08 May 2009
ASX Code: CAH
CATALPA RESOURCES GENERAL MEETING PRESENTATION TO SHAREHOLDERS
Capital Structure
Total number of shares on issue: 595,824,281
Attached is a copy of a presentation to be given by Mr Bruce McFadzean, Managing Director of Catalpa Resources (ASX: CAH) at the General Meeting of shareholders today the 8 May 2009.
Share Price (as at 07 May 2009): $0.077
Board of Directors
ENDS
For further enquiries contact:
Bruce McFadzean Ellis
Managing Director Catalpa Resources Limited Tel (08) 9321 3088
Warrick Hazeldine / Annette
Media and Investor Relations Purple Communications Tel: (08) 9485 1254
Mr John Rowe: Non Exec Chairman Mr Bruce McFadzean: Managing Director Mr Murray Pollock: Non Exec Director Mr Barry Sullivan: Non Exec Director Mr Nigel Johnson: Non Exec Director Mr Graham Anderson: Company Secretary Mr Leonard Math: Company Secretary
Senior Management
Erik Palmbachs CFO Stuart Pether GM Operations Nick Winnall Exploration Manager
Major Shareholders
Lion Selection Group Limited 44.39% HSBC Custody Nominees 2.91% Goldrich Holdings Pty Ltd 2.69% National Nominees Limited 2.31% Zero Nominees Pty Ltd 1.49% Austock Nominees Pty Ltd 1.47% ANZ Nominees Limited 1.41% Mrs Shay Margaret Drummond 1.01% Parkrange Nominees Pty Ltd 0.84% Charlemagne Investments 0.74%
==> picture [568 x 69] intentionally omitted <==
==> picture [590 x 109] intentionally omitted <==
ABOUT CATALPA RESOURCES
Perth-based Catalpa Resources Limited (ASX: CAH) aims to become Australia’s next mid tier producer by developing its open pit assets located on its extensive and wholly-owned mining tenements in Western Australia.
Catalpa has recently finalised project funding to commence capital construction of the process plant and other infrastructure at the Edna May Gold Project in the current quarter of 2009. Catalpa plans to pour the first gold from Edna May in the June quarter 2010.
The Edna May Gold Project is conveniently positioned a few kilometres from the infrastructure of Westonia, an established town with a long mining history. The Project is just three hours or 300km by road from Perth; half way between Perth and Kalgoorlie and ideally situated to be serviced by both centres.
The Project has sound economics at a gold price of AUD$1,400 per ounce, which will realise an average annual operating cash margin in excess of $AU75 million. Catalpa’s mine and processing schedule demonstrate average gold production in excess of 100,000 ounces recovered per annum for a life of mine of more than seven years.
In preparation for planned production at Edna May, the Company relocated its 2.8 Mtpa Big Bell mill to site in 2007. The process plant has a twelve month construction and commissioning period scheduled to commence In the June quarter 2009
With its early cash flow profile, Catalpa aims to grow and develop the Company into Australia’s next mid tier
gold producer.
Significantly, 64% of the Edna May Ore Reserve and 33% of Greenfinch Ore Reserve are already in the highest confidence ‘Proved’ JORC category. Catalpa has demonstrated a sound Mineral Resource base with significant growth potential which, in conjunction with uncomplicated metallurgy and consistent mill feed provide recoveries greater than 91%, making this project an attractive long term opportunity to grow a mid tier gold producer.
Catalpa has amassed a management team with considerable technical, project and operational expertise and has the support of an experienced and innovative Board that is committed to using the continuing strength of the gold price, to realise value for Catalpa’s shareholders.
Catalpa is pursuing parallel growth with a wide-ranging exploration programme underway on its 880km² of under-explored Westonia Greenstone Belt, and is also reviewing regional and other opportunities.
The Company has adopted best practice standards across all of its activities, including health and safety, environmental management, corporate governance functions and social responsibility.
With a buoyant outlook for the Australian gold price, an impressive gold forward sold position, the Board believes that Catalpa Resources presents a solid investment opportunity with attractive margins to provide a solid long life platform for growth.
==> picture [568 x 69] intentionally omitted <==
==> picture [590 x 109] intentionally omitted <==
==> picture [285 x 285] intentionally omitted <==
==> picture [568 x 69] intentionally omitted <==
CATALPA RESOURCES AUSTRALIA’S NEXT MID TIER GOLD PRODUCER May 2009
==> picture [124 x 99] intentionally omitted <==
==> picture [120 x 93] intentionally omitted <==
==> picture [120 x 93] intentionally omitted <==
==> picture [117 x 106] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
DISCLAIMER
Presentation (in this projected form and as verbally presented) is provided on the basis that none of the Company nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing contained in the Presentation is, or may be relied upon as, a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law. The Presentation contains prospective financial material which is predictive in nature and may be affected by inaccurate assumptions or by known or unknown risks and uncertainties, and may differ materially from results ultimately achieved.
The Presentation contains "forward-looking statements". All statements other than those of historical facts included in the Presentation are forward-looking statements including, without limitation, (i) estimates of future earnings, and the sensitivity of earnings to the gold and other metals prices; (ii) estimates of future gold and other metals production and sales; (iii) estimates of future cash costs; (iv) estimates of future cash flows, and the sensitivity of cash flows to gold and other metals prices; (v) estimates of future capital expenditures; and (vi) estimates of reserves, and statements regarding future exploration results and the replacement of reserves.
Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. The Company does not undertake any obligation to release publicly any revisions to any "forward-looking statement" to reflect events or circumstances after the date of the Presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. All persons should consider seeking appropriate professional advice in reviewing the Presentation and all other information with respect to the Company and evaluating the business, financial performance and operations of the Company. Neither the provision of the Presentation nor any information contained in the Presentation or subsequently communicated to any person in connection with the Presentation is, or should be taken as, constituting the giving of investment advice to any person.
==> picture [708 x 60] intentionally omitted <==
THE CATALPA STORY
==> picture [625 x 147] intentionally omitted <==
----- Start of picture text -----
METALLURGICALLY TECHNICALLY &
WELL DEFINED & STRONG CASH FLOW
CONSISTENT OPERATIONALY
DRILLED RESOURCE GENERATION
RECOVERY 92% SKILLED TEAM
NEAR TERM > 100,000 STRONG CASH POURING GOLD IN
RESERVE RECOVERED OPERATING MARGIN JUNE QTR 2010
UPGRADES OUNCES/YEAR (APPROX $75M pa)
----- End of picture text -----
==> picture [50 x 94] intentionally omitted <==
==> picture [50 x 94] intentionally omitted <==
==> picture [50 x 94] intentionally omitted <==
CAH value proposition
==> picture [708 x 60] intentionally omitted <==
CATALPA OVERVIEW
==> picture [19 x 17] intentionally omitted <==
==> picture [19 x 17] intentionally omitted <==
==> picture [19 x 17] intentionally omitted <==
==> picture [19 x 17] intentionally omitted <==
==> picture [19 x 17] intentionally omitted <==
==> picture [19 x 17] intentionally omitted <==
==> picture [19 x 17] intentionally omitted <==
1.5M oz Resource / 817,000 oz Reserve (61% proven) Targeting >100,000 oz pa production First gold pour for June Qtr 2010 Greater than 7 year mine life based on current Reserve Ability to generate strong operating cash flow – A$75m pa (based on A$1,400/oz gold price post royalty) Resource & Reserve upgrades planned Project capital funded Construction commencing current quarter
==> picture [713 x 20] intentionally omitted <==
SOCIAL, ECONOMIC & LOCATION BENEFITS
==> picture [17 x 15] intentionally omitted <==
Two kilometres from Westonia town site
==> picture [17 x 15] intentionally omitted <==
==> picture [17 x 15] intentionally omitted <==
==> picture [17 x 15] intentionally omitted <==
Westonia community very supportive of Project Drive in/drive out roster
-
3 hours by road from Perth
-
3 hours drive from Kalgoorlie
-
Less for local residents
-
4 hours by train from Perth or Kalgoorlie
Employment
-
180 peak construction (commence in May 09)
-
110 full time operational jobs (mid 2010)
==> picture [257 x 252] intentionally omitted <==
- Source 30 – 60 % of workers from local region
==> picture [17 x 15] intentionally omitted <==
Committed to sustainable development for local communities
==> picture [708 x 60] intentionally omitted <==
CORPORATE SNAPSHOT
(As at 4 April 2009[1] )
Capital Structure
1,113M shares Options:
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
-
38m listed @ 10 c, expire June 2010
-
173m listed @ 10 c, expire Oct 2011
-
23m unlisted @ 6 – 14 c, various expiries
-
Up to 133.3m unlisted @ 7.5c, expire Mar 2014[2]
Market cap $87M @ 7.8cps (5[th] May 09) Market cap/Resource oz $58 Market cap/Reserve oz $106
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [272 x 183] intentionally omitted <==
----- Start of picture text -----
CAH share price (June 08 – May 09)
$0.10
$0.09
$0.08
$0.07
$0.06
$0.05
$0.04
$0.03
$0.02
$0.01
$0.00
Source: IRESS
Jun-08Jun-08 Jul-08Aug-08Aug-08Sep-08Oct-08Oct-08Nov-08Dec-08Dec-08Jan-09Feb-09Mar-09Mar-09Apr-09
----- End of picture text -----
Supportive Shareholder Base
Lion Selection (49.3%) supportive $35.4M raised via:
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
-
Placement ($31.4m); and
-
Share Purchase Plan ($4m underwritten)
-
Placement has seen the introduction of a number of long term supportive shareholders – both domestic and offshore
==> picture [15 x 14] intentionally omitted <==
SPP offered the opportunity for all shareholders to participate
==> picture [15 x 14] intentionally omitted <==
-
1 Assumes 450.2m shares issued under the second tranche of placement announced on 30 March 2009 (subject to shareholder approval). Also assumes that a minimum of $4m is raised under the SPP representing the underwritten amount
-
2 To be issued to Macquarie Bank in conjunction with a $10m mezzanine finance facility (Facility). Half of the options are to be issued by 15 May 2009 with the other half only issued if funds are drawn down under the Facility
==> picture [713 x 20] intentionally omitted <==
AN EXPERIENCED BOARD
==> picture [122 x 447] intentionally omitted <==
JOHN ROWE, Non-Executive Chairman
John Rowe brings a wealth of geological and business development skills to the Company. Mr Rowe has 35 years experience within the Nickel and Gold industries of Western Australia. He has held a variety of positions in mine management, exploration and business development and was previously employed as an executive of Lion Ore in Australia. Mr Rowe is also a Non Executive Director of Panoramic Resources Limited (PAN)
NIGEL JOHNSON, Non-Executive Director
Mr. Johnson is a Charted Accountant with strong finance and management experience attained over a period of 36 years in both publicly listed and private companies and within a number of industries. Mr Johnson has significant expertise in financial management, equity and debt raisings, treasury and financial risk management and strategic and business planning. Most recently, Mr. Johnson was Chief Financial Officer for Straits Resource Limited, responsible for the financial, commercial and treasury activities of the Straits Group. Mr Johnson is also a non-executive director of Matrix Composites and Engineering Limited.
BARRY SULLIVAN, Non-Executive Director
Mr. Sullivan is an experienced and successful mining engineer with a career spanning 40 years. His initial mining experience was gained in the South African gold mining industry, followed by more than 20 years with Mount Isa Mines. In the final 5 years of his tenure with MIM, Mr Sullivan was Executive General Manager responsible for the extensive Mount Isa and Hilton operations. More recently, Mr Sullivan has been working with a number of smaller exploration and mining companies. Presently Mr Sullivan is a non-executive and Chairman of Exco Resources Limited, Non-Executive Director of Lion Selection Limited and a non-executive Director of Sedimentary Holdings.
MURRAY POLLOCK, Non-Executive Director
Murray Pollock is a businessman with 40 years experience within the mineral resource sector, principally in drilling. Mr Pollock is a drilling and mine management services consultant for several companies.
==> picture [713 x 20] intentionally omitted <==
STRONG MANAGEMENT TEAM
==> picture [122 x 447] intentionally omitted <==
BRUCE MCFADZEAN, Managing Director
Mr McFadzean, 51, a mining engineer, brings over 30 years of management, mining, processing and project "start up" experience to the organisation, half of which was gained in the employ of global resources brands, Rio Tinto and BHP Billiton. Mr McFadzean has broad commodity experience in gold, iron ore, diamonds and nickel/cobalt and in a wide range of roles including corporate, managerial, technical and operational. Mr McFadzean is a non-executive director of Venture Minerals Limited.
ERIK PALMBACHS, Chief Financial Officer
Mr Palmbachs is an experienced CFO and holds an MSc in Mineral Economics and a Bachelor of Business (Accounting). He is a member of the Australian Society of Accountants (AASA, CPA) and has an impressive resume with over 30 years hands-on experience, much of which was gained in the resources sector.
STUART PETHER, General Manager - Operations
Mr Pether is an experienced Mining Engineer and holds a BEng (Mining) with an impressive resume with over 20 years hands-on and technical experience in the resources sector. Mr Pether has worked in various operational, managerial, technical and corporate roles in Australia and Canada in his career covering several commodities predominately in gold, nickel and zinc. Mr Pether is equally skilled in both open pit and underground mining environments.
==> picture [713 x 20] intentionally omitted <==
Flyover
==> picture [15 x 13] intentionally omitted <==
Catalpa Voice 120209.wmv
==> picture [708 x 60] intentionally omitted <==
CURRENT RESOURCE & RESERVE
| Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
Edna May Gold Project Mineral Resource Statement Reported to 0.5g/tAu cut-off |
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Measured | Indicated | Total Measured & Indicated | Inferred | Total Measured, Indicated & Inferred |
|||||||||||
| Million Tonnes |
Gold g/t |
'000 Ounces |
Million Tonnes |
Gold g/t | '000 Ounces |
Million Tonnes |
Gold g/t | '000 Ounces |
Million Tonnes |
Gold g/t | '000 Ounces |
Million Tonnes |
Gold g/t | '000 Ounces |
|
| Greenfinch | 0.71 | 1.26 | 29 | 2.03 | 1.15 | 75 | 2.74 | 1.18 | 104 | 0.45 | 1.2 | 17 | 3.19 | 1.18 | 121 |
| Edna May | 16.56 | 1.15 | 615 | 13.32 | 1.13 | 484 | 29.88 | 1.14 | 1,099 | 8.36 | 1.0 | 267 | 38.24 | 1.11 | 1,366 |
| TOTAL | 17.27 | 1.16 | 644 | 15.35 | 1.13 | 559 | 32.62 | 1.14 | 1,203 | 8.81 | 1.0 | 284 | 41.43 | 1.11 | 1,487 |
==> picture [626 x 164] intentionally omitted <==
==> picture [117 x 106] intentionally omitted <==
A$1,025 gold price used in modelling (EM) A$1,250 (GF) 817,000 oz Reserve (61% Proved) 273,000 oz or 50% Reserve growth since Oct 2008
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
FEASIBILITY STUDY UPDATE
==> picture [124 x 333] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
Average production of more than 100,000 oz/pa 91.6% recovery rate Mill on site ready to construct Processing 2.8 Mtpa of ore ramping up to 3.2 Mtpa LOM Cash operating cost of A$636/oz (pre-royalty) LOM Cash operating margin totals A$343M at A$1,200/oz gold price A$92M capex (including pre-strip) Government Approvals imminent and infrastructure available
==> picture [708 x 60] intentionally omitted <==
2008 FEASIBILITY STUDY – EDNA MAY PIT
==> picture [604 x 322] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
-
58 Mt mined
-
19 Mt ore
-
39 Mt waste
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
-
2:1 strip ratio
-
6.3 years processing 4 stage cutback
==> picture [117 x 106] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
PROCESS PLANT UPDATE
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
CIL circuit Mine to Mill strategy Reduced SAG feed size Reduced pebble crush size Increase gravity circuit capacity 60% increase in leach/absorption capacity
==> picture [502 x 256] intentionally omitted <==
==> picture [117 x 106] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
OPEN PIT DESIGNS AND SITE LAYOUT
==> picture [547 x 337] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
Greenfinch now included in LOM plan
Greenfinch and Edna May Reserve growth positive Further drilling planned for 2009/10
==> picture [117 x 106] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
OPEN PIT & UNDERGROUND POTENTIAL
==> picture [14 x 13] intentionally omitted <==
==> picture [531 x 367] intentionally omitted <==
==> picture [117 x 106] intentionally omitted <==
Open pit expansion to….. Underground potential expanding on 2008 drilling success
==> picture [713 x 20] intentionally omitted <==
Edna May Gold Project Reserve Growth Potential
==> picture [708 x 436] intentionally omitted <==
----- Start of picture text -----
Edna May Gold Project - Ore Reserve Upgrade Path
1,400,000
1.20M
1,200,000
1,000,000
800,000
600,000
2009/12 Reserve Growth Path
400,000
2008/09 Reserve
200,000 Growth Path 50%
-
Planned Ore Reserve growth to 1.25M ounces
Reserve growth projected to twice Edna May’s historical production of 630,000 ounces
Ounces
----- End of picture text -----
FAVOURABLE VALUATION METRICS
==> picture [538 x 356] intentionally omitted <==
----- Start of picture text -----
A$ Mkt Cap/Oz Au Reserves and Resources
700
600
500
400
300
200
100
0
Avoca Sino Gold Andean Kingsgate Allied St Barbara Catalpa Norton Red 5 Integra Navigator
Ev/ Oz Au Reserves Ev/ Oz Au Resources
----- End of picture text -----
- Proforma adjusted for A$92M Edna May funding
==> picture [708 x 60] intentionally omitted <==
FAVOURABLE VALUATION METRICS
==> picture [548 x 354] intentionally omitted <==
----- Start of picture text -----
Catalpa production estimate compared to
selected 2008 Australian gold producers
350
307
300
250
202
200
151
150
130
107
100+
100
66
58
50
0
Resolute St Barbara Sino Norton Dominion Catalpa Kingsgate Troy
Market Cap
(A$m) 211.6 418.3 1,593 65.1 540.7 87.0 575.6 93.2
30/4/09
'000 Oz Au
----- End of picture text -----
==> picture [117 x 106] intentionally omitted <==
Source: Production for 12 months ended 31 December 2008 Catalpa estimate
==> picture [713 x 20] intentionally omitted <==
PROJECT FINANCING
==> picture [120 x 328] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
Capex of A$92M (including pre-strip)
A$67.5M project finance facility in place
Comprising
-
A$55M secured loan
-
Up to A$10M mezzanine facility
-
A$2.5M performance bond faculty
-
Gold hedge at A$1,544 per ounce for 352koz of gold (Represents 24% of Edna May Gold Project Mineral Resource )
-
Macquarie to be issued up to $10M of options with a 7.5 c exercise price. If the mezzanine facility is not drawn only half options will be issued
A35.4M raised from equity
-
$31.4M placement announced 31 March 2009 (subject to shareholder approval)
-
Lion committedA$15m to placement & A$2m of SPP underwriting
-
SPP planned for all shareholders (A$4m underwritten)
-
Austock Corporate Finance managing the equity raising
==> picture [708 x 60] intentionally omitted <==
PROJECT TIMELINE – MILESTONES TO MONITOR
==> picture [635 x 316] intentionally omitted <==
==> picture [117 x 106] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
Commence construction May 2009 Commissioning April 2010 First gold June 2010
==> picture [15 x 14] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
CATALPA UPSIDE FROM FEASIBILITY STUDY
==> picture [122 x 345] intentionally omitted <==
==> picture [117 x 133] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
Reduced capital
Reduced operating costs
Greenfinch Open Pit
-
Reserve in April 2009
-
Further drilling to west 2009
-
Further drilling at depth 2009/10
Edna May Open Pit
-
Final pit re-optimised at higher gold price June quarter 2009
-
Further drilling below FS pit September quarter 2009
Underground opportunity
-
Continued geological review of underground mineralisation
-
– Plan for further drilling 2009/10
==> picture [117 x 106] intentionally omitted <==
Conclusion
-
Growth of Reserves in 2009 & 2010
-
Improved Feasibility Study production profile from 2010
CATALPA VALUE PROPOSITION
==> picture [122 x 345] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 13] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
Experienced team with track record of delivering projects Favourable valuation metrics Well defined and understood resource – upside potential Feasibility Study completed and assumptions conservative Debt funding complete and Equity financing almost complete Supportive major shareholder (Lion Selection @ 49.3%) Favourable environment to negotiate capital & operating costs Plant on site and most permits issued Grid power and town infrastructure adjacent to the project Strong cash margin provides a platform for growth
==> picture [708 x 60] intentionally omitted <==
CONTACT
==> picture [135 x 346] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
==> picture [15 x 14] intentionally omitted <==
Bruce McFadzean Managing Director Catalpa Resources Limited Tel (08) 9321 3088 Warrick Hazeldine Investor Relations PurpleCommunications Tel (08) 9485 1254
www.catalparesources.com.au
==> picture [117 x 106] intentionally omitted <==
==> picture [713 x 20] intentionally omitted <==
COMPETENT PERSONS
The exploration data have been supplied according to the JORC Code for the reporting of Mineral Resources and Ore Reserves by Mr Nick Winnall (Exploration Manager), a full-time employee of Catalpa Resources Limited. Mr. Winnall is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2004 edition of the “Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr. Winnall consents to the inclusion in the report of the matters based upon his information in the form and context in which it appears.
The information in this report that relates to mineral resources is based on work completed by Mr Nicolas Johnson, who is a Member of the Australian Institute of Geoscientists. Mr Johnson is a full time employee of Hellman and Schofield Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Johnson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to mineral reserves is based on work completed by Mr Harry Warries, who is a Member of the Australian Institute of Geoscientists. Mr Warries is a full time employee of Coffey Mining and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Warries consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.