Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EV RESOURCES LTD Investor Presentation 2020

May 24, 2020

64887_rns_2020-05-24_db46f4c4-74a0-4958-901d-52108f19af26.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [66 x 90] intentionally omitted <==

==> picture [117 x 61] intentionally omitted <==

==> picture [260 x 135] intentionally omitted <==

Jadar Resources Limited ASX:JDR INVESTOR PRESENTATION May 2020

==> picture [76 x 101] intentionally omitted <==

==> picture [66 x 90] intentionally omitted <==

Disclaimer

==> picture [117 x 61] intentionally omitted <==

This presentation has been prepared by Jadar Resources Limited (“JDR”). The information contained in this presentation is a professional opinion only and is given in good faith. The material in this presentation (“material”) is not and does not constitute an offer, invitation or recommendation to subscribe for or purchase any security in JDR, nor does it form the basis of any contract or commitment. JDR makes no representation or warranty, express or implied, as to the accuracy, reliability or completeness of this material. JDR, its directors, employees, agents and consultants shall have no liability, including liability to any person by reason of negligence or negligent misstatement, for any statements, opinions, information or matters, express or implied, arising out of, contained in or derived from, or for any omissions from, this material, except liability under statute that cannot be excluded. Statements contained in this material, particularly those regarding possible or assumed future performance, costs, dividends, production levels or rates, prices, resources, reserves or potential growth of JDR, industry growth or other trend projections are, or may be, forward looking statements. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties, many of which are outside the control of, and may be unknown to, JDR. Actual results and developments may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. Recipients of this presentation are cautioned to not place undue reliance on such forward looking statements. JDR does not take responsibility to release publicly any revisions or updates to any forward looking statements to reflect events, circumstances or unanticipated events occurring after the date of this presentation except as required by law or by any appropriate regulatory authority.

This presentation is a visual aid and is not intended to be read as a stand alone document. The material contains selected and abbreviated summary information about JDR and its subsidiaries and their activities current as at the date of this presentation. The material is of general background and does not purport to be complete. JDR does not take responsibility for updating any information or correcting any error or omission which may become apparent after the date of this presentation.

Compliance Statement

This presentation contains information extracted from ASX market announcements reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” ("2012 JORC Code") and available for viewing at www.jadar.com. JDR confirms that it is not aware of any new information or data that materially affects the information included in any original ASX market announcement.

ASX announcements are as follows:

Eastern Alps Satellite Project – 14 March 2019; Weinebene Project – 19 February 2019; Cer Project – 6 July 2018; Vranje South Project – 20 August 2018, 14 November 2018 and 14 July 2019; Rekovac Project – 7 August 2019 and 20 May 2020; and Yanamina Project – 10 February 2020

The release of this presentation on ASX has been authorised by the Board of Jadar Resources Limited

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

2
----- End of picture text -----

==> picture [66 x 90] intentionally omitted <==

Investment Highlights FIRST MOVER ADVANTAGE

==> picture [117 x 61] intentionally omitted <==

==> picture [60 x 323] intentionally omitted <==

Strategic landholdings in some of the most prolific and unexplored regions in the world.

Clear short-term path to production for the Yanamina Gold project in Peru, with a Maiden JORC Resource of 265,987ozs Gold and 934,528ozs Silver.

Targeted exploration programme planned for the Yanamina Gold project, with the aim of Resource upgrade in 2020.

Target definition and drilling across multiple projects planned, targeting large Lithium +/- Borate deposits in Serbia and Austria.

Portfolio offers outstanding opportunity for a Tier 1 discovery, with first reconnaissance drilling just completed at Rekovac lithium project in Serbia.

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

2

==> picture [66 x 90] intentionally omitted <==

Strategically Diversified Asset Portfolio

BASED ON COMMODITY, LOCATION & PROJECT STAGE

==> picture [117 x 61] intentionally omitted <==

Jadar Resources Limited (ASX:JDR) has acquired a strategically diversified asset portfolio, across Gold/Silver and Lithium/Borate, with projects at varying stages of exploration, across Peru, Serbia and Austria. Jadar aims to generate shareholder value through targeted exploration and development of these assets.

Commodity

Location

Project Stage

==> picture [22 x 22] intentionally omitted <==

==> picture [22 x 23] intentionally omitted <==

==> picture [23 x 22] intentionally omitted <==

==> picture [676 x 194] intentionally omitted <==

----- Start of picture text -----

Gold & Silver Peru Brownfield Exploration
Yanamina Yanamina Yanamina
Weinebene
Lithium Serbia
Rekovac Rekovac
Greenfield Exploration
Vranje
Vranje Rekovac
Cer Cer
Vranje
Weinebene Cer
Austria
Eastern Alps
Eastern Alps
Weinebene
Eastern Alps
----- End of picture text -----

4

==> picture [66 x 90] intentionally omitted <==

Project Summary PERU, SERBIA AND AUSTRIA

==> picture [117 x 61] intentionally omitted <==

A strategically diversified asset portfolio based on:

Yanamina Gold / Silver Peru Brownfields

The Yanamina Gold Project in Peru holds a Maiden JORC 2012 Resource Estimate of 6,742,260 tonnes @ 1.23g/t gold and 4.31 g/t silver for 265,987 ounces of contained gold, and 934,528 ounces of contained silver, confirming the Yanamina Gold Project as a significant bulk mining development opportunity with strong economic potential.

Rekovac / Vranje South / Cer Lithium +/- Borate

Serbia Greenfields

Significant potential upside through greenfield exploration in Serbia for Rekovac, Vranje South and Cer licenses, which exhibits similar geological setting to the Jadar Basin, which is host to Rio Tinto’s world-class Jadarite discovery = one of the world’s largest lithium deposits (Resource of 135.7 Mt @ 1.86% Li2O and 15.4% B2O3 now in PFS)

Weinebene / Eastern Alps Lithium Austria

Brownfields Greenfields

Significant potential upside through brownfield exploration, with the surrounding area including European Lithium Limited’s Wolfsberg lithium deposit with 11MT at 1.0% Li2O - in accordance with the 2012 JORC Code (now in DFS).

5

==> picture [66 x 90] intentionally omitted <==

Project Summary

==> picture [117 x 61] intentionally omitted <==

Project Commodity Area (Km²) Deposit/Target
Type
Status Development Strategy Location
Yanamina Gold (Au)
Silver (Ag)
2.24 Low sulphidation
epithermal gold
JORC 2012 Resource:
• 265,987ozs Gold
• 934,528ozs Silver
Brownfields – Targeted
exploration for Resource
upgrade
Peru
Rekovac Lithium (Li) &
Borate (B)
75.4 Sedimentary lithium
borate type
Reconnaissance drilling
program confirmed
extensive borate and
lithium mineralisation
Additional target testing –
targets for B-Li mineralisation
remain open to the east, west
and south as well as at depth
Serbia
Weinebene Lithium (Li) 27.5 Spodumene
bearing pegmatites
Mapping, rock chips
sampling, soil sampling,
defined drill targets.
Brownfield drilling Austria
Eastern Alps Lithium (Li) 36.6 Spodumene
bearing pegmatites
Reconciliation and initial
rock chip sampling
Detail mapping and sampling Austria
Vranje South Lithium (Li) &
Borate (B)
90.4 Sedimentary lithium
borate type
Reconciliation, rock chips,
soil sampling, gravity and
magnetic
Target evaluation Serbia
Cer Lithium (Li) &
Borate (B)
92.8 Pegmatites Reconciliation, rock chips
and soil sampling
Target evaluation Serbia

6

==> picture [66 x 90] intentionally omitted <==

Corporate Overview

AN EXPERIENCED TEAM WITH A PROVEN TRACK RECORD

==> picture [117 x 61] intentionally omitted <==

Luke Martino - Chairman

  • 25+ years experience at partner & board level with Deloitte and currently Director of Indian Ocean Corporate, a boutique corporate & investment banking firm in Australia & Mainland China.

  • Experience & credibility in mining & resources, property and hospitality industries and specialist in corporate & growth consulting.

  • Adrian Paul – CEO / Executive Director

Adrian Paul – CEO / Executive Director
• 30+ years experience in securities industry
• Vast
experience
in
the
junior
explorer
market
and,
in
particular
the Capital Structure
capitalisation of these businesses. Shares on Issue (Undiluted) 524.9 million
• Drives execution of strategy to add shareholder value.
Steven Dellidis - Non-Executive Director
Options ($0.02; 12/2020) 70.2 million
• Project management and strategic investment for 20+ years – holds significant Options ($0.03; 07/2020) 30.0 million
experience in managing a number of listed companies. Options ($0.02; 05/2023) 25.0 million
• Assisted in initial acquisitions of important assets, bolstering company profiles Performance Rights (12/2021) 8.0 million
and currently manages a variety of businesses, across a range of industries
from mechanical engineering to earth moving.
Jim Malone - Non-Executive Director
Performance Rights (12/2024)
Share Price (22/5/2020)
10.0 million
A$0.013
• Over 30 years’ experience in the mining, resources, financial, broking and Market Capitalisation (Undiluted) ~A$6.8 million
sporting industries.
• Worked in Perth, Melbourne, London, Santiago, Lima and New York.
Cash balance 31/3/2020 ~A$1.2 million
• Raised over A$250 million in equity and debt for ASX listed companies since
2001.
Listing ASX “JDR”
Frankfurt Exchange R1E.F
Berlin Exchange R1E.B
Dejan Jovanovic - General Manager, Exploration Stuttgart Exchange R1E.SG

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

and
7
----- End of picture text -----

  • Graduate of Economic Geology at the University of Belgrade and a member of the European Federation Geologist (CP under JORC) and oversees lithium exploration and mining projects.

  • Experienced with both Rio Tinto’s “Jadar” deposit and lithium pegmatite.

  • Extensive experience working with a variety of mineral commodities including lithium, borates, gold, cobalt, nickel and rare earths.

==> picture [66 x 90] intentionally omitted <==

Yanamina Project

MAIDEN JORC RESOURCE + SIGNIFICANT EXPLORATION UPSIDE

==> picture [117 x 61] intentionally omitted <==

==> picture [308 x 394] intentionally omitted <==

==> picture [32 x 20] intentionally omitted <==

==> picture [19 x 19] intentionally omitted <==

==> picture [19 x 19] intentionally omitted <==

==> picture [17 x 17] intentionally omitted <==

Brownfields

Gold / Silver

Peru

  • Maiden JORC 2012 Resource of 265,987ozs Gold and 934,528ozs Silver.
Cut-off
Grade
Indicated Indicated Inferred Inferred Total Total
g/t Tonnes Au g/t Tonnes Au g/t Tonnes Au g/t
0.5 2,790,620 1.35 3,951,640 1.14 6,742,260 1.23
  • Located in the Ancash Province in Central Peru.

  • Yanamina is an outcropping epithermal gold resource with existing resource of +265,000 ozs gold.

  • Provides significant exploration upside through potential depth and lateral extensions and a significant faulted extension target at depth.

  • Clear short term path to production with defined short term plan.

  • Purchase cost minimal, relative to potential upside of project.

8

==> picture [66 x 90] intentionally omitted <==

Maiden JORC Resource

6,742,260 TONNES @ 1.23g/t gold and 4.31g/t silver

==> picture [117 x 61] intentionally omitted <==

Maiden JORC 2012 Resource Estimate of 6,742,260 tonnes @ 1.23g/t gold and 4.31 g/t silver for 265,987 ounces of contained gold, and 934,528 ounces of contained silver, confirming the Yanamina Gold Project as a significant bulk mining development opportunity with strong economic potential.

Cut-off Grade Indicated Indicated Indicated Indicated Indicated Indicated Inferred Inferred Inferred Inferred Inferred
(Au) Tonnes Grade (Au g/t) Grade (Ag g/t) Tonnes Grade (Au g/t) Grade (Ag g/t)
0.50 2,790,620 1.35 4.34 3,951,640 1.14 4.29
1.00 1,433,460 1.95 5.03 1,791,580 1.66 4.71
1.50 806,960 2.50 4.90 854,000 2.14 3.66
2.00 449,540 3.12 5.39 400,120 2.64 3.84
2.50 256,760 3.80 6.00 195,580 3.09 4.63
3.00 156,940 4.48 6.97 75,740 3.72 4.80
Resources Tonnes Grade (Au g/t) Grade (Ag g/t) Total ozs (Au) Total ozs (Ag)
Indicated 2,790,620 1.35 4.34 121,136 389,431
Inferred 3,951,640 1.14 4.29 144,851 545,097
Total/average
6,742,260
1.23
4.31 265,987 934,528
~~Summary Table (0.5 g/t cut-off)~~
Resources Tonnes Grade (Au g/t) Grade (Ag g/t) Total ozs (Au) Total ozs (Ag)
Indicated 1,433,460 1.95 5.03 89,879 231,842
Inferred 1,791,580 1.66 4.71 95,628 271,329
Total/average 3,225,040 1.79 4.85 185,507 503,171
  • The JORC study has identified lateral and at depth exploration potential to expand the existing resource outline.

  • The study also highlighted a significant exploration target in the down faulted hanging wall that bounds the upper part of the resource.

The large majority of the resource outcrops or sub outcrops indicating the potential for a low strip (waste: ore) ratio of around one times.

  • The insitu contained gold resource of 265,987 ounces equates to Jadar’s market capitalisation on 22 May 2020 at only $25 per oz.

Summary Table (1.0g/t cut-off)

For more information, please see ASX release dated 10 February 2020

9

==> picture [66 x 90] intentionally omitted <==

Exploration History

==> picture [117 x 61] intentionally omitted <==

Yanamina is a historic artisanal mining area, with over 100 small artisanal pits and short tunnels (adits) up to 15 metres in length, distributed across the Project. Local knowledge suggests that artisanal work began with Portuguese miners in the 1600’s, continuing through to late 1890’s. Gold or silver production records are not available, however it is assumed that production was small and concentrated.

1994 – Exploration Commenced

  • Arequipa Resources and subsidiary, Acuarios Mineral y Exploradora (“AME”), completed regional and prospect sampling, reopened select historic adits, drove three new adits totalling 48.6 metres, collected samples for metallurgical testing and completed 7 diamond drill holes in 1994 (543.15 metres), and 55 diamond holes in 1995 (1,636.05 metres).

2000 – Project Acquisition

  • In 2000, Barrick Gold acquired Arequipa Resources, the parent company of AME, and apart from apparent desk top studies, no additional exploration on Yanamina was carried out.

2006 – Acquisition

  • In 2006, Latin Gold Limited (ASX:LAT), purchased Yanamina and undertook an extensive exploration programme, which included the digitizing of the historic data base, detailed geological mapping, channel sampling comprising 280 samples, limited adit sampling and the completion of 25 diamond drill holes totalling 1,468 metres.

  • From 2007-2011, Latin undertook additional field studies, preliminary metallurgical test work and completed a pre-feasibility, updated PFS.

2011 – Acquisition

  • Coronet Minerals acquired Yanamina and retained Southampton Resources to conduct a NI 43-101 compliant deposit model, resource estimate and preliminary assessment.

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

10
----- End of picture text -----

2019 (December) – Acquisition

  • Jadar Resources acquired Yanamina, maiden 2012 JORC Resource estimate and preliminary assessment.

==> picture [66 x 90] intentionally omitted <==

Geology

Sediments

  • Located within northwest trending belt of complexly folded and faulted, Late Mesozoic marine sediments intruded by Tertiary batholithic rocks of granodiorite composition. Oldest rocks in region are Cretaceous quartzites, shales, and minor coal seams.

Fault Zone

  • Yungay Graben, which trends northerly across the region and has been traced along strike for almost 100 kms.

  • Straddles the Ancash Fault Zone, the mineralisation within the Project is hosted by a batholith of monzo-granitic composition and the emplacement of this batholith has been structurally controlled with intense mylonitic textures adjacent to the faulted contacts.

  • .

  • 38-42 degree dipping hillside which reflects a low angle normal fault

Associated Deposits

  • Barrick’s Pierina Mine and Lagunas Norte Gold Mine.

Deposit Type

  • Low-sulphidation epithermal gold, structural deformation and alteration of a shear-hosted gold deposit. Quartz-sericite alteration, with gold of 0.10 – 30 gpt recorded over widths of up to 1.5 metres wide.

==> picture [372 x 507] intentionally omitted <==

Yanamina Outcrop Geology (post Latin Gold circa 2007)

==> picture [66 x 90] intentionally omitted <==

Location and Infrastructure

2.24km² IN CENTRAL PERU

  • The Yanamina Gold project consists of five mining concessions for 2.24 Km², located in the Department of Ancash, Northern Peru, District of Caraz.

  • The Project is located 40 km to the north and 120 km south respectively of Barrick Gold’s Pierina (210 MT @ at 1.1 g/t for 7.5 million ounces), and Alto Chicama/Lagunas Norte (227 MT @ 1.1 g/t for 8 million ounces) gold mines.

  • Located 16 km east of the village of Caraz - a skilled trade population totalling 7,000 people.

  • Vehicle access to Yanamina is via 448kms of paved highway from Lima, the capital of Peru, to Caraz and then from Caraz to Yanamina. The road to Yanamina is unsealed but suitable for 2 wheel drive vehicles.

  • Commercial airline access to Huaraz, 93km south of the property.

Yanamina Project Location Map

==> picture [66 x 90] intentionally omitted <==

Exploration Target

SIGNIFCANT POTENTIAL EXPLORATION UPSIDE

==> picture [117 x 61] intentionally omitted <==

  • Work carried out for the maiden JORC Resource highlighted a number of areas which show potential for additional mineralisation, both as an extension but also proximal to the existing resource.

  • An extensive drilling program planned for Yanamina with drilling to commence H2 2020.

  • A number of these target areas can be initially explored geologically to determine their potential.

  • An additional exploration target that remains open is the potential faulted extension to the existing Yanamina resource.

  • The Yanamina resource is located on a fault scarp and there is sound geological evidence that the top of the resource has been removed by faulting.

  • How substantial the “missing” top of the resource is unknown but presents a simple exploration target with possible significant exploration upside.

Cross Section View of Additional Exploration Targets

==> picture [76 x 101] intentionally omitted <==

Yanamina Exploration Targets

==> picture [66 x 90] intentionally omitted <==

Exploration Target

SIGNIFCANT POTENTIAL EXPLORATION UPSIDE

==> picture [536 x 395] intentionally omitted <==

==> picture [117 x 61] intentionally omitted <==

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

14
----- End of picture text -----

Cross Section View of Additional Yanamina Exploration Targets

==> picture [66 x 90] intentionally omitted <==

Lithium

Europe’s lithium sources

==> picture [117 x 61] intentionally omitted <==

  • 1a. Rio Tinto (Serbia)

  • Resource of 135.7Mt @ 1.86% Li2O and 15.4% B2O3 (One of the world’s largest Li deposits)[1]

  • 1b. Jadar Resources (Serbia)

  • Two licences with very similar geological setting to Rio’s Jadar project

  • • Significant upside potential

  • 2a. European Lithium (Austria)

    • 11Mt @ 1.0% Li2O (Wolfsberg project) JORC 2012[2]
  • 2b. Jadar Resources (Austria)

    • Licences surrounding European Lithium’s Wolfsberg project

    • Attractive satellite exploration assets with potential for near-term discovery

  • Savannah Resources (Portugal)

  • 27Mt Mineral Resource including 15Mt in Measured and Indicated[3]

    1. Infinity Lithium (Spain)

    2. Resource 111.2Mt @ 0.60% Li2O[4]

  • European Metals/Cinovec Lithium/Tin (Czech Republic)

  • Inferred Resource 695.9Mt @ 0.4% Li2O and 0.04% Sn[5]

    1. Vulcan Energy Resources (Germany)

    2. Indicated Mineral resource of 722,000 t of contained Lithium Carbonate Equivalent (LCE)[6]

  • Keliber Oy (Finland)

    • Measured and Indicated mineral resources amount to 11.76Mt @ 0.50% Li₂O[7]
  • https://www.asx.com.au/asxpdf/20170302/pdf/43gj5cwybfdfcz.pdf 2. https://europeanlithium.com/wolfsberg-lithium-project/

  • https://www.savannahresources.com/assets/mina-do-barroso/ 4. https://0591826f-6a3d-4dc5-bb744de895dca9c3.filesusr.com/ugd/b8c660_79b7117f9cb44a748aefb38fcb0b3

110.pdf

  1. https://www.europeanmet.com/cinovec-lithium-tin-project/ 6. https://www.asx.com.au/asxpdf/20200120/pdf/44dcvqjbp4k9yf.pdf 15 7. https://www.keliber.fi/en/geology/mineral-resources-and-ore-reserves/

==> picture [66 x 90] intentionally omitted <==

Lithium

Lithium Supply and Demand

==> picture [117 x 61] intentionally omitted <==

  • The supply of lithium is dominated by two sources; brine - based deposits or from hardrock mineral deposits

==> picture [60 x 10] intentionally omitted <==

----- Start of picture text -----

Wolfsberg
Jadar
----- End of picture text -----

  • Other sources of lithium are sedimentary deposit – jadarite, lithium enriched clay minerals

  • Hard rock production currently outweighs brine production (approximately 70:30)

  • Australia, Chile and Argentina accounted for over 80% of global supply

  • The long-term demand range of 17% to 20% CAGR between 2019 and 2025

  • Traditional markets are glass, ceramics, greases are not seen to be major drivers of demand growth (existing markets to grow at 3.6% p.a.)

  • Global EV sales forecast to rise from 2.3m in 2019 to c.10m in 2025 driving a 3x increase in total lithium chemical demand (EV sales are forecast at 28m in 2030)

  • Lithium ion battery demand has grown from a production base of 19GWh in 2010 from a capacity of 30GWh, to a production of 160GWh in 2019 from a capacity of 285GWh.

==> picture [428 x 148] intentionally omitted <==

  • Benchmark Minerals stating that 68 plants in the pipeline with a total capacity of 1.45TWh by 2028 (2019 assessment)

https://blogs.platts.com/2019/10/23/lithium-supply-set-to-triple-2025/ https://www.orocobre.com/the-markets/lithium/ 15 *CanaccordGenuity research note ‘Cosmic Irony’, 12 August 2019, Bloomberg Electric Vehicle Outlook 2019

==> picture [66 x 90] intentionally omitted <==

Borates

The Boron Supply Chain

  • Boron is widely distributed but rarely found in high economic concentrations

  • Deposits of borates are almost exclusively associated with volcanic activity and arid climates, with the largest economically viable deposits located in California’s region of Mojave Desert and Death Valley, the Vardar Zone (Serbia and Turkey), and the Andean belt of South America

Borates Global Production

  • The supply of boron is dominated by two companies - 80% of market

  • Rio Tinto - Boron Mine in California

  • Eti Maden - (a Turkish state-owned mining and chemicals company)

==> picture [117 x 61] intentionally omitted <==

==> picture [381 x 247] intentionally omitted <==

  • Lesser production from Bolivia, Chile, China, and Peru

  • Serbia currently accounts for between 2 to 3 percent of global boron reserves

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

17
----- End of picture text -----

==> picture [66 x 90] intentionally omitted <==

Borates

Global Boron Demand - Increasing

  • Boron plays an extremely important role in everyday life in the modern world and it is one of the most versatile elements on earth used in everything from computer and smartphone screens to fertilisers and the construction of powerful magnets for wind turbines

  • Geographically, boron demand is dominated by Asia (46 percent) and North America (32 percent)

==> picture [117 x 61] intentionally omitted <==

==> picture [315 x 173] intentionally omitted <==

Factors Driving Demand

  • Urbanisation - Boron is widely used in cities and many building materials, in applications such as heat-resistant glass windows, glazed ceramics, television screens and electronics.

  • Electric efficiency - Boron is used in energy-saving applications such as fiberglass insulation and glass tubes for solar panels, high-powered magnets in applications like wind turbines

  • Agriculture – Boron is essential micronutrients for a variety of agricultural fertilisers

==> picture [235 x 199] intentionally omitted <==

Borates are an essential mineral group for modern society with demand expected to continue to grow at or above global GDP rates

==> picture [66 x 90] intentionally omitted <==

==> picture [117 x 61] intentionally omitted <==

Rekovac

Preserved Borate and Lithium mineralisation observed in both drill holes

==> picture [19 x 20] intentionally omitted <==

==> picture [314 x 208] intentionally omitted <==

Lithium/Borate Serbia Greenfields

  • The first reconnaissance included two diamond drill holes totaling 1,238.1m

  • Drill hole REK_001 encountered preserved borate and lithium mineralisation resulted in 2.5m with up to 16,454 ppm B2O3 and 474 ppm Li2O from 515.9m and over 195m of elevated boron and lithium geochemistry from 405m.

  • Drill Hole REK-002 intercepted over 171m with up to 60,858 ppm B2O3 and up to 969 ppm Li2O from 35m

==> picture [314 x 208] intentionally omitted <==

  • Mineralisation occur as sodium borosilicate mineral tentatively identified as searlesite and lithium bearing clay mineral

  • Considering the thickness of preserved mineralisation and the thickness of lacustrine boratiferous sequence, the targets for B-Li mineralisation remain open to the east, west and south as well as at depth

  • The Company is of the view that the basin is large enough to host an area with a better concentration mechanism that may host greater mineralised thickness as well as boron and lithium grades

19

==> picture [66 x 90] intentionally omitted <==

Rekovac

The target for B-Li mineralisation remain open to the east, west and south as well as at depth

==> picture [668 x 401] intentionally omitted <==

==> picture [117 x 61] intentionally omitted <==

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

20
----- End of picture text -----

Rekovac project - cross-section (looking westerly)

==> picture [66 x 90] intentionally omitted <==

Weinebene

SIGNIFICANT POTENTIAL EXPLORATION UPSIDE

==> picture [19 x 20] intentionally omitted <==

Lithium Austria Brownfields

  • Weinebene project area surrounds the European Lithium Limited’s Wolfsberg lithium deposit with 11MT @ 1.0%Li2O

  • 60 overlapping licenses covering in total 27.52 km[2]

==> picture [294 x 209] intentionally omitted <==

  • Mapping, rock chips sampling, soil sampling undertaken to-date.

  • Identified numerous spodumene bearing pegmatites with very high lithium values up to 3.39% Li2O - indicates the European Lithium resource likely extends into JDR project area.

==> picture [106 x 25] intentionally omitted <==

----- Start of picture text -----

WOLFSBERG PROJECT
----- End of picture text -----

11MT @1.0% Li20

  • Soil sampling showing anomalous values in the northern portion of the sampled area to be aligned with the projected trend of the known pegmatite veins – anomaly still open to the southeast.

==> picture [33 x 24] intentionally omitted <==

----- Start of picture text -----

Li
----- End of picture text -----

  • Planned work - soil sampling of north-eastern part; define drill targets for H2.

17

==> picture [66 x 90] intentionally omitted <==

Other Projects

Austria (80% JDR)

==> picture [19 x 20] intentionally omitted <==

Lithium Austria Greenfields

Eastern Alps Satellite Project

  • Eight project areas covered by 75 overlapping licenses covering in total 36.7 km[2]

  • Identified numerous spodumene bearing pegmatites with very high lithium values up to 3.88% Li2O (average 1.54%)

  • Early stage results provide strong indications that the high-grade lithium mineralization within the Eastern Alps is similar to that seen at the Wolfsberg Project owned by European Lithium

  • Some of exposed pegmatites showed extension along strike over couple of hundred meters

  • Planned work – detail mapping and sampling of exposed pegmatite, target prioritisation.

==> picture [117 x 61] intentionally omitted <==

Serbia (100% JDR)

==> picture [19 x 19] intentionally omitted <==

Lithium/Borate Serbia Greenfields

Vranje South

  • Sampling and mapping undertaken, with numerous target areas defined with high values of both Li and B present in soil and rock chip samples

  • Highest values include 1380 ppm B2O3 and 280ppm Lithium from rock chips sampling

  • Gravity results acquired and used to define basin geometry

Cer

  • Initial reconnaissance sampling delineated target areas.

New opportunity

  • Applied for aditional 4 blocks of exploration licenses totaling >300km[2]

22

==> picture [66 x 90] intentionally omitted <==

Contact

FOR MORE INFORMATION

==> picture [204 x 105] intentionally omitted <==

==> picture [235 x 110] intentionally omitted <==

Luke Martino Chairman Jadar Resources Limited [email protected]

Jane Morgan Investor Relations Advisor [email protected] +614 (0) 405 555 618

==> picture [117 x 61] intentionally omitted <==

==> picture [76 x 101] intentionally omitted <==

----- Start of picture text -----

23
----- End of picture text -----