EQ RESOURCES LIMITED — Investor Presentation 2013
Sep 22, 2013
64867_rns_2013-09-22_d58e98ed-0035-42f1-86dd-5b04c8a2d6d3.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [720 x 89] intentionally omitted <==
==> picture [216 x 146] intentionally omitted <==
==> picture [364 x 264] intentionally omitted <==
Carbine Tungsten Limited (ASX: CNQ)
==> picture [180 x 89] intentionally omitted <==
Mt Carbine Project – September 2013
Disclaimer
==> picture [86 x 58] intentionally omitted <==
Forward Looking Statements
Some statements in this presentation relate to the future and are forward looking statements. Such statements may include, but are not limited to, statements with regard to intention, capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals and metals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward-looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside Carbine Tungsten Limited’s (CNQ) control. Actual results and developments may differ materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation.
Given these risks and uncertainties, undue reliance should not be placed on forward-looking statements and intentions which speak only as at the date of the presentation. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, CNQ does not undertake any obligation to publicly release any updates or revisions to any forward looking statements contained in this presentation, whether as a result of any change in CNQ’s expectations in relation to them, or any change in events, conditions or circumstances on which any such statement is based.
Certain statistical and other information included in this presentation is sourced from publicly available third party sources and has not been independently verified.
Ore Reserves and Mineral Resources Reporting Requirements
As an Australian company with securities listed on the Australian Securities Exchange (“ASX”), CNQ is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”) and that CNQ’s ore reserve and mineral resource estimates comply with the JORC Code.
Competent Person’s Statement
The information in this document relating to Exploration Targets, Exploration Results, Mineral Resources, Production Targets and Ore Reserves is based on information compiled by Dr Andrew White, who is a Fellow of the Australian Institute of Geoscientists and a Director of CNQ. Dr White has sufficient experience relevant to the style of mineralisation, mining and processing the type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC code). Dr White consents to the inclusion of matters based on his information in the form and context in which it appears. The potential quantity and grade of exploration targets is conceptual in nature. Where Exploration Targets are stated, there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource.
Updated Highlights
==> picture [86 x 58] intentionally omitted <==
-
Well positioned to increase production at flagship Mt Carbine Tungsten Project in Far North Queensland
-
Producing ~1500 mtu a month from Tailing Retreatment Plant - concentrate shipped to off-take partner Mitsubishi Corporation RtM Japan (“Mitsubishi RtMJ”)
-
Focus on development of hard rock tungsten stockpiles and former open pit mine (Hard Rock Project)
-
Recently secured environmental permitting to commence processing of the hard rock stockpiles
-
Development of hard rock stockpiles due to commence in Q4 2013 - Strong production upside with 8 year mine life potential
-
MOU signed with Mitsubishi RtMJ to provide $15 million in project funding and off-take
-
Simple production process through crushing and gravity separation – low CAPEX requirements
-
Feasibility study completed with a JORC compliant resource having an NPV of ~$161 million
-
Exploration upside with targets close to existing operation – Exploration target of 25.5Mt
-
Board and senior management with vast experience in development and construction of mining operations
Increasing Production through development of Hard Rock Project
Experienced Board in Place
==> picture [86 x 58] intentionally omitted <==
| Board Member | Experience |
|---|---|
| Russell Krause Non-Executive Chairman |
Mr. Krause has over 25 years Executive Management and Director level experience in a range of corporate advisory, stockbroking, and investment banking roles with some of Australia’s leading financial services firms. Mr. Krause also has extensive experience in the resources sector providing equity capital markets, capital raising and corporate advisory services to a range of ASX listed mining and energy companies. Mr. Krause is currently a Director of ASX-listed Oil & Gas producer, Austex Oil Ltd (ASX:AOK), Singaporean registered AuzMinerals Resources Group Pte Ltd, and Novus Capital Ltd. |
| Jim Morgan Managing Director |
Mr. Morgan has over 30 years of experience in the Australian and international mining and construction industries, most recently as General Manager - Project Development for ASX-listed Paladin Energy Ltd. Before joining Paladin, he held senior positions and played key roles in the mine development of Lafayette Mining Limited (Owner's Representative), Rapu Rapu mine in the Philippines and Ticor (Owner's Representative) at the Richards Bay mineral sands mining and titanium smelter project in South Africa. |
| Tony Gordon Non-Executive Director |
Mr. Gordon has over 25 years experience in financial markets and has held directorships and senior management positions with a number of Australian stockbroking and financial services companies. Over this time his focus has been the listed resources sector. More recently Mr. Gordon has provided advice to a number of Chinese, South East Asian and North American projects that are held by Australian Listed and un-listed entities. |
| Roland (Rolly) Nice Non-Executive Director |
Mr. Nice is a metallurgical engineer with over 45 years experience. Mr. Nice has a strong track record in mineral processing and metallurgy, most recently as a consulting metallurgical engineer in the role of Senior Associate for Behre Dolbear Australia. Prior to this, Mr. Nice was the Principal at technical consulting firm, R. W. Nice and Associates, which followed approximately 20 years in a range of roles with Pancontinental Mining Limited. Mr. Nice has a B.Sc (Metallurgical Engineering) from Queen’s University, Canada, and is a member of the Australian Institute of Engineers and the Canadian Institute for Mining, Metallurgy and Petroleum, and a fellow of the Australian Institute of Mining and Metallurgy. |
Tungsten Market Application & Pricing
==> picture [86 x 58] intentionally omitted <==
-
Two Tungsten bearing minerals are important for industrial use - wolframite and scheelite
-
Cemented carbides (hardmetals) are the most important usage of tungsten today
-
The hardest metal – close to diamond
-
Hardmetal tools are used to shape metals, alloys, wood, composites, plastics and ceramics
-
Use in mining and construction e.g. hydraulic fracturing to fuel increased demand
-
Tungsten mill products are either tungsten metal products, such as lighting filaments, electrodes, electrical and electronic contacts, wires, sheets, rods etc or tungsten alloys
Strategic metal with very strong demand fundamentals
Tungsten Market Application & Pricing
==> picture [86 x 58] intentionally omitted <==
• Other uses of tungsten include:
-
High-strength, high-speed steel for cutting, stamping, casting tools, dies & rock/concrete drilling;
-
Alloy steel armour for military vehicles, warships and specialised armour piercing ammunition;
-
High temperature coating materials in the construction of jet engines;
-
Very specialised surgical instructions.
==> picture [235 x 182] intentionally omitted <==
Rising Tungsten Prices
-
APT (Europe) Price has been rising sharply since February 2013
-
APT (Europe) Price is currently quoted at US$410+/MTU (September 2013)
Source: Metal Pages September 2013
Mt Carbine Tungsten Project Recent Developments
-
July 2012 - First bulk shipment of Tungsten concentrate dispatched
-
August 2012 - Feasibility study reveals favourable project economics at Mt Carbine
-
August 2012 - Mt Carbine Resource estimate upgrade
-
September 2012 - Low grade stockpile upgraded to Indicated Resource status
==> picture [86 x 58] intentionally omitted <==
==> picture [221 x 158] intentionally omitted <==
Tailings Retreatment Plant
-
December 2012 - Second off take party LOI for 50100% of hard rock production.
-
February 2013 - Signs MOU with Mitsubishi for Hard Rock Project funding and further off-take
-
March 2013 - Environmental Management Plan (EMP) submitted covering stockpile processing
-
August 2013 – Mitsubishi RtMJ undertakes site visit
-
August 2013 – Awarded Environmental Authority for processing of Tungsten stockpiles
Current Status and Strategy Overview
==> picture [86 x 58] intentionally omitted <==
- Currently producing ~ 1,500mtu high-grade concentrate per month
Tailings
- Supplying concentrate to existing off-take partner – Mitsubishi Corporation RtM Japan (Mitsubishi)
Retreatment • Ongoing optimisation work to increase recovery and throughput
- Environmental approvals secured
• Approvals cover processing of up to 3 Million tonnes per annum (MTPA). • Commercial resource with mine life potential of ~8 years @ 1.5 MTPA Stockpiles
-
Permitting and approvals expected to be in place during 2014
-
Previously mined for 13+ years with existing mine life potential of ~10 years
• Open Pit Further exploration planned on adjacent Iron Duke prospect to extend Mine potential resource base
Hard Rock Feasibility Study
-
Feasibility Study completed in July 2012 confirmed the technical and financial feasibility of the Mt Carbine project
-
The scope of the study @ 1 AU$ = 1 US$ having significant upside with decreasing AU$
-
Re-establishment of mining in the open pit
-
Recovery and processing of ore from existing lower grade stockpiles
-
X-ray ore sorting to reject waste rock preprocessing
-
Gravity processing using similar technology to previous operations
-
Recovery of product from fines – the previous operation sent all fines to tails
- Current tailings operation demonstrates viability
==> picture [86 x 58] intentionally omitted <==
| Mt. Carbine Project Outline | Mt. Carbine Project Outline |
|---|---|
| NPV | $161 million |
| Resources | |
| Mine | 47Mt @ 0.13% WO3 |
| Stockpile | 12Mt @ 0.07% WO3 |
| Tailings | 2Mt @ 0.1% WO3 |
| Reserves | |
| Mine | 18Mt @ 0.14% WO3 |
| Rock feed rate | 3 Mtpa |
| Rock feed grade | 0.12% WO3 |
| Ore sorted feed rate | 350 ktpa |
| Ore sorted feed grade | 0.7% WO3 |
| Processing recovery | 76% |
| Production WO3 | >2,61550 MTUpa |
| Project capital | $55M |
| Operating costs | 130 $/MTU |
| Budget sale price | 290 $/MTU |
- Further exploration has potential to significantly extend mine life and resource
Strengthening Relationship with Mitsubishi
==> picture [86 x 58] intentionally omitted <==
-
January 2012 – Mitsubishi provides CNQ with LOI to purchase tailings products
-
May 2012 – CNQ signs bulk product sales shipment contract with Mitsubishi
-
September 2012 – CNQ signs second off-take agreement with Mitsubishi
-
October 2012 – 15 tonne consignment of Tungsten concentrate shipped to Mitsubishi
-
February 2013 – MOU signed outlining Mitsubishi’s intention to provide funding for Hard Rock project and continue off-take (see next slide)
-
May 2013 – Mitsubishi agrees to provide advance production payment of $400,000 to support ongoing tailings retreatment production operations
-
August 2013 – CNQ hosts CEO and senior representatives from Mitsubishi RtMJ on site visit
MOU with Mitsubishi for
Hard Rock Project development
==> picture [86 x 58] intentionally omitted <==
-
CNQ announced execution of MOU with existing off-take partner, Mitsubishi, in February 2013, outlining that Mitsubishi will support the development of Carbine’s existing hard rock stockpiles and historical open pit tungsten mine
-
MOU with Mitsubishi covers both potential funding and collaboration for the development of the Hard Rock Project
-
Includes potential off-take consideration for the tungsten stockpiles and 50% of the ore produced from the historical open pit tungsten mine.
-
Mitsubishi has stated consideration to fund $15 million of the capital requirement needed for CNQ to undertake the planned development program of the existing stockpiles – CNQ’s immediate focus
-
Progression to MOU on Hard Rock Project with Mitsubishi RtMJ demonstrates strong demand for tungsten amongst leading players in the industry
Development Timeline
==> picture [86 x 58] intentionally omitted <==
==> picture [693 x 436] intentionally omitted <==
----- Start of picture text -----
Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Procurement
Low Grade
EA
Stockpile AWARDED Plant Construction (10 Months)
Processing
Commissioning
Low Grade Stockpile Operation (up to 8 years)
Duration allowed for Open Pit Permitting Process
Hard Rock
Processing
Open Pit Mining Establishment
Open Pit
Operation
Exploration Exploration Activities
Projects
Ongoing Tailings Re-treatment Optimisation
----- End of picture text -----
Exploration Upside Mt Carbine Open Pit Mine
==> picture [86 x 58] intentionally omitted <==
-
Pit extension exploration adjacent to existing open pit
-
Previous workings and two CNQ drill holes indicate tungsten mineralisation extends north and north west for at least 700m from the open pit
-
Main ore body open at depth (drilled to 650m), and to the north and south
==> picture [392 x 232] intentionally omitted <==
- Evidence indicates main
wolframite ore body plunges north
Exploration Upside Location of Target Zones
==> picture [86 x 58] intentionally omitted <==
Mt Carbine Open Pit Granite 49Mt @0.13% WO3 Iron Duke Exploration Target 4.5Mt @0.32%WO3 (6 drill holes) Metasediments Petersen’s Lodes Old open pits 950t @~0.6% WO3 Exploration Target >>11Mt @0.32% WO3 NO drilling to date.
Exploration Upside Additional Prospects
==> picture [86 x 58] intentionally omitted <==
Iron Duke Prospect
-
Target area is contained within Mining Lease – 70m from open pit
-
One historical and 5 CNQ drill holes on east side of open pit intersected the Iron Duke lode
-
Exploration target based on drilling to date (6 cored holes) and surface mapping and sampling: 4,500,000 tonnes @ high grade 0.32% WO3 in scheelite
-
Planned incorporation in the design of the main pit and targeted for initial production
Petersens Prospect
-
Petersens Lodes located 2.5km from Mt Carbine
-
Exploration target based on surface mapping, sampling and historical production: >>11Mt @ 0.32%WO3 in scheelite
-
Contained within CNQ exploration permits – pending mining lease & native title
Mt Holmes Prospect
-
Located 20km south of Mt Carbine
-
Exploration target based on previous drilling, mapping, sampling and historical production:
-
~10Mt wolframite, tin in sheeted quartz vein system (previously mined on small scale)
-
Contained within CNQ exploration permits – pending mining lease & native title
Mt Carbine Tungsten Project Historical Developments
==> picture [86 x 58] intentionally omitted <==
-
Open pit mine operated from 1974 to 1987
-
Process: primary crush, hand and optical ore sort, secondary crush, jigs, spirals and tables produced 6872% WO3 concentrates in ratio 4 wolframite: 1 scheelite
-
1993 study disproved relationship between tungsten grade and quartz vein density
-
2010, 2012, Geostat estimated inferred resource using assayed grades
-
CNQ acquired rights to explore project in early 2008
-
CNQ opened tailings re-treatment plant in March 2012
-
Average recovered grades from remaining government records 1975-1983 is 0.16%
==> picture [478 x 236] intentionally omitted <==
----- Start of picture text -----
Mt Carbine Mine Historical Head Grade Jan-1975 to Feb1983
0.30%
0.25%
0.20%
0.15%
0.10%
0.05%
0.00%
Historical Head Grade Average Head Grade 0.16%
Available Source Data: Queensland Government Mining Journal - Mining Warden Reports
1975 J F M A M J J A S O N D 1976 J F M A M J J A S O N D 1977 J F M A M J J A S O N D 1978 J F M A M J J A S O N D 1979 J F M A M J J A S O N D 1980 J F M A M J J A S O N D 1981 J F M A M J J A S O N D 1982 J F M A M J J A S O N D 1983 J F
----- End of picture text -----
Mt Carbine Overview
==> picture [86 x 58] intentionally omitted <==
-
The Mt Carbine project mining leases cover approx. 367 hectares.
-
Previous large scale, open cut mining operation – operated for 13+ years until 1987
-
CNQ has detailed technical information from historical exploration and mining activity
-
Supporting current and planned CNQ activity
-
Transport infrastructure in place:
-
The historical Mt Carbine tungsten mine is located 130km by sealed highway from the port of Cairns
==> picture [324 x 201] intentionally omitted <==
-
45 minutes drive from Port Douglas
-
CNQ currently producing high-grade Tungsten from tailings re-treatment operation
Low Cost Processing
==> picture [86 x 58] intentionally omitted <==
-
Crushing/Screening X-Ray Sorting
-
• Total feed of 3MTPA • Easily assess average grade of rock
-
• Extensive testing of stockpile already undertaken
==> picture [77 x 182] intentionally omitted <==
==> picture [399 x 161] intentionally omitted <==
----- Start of picture text -----
Fines Gravity Processing
• 76% overall recovery • Throughput capacity of
producing >65% 0.5MTPA
concentrate
• 70% recovery
modeled for stockpiles
----- End of picture text -----
-
Product
-
• Very high quality • Off-take agreements already in place
==> picture [62 x 43] intentionally omitted <==
Strong Infrastructure
==> picture [86 x 58] intentionally omitted <==
-
Transport – project site located within 250 metres of Mulligan Highway leading to Port Douglas and Cairns.
-
Port – Cairns Port located approximately 130km Townsville port 470 km by road from site.
-
Power - Access to grid power.
-
Water – Existing facilities expected to provide for planned operations.
-
Labour – Surrounding cities and townships provide strong access to labour.
-
Robust - Low risk, low cost, long term Brown Fields Project with flexibility and upside.