 0.7 |
5.1 0.8 6.9 1.5 0.5 2.2 4.9 1.7 3.9 |
462 194 127 68 125 1 440 35 87 |
4.09 44.6 1.21 25.2 52.5 0.231 5.16 3.06 1.56 |
5.8 0.9 7.0 1.7 0.7 3.6 5.3 2.1 3.9 |
768 1,269 273 1,350 1,194 27 873 204 194 |
| Sub Total | 28.5 | 1.5 | 1,332 | 85.1 | 1.2 | 3,280 | 24.0 | 2.0 | 1,540 | 138 | 1.4 | 6,152 | ||
| Silver Resources | Measured | Indicated | Inferred | Total Resour | ces | |||||||||
| Project | Type | Cut-Off | Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
| Mt Carlton | Open-pit | * | 11.4 | 57 | 20,790 | 14.9 | 19 | 9,004 | 1.5 | 16 | 796 | 27.9 | 34 | 30,590 |
| Total | 11.4 | 57 | 20,790 | 14.9 | 19 | 9,004 | 1.5 | 16 | 796 | 27.9 | 34 | 30,590 | ||
| Copper Resources | Measured | Indicated | Inferred | Total Resour | ces | |||||||||
| Project | Type | Cut-Off | Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
| Mt Carlton | Open-pit | * | 11.4 | 0.24 | 27.6 | 14.9 | 0.21 | 32.1 | 1.51 | 0.20 | 3.0 | 27.9 | 0.23 | 62.8 |
| Total | 11.4 | 0.24 | 27.6 | 14.9 | 0.21 | 32.1 | 1.51 | 0.20 | 3.0 | 27.9 | 0.23 | 62.8 | ||
| Measured | Indicated | Inferred | Total Resour | ces | ||||||||||
| Gold Equivalent Resources | Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
||
| Total Group | 30.8 | 1.9 | 1,852 | 85.3 | 1.3 | 3,577 | 24.1 | 2.0 | 1,567 | 140 | 1.6 | 6,996 |
Notes:
-
1 Includes stockpiles
-
- Combined figure for V2 using 0.35g/t Au cut-off and A39 using 42 g/t Ag cut-off
-
Mineral Resource figures are inclusive of Ore Reserves
-
Data is reported to significant figures and differences may occur due to rounding
The gold equivalence calculation represents total metal value for each metal summed and expressed in equivalent gold grade or ounces. The prices used in the calculation being A$1350/oz Au, A$28.00/oz Ag and A$2.00/lb Cu
Metallurgical recovery to concentrate of 90.0% for gold, 92.0% for silver at V2 and 88% silver at A39 and 92.0% for copper as indicated by metallurgical testwork
Au Eq for silver = ((Price Ag per Oz x Ag Recovery)/(Price Au per Oz x Au Recovery)) x Ag Grade
Au Eq for copper = ((Price Cu per lb x 2204.623) x (Cu Recovery)) / (Price Au per Oz x Au Recovery / 31.1034768) x (Cu Grade / 100)
2
==> picture [478 x 136] intentionally omitted <==
Evolution Mining
Ore Reserve Statement - June 2012
| Gold Reserves | Gold Reserves | Gold Reserves | Proved | Proved | Proved | Probable | Probable | Probable | Total Reserve | Total Reserve | Total Reserve |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off | Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Million) |
Gold Grade (g/t) |
Gold Metal (koz) |
| Cracow1 | Underground | 3.0 | 0.126 | 10.9 | 44 | 1.16 | 5.3 | 198 | 1.28 | 5.9 | 242 |
| Edna May1 Mt Carlton Mt Rawdon1 Pajingo Pajingo1 |
Open-pit Open-pit Open-pit Open-pit Underground |
0.4 0.7 0.3 0.7 3.0 |
12.9 4.52 0.614 - 0.046 |
1.0 3.1 0.5 - 6.0 |
418 446 10 - 9 |
11.7 4.61 35.6 0.214 0.859 |
0.9 2.5 0.8 3.3 5.5 |
349 366 904 23 153 |
24.6 9.13 36.2 0.214 0.904 |
1.0 2.8 0.8 3.3 5.6 |
767 812 914 23 161 |
| Total | 18.2 | 1.6 | 927 | 54.1 | 1.1 | 1,991 | 72.4 | 1.3 | 2,918 |
| Silver Reserves | Silver Reserves | Silver Reserves | Proved | Proved | Proved | Probable | Probable | Probable | Total Reserve | Total Reserve | Total Reserve |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off | Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
Tonnes (Million) |
Silver Grade (g/t) |
Silver Metal (koz) |
| Mt Carlton | Open-pit | ** | 5.56 | 69 | 12,322 | 4.61 | 20 | 2,991 | 10.2 | 47 | 15,313 |
| Total | 5.56 | 69 | 12,322 | 4.61 | 20 | 2,991 | 10.2 | 47 | 15,313 | ||
| Copper Reserves | Proved | Probable | Total Reserve | ||||||||
| Project | Type | Cut-Off | Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Million) |
Copper Grade (%) |
Copper Metal (kt) |
| Mt Carlton | Open-pit | ** | 5.56 | 0.30 | 16.8 | 4.61 | 0.23 | 10.5 | 10.2 | 0.27 | 27.3 |
| Total | 5.56 | 0.30 | 16.8 | 4.61 | 0.23 | 10.5 | 10.2 | 0.27 | 27.3 | ||
| Gold Equivalent Reserves | Proved | Probable | Total Reserve | ||||||||
| Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
Tonnes (Million) |
Gold Equiv. Grade (g/t) |
Gold Equiv. Metal (koz) |
|||
| Total Group | 19.3 | 2.0 | 1,236 | 54.1 | 1.2 | 2,090 | 73.4 | 1.4 | 3,326 |
Notes:
1 Includes stockpiles
** Combined figure for V2 using 0.69g/t Au cut-off and A39 using 53 g/t Ag cut-off
Data is reported to significant figures and differences may occur due to rounding
The gold equivalence calculation represents total metal value for each metal summed and expressed in equivalent gold grade or ounces The prices used in the calculation being A$1350/oz Au, A$28.00/oz Ag and A$2.00/lb Cu
Metallurgical recovery to concentrate of 90.0% for gold, 92.0% for silver at V2 and 88% silver at A39 and 92.0% for copper as indicated by metallurgical testwork
1 Troy Ounce = 31.1034768 grams
Au Eq for silver = ((Price Ag per Oz x Ag Recovery)/(Price Au per Oz x Au Recovery)) x Ag Grade
Au Eq for copper = ((Price Cu per lb x 2204.623) x (Cu Recovery)) / (Price Au per Oz x Au Recovery / 31.1034768) x (Cu Grade / 100)
3
==> picture [478 x 136] intentionally omitted <==
Competent Persons Statement
The information in this statement that relates to the Mineral Resources or Ore Reserves listed in the table below is based on work compiled by the person whose name appears in the same row, who is employed on a full-time basis by the employer named in that row and is a member of the institute named in that row. Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he or she has undertaken to qualify as a Competent Person as defined by the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Each person named in the table below consents to the inclusion in this report of the matters based on his or her information in the form and context in which they appear.
| Resource/Reserve | Name of Competent Person |
Employer | Institute |
|---|---|---|---|
| Mt Carlton Ore Reserve | John Wyche | Australian Mine Design and Development Pty Limited |
Australasian Institute of Mining and Metallurgy |
| Mt Carlton Mineral Resources | John Winterbottom | Evolution Mining | Australian Institute of Geoscientists |
| Pajingo Mineral Resources | Calvin Ferguson | Evolution Mining | Australasian Institute of Mining and Metallurgy |
| Pajingo Underground Ore Reserves | Andrew Fox | Formerly Evolution Mining | Australasian Institute of Mining and Metallurgy |
| Pajingo Open-pit Ore Reserves | Cameron Skinner | Evolution Mining | Australasian Institute of Mining and Metallurgy |
| Twin Hills Mineral Resources | Peter Brown | Formerly Evolution Mining | Australian Institute of Geoscientists |
| Edna May Underground Mineral Resource | John Winterbottom | Evolution Mining | Australian Institute of Geoscientists |
| Edna May Open-pit Mineral Resources and Ore Reserves |
Luke Cox | Evolution Mining | Australasian Institute of Mining and Metallurgy |
| Cracow Mineral Resources | John Winterbottom | Evolution Mining | Australian Institute of Geoscientists |
| Cracow Ore Reserves | Fusheng Li | Evolution Mining | Australasian Institute of Mining and Metallurgy |
| Mt Rawdon Mineral Resource | John Winterbottom | Evolution Mining | Australian Institute of Geoscientists |
| Mt Rawdon Ore Reserve | Karl Smith | Karl Smith Mine and Geology Consulting Pty Ltd |
Australasian Institute of Mining and Metallurgy |
For further information please contact:
Investor Enquiries Donna Kelly and Liesl Kemp Investor Relations Evolution Mining Limited Tel: +61 8 6216 9700
Media Contact
Michael Vaughan Media Relations FTI – Media Relations Tel: +61 2 8298 6100
4
==> picture [478 x 136] intentionally omitted <==
Appendix A
Discussion of Mineral Resources and Ore Reserves
Pajingo Mineral Resource
The June 2012 Pajingo Mineral Resource estimate of 5.39 million tonnes at 5.2g/t gold for 900koz represents an increase of 172koz (24%) net of mining depletion compared to the previous estimate. Changes in the 2012 Mineral Resource estimate compared to the previously reported estimate include:
-
An increase of 375koz as a result of resource definition drilling within the main Vera-Nancy trend successfully defining additional resources at the Jandam and Faith lodes;
-
New mineralised lodes at Janine, Olivia and Leaping Dog;
-
A decrease of 116koz due to a change in the cut-off grade for underground resources from 1.0g/t to 2.4g/t gold; and
-
Mining depletion.
Open-pit Mineral Resources are reported at a 0.65g/t gold cut-off, constrained to an A$1,350 per ounce pit shell and estimated using Ordinary Kriging into blocks with dimensions 10 metres east by 4 metres north by 5 metres elevation.
Underground Mineral Resources are reported at a 2.4 g/t gold cut-off and estimated using Ordinary Kriging into blocks with dimensions 10 metres east by 5 metres north by 10 metres elevation.
Pajingo Ore Reserves
The June 2012 Pajingo Ore Reserve estimate of 1.12 million tonnes at 5.1g/t gold for 184koz represents an increase of 44koz ounces (31%) net of mining depletion compared to the 2011 Ore Reserve estimate.
Changes in the 2012 Ore Reserve estimate compared to the previously reported estimate include:
-
Increase in Faith Ore Reserve of 13koz gold;
-
Increase in Sonia Ore Reserve of 14koz gold due to additional drilling in Sonia and Sonia East;
-
Increase in Veracity Ore Reserve of 19koz gold;
-
Inclusion of Leaping Dog Ore Reserve of 13koz gold: and
-
Mining depletion.
The Ore Reserves are reported at a 3.0g/t gold (diluted panel grade) cut-off for underground and 0.65g/t gold for open pit. Ore Reserves were estimated based on a gold price of A$1,350 per ounce and a gold recovery of 96%.
Cracow Mineral Resource
The June 2012 Cracow Mineral Resource estimate of 4.09 million tonnes at 5.8g/t gold for 768koz represents a decrease of 124koz (14%) net of mining depletion compared to the previous estimate.
Changes in the 2012 Mineral Resource estimate compared to the previously reported estimate include:
-
Decrease in ounces due to the narrowing of some lode structures;
-
Change in cut-off grade from 2.5g/t gold to 2.3g/t gold resulting in a 14koz increase; and
-
Mining depletion.
5
==> picture [478 x 136] intentionally omitted <==
The Mineral Resources are reported at a 2.3g/t gold cut-off and estimated using Ordinary Kriging into blocks with a range of dimensions optimised to the characteristics and geometry of each deposit.
Cracow Ore Reserves
The June 2012 Cracow Ore Reserve estimate of 1.28 million tonnes at 5.9g/t gold for 242koz represents a minimal change(-1%) net of mining depletion compared to the previous estimate.
Changes in the 2012 Ore Reserve estimate compared to the previously reported estimate include:
-
Increases at the Kilkenny and Roses Pride lodes (20koz net of depletion);
-
Extension of the Klondyke North Shoot as a result of additional drilling (17koz); and
-
Mining depletion.
The Ore Reserves have been reported above a cut-off grade of 3.0g/t gold. Ore Reserves were estimated based on a gold price of A$1,350 per ounce and a gold recovery of 93%.
Mt Rawdon Mineral Resource
The June 2012 Mt Rawdon Mineral Resource estimate of 52.5 million tonnes at 0.7g/t gold for 1,194koz represents an increase of167koz (16%) net of mining depletion compared to the previous estimate.
Changes in the 2012 Mineral Resource estimate compared to the previously reported estimate include:
-
Increase of 307koz as a result of constraining mineralisation to an A$1,800 per ounce pit shell (from A$1200 per ounce previously) and a change in cut-off grade from 0.38g/t gold to 0.23g/t gold.
-
Decrease of 32koz due to model methodology changes;
-
2koz increase from a stockpile balance change; and
-
Mining depletion.
The Mineral Resources are reported at a 0.23g/t gold (un-factored model grade) cut-off, constrained to an A$1,800 per ounce pit shell and estimated using Ordinary Kriging into blocks with dimensions 20 metres east by 20 metres north by 10 elevation.
Mt Rawdon Ore Reserves
The June 2012 Mt Rawdon Ore Reserve estimate of 36.2 million tonnes at 0.8g/t gold for 914koz represents a slight decrease (1%) net of mining depletion compared to the previous estimate.
Changes in the 2012 Ore Reserve estimate compared to the previously reported estimate include:
-
Increase of 101koz due to lowering the cut-off from 0.4g/t to 0.3g/t gold and changing the gold price assumption from A$1,133 per ounce to A$1,350 per ounce;
-
Decrease of 6koz due to model methodology changes; and
-
Mining depletion
The Ore Reserves are reported at a 0.30g/t gold (un-factored model grade) cut-off. Ore Reserves were estimated based on a gold price of A$1,350 per ounce and a variable gold recovery averaging 89.5%.
6
==> picture [478 x 136] intentionally omitted <==
Edna May Mineral Resource
The June 2012 Edna May Mineral Resource estimate of 45.8 million tonnes at 1.0g/t gold for 1,542koz represents a decrease of 220koz (13%) net of mining depletion compared to the 2011 estimate.
An increase in the underground Mineral Resource estimate of 107koz was off-set by the following changes:
-
Decrease of 67koz due to re-interpretation of mineralisation outside the Edna May Gneiss within the open-pit resource;
-
Decrease of 38koz due to reporting average grades (E-Type[1] ) panel grades excluding panels from the openpit resource below the 0.4g/t cut-off rather than using the recovery proportion assigned to a panel;
-
Decrease of 146koz due to improved structural domaining to better capture the changes in orientation of mineralisation; and
-
Mining depletion.
The Mineral Resources are reported at a 0.4g/t gold cut-off for Edna May and Greenfinch open-pits and 3.0g/t gold cut-off for the Edna May Underground. Edna May and Greenfinch were estimated using E-Type Multiple Indicator Kriging into blocks with dimensions 25 metres east by 25 metres north by 5 elevation and 20 metres east by 15 metres north by 5 elevation respectively. Edna May open pit was reported above the 1050mRL (290 metres below surface).
Edna May’s underground deposit was estimated using a combination of Ordinary Kriging into blocks with dimensions 5 metres east by 5metres north by 5m elevation and is reported below the 1050mRL. No additional drilling has been included in the 2012 Mineral Resource as compared to the previously reported Mineral Resource.
Edna May Ore Reserves
The June 2012 Edna May Ore Reserve estimate of 24.6 million tonnes at 1.0g/t gold for 767koz represents a decrease of 160koz (17%) net of mining depletion compared to the 2011 estimate.
Changes in the 2012 Ore Reserve estimate compared to the previously reported estimate include:
-
Decrease of 83koz due to optimisation of the open-pit design using the revised Mineral Resource estimate (i.e. excludes mineralisation outside the Edna May Gneiss, and uses E-Type grade estimates), and an increase in the input costs for the Ore Reserve estimation; and
-
Mining depletion.
The 2012 Ore Reserves are reported at a 0.4g/t gold cut-off. Ore Reserves were estimated based on a gold price of A$1,500 per ounce gold price and a gold recovery of 91.5%.
Mt Carlton Mineral Resource
The June 2012 Mt Carlton Mineral Resource estimate of 27.9 million tonnes at 2.4g/t gold equivalent for 2.2 million gold equivalent ounces represents a 2% increase in gold equivalent ounces compared to the previous estimate. Changes in the 2012 Mineral Resource estimate compared to the previously reported estimate are a result of:
-
Changes in grade estimation methodology from a recovery value model to an average grade (E-Type) model; and
-
Changes in cut-off value parameters from an in-situ value of $A20/t previously to a cut-off grade of 0.35g/t gold for V2 and 42g/t silver for A39.
The Mt Carlton Mineral Resource consists of the V2 and A39 deposits.
1 The E-Type estimate is taken as the mean grade for a block in space accounting for the estimation error or uncertainty of the resultant grade. The identification of the mean value is based on the CCDF (conditional cumulative distribution function) of real data.
7
==> picture [478 x 136] intentionally omitted <==
The V2 deposit Mineral Resources are reported at a 0.35g/t gold cut-off and estimated using E-Type Multiple Indicator Kriging into blocks with dimensions 25 metres east by 25 metres north by 5 elevation.
The A39 deposit Mineral Resources are reported at a 42g/t silver cut-off and estimated using a combination of Ordinary Kriging, for more broadly spaced resource definition drilling, and Sequential Gaussian Simulation for closespaced grade-control drilled areas of the deposit into blocks with dimensions 10 metres by 10 metres by 2.5m elevation.
Mt Carlton Ore Reserves
The June 2012 Mt Carlton Ore Reserve estimate of 10.2 million tonnes at 3.7g/t gold equivalent for 1.22 million gold equivalent ounces represents a slight decrease (3%) in gold equivalent ounces compared to the previous estimate.
Changes are largely the result of a change in grade estimation technique from a recovery value model to an average grade (E-Type) model.
Changes in the 2012 Ore Reserve estimate compared to the 2011 Ore Reserve estimate are a result of:
-
Updated resource model using a simpler grade estimation technique and additional drilling;
-
Updated metal prices, process recoveries, mining costs, smelter payables, concentrate transport costs and royalties; and
-
New final pit designs based on updated pit optimisation with updated resource model and inputs.
Mt Carlton Ore Reserves are estimated based on metal prices of A$1,350 per ounce for gold, A$28.00 per ounce for silver and A$2.00 per pound for copper.
The V2 deposit Ore Reserves are reported at a 0.69g/t gold cut-off. The V2 deposit Ore Reserve estimate used variable metal recoveries proportionate to head grade with gold recovery ranging from 82 to 90% and silver and copper recoveries ranging from 84 to 92%.
The A39 Deposit Ore Reserves are reported at a 53g/t silver cut-off. The A39 deposit Ore Reserve estimate used metal recoveries proportionate to head grade with a silver recovery of 88% and copper recovery of 92%.
The new modelling parameters as described above have also seen the waste to ore ratios improve significantly at both the V2 and A39 pits. The V2 strip ratio (waste tonnes to ore tonnes) has fallen to 2.7 from 3.9 previously and the A39 strip ratio has fallen to 3.3 from 11.9 previously.
Twin Hills Mineral Resource
The June 2012 Twin Hills Mineral Resource estimate of 4.62 million tonnes at 2.7g/t gold for 398koz is unchanged from the 2011 estimate as no new drilling or estimation has been conducted at Twin Hills.
The Mineral Resource estimate is reported above a cut-off of 0.5g/t gold and within a A$1,500 per ounce pit shell for the Twin Hills open-pit and 2.0g/t gold for the Twin Hills Underground Deposits.
Twin Hills Ore Reserves
No Ore Reserves have been estimated for Twin Hills.
8
Appendix B
Mineral Resources and Ore Reserve Tables by Operation
| Mineral Resources by Lodes Underground Cindy Venue Faith Jandam1 Sonia2 Veracity Zed LeapingDog Olivia Janine Open-Pit Venue3 Stockpiles Total |
||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Pajingo Mineral Resources - June 2012 | ||||||||||||
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
|
| Au (koz) |
Au (koz) |
Au (koz) |
Au (koz) |
|||||||||
| Mt | Au (g/t) | Mt | Au (g/t) | Mt | Au (g/t) | Mt | Au (g/t) | |||||
| - | - | - | 0.06 | 7.2 | 14 | 0.043 |
4.8 | 7 | 0.104 |
6.2 | 21 | |
| - | - | - | 0.137 | 4.5 | 20 | 0.18 |
3.8 | 22 | 0.317 |
4.1 | 42 | |
| 0.002 | 5.7 | 0.3 | 0.174 | 6.0 | 34 | 0.125 |
4.7 | 19 | 0.301 |
5.5 | 53 | |
| 0.213 | 6.6 | 45 | 0.846 |
5.0 | 137 | 0.691 |
4.6 | 101 | 1.75 |
5.0 | 283 | |
| - | - | - | 0.22 | 8.2 | 58 | 0.248 |
8.7 | 69 | 0.468 |
8.5 | 128 | |
| - | - | - | 0.308 | 5.3 | 53 | 0.074 |
5.1 | 12 | 0.383 |
5.3 | 65 | |
| - | - | - | 0.225 | 5.4 | 39 | 1.05 |
4.9 | 167 | 1.28 |
5.0 | 206 | |
| 0.053 | 6.6 | 11 | 0.077 |
4.6 | 11 | 0.005 |
5.1 | 1 | 0.134 |
5.4 | 23 | |
| - | - | - | - | - | - | 0.305 | 3.6 | 35 | 0.305 |
3.6 | 35 | |
| - | - | - | 0.059 | 4.5 | 8 | 0.06 |
3.7 | 7 | 0.119 |
4.1 | 16 | |
| - | - | - | 0.221 | 3.7 | 26 | 0.01 |
2.2 | 1 | 0.231 |
3.6 | 27 | |
| 0.008 | 5.3 | 1 | - |
- | - | - | - | - | 0.008 | 5.3 | 1 | |
| 0.274 | 6.6 | 58 | 2.33 |
5.4 | 401 | 2.79 |
4.9 | 441 | 5.39 |
5.2 | 900 |
1 Includes J1, J1 HW, J2, J3 and J4 Lodes
2 Includes Sonia and Sonia East Lodes
3 Includes Venue and Vera North Upper Lodes
Notes:
Data is reported to significant figures and differences may occur due to rounding
Pajingo Mineral Resources have been reported above a cut-off grade of 2.4g/t of gold for underground, 0.65 g/t of gold for open pit and constrained to an A$1,350 pit design
Pajingo was estimated using Ordinary Kriging into blocks with dimensions 10 metres East by 5 metres North by 10 metres elevation Mineral Resource figures are inclusive of Ore Reserves
Competent Person: Calvin Ferguson a member of the Australasian Institute of Mining and Metallurgy
| Pajingo Ore Reserves - June 2012 | |||||||||
| Proved | Probable | Total | |||||||
| Ore Reserves by Lodes |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | Au(g/t) | Au(koz) | Mt | Au(g/t) | Au(koz) | Mt | Au(g/t) | Au(koz) | |
| Underground | |||||||||
| Cindy | - | - |
- | 0.031 | 5.9 |
6 | 0.031 |
5.9 | 6 |
| Faith | 0.003 | 4.2 |
0.4 | 0.171 | 5.5 |
30 | 0.174 |
5.5 | 31 |
| Jandam1 | - | - |
- | 0.018 | 4.4 |
3 | 0.018 |
4.4 | 3 |
| LeapingDog | 0.035 | 6.3 |
7 | 0.04 |
4.6 |
6 | 0.075 |
5.4 | 13 |
| Sonia2 | - | - |
- | 0.219 | 7.1 |
50 | 0.219 |
7.1 | 50 |
| Veracity | - | - |
- | 0.228 | 4.4 |
32 | 0.228 |
4.4 | 32 |
| Zed | - | - |
- | 0.152 | 5.3 |
26 | 0.152 |
5.3 | 26 |
| Open-pit | |||||||||
| Venue3 | - | - |
- | 0.214 | 3.3 |
23 | 0.214 |
3.3 | 23 |
| Stockpiles | 0.008 | 5.3 |
1 | - |
- |
- | 0.008 | 5.3 | 1 |
| Total | 0.046 | 6.0 |
9 | 1.07 |
5.1 |
175 | 1.12 |
5.1 | 184 |
1 Includes J1, J1 HW, J2, J3 and J4 Lodes
2 Includes Sonia and Sonia East Lodes
3 Includes Venue and Vera North Upper Lodes
Notes:
Data is reported to significant figures and differences may occur due to rounding Ore Reserves are reported above a 3.0g/t gold cut-off
Ore Reserves are calculated using a A$1,350 per ounce gold price and a gold recovery of 96%
Underground Competent Person: Andrew Fox a member of the Australasian Institute of Mining and Metallurgy
Open-pit Competent Person: Cameron Skinner a member of the Australasian Institute of Mining and Metallurgy
9
==> picture [478 x 136] intentionally omitted <==
| Cracow Mineral Resources | - June 2012 | |||||||||||
| Measure Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Lodes |
||||||||||||
| Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
|
| Au (g/t) |
Au (koz) |
Au (g/t) |
Au (koz) |
Au (g/t) |
Au (koz) |
Au (g/t) |
Au (koz) |
|||||
| Mt | Mt | Mt | Mt | |||||||||
| Royal | 0.017 | 8.8 | 5 | - | - | - | 0.085 |
6.7 | 18 | 0.103 | 7.1 | 23 |
| Crown | 0.073 | 9.4 | 22 | - | - | - | 0.38 |
4.5 | 55 | 0.454 | 5.3 | 77 |
| Klondyke North | 0.001 | 7.7 | 0.3 | 0.225 | 5.7 | 41 | 0.192 | 3.7 | 23 | 0.418 | 4.7 | 64 |
| Sovereign | 0.037 | 5.0 | 6 | 0.119 | 4.3 | 17 | 0.381 | 3.6 | 44 | 0.536 | 3.9 | 67 |
| Kilkenny | 0.051 | 9.9 | 16 | 0.282 | 7.4 | 67 | 0.776 | 5.2 | 131 | 1.11 | 6.0 | 215 |
| Tipperary | - | - |
- | 0.319 | 7.6 | 78 | 0.156 | 5.5 | 28 | 0.476 | 6.9 | 106 |
| Empire | - | - |
- | - | - | - | 0.474 |
6.1 | 93 | 0.474 | 6.1 | 93 |
| Roses Pride | 0.007 | 7.2 | 2 | 0.051 | 15.9 | 26 | 0.385 | 5.7 | 70 | 0.443 | 6.9 | 98 |
| Phoenix | 0.005 | 14.2 | 2 | 0.063 | 9.3 | 19 | 0.002 | 4.4 | 0.3 | 0.069 | 9.5 | 21 |
| Stockpiles | 0.011 | 13.3 | 5 | - | - | - | - |
- |
- | 0.011 | 13.3 | 5 |
| Total | 0.203 | 8.9 | 58 | 1.06 |
7.3 | 248 | 2.83 |
5.1 | 462 | 4.09 | 5.8 | 768 |
Notes:
Data is reported to significant figures and differences may occur due to rounding Cracow Mineral Resources have been reported above a cut-off grade of 2.3 g/t of gold
Cracow was estimated using Ordinary Kriging into blocks with a range of dimensions optimised to the characteristics and geometry of each deposit
Mineral Resource figures are inclusive of Ore Reserves
Competent Person: John Winterbottom a member of Australian Institute of Geoscientists
| Cracow Ore Reserves - | June 2012 | ||||||||
| Proved | Probable | Total | |||||||
| Ore Reserves by Lodes | Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
| Mt | Au(g/t) | Au(koz) | Mt | Au(g/t) | Au(koz) | Mt | Au(g/t) | Au(koz) | |
| Royal | 0.015 | 8.0 |
4 | - |
- | - | 0.015 | 8.0 | 4 |
| Crown | 0.032 | 12.2 |
13 | 0.003 | 1.0 | 0.1 | 0.035 | 11.1 | 13 |
| Klondyke North | 0.0004 | 5.7 | 0.1 | 0.158 | 4.4 | 22 | 0.159 | 4.4 | 22 |
| Sovereign | 0.004 | 7.5 |
1 | 0.038 |
4.3 | 5 | 0.042 | 4.7 | 6 |
| Kilkenny | 0.053 | 11.8 |
20 | 0.368 |
4.7 | 55 | 0.421 | 5.6 | 75 |
| Roses Pride | 0.007 | 4.6 |
1 | 0.094 |
8.1 | 24 | 0.101 | 7.8 | 25 |
| Phoenix | 0.002 | 8.5 |
1 | 0.096 |
7.7 | 24 | 0.098 | 7.7 | 24 |
| Tipperary | - | - |
- | 0.398 | 5.2 | 66 | 0.398 | 5.2 | 66 |
| Stockpiles | 0.011 | 13.3 |
5 | - |
- | - | 0.011 | 13.3 | 5 |
| Total | 0.126 | 10.9 |
44 | 1.16 |
5.3 | 198 | 1.28 | 5.9 | 242 |
Notes:
Data is reported to significant figures and differences may occur due to rounding Ore Reserves are reported above a 3.0 g/t gold cut-off
Ore Reserves are calculated using a A$1,350 per ounce gold price and a gold recovery of 93% Cracow tonnes and grades are stated to a number of significant digits reflecting confidence of the estimate Competent Person: Fusheng Li a member of the Australasian Institute of Mining and Metallurgy
10
==> picture [478 x 136] intentionally omitted <==
| Mt Rawdon Mineral Resources - June 2012 | ||||||||||||
| Measure Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources |
Cont. Metal |
Cont. Metal |
Cont. Metal |
Cont. Metal |
||||||||
| Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | |||||
| Au (koz) |
Au (koz) |
Au (koz) |
Au (koz) |
|||||||||
| Mt | Au (g/t) | Mt | Au (g/t) | Mt | Au (g/t) | Mt | Au (g/t) | |||||
| Mt Rawdon | - | - | - | 44.7 | 0.7 | 1,058 | 7.17 | 0.5 | 125 | 51.9 | 0.7 | 1,183 |
| Stockpiles | 0.6 | 0.5 | 10 | 0.6 | 0.5 | 10 | ||||||
| Total | 0.6 | 0.5 | 10 | 44.7 | 0.7 | 1,058 | 7.17 | 0.5 | 125 | 52.5 | 0.7 | 1,194 |
Notes:
Data is reported to significant figures and differences may occur due to rounding
Mt Rawdon Mineral Resources have been reported above a cut-off grade of 0.23 g/t of gold and constrained to an A$1,800 pit optimisation shell Mt Rawdon was estimated using Ordinary Kriging into blocks with dimensions 20 metres East by 20 metres North by 5 elevation Mineral Resource figures are inclusive of Ore Reserves
Competent Person: John Winterbottom a member of Australian Institute of Geoscientists
| Mt Rawdon Ore Reserves - June 2012 | |||||||||
| Proved | Probable | Total | |||||||
| Cont. Metal |
Cont. Metal |
Cont. Metal |
|||||||
| Ore Reserves | Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | |||
| Mt | Au (g/t) | Au (koz) | Mt | Au (g/t) | Au (koz) | Mt | Au (g/t) | Au (koz) | |
| Open Pit | - | - |
- |
35.6 |
0.8 | 904 | 35.6 | 0.8 | 904 |
| Stockpiles | 0.6 | 0.5 | 10 | - | - |
- |
0.6 |
0.5 | 10 |
| Total | 0.6 | 0.5 | 10 | 35.6 | 0.8 | 904 | 36.2 | 0.8 | 914 |
Notes:
Data is reported to significant figures and differences may occur due to rounding Ore Reserves are reported above a 0.3 g/t gold cut-off
Ore Reserves are calculated using a A$1,350 per ounce gold price and a variable gold recovery, approximately 89.5% for average head grade reported
Mt Rawdon tonnes and grades are stated to a number of significant digits reflecting confidence of the estimate Competent Person: Karl Smith a member of the Australasian Institute of Mining and Metallurgy
11
==> picture [478 x 136] intentionally omitted <==
| Edna May Mineral Resources - | June 2012 | |||||||||||
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Deposit |
Cont. Metal |
Cont. Metal |
Cont. Metal |
Cont. Metal |
||||||||
| Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | |||||
| Au (g/t) |
Au (koz) |
Au (g/t) |
Au (koz) |
Au (g/t) |
Au (koz) |
Au (g/t) |
Au (koz) |
|||||
| Mt | Mt | Mt | Mt | |||||||||
| Greenfinch | 0.866 | 1.1 | 31 | 2.58 | 1.0 | 83 | 0.65 | 1.0 |
20 | 4.09 | 1.0 | 134 |
| Edna May (Open- pit) |
||||||||||||
| 16.9 | 1.0 | 518 | 14.4 | 0.9 | 412 | 7.22 | 0.8 |
174 | 38.6 | 0.9 | 1,104 | |
| Edna May (U/G) | - | - | - | 0.63 | 7.2 | 146 | 0.58 | 6.9 |
127 | 1.21 | 7.0 | 273 |
| Stockpiles | - | - | - | 1.92 | 0.5 | 31 | - | - |
- | 1.92 | 0.5 | 31 |
| Total | 17.8 | 1.0 | 549 | 19.5 | 1.1 | 672 | 8.44 | 1.2 |
321 | 45.8 | 1.0 | 1,542 |
Notes:
Data is reported to significant figures and differences may occur due to rounding
Edna May and Greenfinch Mineral Resources have been reported above a cut-off grade of 0.4g/t of gold and Edna May underground reported above 3g/t gold
Edna May and Greenfinch were estimated using E-Type Multiple Indicator Kriging (MIK) into blocks with dimensions 25 metres East by 25 metres North by 5 elevation and 20 metres East by 15 metres North by 5 elevation respectively. Edna May open-pit was reported above the 1050mRL (290 metres below surface)
Edna Mays underground deposit was estimated using a combination of Ordinary Kriging into blocks with dimensions 5 metres East by 5metres North by 5m elevation and is reported below the 1050mRL
Mineral Resource figures are inclusive of Ore Reserves
Competent Person: Underground, John Winterbottom a member of Australian Institute of Geoscientists
Competent Person: Open-pit & Greenfinch, Luke Cox a member of the Australasian Institute of Mining and Metallurgy
| Edna May Ore Reserves | - June 2012 | ||||||||
| Proved | Probable | Total Ore Reserves | |||||||
| Ore Reserves by Deposit |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
| Mt | Au(g/t) | Au(koz) |
Mt | Au(g/t) | Au(koz) |
Mt | Au(g/t) | Au(koz) |
|
| Greenfinch | 0.8 | 1.1 | 28 |
1.7 | 1.0 | 58 | 2.5 |
1.1 | 86 |
| Edna May (OP) | 12.1 | 1.0 | 390 |
8.07 | 1.0 | 259 | 20.2 |
1.0 | 649 |
| Edna May (U/G) | - | - | - |
- | - | - | - | - | - |
| Stockpiles | - | - | - |
1.92 | 0.5 | 31 | 1.92 |
0.5 | 31 |
| Total | 12.9 | 1.0 | 418 |
11.7 | 0.9 | 349 | 24.6 |
1.0 | 767 |
Notes:
Ore Reserves are reported above a 0.4g/t gold cut-off Ore Reserves were calculated using a A$1,500 per ounce gold price and a gold recovery of 91.5% Competent Person: Luke Cox a member of the Australasian Institute of Mining and Metallurgy Data is reported to significant figures and differences may occur due to rounding
12
==> picture [478 x 136] intentionally omitted <==
Gold - Mt Carlton Mineral Resources - June 2012
| Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 | Gold - Mt Carlton Mineral Resources - June 2012 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Deposit |
Cont. Metal |
Cont.Me tal |
Cont. Metal |
Cont. Metal |
||||||||
| Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | |||||
| Au (koz) |
Au (koz) |
Au (koz) |
Au (koz) |
|||||||||
| Mt | Au (g/t) | Mt | Au (g/t) | Mt | Au (g/t) | Mt | Au (g/t) | |||||
| V2 | 9.02 2.0 586 |
14.7 1.5 695 |
1.41 1.5 68 |
25.2 1.7 1,350 |
||||||||
| Total | 9.02 2.0 586 |
14.7 1.5 695 |
1.41 1.5 68 |
25.2 1.7 1,350 |
Silver - Mt Carlton Mineral Resources - June 2012
| Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 | Silver - Mt Carlton Mineral Resources - June 2012 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Deposit |
Cont. Metal |
Cont. Metal |
Cont. Metal |
Cont. Metal |
||||||||
| Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | |||||
| Ag (koz) |
Ag (koz) |
Ag (koz) |
Ag (koz) |
|||||||||
| Mt | Ag (g/t) | Mt | Ag (g/t) | Mt | Ag (g/t) | Mt | Ag (g/t) | |||||
| V2 | 9.02 21 6,159 |
14.7 18 8,410 |
1.41 12 534 |
25.2 19 15,103 |
||||||||
| A39 | 2.38 192 14,631 |
0.231 80 594 |
0.095 85 262 |
2.7 178 15,487 |
||||||||
| Total | 11.4 57 20,790 |
14.9 19 9,004 |
1.51 16 796 |
27.9 34 30,590 |
Copper - Mt Carlton Mineral Resources - June 2012
| Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 | Copper - Mt Carlton Mineral Resources - June 2012 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Deposit |
||||||||||||
| Cont. Metal |
||||||||||||
| Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | Cont. Metal |
Tonnes | Grade | ||
| Mt | Cu(%) | Cu(kt) | Mt | Cu(%) | Cu(kt) | Mt | Cu(%) | Cu(kt) | Mt | Cu(%) | Cu(kt) | |
| V2 | 9.02 | 0.27 | 24.5 | 14.7 | 0.22 | 32.1 | 1.41 | 0.22 | 3.0 | 25.2 | 0.24 | 59.7 |
| A39 | 2.38 | 0.13 | 3.1 | 0.231 | 0.01 | 0.03 | 0.095 | 0.04 | 0.004 | 2.7 | 0.12 | 3.1 |
| Total | 11.4 | 0.24 | 27.6 | 14.9 | 0.21 | 32.1 | 1.51 | 0.20 | 3.0 | 27.9 | 0.23 | 62.8 |
| Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Silver) - Mt Carlton Mineral Resources - June 2012 | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Deposit |
Tonnes | Grade | Cont. Mtl |
Tonnes | Grade | Cont. Mtl |
Tonnes | Grade | Cont. Mtl |
Tonnes | Grade | Cont. Mtl |
| AuEq (g/t) |
ea AuEq (koz) |
AuEq (g/t) |
ea AuEq (koz) |
AuEq (g/t) |
ea AuEq (koz) |
AuEq (g/t) |
ea AuEq (koz) |
|||||
| Mt | Mt | Mt | Mt | |||||||||
| V2 | 9.02 0.5 131 |
14.7 0.4 178 |
1.41 0.2 11 |
25.2 0.4 320 |
||||||||
| A39 | 2.38 3.9 297 |
0.231 1.6 12 |
0.095 1.7 5 |
2.7 3.6 314 |
||||||||
| Sub-Total | 11.4 1.2 427 |
14.9 0.4 190 |
1.51 0.3 17 |
27.9 0.7 634 |
Gold Equivalence (Copper) - Mt Carlton Mineral Resources - June 2012
| Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 | Gold Equivalence(Copper) - Mt Carlton Mineral Resources - June 2012 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral Resources by Deposit |
Cont. Metal |
Cont. Metal |
Cont. Metal |
Cont. Metal |
||||||||
| Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | Tonnes | Grade | |||||
| AuEq (g/t) |
AuEq (koz) |
AuEq (g/t) |
AuEq (koz) |
AuEq (g/t) |
AuEq (koz) |
AuEq (g/t) |
AuEq (koz) |
|||||
| Mt | Mt | Mt | Mt | |||||||||
| V2 | 9.02 0.3 82 |
14.7 0.2 107 |
1.41 0.2 10 |
25.2 0.2 199 |
||||||||
| A39 | 2.38 0.1 10 |
0.231 0.01 0.1 |
0.095 0.004 0.01 |
2.7 0.1 10 |
||||||||
| Sub-Total | 11.4 0.3 92 |
14.9 0.2 107 |
1.51 0.2 10 |
27.9 0.2 210 |
| Total Gold Equivalence - Mt Carlton Mineral Resources - June 2012 | Total Gold Equivalence - Mt Carlton Mineral Resources - June 2012 | Total Gold Equivalence - Mt Carlton Mineral Resources - June 2012 | ||
|---|---|---|---|---|
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |
| Mineral Resources by Deposit |
Tonnes Grade Cont. Metal |
Tonnes Grade Cont. Metal |
Tonnes Grade Cont. Metal |
Tonnes Grade Cont. Metal |
| Mt AuEq (g/t) AuEq (koz) |
Mt AuEq (g/t) AuEq (koz) |
Mt AuEq (g/t) AuEq (koz) |
Mt AuEq (g/t) AuEq (koz) |
|
| V2 | 9.02 2.8 799 |
14.7 2.1 981 |
1.41 2.0 90 |
25.2 2.3 1,869 |
| A39 | 2.38 4.0 307 |
0.231 1.6 12 |
0.095 1.7 5 |
2.7 3.7 325 |
| Total | 11.4 3.0 1,106 |
14.9 2.1 993 |
1.51 2.0 95 |
27.9 2.4 2,193 |
13
==> picture [478 x 136] intentionally omitted <==
Notes:
Data is reported to significant figures and differences may occur due to rounding
Mt Carlton V2 deposit Mineral Resources have been reported above a cut-off grade of 0.35 g/t of gold and A39 deposit reported above 42 g/t silver
Mt Carlton V2 deposit was estimated using E-Type Multiple Indicator Kriging into blocks with dimensions 25 metres East by 25 metres North by 5 elevation
Mt Carlton A39 deposit was estimated using a combination of Ordinary Kriging, for more broadly spaced Resource Definition drilling, and Sequential Gaussian Simulation for close spaced grade control drilled areas of the deposit into blocks with dimensions 10 metres by 10 metres by 2.5m elevation
Mineral Resource figures are inclusive of Ore Reserves
Competent Person: John Winterbottom a member of Australian Institute of Geoscientists
The gold equivalence calculation represents total metal value for each metal summed and expressed in equivalent gold grade or ounces The prices used in the calculation being A$1350/oz Au, A$28.00/oz Ag and A$2.00/lb Cu. Gold, silver and copper will each be recovered to concentrate;
metallurgical recovery to concentrate of 90.0% for gold, 92.0% for silver at V2 and 88% silver at A39 and 92.0% for copper as indicated by metallurgical testwork 1 Troy Ounce = 31.1034768 grams 1t = 2204.62262 lb
Au Eq for Silver = ( (Price Ag per Oz x Ag Recovery)/(Price Au per Oz x Au Recovery) ) x Ag Grade Au Eq for Copper = ((Price Cu per lb x 2204.623) x (Cu Recovery)) / (Price Au per Oz x Au Recovery / 31.1034768) x (Cu Grade / 100)
14
==> picture [478 x 136] intentionally omitted <==
| Gold - Mt Carlton Mine Ore | Gold - Mt Carlton Mine Ore | Gold - Mt Carlton Mine Ore | Reserves - June 2012 | Reserves - June 2012 | |||||
|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Ore Reserve | |||||||
| Mineral Reserves by Deposit |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | Au(g/t) | Au(koz) | Mt | Au(g/t) | Au(koz) | Mt | Au(g/t) | Au(koz) | |
| V2 | 4.52 | 3.1 | 446 |
4.61 |
2.5 | 366 | 9.13 |
2.8 | 812 |
| Total | 4.52 | 3.1 | 446 |
4.61 |
2.5 | 366 | 9.13 |
2.8 |
812 |
| Silver - Mt Carlton Ore Reserves - June 2012 | Silver - Mt Carlton Ore Reserves - June 2012 | Silver - Mt Carlton Ore Reserves - June 2012 | Silver - Mt Carlton Ore Reserves - June 2012 | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Ore Reserve | |||||||
| Mineral Reserves by Deposit |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | Ag (g/t) | Ag (koz) | Mt | Ag (g/t) | Ag (koz) | Mt | Ag (g/t) | Ag (koz) | |
| V2 | 4.52 | 24 | 3,470 | 4.61 | 20 | 2,991 | 9.13 |
22 | 6,461 |
| A39 | 1.04 | 265 | 8,852 | - | - | - | 1.04 |
265 | 8,852 |
| Total | 5.56 | 69 | 12,322 | 4.61 | 20 | 2,991 | 10.2 |
47 | 15,313 |
| Copper - Mt | Carlton Ore Reserves - June 2012 | Carlton Ore Reserves - June 2012 | Carlton Ore Reserves - June 2012 | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Ore Reserve | |||||||
| Mineral Reserves by Deposit |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | Cu(%) | Cu(kt) | Mt | Cu(%) | Cu(kt) | Mt | Cu(%) | Cu(kt) | |
| V2 | 4.52 | 0.32 | 14.3 | 4.61 | 0.23 | 10.5 | 9.13 | 0.27 | 24.8 |
| A39 | 1.04 | 0.24 | 2.5 | - | - | - | 1.04 |
0.24 | 2.5 |
| Total | 5.56 | 0.30 | 16.8 | 4.61 | 0.23 | 10.5 | 10.2 | 0.27 | 27.3 |
| Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Silver) - Mt Carlton Ore Reserves - June 2012 | ||
|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Ore Reserve | |||||||
| Mineral Reserves by Deposit |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | AuEq (g/t) | AuEq (koz) | Mt | AuEq (g/t) | AuEq (koz) | Mt | AuEq (g/t) | AuEq (koz) | |
| V2 | 4.52 | 0.5 | 74 |
4.61 |
0.4 | 63 | 9.13 |
0.5 | 137 |
| A39 | 1.04 | 5.4 | 180 |
- |
- | - | 1.04 |
5.4 | 180 |
| Total | 5.56 | 1.4 | 253 |
4.61 |
0.4 | 63 | 10.2 |
1.0 | 317 |
| Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | Gold Equivalence(Copper) - Mt Carlton Ore Reserves - June 2012 | ||
|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Ore Reserve | |||||||
| Mineral Reserves by Deposit |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | AuEq (g/t) | AuEq (koz) | Mt | AuEq (g/t) | AuEq (koz) | Mt | AuEq (g/t) | AuEq (koz) | |
| V2 | 4.52 | 0.3 | 48 |
4.61 | 0.2 | 35 | 9.13 | 0.3 | 83 |
| A39 | 1.04 | 0.2 | 8 |
- | - | - | 1.04 |
0.2 | 8 |
| Total | 5.56 | 0.3 | 56 |
4.61 | 0.2 | 35 | 10.2 | 0.3 | 91 |
| Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | Total Gold Equivalence - Mt Carlton Ore Reserves - June 2012 | ||
|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Ore Reserve | |||||||
| Mineral Reserves by Deposit |
|||||||||
| Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | Tonnes | Grade | Cont. Metal | |
| Mt | AuEq (g/t) | AuEq (koz) | Mt | AuEq (g/t) | AuEq (koz) | Mt | AuEq (g/t) | AuEq (koz) | |
| V2 | 4.52 | 3.9 | 567 | 4.61 | 3.1 | 464 | 9.13 | 3.5 | 1,032 |
| A39 | 1.04 | 5.6 | 188 | - | - | - | 1.04 |
5.6 | 188 |
| Total | 5.56 | 4.2 | 755 | 4.61 | 3.1 | 464 | 10.2 | 3.7 | 1,220 |
15
==> picture [478 x 136] intentionally omitted <==
Notes:
Data is reported to significant figures and differences may occur due to rounding V2 Ore Reserves are reported above a 0.69 g/t gold cut-off and A39 Ore Reserves reported above a 53g/t silver cut-off Ore Reserves were calculated using a A$1,350 per ounce gold price, a silver price of A$28 per ounce and a copper price of A$2 per pound V2 deposit used variable recoveries proportionate to head grade with gold recovery ranging from82 to 90%,Silver and copper recoveries ranged from 84 to 92%
A39 deposit used 88% and 92% for silver and copper recoveries respectively, with no recovery attributed to gold Smelter payabilities were also considered in the reserve calculation
Competent Person: John Wyche a member of the Australasian Institute of Mining and Metallurgy
The gold equivalence calculation represents total metal value for each metal summed and expressed in equivalent gold grade or ounces The prices used in the calculation being A$1350/oz Au, A$28.00/oz Ag and A$2.00/lb Cu. Gold, silver and copper will each be recovered to concentrate;
metallurgical recovery to concentrate of 90.0% for gold, 92.0% for silver at V2 and 88% silver at A39 and 92.0% for copper as indicated by metallurgical testwork 1 Troy Ounce = 31.1034768 grams 1t = 2204.62262 lb
Au Eq for Silver = ( (Price Ag per Oz x Ag Recovery)/(Price Au per Oz x Au Recovery) ) x Ag Grade
Au Eq for Copper = ((Price Cu per lb x 2204.623) x (Cu Recovery)) / (Price Au per Oz x Au Recovery / 31.1034768) x (Cu Grade / 100)
| Twin Hills Mineral Resources - | June 2012 | |||||||||||
| Measured Resource | Indicated Resource | Inferred Resource | Total Resource | |||||||||
| Mineral | ||||||||||||
Resources by Deosit |
Tonnes | Grade | Cont. |
Tonnes | Grade | Cont. |
Tonnes | Grade | Cont. |
Tonnes | Grade | Cont. Metal |
| Metal | Metal | Metal | ||||||||||
| p | Mt | Au (g/t) | Au (koz) |
Mt | Au (g/t) | Au (koz) |
Mt | Au (g/t) | Au (koz) |
Mt | Au (g/t) | Au (koz) |
| Underground | ||||||||||||
| 309 | - | - | - |
0.04 | 3.9 | 5 | 0.5 | 4.3 |
69 | 0.54 | 4.3 | 74 |
| Lone Sister | 0.54 | 4.1 | 71 |
0.28 | 3.4 | 31 | 0.2 | 2.8 | 18 | 1.02 | 3.7 | 120 |
| Open-Pit | ||||||||||||
| 309 | - | - | - |
2.42 | 2.2 | 170 | 0.64 | 1.7 |
35 | 3.06 | 2.1 | 204 |
| Stockpiles | - | - | - |
- | - |
- |
- | - |
- |
- | - |
- |
| Total | 0.54 | 4.1 | 71 | 2.74 | 2.3 | 205 | 1.34 | 2.8 |
122 | 4.62 | 2.7 | 398 |
Notes:
Data is reported to significant figures and differences may occur due to rounding
Twin Hills Mineral Resources have been reported above a cut-off grade of 2.0g/t of gold for underground, 0.5 g/t of gold for open-pit and within a A$1,500 pit shell
Twin Hills Lone Sister was estimated using Ordinary Kriging and 309 using Multiple Indicator Kriging (E Type) into blocks with dimensions 5 metres East by 5 metres North by 5 metres elevation
Competent Person: Peter Brown a member of the Australasian Institute of Mining and Metallurgy
16