Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EV RESOURCES LTD Investor Presentation 2026

Feb 10, 2026

64887_rns_2026-02-10_98d0560f-315b-43d9-8e95-de37bffc1a20.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

ASX:EVR

==> picture [476 x 56] intentionally omitted <==

High-Grade Antimony. Near-Term Production. North Americas Focus

Corporate Presentation February 2026

DISCLAIMER

Disclaimer

This presentation has been prepared by EV Resources Limited (ASX: EVR) (EVR or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentation is not to be distributed (nor taken to have been distributed) to any persons in any jurisdictions to whom an offer or solicitation to buy shares in the Company would be unlawful. Any recipient of the presentation should observe any such restrictions on the distribution of this presentation and warrants to the Company that the receipt of the presentation is not unlawful. It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation or any information, opinions or conclusions expressed in the course of this presentation. This presentation is not a prospectus, product disclosure document or other offering document under Australian law or under any other law. It has been prepared for information purposes only and is not a recommendation as to whether to invest in EVR shares. The information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. Unless otherwise specified, data and tables set out in this presentation are based on EVR management estimates.

This presentation does not include all available information on EVR, and any potential investor should also refer to EVR’s Annual Reports and ASX releases and take independent professional advice before considering investing in EVR.

No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of EVR or its directors, or any of their employees or agents, nor any other person accepts any liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, projections, prospects or returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies. Past performance is no guarantee of future performance.

This presentation may contain “forward-looking statements” within the meaning of securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “believe”, “continue”, “objectives”, “outlook”, “guidance” or other similar words, and include statements regarding certain plans, strategies and objectives of management and expected financial performance.

These forward-looking statements involve known and unknown risks, uncertainties and other factors, many of which are outside the control of EVR and any of its officers, employees, agents or associates. Actual results, performance or achievements may vary materially from any projections and forward-looking statements and the assumptions on which those statements are based. Readers are cautioned not to place undue reliance on forward-looking statements and EVR assumes no obligation to update such information.

This presentation contains information relating to exploration results extracted from ASX announcements reported previously in accordance with the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (2012 JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement

The information in this release that relates to Exploration Results is based on information compiled by Mr Mike Brown who is a Member of the Australian Institute of Geoscientists (MAIG). Mr Brown is the MD and CEO of EVR. Mr Brown has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Brown consents to the inclusion in this announcement of the matters based on information in the form and context in which it appears.

This presentation was authorised for release by the Board of EV Resources Limited.

2

EVR VISION: MEET NEAR-TERM ANTIMONY DEMAND IN NORTH AMERICA, STRATEGICALLY LEVERAGING THE CRITICAL MINERALS SUPPLY GAP

==> picture [255 x 117] intentionally omitted <==

----- Start of picture text -----

100%
Ownership
NEVADA ANTIMONY PROJECTS:
DOLLAR & MILTON
----- End of picture text -----

Formation of a strategic antimony portfolio in Nevada , acquiring 100% ownership of the past producing Dollar & Milton Projects

70% Ownership

LOS LIRIOS ANTIMONY PROJECT

==> picture [284 x 43] intentionally omitted <==

----- Start of picture text -----

TECOMATLAN PROCESSING PLANT
----- End of picture text -----

Los Lirios is uniquely positioned to become a potential world class, highgrade, low-impurity source of antimony for US & global markets.

EVR has secured a 150-tonne-per-day (TPD) processing plant providing strategic, near-term production with increased scalable potential and nearby ore sourcing

3

INVESTMENT RATIONALE

NEAR TERM PRODUCTION OPTIONS

LONGER TERM SUPPLY

VALUE DRIVERS

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [53 x 53] intentionally omitted <==

Tecomatlán Plant

Nevada Antimony Projects

to support US domestic supply initiatives

  • Process artisanal ore, following refurb and upgrade - scalable

  • Milton (historical production ~30T, avg 40% Sb)[3,] and

  • Pilot plant for Los Lirios

  • Dollar (historical production ~30T assays to 40.63% Sb)[4]

  • Advance design and permitting for Phase 2 Floatation

High Discovery to Production Potential:

Los Lirios Antimony Project

==> picture [53 x 54] intentionally omitted <==

  • High-grade inc 29.2% Sb from stockpiles and up to 15.3% Sb from Los Lirios Pit 1[ 1]

  • Dollar: up to 15.05% Sb, 17.8% Cu and >10,000ppm Ag[5]

  • Milton: up to 9.82% Sb, 24.0% Cu and 434ppm Ag[6]

  • Historical production of direct shipping ore ("DSO") antimony from total of 7 open pits

==> picture [53 x 54] intentionally omitted <==

  • Nevada is a top mining jurisdiction, also where the designated US Army Critical metals Depot is located.

  • Significant scale potential from >6km structural corridor, with parallel trends

  • Simple metallurgy showing Downstream Processing: EVR is 90.8% recovery of Sb[ 2] evaluating potential processing

  • • facility in Nevada Maiden drill program commenced 31 January 2026

==> picture [53 x 54] intentionally omitted <==

==> picture [53 x 53] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 53] intentionally omitted <==

Antimony critical defence sector metal, with supply dominated by China (60-70%) and Russia (10-20%)

Leveraged to benefit from significant geopolitical trends and strategic supply chain security programs and US govt funding

SUCCESS DRIVERS

Refreshed management team

Experienced Board with strong global mining and project delivery experience and a strong in-country management team

Strong Balance Sheet : $3.2m cash 31 Dec 2025 Strong institutional backing from Tribeca plus strategic offtake and financing MoUs with Wogen/XCLR

Sources: 1. ASX Announcement “High Grade Antimony Samples from Los Lirios” dated 12 February 2025,. 2. Exceptional Antimony Recovery Confirmed at Los Lirios” dated 16 Dec 2025. 3. “Acquisition of High-Grade Milton Antimony Project” dated 26 Sep 2025 4. “EVR Acquires 100% of High-Grade Dollar Antimony Project” dated 10 Sep 2025. 5 "High-grade Antimony, Copper and Silver confirmed at Dollar" dated 27 Jan 2026. 6. "High-Grade Critical Metal Results Enhance US Pipeline" dated 28th Jan 2026.

4

ANTIMONY MARKET: SUPPLY, DEMAND, OPPORTUNITY

==> picture [63 x 64] intentionally omitted <==

==> picture [63 x 65] intentionally omitted <==

==> picture [63 x 64] intentionally omitted <==

GROWING DEMAND

  • Forecast to grow significantly (~6.5% CAGR to 2032[1] ) due to increased demand from diverse applications including

  • Flame retardants

  • Energy storage

  • Alloys

  • Military and defence

SUPPLY CHAIN VULNERABILITY

  • Global supply highly concentrated with China controlling 60% production and ~90% refining capacity, presenting significant risk.

  • Recent actions by dominant suppliers (eg China’s export controls) create significant uncertainty/price volatility.

PRICING IMPLICATIONS

  • Global reserves are finite, and easily accessible, high-grade deposits are becoming rarer.

  • Growing demand meeting concentrated, geopolitically sensitive supply creates a significant supply deficit outlook and pressure for new, diversified sources.

GLOBAL ANTIMONY MINE PRODUCTION 2023[2]

==> picture [391 x 364] intentionally omitted <==

----- Start of picture text -----

40%
35%
30%
25%
20%
36%
15%
28%
10%
19%
5%
6%
4%
3% 2% 2%
0%
----- End of picture text -----

  1. Antimony Market (2024 – 2032) – Fortune Business Insights

5

  1. A Market Under Severe Stress – Critical Minerals Commodity Report February 2025 – RFC Ambrian

US CRITICAL MINERAL SECURITY STRATEGY

The US has a critical, well-funded and non-negotiable need for antimony from reliable, non-adversarial sources, directly aligning with EVR’s strategy of developing Antimony assets in allied jurisdictions (Mexico & USA).

DESIGNATED US CRITICAL MINERAL

US GOVT DOMESTIC/ALLIED SUPPLY INITIATIVES

EVR: THE SOLUTION

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 53] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

National Security:

Critical for defence application (munitions, alloys, night vision) and key infrastructure resilience.

Economic Security:

Essential for advanced tech and manufacturing sectors, incl renewable energy and advanced batteries.

Dependence Risk:

US is 99% reliant on foreign sources for its primary antimony supply, posing strategic vulnerability.

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 53] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 53] intentionally omitted <==

Defence Protection Act (DPA):

US$1B of funding and support for projects that strengthen domestic supply chains. OBBB Act:

+US$7.5B to strengthen US supply chains and replenish DoW stockpiles from domestic/allied sources.

Infrastructure Investment & Jobs Act: +US$6.4B to advance critical minerals processing, batteries and recycling.

US-AUS Framework:

+US$3B joint pledge to invest in a pipeline of critical minerals projects in both countries.

US-Mexico Joint Action Plan on Critical Metals:

Joint initiative to identify critical metal projects for prioritisation, funding and product price floors

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 54] intentionally omitted <==

==> picture [54 x 53] intentionally omitted <==

==> picture [54 x 53] intentionally omitted <==

Secure Dual Supply:

Stable, ‘allied-friendly’ source of near-shore (Mexico) and domestic (Nevada) supply.

Fast-Track:

Tecomatlán provides nearterm production opportunity.

Grade is King:

Los Lirios offers high-grade low impurity stibnite supply potential.

US Hub:

Nevada projects strategically close to the Hawthorne Stockpile and DoW.

6

Source: (1) Discovery Alert

ASSET PORTFOLIO

==> picture [549 x 387] intentionally omitted <==

----- Start of picture text -----

DOLLAR MILTON DON ENRIQUE ESTRELLA
ANTIMONY ANTIMONY COPPER COPPER
PROJECT PROJECT PROJECT PROJECT
COMMODITY FOCUS COMMODITY FOCUS COMMODITY FOCUS COMMODITY FOCUS
Antimony Antimony Cu-Au-Ag Cu-Au-Ag
LOCATION LOCATION LOCATION LOCATION
USA USA Peru Peru
Nye County, Nye County, Jauja, Jauja,
Nevada Nevada Central Peru Central Peru
EVR OWNERSHIP EVR OWNERSHIP EVR OWNERSHIP EVR OWNERSHIP
100% 100% 50% 100%
----- End of picture text -----

==> picture [69 x 46] intentionally omitted <==

==> picture [69 x 46] intentionally omitted <==

LOS LIRIOS TECOMÁTLAN ANTIMONY PROCESSING PROJECT PLANT

DOLLAR ANTIMONY PROJECT

ESTRELLA COPPER PROJECT

COMMODITY FOCUS COMMODITY FOCUS Antimony Antimony

COMMODITY FOCUS Antimony

COMMODITY FOCUS Cu-Au-Ag

LOCATION LOCATION LOCATION Mexico Oaxaca Mexico Puebla USA State, Zapotitlan State, 50km from Nye County, Lagunas Los Lirios Nevada

Peru Jauja, Central Peru

EVR OWNERSHIP EVR LEASE WITH OPTION TO PURCHASE 100% 70%

EVR OWNERSHIP

EVR OWNERSHIP

7

==> picture [20 x 22] intentionally omitted <==

LOS LIRIOS

LOS LIRIOS ANTIMONY PROJECT LARGE-SCALE, HIGH-GRADE ASSET WITH DE-RISKED PATH TO NEAR-TERM PRODUCTION

==> picture [447 x 450] intentionally omitted <==

==> picture [75 x 75] intentionally omitted <==

MATERIAL OWNERSHIP

70% share of historically producing antimony mine in Oaxaca Mexico

==> picture [75 x 76] intentionally omitted <==

HIGH-GRADE POTENTIAL

Initial samples up to 29.2% Sb and positive, low impurity met work (90.8% recovery from a 4.45% Sb composite)[1]

==> picture [75 x 75] intentionally omitted <==

LARGE-SCALE POTENTIAL

  • 1,552h across three

  • concessions provides significant resource scale potential

==> picture [75 x 76] intentionally omitted <==

PATHWAY TO JORC

Maiden drill

program commenced Jan 2026 to prepare for Maiden JORC Resource

==> picture [75 x 75] intentionally omitted <==

DISCOVERY POTENTIAL

Historic open pits and shallow WWII period underground workings

==> picture [75 x 76] intentionally omitted <==

COMMERCIALLY DE-RISKED

Strategic partnership with Wogen for offtake and funding for up to USD$3M for mine production restart

9

Refer ASX Announcement “Acquisition of Los Lirios Antimony Mine (EVR:70%), Mexico dated 28 January 2025

LOS LIRIOS ANTIMONY PROJECT LARGE-SCALE STRUCTURAL SYSTEM

High-grade mineralisation hosted in a geologically significant structural setting

==> picture [47 x 47] intentionally omitted <==

Located in the northern part of the Mixteca Terrane, Oaxaca, a complex region known for its metal endowment

==> picture [47 x 47] intentionally omitted <==

Mineralisation primarily hosted in middle and upper Jurassic limestones, conglomerates and shales

==> picture [47 x 46] intentionally omitted <==

Structurally controlled hydrothermal system with antimony occurring as the sulphides stibnite and its oxide form, stibiconite

==> picture [47 x 46] intentionally omitted <==

Lirios Fault Zone (LFZ) acts as the . principal fluid conduit Mineralisation occurs as quartzstibnite veining and brecciation along the anticline axis

==> picture [359 x 448] intentionally omitted <==

==> picture [289 x 220] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

Ductile gypsum layers acted as a barrier/cap, forcing fluids laterally to form flat-lying Carbonate Replacement Deposits (CRD) 2-5m thick

==> picture [47 x 47] intentionally omitted <==

Drilling testing two distinct styles of mineralisation

  1. Vertical high-grade feeders (LFZ)

  2. Horizontal high-tonnage replacement bodies (CRD)

10

LOS LIRIOS ANTIMONY PROJECT MAIDEN DRILL PROGRAM :Q1 2026

Systematic exploration (mapping, trenching, and sampling) to define ‘walk-up’ drill targets and advance the high-grade project towards a Maiden MRE

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 48] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

    • 5km of new and

reconditioned roads completed for key access

Detailed mapping and trenching across 3 priority

zones identified widespread Stibnite mineralisation

27 trenches completed and 310 channel samples collected along 5km mineralised structure to confirm structural continuity and expose fresh rock

First-ever test of the Lirios Fault Zone at depth. Targeting high-grade extensions beneath historical pits over ~900m strike.

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

High-grade results from initial work include[1] :

  • 29.2% Sb from stockpiles

  • Samples up to 15.3% Sb from Los Lirios Pit 1

Flora and fauna studies have not indicated any at risk or protected species

1.5-2km maiden diamond drill program commenced Jan 31st 2026. Designed to test high-priority areas from mineralisation model

Extensive 2026 campaign, to define Maiden JORC Resource Q3 CY 2026

==> picture [441 x 362] intentionally omitted <==

Sources: 1. ASX Announcement “High Grade Antimony Samples from Los Lirios” dated 12 February 2025

11

LOS LIRIOS ANTIMONY PROJECT PHASE 1 DRILL PROGRAM TARGETING SCALE & GRADE

==> picture [541 x 451] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [46 x 46] intentionally omitted <==

PROGRAM SCOPE

  • Diamond Drilling (HQ Core) for optimal structural definition

  • 1,500m – 2,000m Phase 1

  • Funded from existing cash reserves

TARGETS

  • Testing ~900m of the broader 4km system

  • Immediate extensions beneath historical high-grade workings (Lirios 1 and Lirios 2)

  • Testing the intersection of the main LFZ and cross-cutting NW-SE faults (high-grade enrichment zones)

GEOLOGICAL UPSIDE

  • Vertical: High-grade veins in the main fault

  • Horizontal: Potential for CRD style replacement bodies (1-5m thick) trapped beneath gypsum caps – indicative of a larger volume potential

12

LOS LIRIOS ANTIMONY PROJECT SIMPLE, TWO-STEP GRAVITY PROCESSING PATH IDENTIFIED, 90.8% Sb RECOVERY

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 48] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

Channel sampling across historic pits for a representative sample for met testing returned an average Composite Grade of 4.45% Sb[1]

Preliminary test work results:

  • Sb recovery of 90.8% via simple two-stage gravity concentration. Excellent separation efficiency with low tailing grade of 0.37% Sb[2]

  • Commercial grade concentrate of 22%-36% Sb produced

Highlights a simple, low-cost (both CAPEX and OPEX) production pathway

Utilising a reagent-free process that simplifies permitting, providing a fast path option to operation

Separate high-grade sulphide sample returned 99.2% Recovery via flotation, producing a ~50.7% Sb concentrate[2]

==> picture [287 x 85] intentionally omitted <==

----- Start of picture text -----

Antimony 69.5% 30.5%
Minerals Stibiconite Stibnite
----- End of picture text -----

LOS LIRIOS: 3 STOCKPILE SAMPLES

==> picture [228 x 335] intentionally omitted <==

----- Start of picture text -----

SP-1 SP-2 SP-3
Average Composite
Grade 4.45% Sb
29.2% Sb
20.4% Sb
18.1% Sb
----- End of picture text -----

==> picture [280 x 210] intentionally omitted <==

----- Start of picture text -----

WWII aditsexposed in historical
(modern) open pit: Lirios 1 Pit
----- End of picture text -----

==> picture [279 x 258] intentionally omitted <==

----- Start of picture text -----

Maidendrill program commenced 31 January
----- End of picture text -----

13

Refer ASX Announcement 1 “High Grade Antimony and fast-track production potential at Los Lirios” dated 2 July 2025 and 2: “Exceptional Antimony Recovery Confirmed at Los Lirios” dated 16 Dec 2025.

TECOMATLÁN PROCESSING PLANT LOW CAPEX, PERMITTED PLANT READY TO REFURBISH ALLOWING RAPID RESTART

The acquisition of the Tecomatlán Plant firmly positions EVR as a first mover in North American antimony supply, underpinning its strategy to fast-track development and production of this critical mineral.

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

150 tpd nameplate capacity with upgrade potential

Phase 1: Refurbishment

  • Modernise crushing and grinding circuits, install simple high recovery gravity concentrators ( 90.8%Sb recovery )

  • ✓ Low CAPEX

  • ✓ Simple Permitting

Phase 2: Add Floatation/Leaching

Expected optimal processing for sulphide ore, subject to met testing from drill core.

✓ Initial recovery of 99.2%

Sb from high-grade Sb sample (31.2% Sb).

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

Short Term Production Path:

Processing of artisanal ore would provide both a short-term production timeline and direct and indirect community benefits

  • Only 50 km from Los Lirios with grid power 100m from site. Provides potential for low operating expenses

  • Option to purchase price USD 1.8 million ,

including staged lease payments, preserving working capital

==> picture [417 x 336] intentionally omitted <==

14

Refer ASX Announcement “High Grade Antimony and fast-track production potential at Los Lirios” dated 2 July 2025 and “High Grade Antimony Samples from Los Lirios” dated 12 February 2025, and “Exceptional Antimony Recovery Confirmed at Los Lirios” dated 16 Dec 2025.

TECOMATLÁN PROCESSING PLANT DE-RISKED ENGINEERING & REFURBISHMENT EXECUTION STRATEGY FOR Q1 CY2026

Installation design complete, including equipment and contracting costings

PHASE 1: TWO-STAGE GRAVITATIONAL PROCESSING

Construction Activities:

  • Refurbishment and realignment of crushing circuit

  • Commissioning of existing ball mills

  • Installation of 2 gravity concentrators, tailings thickener and filter press

  • Installation of compressed natural gas gensets and grid connection for power options

Simple Permitting:

  • Prepare Informe Preventitivo for Refurbishment of Tecomátlan plant

  • 20 day Q&A period and commence construction

Metallurgy:

  • Collect sample ore from artisanal miners for gravitational testing

PHASE 2: FLOATATION/LEACHING PROCESSING

Metallurgy:

  • Collect representative sample core from mineralisation to establish optimal processing path

==> picture [564 x 255] intentionally omitted <==

----- Start of picture text -----

Plant Equipment
----- End of picture text -----

==> picture [282 x 213] intentionally omitted <==

----- Start of picture text -----

Existing Ball Mills
----- End of picture text -----

==> picture [282 x 211] intentionally omitted <==

----- Start of picture text -----

Crushing Circuit
----- End of picture text -----

15

Refer ASX Announcement “High Grade Antimony and fast-track production potential at Los Lirios” dated 2 July 2025 and “High Grade Antimony Samples from Los Lirios” dated 12 February 2025, and “Exceptional Antimony Recovery Confirmed at Los Lirios” dated 16 Dec 2025.

TECOMATLÁN PROCESSING PLANT GRAVITY CIRCUIT FLOWSHEET

==> picture [148 x 29] intentionally omitted <==

----- Start of picture text -----

FEEDSTOCK
Source A: Regional Artisanal Ore
Source B: Los Lirios ‘Pilot Ore’
----- End of picture text -----

==> picture [154 x 19] intentionally omitted <==

----- Start of picture text -----

GRADE: 22% - 36% Sb
MARKET: Direct to Smelter/Offtake
----- End of picture text -----

Safe, dry, environmentally benign storage TAILINGS GRADE: Extremely low (~0.37% Sb)

16

LOW IMPACT PROCESSING IMPLEMENTING DRY-STACK TAILINGS AT TECOMATLAN

==> picture [46 x 47] intentionally omitted <==

==> picture [46 x 47] intentionally omitted <==

==> picture [46 x 47] intentionally omitted <==

==> picture [46 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

DRY-STACK TAILINGS (DST)

Utilise filter press technology to remove water from waste material, creating a stable, ‘dry’ cake

Eliminates need for traditional dams, significantly lowering potential negative environmental impacts.

+85% of process water is recovered and immediately recycled back into the plant – reducing the project’s freshwater footprint.

DST requires significantly less land area than traditional tailings dams, preserving the surrounding local ecosystem.

DST facilities significantly reduce tailing storage facility (TSF) failure risk.

Proposed gravity-only concentration in Phase 1 means tailings are chemically benign and easier to manage.

==> picture [567 x 424] intentionally omitted <==

----- Start of picture text -----

TecomatlanPlant
----- End of picture text -----

17

==> picture [417 x 233] intentionally omitted <==

NEVADA ANTIMONY PROJECTS

DOLLAR ANTIMONY PROJECT HIGH-GRADE, HISTORICALLY PROVEN PROSPECT FOR US DOMESTIC SUPPLY

==> picture [375 x 448] intentionally omitted <==

DOLLAR ANTIMONY PROJECT

HIGH-GRADE POTENTIAL

==> picture [47 x 46] intentionally omitted <==

  • Historical assays up to 40.63% Sb , with modern sampling up to 1.0% Sb , alongside Ag, Pb and Cu credits.

==> picture [47 x 48] intentionally omitted <==

STRATEGIC LOCATION

  • 8 claims, 160ac, in the Jett Mining District, ~100km from US Hawthorne Military storage facility.

==> picture [47 x 47] intentionally omitted <==

KEY STRUCTURAL SETTING

Toiyabe Range east slope at highly prospective contacts of Tertiary volcanics and Paleozoic sediments.

==> picture [47 x 46] intentionally omitted <==

HIGH-GRADE CIRITICAL METALS

  • Sampling of Historic works:

  • Up to 15.05% Sb, 17.8% Cu and >10,000ppm Ag

==> picture [47 x 47] intentionally omitted <==

EXISTING ACCESS IN PLACE

Development includes three adits (>400 ft total) and 30ft inclined shaft.

==> picture [47 x 46] intentionally omitted <==

INFRASTRUCTURE PROXIMAL

Road accessible, close to Nevada State Route 376 within 15km of Round Mountain operation.

==> picture [252 x 299] intentionally omitted <==

==> picture [46 x 47] intentionally omitted <==

EXPLORATION TO TARGET WWII WORKINGS

  • Two trends followed by historical adits.

  • • Quartz-stibnite vein observed in roof of adit offers highly prospective initial target.

  • 2026 fieldwork to establish geochemical grid over the tenements.

  • Review utilisation of geophysical survey (CSAMT & others).

19

Sources: ASX Announcement "High-grade Antimony, Copper and Silver confirmed at Dollar" dated 27 Jan 2026.

DOLLAR ANTIMONY PROJECT HIGH-GRADE MULTIPLE SYSTEM CRITICAL METAL PROJECT

==> picture [468 x 437] intentionally omitted <==

==> picture [482 x 437] intentionally omitted <==

20

Sources: 1 ASX Announcement "High-grade Antimony, Copper and Silver confirmed at Dollar" dated 27 Jan 2026.

MILTON ANTIMONY PROJECT HIGH-GRADE, HISTORICALLY PROVEN PROSPECTS FOR US DOMESTIC SUPPLY

==> picture [47 x 46] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 46] intentionally omitted <==

==> picture [46 x 47] intentionally omitted <==

==> picture [46 x 47] intentionally omitted <==

MILTON ANTIMONY PROJECT

HISTORICAL PRODUCTION

30 tons at avg 40% Sb . Historical assays up to 20.77% Sb from stockpiles and 12% Sb in workings.

POTENTIAL ANTIMONY HUB

  • ~80km from DoD Critical Minerals Storage and Army Depot on the Shoshone Range Western Flank.

FAVOURABLE GEOLOGICAL SETTING

  • Structurally controlled stibnite oxide mineralisation within Triassic Limestone, assoc Ag/Au credits.

HIGH-GRADE MINERALISATION

Sampling of Historic workings

  • Up to 9.82% Sb, 24.0% copper and 434ppm Ag

EXISTING INFRASTRUCTURE

Road accessible, close to Nevada State Route 376, within mining-friendly jurisdiction.

HISTORICAL WWII PRODUCTION

Evidence of 3-4 historical mining phases observed in shafts, adits and open pits.

  • Stibnite and copper oxides present point

2026 EXPLORATION PROGRAM Q2

Early-stage exploration program to be developed, focusing on southern area where stibnite observed. Expected to commence in April due to northern hemisphere winter.

==> picture [171 x 228] intentionally omitted <==

----- Start of picture text -----

-
MH 04: 2.44% Cu, 0.79% Sb
and 108ppm Ag
----- End of picture text -----

==> picture [376 x 450] intentionally omitted <==

==> picture [171 x 228] intentionally omitted <==

----- Start of picture text -----

Historical Workings
----- End of picture text -----

21

Sources: 1. ASX Announcement "High-Grade Critical Metal Results Enhance US Pipeline" dated 28th Jan 2026

MILTON ANTIMONY PROJECT HIGH-GRADE CRITICAL METALS-STRONG SYNERGIES

==> picture [400 x 437] intentionally omitted <==

==> picture [400 x 437] intentionally omitted <==

Source. ASX Announcement "High-Grade Critical Metal Results Enhance US Pipeline" dated 28th Jan 2026

22

WORK PROGRAMS AND NEWS FLOW CATALYSTS

LOS LIRIOS ANTIMONY PROJECT MULTIPLE VALUE ACCRETIVE CATALYSTS TO DRIVE VALUE CREATION

PROJECT ACTIVITES
CY26
ACTIVITES
CY26
ACTIVITES
CY26
ACTIVITES
CY26
ACTIVITES
CY26
Q1 Q2 Q3 Q4
Los Lirios
Antimony Project
Mapping, Trenching & Sampling Program
Phase 1 Drilling – Confirmation & Feed Definition
Resource Definition Drilling (Phase 2)
Maiden Resource Estimate & Scoping Study
Tecomatlán
Processing Plant
Pilot Plant Refurbishment & Upgrade
Pilot Plant Commissioning & First Sb Concentrate
Metallurgical Optimisation
Nevada
Antimony Projects
Mapping, Trenching & Sampling Program
Geophysical Surveys
Phase-1 Scout Core Drilling Completed

24

COMMUNITY ENGAGEMENT EMPOWERING OUR HOST COMMUNITIES

EVR is committed to a ‘Community-First’ approach, ensuring that our presence creates a measurable, positive difference for now and in the future

CASE STUDY

Immediate impact and live-saving intervention

The Challenge:

A tragic fatality in early 2025 highlighted critical lack of local medical resources (scorpion antivenom).

The Action:

Upon acquiring Los Lirios, EVR immediately established a dedicated nursing station equipped with specialised scorpion anti-venom.

The Result:

Dec 2025, the facility successfully treated a bitten child, preventing a fatality.

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

==> picture [47 x 47] intentionally omitted <==

EVR’s COMMUNITY INITIATIVES

We focus on four key pillars: Health, Infrastructure, Education, and Economic Circularity

Healthcare:

Launched Telemedicine capabilities at Guadalupe nursing station for remote specialist consultations.

Water Security:

Restored water supply to the Guadalupe and repaired the San Pedro community water truck.

Education:

Completed engineering and design of critical retaining wall at San Pedro Primary School.

Local Community:

Investing in the local village by actively hiring community-owned equipment and workers for exploration.

==> picture [312 x 296] intentionally omitted <==

----- Start of picture text -----

Guadalupe Water Pump Restoration
Guadalupe Primary School Retaining Wall Construction
----- End of picture text -----

25

CORPORATE OVERVIEW

BOARD & MANAGEMENT

==> picture [86 x 86] intentionally omitted <==

SHANE MENERE

Non-Executive Chairman

  • +25 years mining executive and entrepreneur experience including senior executive and director positions across several ASX gold mining and exploration companies.

  • International track-record, leading projects across Australia, Indonesia, and the broader AsiaPacific region.

  • An experienced professional with deep experience supporting globally significant mines into production.

  • Original founder and current Managing Director/CEO of Far East Gold Ltd (ASX:FEG)

==> picture [87 x 86] intentionally omitted <==

MIKE BROWN

Managing Director & CEO

  • 30+ years international mining and energy experience, including senior leadership roles with listed and private resource companies across Australia, North America, Africa, Latin America and the Middle East.

  • Strong track record of building value from exploration to development for junior and major ASX and TSX companies.

  • Extensive experience working with governments and strategic partners to secure long-term development agreements and funding.

==> picture [86 x 86] intentionally omitted <==

JUSTIN WERNER

Non-Executive Director

  • A seasoned mining executive with more than 20 years’ global mining experience, currently the Managing Director of Nickel Industries Limited (ASX: NIC) with operations in Indonesia and a market capitalization of A$3 billion.

  • Successful co-founder and non-executive director of several resource companies including Far East Gold and Alpha HPA, with expertise in building and scaling businesses in nickel, gold, and specialty minerals.

==> picture [86 x 86] intentionally omitted <==

==> picture [86 x 86] intentionally omitted <==

LUKE MARTINO

ADRIAN PAUL

Non-Executive Director

Non-Executive Director

  • Brings over 30 years’ securities • 25+ years experience at partner industry experience, previously & board level with Deloitte and a partner in the respected currently Director of Indian Australian stockbroking firm D.J. Ocean Corporate, a boutique Carmichael. corporate & investment

  • • banking firm in Australia & Has held multiple nonMainland China.

  • Has held multiple nonMainland China.

  • executive directorships of ASXlisted public companies and is • Previously Non-executive skilled in capital raising for Chairman of Magnum Mining & junior explorers. Exploration Limited. (ASX: MGU)

  • • Currently manages a private A Company focused on green metals, Iron Ore and Saudi Steel

  • investment company, development.

  • leveraging extensive networks in stockbroking and investment banking.

27

CORPORATE SNAPSHOT

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 55] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

==> picture [55 x 54] intentionally omitted <==

==> picture [55 x 56] intentionally omitted <==

SHARES ON ISSUE

3.04B

OPTIONS & PERFORMANCE RIGHTS 1.30B

SHARE PRICE AT 30 JAN 2026 0.9c

MARKET CAP AT 30 JAN 2026 $27.36M

52 WEEK HIGH 52 WEEK LOW 1.6c 0.3c

CASH POSITION AT 31 DEC 2025 $3.2M

==> picture [554 x 424] intentionally omitted <==

----- Start of picture text -----

$0.016 60m
$0.014
50m
$0.012
40m
$0.010
$0.008 30m
$0.006
20m
$0.004
10m
$0.002
-
$-
30-Jul 30-Aug 30-Sep 31-Oct 30-Nov 31-Dec
Volume Close
MAJOR SHAREHOLDERS
11.57%
319.3 million 84.32%
Sunshore Holdings Pty Ltd Delta
Other holders
4.11%
3.04m
Tribeca
----- End of picture text -----

28

APPENDIX

Photo of historic working referenced and sampled: refer to ASX Announcement "High-Grade Critical Metal Results Enhance US Pipeline" dated 28th Jan 2026

ASSET PORTFOLIO

==> picture [549 x 387] intentionally omitted <==

----- Start of picture text -----

DOLLAR MILTON DON ENRIQUE ESTRELLA
ANTIMONY ANTIMONY COPPER COPPER
PROJECT PROJECT PROJECT PROJECT
COMMODITY FOCUS COMMODITY FOCUS COMMODITY FOCUS COMMODITY FOCUS
Antimony Antimony Cu-Au-Ag Cu-Au-Ag
LOCATION LOCATION LOCATION LOCATION
USA USA Peru Peru
Nye County, Nye County, Jauja, Jauja,
Nevada Nevada Central Peru Central Peru
EVR OWNERSHIP EVR OWNERSHIP EVR OWNERSHIP EVR OWNERSHIP
100% 100% 50% 100%
----- End of picture text -----

==> picture [69 x 46] intentionally omitted <==

==> picture [69 x 46] intentionally omitted <==

LOS LIRIOS TECOMÁTLAN ANTIMONY PROCESSING PROJECT PLANT

DOLLAR ANTIMONY PROJECT

ESTRELLA COPPER PROJECT

COMMODITY FOCUS COMMODITY FOCUS Antimony Antimony

COMMODITY FOCUS Antimony

COMMODITY FOCUS Cu-Au-Ag

LOCATION LOCATION LOCATION Mexico Oaxaca Mexico Puebla USA State, Zapotitlan State, 50km from Nye County, Lagunas Los Lirios Nevada

Peru Jauja, Central Peru

EVR OWNERSHIP EVR LEASE WITH OPTION TO PURCHASE 100% 70%

EVR OWNERSHIP

EVR OWNERSHIP

30

==> picture [476 x 55] intentionally omitted <==

CONTACT

Mike Brown Managing Director and CEO Tel: +61 8 6489 0600 E: [email protected]