EVOLUTION MINING LIMITED — Investor Presentation 2018
Aug 5, 2018
64885_rns_2018-08-05_76a9c939-653e-4705-a261-9eef91211746.pdf
Investor Presentation
Open in viewerOpens in your device viewer
MUNGARI SITE VISIT
CLICK TO EDIT MASTER TITLE STYLE A N DREW MI LLA R G E N E R A L M A N A G E R K A L G O O R L I E R E G I O N 6 A U G U S T 2 0 1 8

FORWARD LOOKING STATEMENT
These materials prepared by Evolution Mining Limited (or "the Company") include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company's business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the Company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company's control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
MUNGARI'S CONTRIBUTION TO EVOLUTION MINING

This information is extracted from the report entitled "Annual Mineral Resources and Ore Reserve Statement" released by Evolution to ASX on 19 April 2018 and is available to view on www.evolutionmining.com.au Mineral Resources and Ore Reserves are depleted to 31 December 2017. Further information is provided in the appendix of this release Location bubble size denotes FY18 gold production 3
Mungari
Ernest
Henry
Mt
Carlton
Cracow
Cowal
Mt
Rawdon
MUNGARI
A key asset in Evolution's portfolio
10 year mine life with material upside
Strategic footprint in a world-class gold district
1.6Mtpa low cost plant consistently performing above nameplate
Highly skilled local workforce
Ability to adopt new technology to further improve productivity
FY19 cash flow to increase substantially
FY19 exploration budget A\$15 – 20 million
SNAPSHOT
| Location | 600km east of Perth, Western Australia, and 20km West of Kalgoorlie |
|---|---|
| Mining method | White Foil: conventional open-pit Frog's Leg: underground |
| Minerals | Gold |
| Mineralisation type | Quartz and stockwork veins |
| Process method | 3-stage crush and conventional CIL |
| Recovery | 93 - 94% |
| Ore Reserves1 | 14.13Mt @ 1.82g/t for 828koz Au |
| Mineral Resources1 | 50.52Mt @ 1.59g/t for 2,583koz Au |
(1) See Mungari Mineral Resources and Ore Reserves and footnotes provided in the appendices of this presentation for details on Ore Reserve and Mineral Resource estimates
Reserves calculated using a conservative gold price assumption of A\$1,350 (US\$1,000) per ounce
- Owner-operator with ~273 employees and ~70 contractors
- Underground and mill 7/7 4 panel roster
- Open-pit 7/3/5/6 3 panel roster
- Residential workforce
- Processing plant operating above nameplate at 1.7Mtpa. Potential to further increase throughput with low cost adjustments to the crushing circuit
- Cutback at the White Foil pit is now complete strip ratio to reduce accordingly
- Frog's Leg exploration decline being developed to drill for extensions at depth
- Plan to develop an operational hub at Castle Hill to provide operating synergies for satellite deposits – engineering studies are underway
SITE LAYOUT

White Foil Open-pit
Frog's Leg Underground
Mungari Process plant
Kalgoorlie 20km


ZERO HARM
- FY18 LTIF = 1.2 and TRIF = 8.5
- Significant year-on-year improvement demonstrates positive shift in safety culture
- Safety culture has moved from 'compliance' to 'ownership'
- Focus on critical controls:
- Waste rock management
- Tailings Storage Facility
- Ground control
- Fall from elevation
- Water management
MUNGARI FY18 HIGHLIGHTS
- Gold production of 118,498 ounces
- AISC1of A\$1,181 per ounce
- Operating mine cash flow A\$71 million
- Net mine cash flow A\$24 million
- Ore Reserves increased by 38% year-on-year to 828koz2
- Open-pit cut back completed on schedule
- Mill productivity improved with lower costs and improved recovery from the gravity circuit
- Pit optimisations and designs for regional resources progressed into Life of Mine Plan
- Native Title and Cultural Heritage agreements signed with Maduwongga

-
- AISC (All-in sustaining cost) includes C1 cash cost plus royalty expense, sustaining capital expense, general corporate and administration. Calculated on per ounce sold
-
- Post depletion and inclusive of Castle Hill restructure
FY18 UNDERGROUND PERFORMANCE

| Units | FY18 | |
|---|---|---|
| UG lateral development – capital |
m | 992 |
| UG lateral development – operating |
m | 758 |
| Total UG lateral development | m | 1,749 |
| UG ore mined | kt | 462 |
| UG grade mined | g/t | 5.32 |
- Frog's Leg underground production split between Mist and Rocket
- Significant reduction in paste fill costs
Frog's Leg MROR at 31 December 2017 Mineral Resource 1.69Mt grading 6.22g/t Au for 338koz1 Ore Reserves 1.08Mt grading 5.11g/t Au for 178koz1
- This information is extracted from the report entitled "Annual Mineral Resources and Ore Reserves Statement" released to the ASX on 19 April 2018 and is available to view on www.evolutionmining.com.au. See the appendices of this presentation for details on Mungari Mineral Resource and Ore Reserve estimates
FY18 WHITE FOIL PERFORMANCE
| Units | FY18 | |
|---|---|---|
| OP capital waste | kt | 6,286 |
| OP operating waste |
kt | 3,086 |
| OP ore mined | kt | 501 |
| OP strip ratio | waste:ore | 18.7:1 |
| OP grade mined | g/t | 1.61 |

- White Foil open-pit located adjacent to Mungari plant
- FY18 was a capital intensive year with a high strip ratio due to the Stage 3 cutback
- Cutback now complete with Stage 3 ore exposed
- Remaining Life of Mine strip ratio of 3.9:1
White Foil MROR at 31 December 2017 Mineral Resource 4.55Mt grading 2.00g/t Au for 292koz1 Ore Reserves 4.69Mt grading 1.72g/t Au for 259koz1
- This information is extracted from the report entitled "Annual Mineral Resources and Ore Reserves Statement" released to the ASX on 19 April 2018 and is available to view on www.evolutionmining.com.au. See the appendices of this presentation for details on Mungari Mineral Resource and Ore Reserve estimates
WHITE FOIL MATERIAL MOVEMENT

FY18 PLANT PERFORMANCE
- Plant continues to perform above nameplate
- Continuous improvement initiatives resulted in plant recovery increasing to 94.2% (FY17: 93.1%)
- Second Knelson concentrator improved gravity recovery performance to 53.0% (FY17: 48.1%)
- Focus on planning and maintenance increased plant utilisation by 1% year-on-year to 95.8%
| Units | FY18 | |
|---|---|---|
| Tonnes processed | kt | 1,654 |
| Grade processed | g/t | 2.36 |
| Gold recovery | % | 94.2 |
| Gold produced | oz | 118,498 |

MUNGARI FY19 OUTLOOK

-
AISC (All-in sustaining cost) includes C1 cash cost plus royalty expense, sustaining capital expense, general corporate and administration. Calculated on per ounce sold
-
Gold production 125,000 135,000 ounces
- AISC1A\$1,050 A\$1,100 per ounce
- A\$10 A\$15 million sustaining capital
- ~A\$5 million major project capital
- A\$15 A\$20 million resource definition and discovery budget focussed on:
- Drilling for extensions at depth at Frog's Leg
- Regional exploration at the Ora Banda camp
- Cash flow expected to increase substantially:
- White Foil strip ratio reduces to 3.3:1 (FY18: 18.7:1)
- Reduced capital development at Frog's Leg
- Pit optimisations and designs for regional resources progressed into LOMP
- Infill drilling and engineering studies at Castle Hill and the surrounding deposits
- White Foil underground studies to be progressed
UNLOCKING THE POTENTIAL
- Ore Reserves and Inferred Mineral Resources provide solid 10 year base load production platform to build on
- Current life of mine plan ore sources:
- Frog's Leg underground
- White Foil open pit and underground
- Castle Hill open pit
- Regional open pits
- Opportunity to grow resources and reserves to restore production profile to 150koz p.a. through discovery of a high -grade ore body
- FY19 focus:
- Frog's Leg Deeps
- Ora Banda camp
- Developing new high -grade targets across tenure
- Unlocking additional resources by reducing cost base

FROG'S LEG EXTENSIONS
- Underground mining at Frog's Leg scheduled to be completed in 2020
- Remnant targets yet to be fully tested
- Exploration decline commenced June 2018 quarter from the Mist decline and drilling scheduled for December 2018 quarter
- K2 mineralised contact intersected in drilling below the current base of mine – thickness and grade diminished
- A zone of potential increase in grade and thickness has been identified by projecting the K2 contact down dip and using public data from the EKJV to the north

WHITE FOIL
White Foil Open -Pit
- Open pit mining currently scheduled to be completed in 2020
- Planned stockpile at completion of mining – 2.06Mt grading 1.9g/t Au for 130koz
White Foil Underground
- Mineral Resource of 3.91Mt grading 2.4g/t Au containing 295koz 1
- Bulk deposit close to the Mungari plant
- Predominantly an Inferred Mineral Resource – infill drilling scheduled for the December 2018 half year
1 . This information is extracted from the report entitled "Annual Mineral Resources and Ore Reserves Statement" released to the ASX on 19 April 2018 and is available to view on www .evolutionmining .com .au . See the appendices of this presentation for details on Mungari Mineral Resource and Ore Reserve estimates

CASTLE HILL

| Castle Hill Metrics (June 18) | Units | June 18 |
|---|---|---|
| Waste | Mt | 28.3 |
| Ore | Mt | 5.3 |
| Grade | g/t | 1.4 |
| Ore Reserves | koz | 236 |
| Strip ratio | waste:ore | 5.3:1 |
- Termination of historic Norton right to mine agreement provides Evolution with full ownership and unfettered access to the Castle Hill deposit
- Located just 25km from Mungari processing plant
- Mineral Resources of 695,000 ounces and Ore Reserves of 236,000 ounces1
- Infill drilling and engineering studies commenced
- Castle Hill project comprised of the Kiora, Mick Adam and Wadi deposits. Ore Reserve includes Mick Adam only – others to be progressed in FY19
Evolution Mining – Mungari Site Visit August 2018 17 1. This information is extracted from the report entitled "Restructure of ownership of Castle Hill Gold Deposit" released to the ASX on 18 July 2018. See Mungari's Mineral Resources and Ore Reserves in the appendices of this presentation for further details
KUNANALLING
- Castle Hill is part of the Kunanalling Camp which currently contains >1Moz in Mineral Resources
- Adjacent to the Broads Dam camp which contains an additional Mineral Resource of 272Koz1
- Majority of the metal is associated with the Kintore Tonalite, where Mineral Resources are reported at four prospects: Kintore; Ridgeback; Picante; and Castle Hill
- All of these resources are open and have high potential for growth
- Resource Definition drilling is scheduled at Castle Hill, Ridgeback and Picante in FY19. Drilling objectives:
- Conversion of Inferred Mineral Resources to Indicated within the A\$1,800/oz pit shells
- Definition of high-grade plunging shoots on the eastern contact of the Kintore Tonalite
- Testing of structural models which improve our ability to target higher grade zones
1. This information is extracted from the report entitled "Annual Mineral Resources and Ore Reserves Statement" released to the ASX on 19 April 2018 and is available to view on www.evolutionmining.com.au. See the appendices of this presentation for details on Mungari Mineral Resource and Ore Reserve estimates

ORA BANDA CAMP
- Focused exploration program prioritising targets with potential to deliver high grade
- Recent drilling results illustrating grade potential in the well endowed Ora Banda camp – ~3Moz historic production and resources at >3g/t Au
- Several areas ineffectively explored for Ora Banda style mineral systems
-
Results at Perimeter and Scottish Archer confirming new target models and transfer of knowledge from Frog's Leg
-
- Mindat (www.mindat.org)
- Tripp, Gerard Ignatius (2013) Stratigraphy and structure in the Neoarchaean of the Kalgoorlie district, Australia: critical controls on greenstone-hosted gold deposits. PhD thesis, James Cook University
- Evolution Mining Mungari Site Visit August 2018 1. Historic production information and resources sourced from: - Annual Mineral Resources and Ore Reserves Statement released to the ASX on 19 April 2018 and is available to view on www.evolutionmining.com.au. See the appendices of this presentation for details on Mungari Mineral Resource and Ore Reserve estimates

ORA BANDA CAMP

Perimeter is an Enterprise style analogue hosted by parallel structures in the Bent Tree Basalt

Scottish Archer is a high-grade narrow vein target
COMMUNITY
- Native Title and Cultural Heritage agreements signed with Maduwongga
- Return to Work Program flexible hours for people returning to the workforce while raising a young family
- Third Shared Value Project completed Nature Sensory Outdoor Area
- Donation to St John Ambulance Kambalda to help fund a new ambulance
- Donation for equipment at the Children's Ward of Kalgoorlie Health Campus
- Lead Partner in the Women in Leadership Forum held in Kalgoorlie

UNLOCKING MUNGARI'S POTENTIAL
10 year mine life
Reliable low cost mill
Strategic footprint in a world class gold district
Commitment to exploration
Opportunity for high-grade discoveries to increase production, lower costs and extend mine life
Vastly improved cash flow expected in FY19
Objective Increase production to a sustainable 150,000oz per annum
MUNGARI'S EVOLUTION

| 1996 | White Foil discovery |
|---|---|
| 1999 | Frog's Leg discovery |
| 2002 - 2006 |
Limited mining of White Foil open-pit (2002-2003) and Frog's Leg open-pit (2004-2005) |
| 2008 | First gold pour from Frog's Leg underground mine Processing via toll treatment |
| 2011 | Frog's Leg Ore Reserve grows to 786koz |
| 2013 | Mungari plant construction commenced |
| 2014 | Mungari plant completed White Foil open-pit production restarts |
| 2015 | Evolution acquires 100% of La Mancha's Australian Operations and also acquires Phoenix Gold |
| 2018 | Evolution acquires full ownership of Castle Hill |
Gold Production (koz)

* FY19 shows midpoint of production guidance
Source: Company reports

PROCESS EQUIPMENT
- Power
- Western Power grid supply
- Crushing
- Three stage crushing
- Primary: Metso 40" Single Toggle Jaw Crusher
- Secondary: Metso Cone HP 4 Coarse liners
- Tertiary: Metso Cone HP 4 Coarse liners
- Grinding
- Polysius overflow Ball mill 5.5m (dia) 8.74m (l)
- 4.5 MW power, Hoffman gearbox, VSD, Dual direction
- Maggotaux 78mm and 94mm balls (50/50)
- Polymet composite liners
-
Grind size 75% 106µm
-
Gravity Circuit
- 2 * Knelson concentrator 30"
- 40-60% of gold recovered via gravity
- Leaching
- CIL circuit
- 2 x 1,140m3 leaching tank
- 6 x 750m3 adsorption tanks
- Cyanide supply CSBP
- Lime supply Chememan
MINING EQUIPMENT
Underground mining equipment Open-pit mining equipment
- Development drills
- 1 x development jumbo Sandvik DD421
- Production drills
- 2 x longhole drills Sandvik DL421
- Underground mine trucks
- 3 x Caterpillar AD55B
- Underground loaders
- 2 x Caterpillar R2900 (loading)
- 2 x Caterpillar R1700 (remoting)
- Ancillary Equipment
- 2 x Charge-up Atlas Copco
- 3 x Integrated Tool Carrier
- 1 x Dry tailings pastefill plant
-
1 x Shotcrete batching plant, agitator truck and sprayer
-
Loading
- 1 x 250t Hitachi EX2600
- 1 x 200t PC2000 (backup)
- 1 x 110t Komatsu PC1250 (batters)
- Hauling
- 7 x 135t Caterpillar 785 dump trucks
- Dozers
- 2 x Caterpillar D10T
- Haul road maintenance
- 1 x Caterpillar 773D 40,000L Water cart
- 1 x Caterpillar 16M Grader
- Drilling
- 5 x Sandvik DP1500i drills, (115, 102mm, 5m bench blasting)
EVOLUTION 2017 GOLD ORE RESERVES MUNGARI GOLD ORE RESERVES
| Mungari Gold Ore Reserves - December 2017 (incl. Castle Hill update – July 2018) |
||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Proved | Probable | Total Reserve | ||||||||||||
| Ore Reserve | Type | Cut-off | Tonnes (Mt) |
Grade Au (g/t) |
Cont. Metal Au (koz) |
Tonnes (Mt) |
Grade Au (g/t) |
Cont. Metal Au (koz) |
Tonnes (Mt) |
Grade Au (g/t) |
Cont. Metal Au (koz) |
|||
| Frog's Leg UG | UG | 2.75 | 0.38 | 5.87 | 71 | 0.71 | 4.70 | 107 | 1.08 | 5.11 | 178 | |||
| White Foil | OP | 0.70 | 0.18 | 0.79 | 4 | 4.51 | 1.75 | 254 | 4.69 | 1.72 | 259 | |||
| Mungari Subtotal |
0.55 | 4.24 | 75 | 5.22 | 2.15 | 361 | 5.77 | 2.35 | 437 | |||||
| Red Dam | OP | 0.90 | - | - | - | 1.22 | 1.79 | 71 | 1.22 | 1.79 | 71 | |||
| Broads Dam Subtotal | - | - | - | 1.22 | 1.79 | 71 | 1.22 | 1.79 | 71 | |||||
| Carbine North | OP | 0.95 | - | - | - | 0.63 | 1.64 | 33 | 0.63 | 1.64 | 33 | |||
| Zuleika North Subtotal | - | - | - | 0.63 | 1.64 | 33 | 0.63 | 1.64 | 33 | |||||
| Burgundy | OP | 0.85 | - | - | - | 0.38 | 1.51 | 18 | 0.38 | 1.51 | 18 | |||
| Castle Hill | OP | 0.85 | - | - | - | 5.35 | 1.38 | 236 | 5.35 | 1.38 | 236 | |||
| Kunanalling Subtotal |
- | - | - | 5.73 | 1.38 | 255 | 5.73 | 1.38 | 255 | |||||
| Cutters Ridge | OP | 0.85 | - | - | - | 0.78 | 1.31 | 33 | 0.78 | 1.31 | 33 | |||
| Kunan. Sth Subtotal |
- | - | - | 0.78 | 1.31 | 33 | 0.78 | 1.31 | 33 | |||||
| Total | 0.55 | 4.24 | 75 | 13.58 | 1.75 | 753 | 14.13 | 1.82 | 828 |
Note: Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding
Ore Reserves are reported above variable cut-off grades (as indicated), depending on the haulage cost and applicable third-party royalties applicable for each project
Ore Reserves information for Castle Hill open pit extracted from announcement entitled "Castle Hill Restructure" released to ASX on 18 July 2018 and reflects 100% Castle Hill attributable to Evolution.
Ore Reserves information for Frog's Leg underground and White Foil open pit extracted from the report entitled "Annual Mineral Resources and Ore Reserve Statement" released to ASX on 19 April 2018.
Ore Reserves information for Regional open pit extracted from the report entitled "Annual Mineral Resources and Ore Reserve Statement" released to ASX on 19 April 2018, adjusted to remove contribution from Castle Hill open pit.
All reports available to view at www.evolutionmining.com.au
Ore Reserve Competent Person: Matt Varvari
The Company confirms that it is not aware of any new information or data that materially affects the information included in the Report and that all material assumptions and technical parameters underpinning the estimates in the Report continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Report
EVOLUTION 2017 GOLD ORE RESERVES MUNGARI GOLD MINERAL RESOURCES
| Mungari | Mineral Resources –December 2017 (incl. Castle Hill update – | July 2018) | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured | Indicated | Inferred | Total Resource | ||||||||||||
| Region | Prospect | Type | Cut-Off | Tonnes (Mt) | Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) | Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) | Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) | Gold Grade (g/t) |
Gold Metal (koz) |
| Frog's Leg UG | UG | 2.00 | 0.41 | 9.46 | 124 | 1.16 | 5.16 | 193 | 0.11 | 5.49 | 20 | 1.69 | 6.22 | 338 | |
| Mungari | White Foil UG | UG | 1.50 | 0.32 | 2.07 | 21 | 3.59 | 2.38 | 274 | 3.91 | 2.35 | 295 | |||
| White Foil OP | OP | 0.50 | 4.41 | 1.97 | 279 | 0.14 | 2.85 | 13 | 4.55 | 2.00 | 292 | ||||
| Stockpiles | 0.18 | 0.94 | 5 | 0.10 | 0.78 | 3 | 0.29 | 0.88 | 8 | ||||||
| Mungari Subtotal |
0.59 | 6.84 | 130 | 6.00 | 2.57 | 496 | 3.84 | 2.49 | 307 | 10.43 | 2.78 | 933 | |||
| Johnsons Rest | OP | 0.50 | - | - | - | 0.97 | 1.36 | 42 | 0.05 | 1.30 | 2 | 1.01 | 1.36 | 44 | |
| Broads Dam | OP | 0.50 | - | - | - | - | - | - | 0.82 | 2.43 | 64 | 0.82 | 2.43 | 64 | |
| Broads Dam | Blue Funnel | OP | 0.50 | - | - | - | - | - | - | 0.22 | 2.96 | 21 | 0.22 | 2.96 | 21 |
| Red Dam | OP | 0.50 | - | - | - | 2.94 | 1.35 | 128 | 0.41 | 1.14 | 15 | 3.35 | 1.33 | 143 | |
| Stockpiles | - | - | - | - | - | - | 0.02 | 0.98 | 1 | 0.02 | 0.98 | 1 | |||
| Broads Dam Subtotal | - | - | - | 3.90 | 1.35 | 170 | 1.51 | 2.11 | 102 | 5.42 | 1.56 | 272 | |||
| Zuleika North | Carbine North | OP | 0.50 | - | - | - | 1.48 | 1.39 | 67 | 0.13 | 2.06 | 8 | 1.61 | 1.45 | 75 |
| Lady Jane OP |
0.50 | - | - | - | - | - | - | 0.55 | 1.97 | 35 | 0.55 | 1.97 | 35 | ||
| Zuleika North Subtotal | - | - | - | 1.48 | 1.39 | 67 | 0.67 | 1.99 | 43 | 2.16 | 1.58 | 110 | |||
| Nazzaris | OP | 0.50 | - | - | - | - | - | - | 1.74 | 1.46 | 82 | 1.74 | 1.46 | 82 | |
| Ora Banda | Whitehaven | OP | 0.50 | - | - | - | - | - | - | 0.22 | 1.46 | 10 | 0.22 | 1.46 | 10 |
| Boundary | OP | 0.50 | - | - | - | - | - | - | 0.65 | 1.81 | 38 | 0.65 | 1.81 | 38 | |
| Ora Banda Subtotal | - | - | - | - | - | - | 2.61 | 1.54 | 129 | 2.61 | 1.54 | 129 | |||
| Castle Hill | OP | 0.50 | - | - | - | 16.54 | 1.10 | 585 | 2.78 | 1.22 | 110 | 19.32 | 1.12 | 695 | |
| Picante | OP | 0.50 | - | - | - | 0.37 | 1.59 | 19 | 2.27 | 0.95 | 70 | 2.65 | 1.04 | 89 | |
| Kintore | OP | 0.50 | - | - | - | 1.89 | 1.05 | 64 | 0.58 | 2.07 | 39 | 2.47 | 1.29 | 102 | |
| Kunanalling | Ridgeback | OP | 0.50 | - | - | - | - | - | - | 0.65 | 1.62 | 34 | 0.65 | 1.62 | 34 |
| Burgundy-Telegraph | OP | 0.50 | - | - | - | 1.94 | 1.34 | 83 | 0.14 | 1.31 | 6 | 2.08 | 1.34 | 89 | |
| Catherwood | OP | 0.50 | - | - | - | 0.33 | 1.78 | 19 | 0.01 | 1.26 | 0 | 0.34 | 1.77 | 19 | |
| Emu | OP | 0.50 | - | - | - | 0.48 | 1.34 | 20 | 0.05 | 1.38 | 2 | 0.53 | 1.34 | 23 | |
| Stockpiles | - | - | - | 0.09 | 0.83 | 2 | - | - | - | 0.09 | 0.83 | 2 | |||
| Kunanalling Subtotal |
- | - | - | 21.64 | 1.14 | 793 | 6.49 | 1.25 | 260 | 28.13 | 1.16 | 1,054 | |||
| Kunanalling South |
Rayjax | OP | 0.50 | - | - | - | 0.10 | 3.32 | 10 | 0.11 | 3.50 | 13 | 0.21 | 3.42 | 23 |
| Cutters Ridge | OP | 0.50 | - | - | - | 1.42 | 1.24 | 57 | 0.16 | 1.08 | 6 | 1.58 | 1.22 | 62 | |
| Kunanalling South Subtotal |
- | - | - | 1.52 | 1.37 | 67 | 0.27 | 2.09 | 18 | 1.79 | 1.48 | 85 | |||
| Total | 0.59 | 6.84 | 130 | 34.54 | 1.43 | 1,593 | 15.40 | 1.74 | 860 | 50.52 | 1.59 | 2,583 |
Note: Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding. Mineral Resources are reported inclusive of Ore Reserves. Open pit Mineral Resource reported above a 0.5g/t cut-off within optimised pit shell. Underground Mineral Resource reported with MSO shapes above the cut-off noted. Castle Hill Mineral resource includes Wadi, Mick Adam, Kiora and Outridge. Picante Mineral Resource includes Picante, Wookie and Lady Alice
This information is extracted from the reports entitled "Annual Mineral Resources and Ore Reserve Statement" released to ASX on 19 April 2018 and "Restructure of Ownership of Castle Hill Gold Deposit" released to ASX on 18 July 2018 and both available to view at www.asx.com.au Mineral Resources Competent Person: Andrew Engelbrecht
The Company confirms that it is not aware of any new information or data that materially affects the information included in the Report and that all material assumptions and technical parameters underpinning the estimates in the Report continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Report
EVOLUTION 2017 GOLD ORE RESERVES EVOLUTION 2017 GOLD ORE RESERVES
| Group Gold Ore Reserves - July 2018 |
||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Gold | Proved | Probable | Total Reserve | |||||||||||
| Project | Type | Cut-Off | Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
CP3 | ||
| Cowal1 | Open pit | 0.4 | 46.64 | 0.70 | 1,049 | 69.64 | 0.89 | 1,998 | 116.28 | 0.81 | 3,046 | 1 | ||
| Cracow1 | Underground | 3.4 | 0.17 | 5.72 | 32 | 1.31 | 5.08 | 213 | 1.48 | 5.14 | 245 | 2 | ||
| Mt Carlton1 | Open pit | 0.8 | 0.59 | 3.65 | 69 | 3.63 | 4.96 | 578 | 4.22 | 4.77 | 647 | 3 | ||
| Mt Carlton | Underground | 3.7 | - | - | - | 0.28 | 7.20 | 65 | 0.28 | 7.22 | 65 | 6 | ||
| Mt Carlton1 | Total | 0.59 | 3.65 | 69 | 3.91 | 5.11 | 643 | 4.50 | 4.92 | 712 | ||||
| Mt Rawdon1 | Open pit | 0.3 | 2.89 | 0.58 | 54 | 23.56 | 0.81 | 617 | 26.44 | 0.79 | 671 | 4 | ||
| Mungari | Underground | 2.75 | 0.37 | 5.86 | 70 | 0.71 | 4.70 | 107 | 1.08 | 5.10 | 177 | |||
| Mungari1 | Open pit | 0.7/0.85- 0.95 |
0.18 | 0.79 | 5 | 12.87 | 1.57 | 646 | 13.05 | 1.55 | 651 | |||
| Mungari1 | Total | 0.55 | 4.24 | 75 | 13.58 | 1.75 | 753 | 14.13 | 1.82 | 828 | 5 | |||
| Ernest Henry2 | Underground | 0.9 | 10.20 | 0.77 | 253 | 41.20 | 0.49 | 649 | 51.40 | 0.55 | 902 | 7 | ||
| Marsden | Open pit | 0.3 | - | - | - | 65.17 | 0.39 | 817 | 65.17 | 0.39 | 817 | 3 | ||
| Total | 61.03 | 0.78 | 1,530 | 218.37 | 0.81 | 5,690 | 279.41 | 0.80 | 7,220 |
Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding
1 Includes stockpiles
2Ernest Henry Operation cut-off 0.9% CuEq
Group Ore Reserve Competent Person3 (CP) Notes refer to 1. Ryan Kare; 2. Phillip Jones; 3. Anton Kruger; 4. Dimitri Tahan; 5. Matt Varvari; 6. Tully Davies; 7. Mark Jamieson (Glencore)
This information is extracted from the reports entitled "Annual Mineral Resources and Ore Reserves Statement" released on 19 April 2018 and "Restructure of Ownership of Castle Hill Gold Deposit" released to ASX on 18 July 2018 and both available and available to view at www.evolutionmining.com.au. Full details of the Ernest Henry Mineral Resources and Ore Reserves are provided in the report entitled "Glencore Resources and Reserves as at 31 December 2017" released February 2018 and available to view at www.glencore.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Reports and that all material assumptions and parameters underpinning the estimates in the Reports continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Reports
EVOLUTION 2017 GOLD ORE RESERVES EVOLUTION 2017 GOLD MINERAL RESOURCES
| Group Gold Mineral Resources – July 2018 |
|||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Gold | Measured | Indicated | Inferred | Total Resource | |||||||||||
| Project | Type | Cut-Off | Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
CP3 |
| Cowal1 | Open pit | 0.4 | 46.64 | 0.70 | 1,049 | 141.99 | 0.91 | 4,173 | 5.27 | 1.50 | 255 | 193.90 | 0.88 | 5,476 | |
| Cowal | Underground | 3 | - | - | - | - | - | - | 5.90 | 3.17 | 603 | 5.90 | 3.17 | 603 | |
| Cowal1 | Total | 0.4 | 46.64 | 0.70 | 1,049 | 141.99 | 0.91 | 4,173 | 11.17 | 2.39 | 858 | 199.80 | 0.95 | 6,079 | 1 |
| Cracow1 | Total | 2.8 | 0.17 | 8.52 | 46 | 1.40 | 7.13 | 321 | 1.56 | 2.87 | 144 | 3.13 | 5.08 | 511 | 2 |
| Mt Carlton1 | Open pit | 0.35 | 0.59 | 3.65 | 69 | 10.36 | 2.38 | 793 | 0.69 | 4.58 | 101 | 11.64 | 2.57 | 963 | |
| Mt Carlton | Underground | 2.4 | - | - | - | 0.21 | 11.56 | 78 | 0.05 | 10.38 | 15 | 0.25 | 11.35 | 93 | |
| Mt Carlton1 | Total | 0.59 | 3.65 | 69 | 10.57 | 2.60 | 870 | 0.73 | 4.90 | 117 | 11.89 | 2.76 | 1,056 | 4 | |
| Mt Rawdon1 | Total | 0.2 | 2.89 | 0.58 | 54 | 39.79 | 0.71 | 905 | 5.77 | 0.58 | 108 | 48.44 | 0.69 | 1,067 | 5 |
| Mungari1 | Open pit | 0.5 | 0.18 | 0.94 | 5 | 33.06 | 1.30 | 1,379 | 11.69 | 1.51 | 566 | 44.93 | 1.35 | 1,950 | |
| Mungari | Underground | 2.5/1.5 | 0.41 | 9.46 | 124 | 1.48 | 4.50 | 214 | 3.70 | 2.47 | 294 | 5.59 | 3.52 | 633 | |
| Mungari1 | Total | 0.59 | 6.84 | 130 | 34.54 | 1.43 | 1,593 | 15.40 | 1.74 | 860 | 50.52 | 1.59 | 2,583 | 3 | |
| Ernest Henry2 | Total | 0.9 | 13.20 | 0.69 | 293 | 67.10 | 0.62 | 1,338 | 15.00 | 0.60 | 289 | 95.30 | 0.63 | 1,920 | 6 |
| Marsden | Total | 0.2 | - | - | - | 119.83 | 0.27 | 1,031 | 3.14 | 0.22 | 22 | 122.97 | 0.27 | 1,053 | 7 |
| Total Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding |
64.07 | 0.80 | 1,640 | 415.22 | 0.77 | 10,231 | 52.77 | 1.41 | 2,398 | 532.06 | 0.83 | 14,269 |
Mineral Resources are reported inclusive of Ore Reserves
1 Includes stockpiles 2 Ernest Henry Operation cut-off 0.9% CuEq
Group Mineral Resources Competent Person3 (CP) Notes refer to 1. James Biggam; 2. Chris Wilson; 3. Andrew Engelbrecht; 4 Matthew Obiri-Yeboah; 5. Tim Murphy; 6. Colin Stelzer (Glencore); 7. Michael Andrew
This information is extracted from the reports entitled "Annual Mineral Resources and Ore Reserves Statement" released on 19 April 2018 and "Restructure of Ownership of Castle Hill Gold Deposit" released to ASX on 18 July 2018 and both available and available to view at www.evolutionmining.com.au. Full details of the Ernest Henry Mineral Resources and Ore Reserves are provided in the report entitled "Glencore Resources and Reserves as at 31 December 2017" released February 2018 and available to view at www.glencore.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Reports and that all material assumptions and parameters underpinning the estimates in the Reports continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Reports. Ernest Henry Resource is reported on a 100% basis for gold and 30% for copper (Evolution Mining has rights to 100% of the revenue from future gold production and 30% of future copper and silver produced from an agreed life of mine area and 49% of future gold, copper and silver produced from the Ernest Henry Resource outside the agreed life of mine area). Apportioning of the resource into the specific rights does not constitute a material change to the reported figures
EVOLUTION 2017 GOLD ORE RESERVES EVOLUTION 2017 COPPER RESERVES & RESOURCES
| Group Copper Mineral Resources Statement | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Copper | Measured | Indicated | Inferred | Total Resource | |||||||||||
| Project | Type | Cut Off |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
CP3 |
| Marsden | Total | 0.2 | - | - | - | 119.83 | 0.46 | 553 | 3.14 | 0.24 | 7 | 122.97 | 0.46 | 560 | 7 |
| Ernest Henry2 | Total | 0.9 | 3.96 | 1.30 | 51 | 20.13 | 1.18 | 238 | 4.50 | 1.00 | 45 | 28.59 | 1.17 | 334 | 6 |
| Mt Carlton1 | Open pit | 0.35 | 0.59 | 0.37 | 2 | 10.36 | 0.41 | 43 | 0.69 | 0.68 | 5 | 11.64 | 0.43 | 50 | |
| Mt Carlton | Underground | 2.4 | - | - | - | 0.21 | 0.99 | 2 | 0.05 | 1.40 | 1 | 0.25 | 1.06 | 3 | |
| Mt Carlton1 | Total | 0.59 | 0.37 | 2 | 10.57 | 0.43 | 45 | 0.74 | 0.73 | 5 | 11.89 | 0.44 | 52 | 4 | |
| Total | 4.55 | 1.18 | 54 | 150.53 | 0.56 | 836 | 8.38 | 0.68 | 57 | 163.45 | 0.58 | 946 |
Group Copper Ore Reserves Statement
| Copper | Proved | Probable | Total Reserve | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off | Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
Tonnes (Mt) |
Copper Grade (%) |
Copper Metal (kt) |
CP3 |
| Marsden | 0.3 | - | - | - | 65.17 | 0.57 | 371 | 65.17 | 0.57 | 371 | 3 | |
| Ernest Henry2 | Total | 0.9 | 3.06 | 1.50 | 46 | 12.36 | 0.96 | 119 | 15.42 | 1.07 | 165 | 7 |
| Mt Carlton1 | Open pit | 0.8 | 0.59 | 0.37 | 2 | 3.63 | 0.70 | 25 | 4.22 | 0.64 | 27 | 3 |
| Mt Carlton | Underground | 3.7 | - | - | - | 0.28 | 0.37 | 1 | 0.28 | 0.36 | 1 | 6 |
| Mt Carlton1 | Total | 0.59 | 0.37 | 2 | 3.91 | 0.66 | 26 | 4.50 | 0.62 | 28 | ||
| Total | 3.65 | 1.32 | 48 | 81.44 | 0.63 | 516 | 85.09 | 0.66 | 564 |
Group Mineral Resources Competent Person3 (CP) Notes refer to 1. James Biggam; 2. Chris Wilson; 3. Andrew Engelbrecht; 4 Matthew Obiri-Yeboah; 5. Tim Murphy; 6. Colin Stelzer (Glencore); 7. Michael Andrew
Group Ore Reserve Competent Person3 (CP) Notes refer to 1. Ryan Kare; 2. Phillip Jones; 3. Anton Kruger; 4. Dimitri Tahan; 5. Matt Varvari; 6. Tully Davies; 7. Mark Jamieson (Glencore)
The following notes relate to both tables above
Data is reported to significant figures to reflect appropriate precision and may not sum precisely due to rounding
Mineral Resources are reported inclusive of Ore Reserves
1 Includes stockpiles 2Ernest Henry Operation cut-off 0.9% CuEq
Full details of the Ernest Henry Mineral Resources and Ore Reserves are provided in the report entitled "Glencore Resources and Reserves as at 31 December 2017" released February 2018 and available to view at www.glencore.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Report and that all material assumptions and parameters underpinning the estimates in the Report continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the Report. Ernest Henry Resource is reported on a 100% basis for gold and 30% for copper (Evolution Mining has rights to 100% of the revenue from future gold production and 30% of future copper and silver produced from an agreed life of mine area and 49% of future gold, copper and silver produced from the Ernest Henry Resource outside the agreed life of mine area). Apportioning of the resource into the specific rights does not constitute a material change to the reported figures