Eolus Vind — Interim / Quarterly Report 2021
Aug 31, 2021
3044_ir_2021-08-31_38c30123-8a78-4214-8271-23f427683974.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
Eolus strengthens the project portfolio through acquisitions
3 Months April 2021 – June 2021
- Net sales 673.1 (409.9) MSEK.
- EBIT 8.2 (64.2) MSEK. Profit before tax -4.3 (16.2) MSEK. Net profit -1.5 (22.9) MSEK.
- Earnings per share, before and after dilution equals -0.06 (0.92) SEK.
- During the period 13 (0) wind turbines were taken into operations with a total installed capacity of 47 (0) MW.
- During the period the equivalent of 13 (1) wind turbines with an installed capacity of 47 (1) MW was handed over to customers.
- At the end of the period Eolus had 921 (687) MW under asset management.
- In May Eolus completed and handed over the repowering project Wind Wall 1 in Tehachapi, California, USA, to Cubico Sustainable Investments. The wind farm is covered by a Power Purchase Agreement (PPA) with Amazon Web Services and has an installed capacity of 47 MW. Eolus will provide asset management services for the wind farm.
- In June Eolus signed an agreement with RWE to acquire two fully permitted wind power projects in Sweden. The projects located in SE3 totals 99 MW and Eolus has initiated the sales process with the ambition to sign an agreement with an investor during the autumn of 2021.
- In June Eolus together with Hydro REIN signed an agreement to acquire the fully permitted wind power project Stor-Skälsjön from Enercon. The project, located in SE2, totals up to 260 MW and is covered by a 12-year Power Purchase Agreement (PPA) with Hydro. The sales process to sell a majority of the shares has been initiated and planned commissioning is during 2023.
6 Months January 2021 – June 2021
- Net sales 914.6 (549.9) MSEK.
- EBIT -21.2 (-58.0) MSEK. Profit before tax -25.4 (-65.2) MSEK. Net profit -18.3 (-40.9) MSEK.
- Earnings per share, before and after dilution equals -0.74 (-1.64) SEK.
- During the four months period 13 (0) wind turbines were taken into operations with a total installed capacity of 47 (0) MW.
- During the four months period the equivalent of 13 (2) wind turbines with an installed capacity of 47 (2) MW was handed over to customers.
- At the end of the period Eolus had 921 (687) MW under asset management.
- Eolus financial year has changed from September 1st August 31st to January 1st December 31st . During the financial year that ended December 31st 2020 the presented periods where based on a prolonged financial year starting September 1st 2019. During 2021 the comparative figures will be presented for quarters corresponding to the period in year 2020. It means that comparative periods during 2021 will correspond to interim periods that have not been presented before.
Eolus Vind AB (publ) Box 95 281 21 HÄSSLEHOLM Tel: 010-199 88 00 (vx)
| Financial summary | Inte rim | Inte rim | 6 month | 6 month | Rolling 12 | Full ye a r |
|---|---|---|---|---|---|---|
| Apr 2 0 2 1 - Jun 2 0 2 1 |
Apr 2 0 2 0 - Jun 2 0 2 0 |
Ja n 2 0 2 1 - Jun 2 0 2 1 |
Ja n 2 0 2 0 - Jun 2 0 2 0 |
Apr 2 0 2 0 - Jun 2 0 2 1 |
Se p 2 0 19 - De c 2 0 2 0 |
|
| Net sales, MSEK | 673,1 | 409,9 | 914,6 | 549,9 | 2 367,5 | 2 468,6 |
| EBIT, MSEK | 8,2 | 64,2 | -21,2 | -58,0 | 105,8 | 280,0 |
| Profit before tax, MSEK | -4,3 | 16,2 | -25,4 | -65,2 | 41,5 | 182,6 |
| Changes in market valuation of financial derivatives, MSEK | 5,2 | 17,7 | -17,7 | 16,2 | 4,9 | 69,6 |
| Net profit, MSEK | -1,5 | 22,9 | -18,3 | -40,9 | 35,9 | 198,3 |
| Earnings per share before and after dilution, SEK | -0,06 | 0,92 | -0,74 | -1,64 | 1,44 | 7,96 |
| Equity per share, SEK | 39,14 | 39,66 | 39,14 | 39,66 | 39,14 | 41,63 |
| Cashflow from operating activities, MSEK | 367,1 | 83,5 | 315,8 | -232,6 | 295,5 | -483,7 |
| Total assets, MSEK | 1 804,6 | 1 939,3 | 1 804,6 | 1 939,3 | 1 804,6 | 1 808,2 |
| Net debt - /net cash +, MSEK | 562,6 | 275,6 | 562,6 | 275,6 | 562,6 | 304,2 |
| Signed customer contracts, MSEK | 4 359,4 | 4 751,6 | 4 359,4 | 4 751,6 | 4 359,4 | 5 130,9 |
| No of turbines taken into operation, amount | 13,0 | - | 13,0 | - | 51,0 | 81,0 |
| No of turbines handed over to customers, amount | 13,0 | 1,0 | 13,0 | 2,0 | 51,0 | 83,0 |
| Turbines taken into operation, MW | 46,8 | - | 46,8 | - | 207,1 | 323,7 |
| Turbines handed over to customers, MW | 46,8 | 0,8 | 46,8 | 1,6 | 207,1 | 325,3 |
| Managed turbines, MW | 921 | 687 | 921 | 687 | 921 | 903 |
| Equity/assets ratio, % | 54,0 | 50,9 | 54,0 | 50,9 | 54,0 | 57,3 |
| Return on equity after tax, % | 3,7 | 24,2 | 3,7 | 24,2 | 3,7 | 20,6** |
**return on equity after tax is calculated for 16 months earnings relative to avarage equity.
Project portfolio
Eolus' success as a developer of renewable energy projects is in large dependent on access to a highquality project portfolio that develops and is optimized over time. Over time the project portfolio consists of projects for wind, solar and storage in different phases developed by Eolus or acquired from others. Development and optimization of projects is done during a long period of time. Development and optimization of the most important projects in the total project portfolio is therefore key activities for Eolus.
All project development normally occurs at Eolus own risk and even if Eolus has well developed processes for project development, there is a risk that some projects might not be able to establish due to market and permit factors in the future.
Projects under establishment
| Proje c t | Loc a tion | Numbe r of WTG |
Ca pa c ity, M W |
Estima te d produc tion, GWh |
Pla nne d c ommissioning |
Comme nt |
|---|---|---|---|---|---|---|
| Öyfjellet | Vefsn, Norway, NO4 |
7 2 | 400 | 1,300 | 2021 | Roads and other infrastructure completed. All wind turbine components have been delivered to the port in Mosjöen. 44 of 72 turbines have reached main installation. Both the transformers in the wind farm is connected to the grid. The first turbines was commissioned and started producing electricity in August. The customer Aquila Capital took over all shares in the project company in December 2019. The project is covered by a 15 year PPA with Alcoa. |
| Rosenskog | Falköping, Sweden, SE3 |
3 | 1 8 | 5 5 | 2023 | The wind farm is sold to Commerz Real that is expected to take over the facility in the autumn of 2023. Turbine supply agreement signed with Siemens Gamesa Renewables . PPA s igned for 100 % of the electricity produced. Procurement of civil works has begun. |
| Dållebo | Ulricehamn, Sweden, SE3 |
4 | 2 6 | 6 6 | 2023 | The wind farm is sold to Commerz Real that is expected to take over the facility in the autumn of 2023. Turbine supply agreement signed with Siemens Gamesa Renewables . PPA s igned for 100 % of the electricity produced. Procurement of civil works has begun. |
| Boarp | Vaggeryd, Sweden, SE3 |
4 | 2 4 | 7 2 | 2023 | The wind farm is sold to Commerz Real that is expected to take over the facility in the autumn of 2023. Turbine supply agreement signed with Siemens Gamesa Renewables . PPA s igned for 100 % of the electricity produced. Procurement of civil works has begun. |
| Timmele | Ulricehamn, Sweden, SE3 |
2 | 8 | 2 3 | 2022 | The wind farm is sold to a private investor that is expected to take over the facility in the summer of 2022. Turbine supply agreement signed with Enercon. Procurement of civil works has begun. |
As of Augsut 30, 2021
| Degree of completion per wind farm under construction | Jun 30, 2021 |
|---|---|
| Wind Farm | |
| Øyfjellet | 28% |
| Boarp | 0% |
| Dållebo | 0% |
| Rosenskog | 0% |
| Timmele | 0% |
Projects in late development phase or sales phase
| Project | Location | Capacity, Technology |
Planned | ||||
|---|---|---|---|---|---|---|---|
| MW | commissioning Comment | ||||||
| Stockåsbodarna | Sundsvall, Sweden |
Wind | 5 0 | 2024 | The project was given a positive decision from the Land and Environment Court in July 2021, which in turn have been appealed. The case of leave to appeal shall be tried. Grid connection secured. |
||
| Ölme | Kristinehamn, Sweden |
Wind | 8 1 | 2025 | Environmental permit with legal force for maximum height of 150 meters. Application for increased maximum height in process. As part of the process the municipality said yes to the application for increased height in April 2021. |
||
| Stor-Vrången | Ockelbo, Sweden | Wind | 0 | Activities for optimization of the project is ongong. Given the prerequisites and the restrictions in the permit the project at this time doesn´t fulfill the criteria to reach favorable profitability. |
|||
| Fågelås | Hjo, Sweden | Wind | 4 3 | 2024 | Environmental permit with legal force for maximum height of 150 meters. Permit regarding increased total height for in total seven wind turbines approved in April 2020. The decision has been appealed to the Land and Environmental court. |
||
| Vaberget | Sollefteå, Sweden |
Wind | 5 0 | 2024 | Environmental permit with legal force. The project dependent on other projects being connected to a new grid sub station. New permit process for project optimization initiated. As part of the process the municipality said yes to the new application in May 2021. |
||
| Siggebohyttan | Lindesberg, Sweden |
Wind | 2 4 | 2025 | Environmental permit granted for 4 of 15 wind turbines in March 2020. Eolus has filed an appeal of the decision to the Land and Environmental Court to grant permit for more wind turbines. |
||
| Skallberget/ Utterberget |
Avesta, Sweden | Wind | 7 4 | 2023 | Fully permitted project acquired during June 2021. Sales process initiated with the ambition to sign an agreement with an investor during 2021. |
||
| Tjärnäs | Hedemora, Sweden |
Wind | 2 5 | 2023 | Fully permitted project acquired during June 2021. Sales process initiated with the ambition to sign an agreement with an investor during 2021. |
||
| Stor-Skälsjön | Sundsvall and Timrå, Sweden |
Wind | 260 | 2023 | Fully permitted project totaling 260 MW which has been acquired together with Hydro Rein in June 2021 with Eolus owning 51% and Hydro REIN 49%. Sales process initiated with the ambition to sign an agreement with an investor during 2021 for the majority of the shares in the project. |
||
| Pörtom | Närpes, Finland | Wind | 5 9 | 2024 | Permit with legal force. The project is dependent on grid connection with other projects in the area. Grid connection design work initiated. |
||
| Peineva/Dobele | Tukums och Dobele, Latvia |
Wind | 172 | 2024 | Environmental impact assessment approved at federal level. Negative decision on municipality level in March 2020. Eolus appeal of the municipal decision was approved in July 2021. A new decision from the municipality is expected during 2021 |
||
| Centennial Flats | Arizona, US | Solar & Storage 500 + 250 | 2023 | Grid connection secured. Required permits are expected to be obtained during 2021. |
|||
| Group | 1 588 |
As of August 30, 2021
| Consolidated income statement | Inte rim | Inte rim | 6 month | 6 month | Rolling 12 | Full ye a r |
|---|---|---|---|---|---|---|
| KSEK | Apr 2 0 2 1 - Jun 2 0 2 1 |
Apr 2 0 2 0 - Jun 2 0 2 0 |
Ja n 2 0 2 1 - Jun 2 0 2 1 |
Ja n 2 0 2 0 - Jun 2 0 2 0 |
Apr 2 0 2 0 - Jun 2 0 2 1 |
Ja n 2 0 2 0 - De c 2 0 2 0 |
| Net sales | 673 079 | 409 906 | 914 621 | 549 867 | 2 367 503 | 2 468 639 |
| Other operating income | 6 692 | 31 265 | 17 205 | 36 693 | 69 668 | 122 061 |
| 679 771 | 441 171 | 931 827 | 586 560 | 2 437 171 | 2 590 700 | |
| Operating expences Change in inventories of w ind turmbines, w ind |
||||||
| turbines under construction and projekts under | ||||||
| development | 550 953 | -295 168 | 453 872 | -371 640 | 754 008 | 38 009 |
| Cost for goods and project development | -1 186 091 | -61 459 | -1 318 334 | -183 198 | -2 921 908 | -2 147 034 |
| Other external costs | -24 475 | -12 524 | -38 312 | -33 456 | -72 575 | -82 772 |
| Employee benefits expenses | -14 644 | -11 622 | -27 913 | -21 770 | -60 623 | -71 005 |
| Depreciation/amortization and impairment of | ||||||
| property, plant and equipment and intangible | -1 361 | -1 323 | -2 725 | -2 794 | -5 820 | -8 131 |
| Other operating expenses | 4 000 | 5 119 | -19 649 | -31 693 | -24 454 | -39 792 |
| Operating profit | 8 154 | 64 195 | -21 233 | -57 993 | 105 797 | 279 975 |
| Profit/loss from financial items | -12 424 | -48 013 | -4 177 | -7 212 | -64 330 | -97 422 |
| Profit before tax | -4 270 | 16 182 | -25 410 | -65 204 | 41 467 | 182 553 |
| Tax on profit | 2 740 | 6 695 | 7 097 | 24 274 | -5 587 | 15 749 |
| Net profit for the period | -1 530 | 22 876 | -18 313 | -40 930 | 35 879 | 198 302 |
| Whereof related to the shareholder of the parent | ||||||
| company | -1 529 | 22 876 | -18 310 | -40 914 | 35 889 | 198 348 |
| Whereof related to minority stakeholders | - 1 | - | - 3 | -16 | -10 | -46 |
| Net profit for the period | -1 530 | 22 876 | -18 313 | -40 930 | 35 879 | 198 302 |
| Total shares | 24 907 | 24 907 | 24 907 | 24 907 | 24 907 | 24 907 |
| Profit per share before/after dilution (SEK) | -0,06 | 0,92 | -0,74 | -1,64 | 1,44 | 7,96 |
| Consolidated statement of comprehensive income | |||||
|---|---|---|---|---|---|
| KSEK | |||||
| Net profit for the period | -1 530 | 22 876 | -18 313 | -40 930 | 35 879 | 198 302 |
|---|---|---|---|---|---|---|
| Other comprehensive income | ||||||
| Translation differences | -1 251 | -519 | 1 828 | -519 | 8 252 | 5 905 |
| Other comprehensive income for the period | ||||||
| net after tax | 607 | 6 165 | 6 029 | -10 461 | 962 | -14 831 |
| Total comprehensive income for the period | -923 | 29 042 | -12 283 | -51 391 | 36 842 | 183 471 |
| Whereof related to the shareholder of the parent | ||||||
| company | -857 | 29 042 | -12 215 | -51 375 | 36 852 | 183 824 |
| Whereof related to minority stakeholders | -66 | - | -68 | -16 | -10 | -353 |
| Total comprehensive income for the period | -923 | 29 042 | -12 283 | -51 391 | 36 842 | 183 470 |
| Consolidated balance sheet KSEK |
Jun 3 0 2021 |
Jun 3 0 2020 |
De c 3 1 2020 |
|---|---|---|---|
| ASSETS | |||
| Non-current assets | |||
| Intangible assets | 21 705 | 30 995 | 24 865 |
| Property, plant and equipment | 30 127 | 41 018 | 29 955 |
| Deferred tax asset | 2 524 | 10 956 | 13 120 |
| Other financial assets | 15 287 | 15 357 | 15 089 |
| Total fixed assets | 69 643 | 98 326 | 83 029 |
| Current assets | |||
| Inventories, w ork in progress | 686 878 | 776 698 | 429 289 |
| Advance payment to suppliers | 63 296 | 250 440 | 47 367 |
| Account receivable - trade | 65 942 | 26 753 | 16 365 |
| Derivative instruments | 18 336 | 16 158 | 37 011 |
| Current tax assets | 44 027 | 63 248 | 34 730 |
| Other receivables | 30 479 | 5 187 | 6 864 |
| Prepaid expenses and accrued income | 60 764 | 7 538 | 462 629 |
| Cash and bank balances | 765 243 | 694 923 | 690 938 |
| Total current assets | 1 734 966 | 1 840 946 | 1 725 193 |
| TOTAL ASSETS | 1 804 608 | 1 939 273 | 1 808 222 |
| Jun 3 0 | Jun 3 0 | De c 3 1 | |
| KSEK | 2021 | 2020 | 2020 |
| EQUITY AND LIABILITIES | |||
| Equity | |||
| Equity related to the share holders of parent company | 974 890 | 987 787 | 1 036 920 |
| Equity related to minority stake holders | -999 | -948 | -956 |
| Total equity | 973 892 | 986 839 | 1 035 964 |
| Non-current liabilities | |||
| Non-current interest bearing liabilities | 179 552 | 152 894 | 135 116 |
| Provision, non current | 575 | 593 | 583 |
| Deferred taxes | 5 390 | 26 076 | 21 291 |
| Other liabilities | 70 721 | 271 | 70 698 |
| Total non-current liabilities | 256 238 | 179 834 | 227 687 |
| Current liabilities | |||
| Current interest bearing liabilities | 23 049 | 266 467 | 251 664 |
| Bills payable | 141 358 | 157 391 | 169 408 |
| Derivative instruments | 3 936 | 6 638 | 4 899 |
| Current tax liabilities | 6 662 | 31 | 6 889 |
| Accrued expenses and deferred income | 174 463 | 138 261 | 102 830 |
| Advance paument from customers | 10 000 | 182 145 | - |
| Other liabilities | 215 010 | 21 667 | 8 880 |
| Total current liabilities | |||
| 574 479 | 772 599 | 544 571 |
| Consolidated cash flow statement | Inte rim | Inte rim | 6 month | 6 month | Rolling 12 | Full ye a r |
|---|---|---|---|---|---|---|
| Apr 2 0 2 1 | Apr 2 0 2 0 | Ja n 2 0 2 1 | Ja n 2 0 2 0 | Apr 2 0 2 0 | Ja n 2 0 2 0 | |
| KSEK | - Jun 2 0 2 1 | - Jun 2 0 2 0 | - Jun 2 0 2 1 | - Jun 2 0 2 0 | - Jun 2 0 2 1 | - De c 2 0 2 0 |
| Operating activities | ||||||
| Operating profit | 8 154 | 64 195 | -21 233 | -57 993 | 105 798 | 279 974 |
| Non cash items | 7 029 | -15 392 | 22 922 | -12 884 | 4 868 | -57 837 |
| 15 183 | 48 803 | 1 690 | -70 877 | 110 666 | 222 138 | |
| Interest received | 441 | 131 | 472 | 1 381 | 2 258 | 3 553 |
| Interest paid | -3 346 | -2 208 | -7 892 | -6 545 | -17 321 | -20 795 |
| Income tax paid | -6 249 | 18 088 | -10 471 | 8 314 | 4 769 | 21 |
| Net cash flow from operating activities before | 6 029 | 64 814 | -16 202 | -67 727 | 100 372 | 204 917 |
| changes in working capital | ||||||
| Adjustments of w orking capital | 361 063- | 18 656- | 332 043- | -164 890 - |
195 173 - |
-688 582 - |
| Cash flow from operating activities | 367 092 | 83 469 | 315 841 | -232 617 | 295 545 | -483 666 |
| Acquisition of property, plant and equipment | -1 573 | -15 453 | -2 429 | -15 908 | -2 664 | -16 260 |
| Sales of property, plant and equipment | 201 | 329 | 391 | 531 | 19 982 | 20 521 |
| Cash flow from investing activities | -1 372 | -15 124 | -2 038 | -15 377 | 17 318 | 4 261 |
| Borrow ings | - | 263 208 | 47 369 | 263 208 | 47 369 | 263 207 |
| Repayment of loans | -236 441 | - | -236 442 | -2 666 | -236 442 | -152 933 |
| Paid dividends | -49 814 | - | -49 814 | -37 361 | -49 814 | -37 361 |
| Cash flow from financing activities | -287 992 | 263 208 | -240 624 | 223 181 | -240 624 | 72 913 |
| Cash flow for the year | 77 728 | 331 553 | 73 179 | -24 813 | 72 239 | -406 492 |
| Cash and cash equivalents at beginning of year | 687 675 | 367 900 | 690 938 | 721 753 | 694 923 | 1 102 983 |
| Exchange-rate differences in cash and cash equivalents | -160 | -4 530 | 1 126 | -2 017 | -1 919 | -5 553 |
| Cash and cash equivalents at year-end | 765 243 | 694 923 | 765 243 | 694 923 | 765 243 | 690 938 |
Consolidated statement of changes in equity
| Sha re | Additiona l pa id- in |
Re ta ine d | Tota l, Eolus's |
Non c ontrolling |
|||
|---|---|---|---|---|---|---|---|
| KSEK | c a pita l | c a pita l | Re se rve s | e a rnings | sha re holde rs | inte re sts | Tota l e quity |
| At 1 September 2019 | 24 907 | 190 843 | -1 210 | 861 982 | 1 076 522 | -932 | 1 075 591 |
| Net profit for the year | -40 914 | -40 914 | -16 | -40 930 | |||
| Other comprehensive income | -10 424 | -37 | -10 461 | -10 461 | |||
| Total comprehensive income | -10 424 | -40 951 | -51 375 | -16 | -51 391 | ||
| Transactions with shareholders | |||||||
| Dividend | -37 361 | -37 361 | -37 361 | ||||
| At 30 June 2020 | 24 907 | 190 843 | -11 634 | 783 671 | 987 787 | -948 | 986 839 |
| Net profit for the year | 54 200 | 54 200 | - 8 | 54 192 | |||
| Other comprehensive income | -5 053 | -14 | -5 067 | -5 067 | |||
| Total comprehensive income | -5 053 | 54 186 | 49 132 | - 8 | 49 125 | ||
| At 31December 2020 | 24 907 | 190 843 | -16 687 | 837 857 | 1 036 920 | -956 | 1 035 964 |
| At 1 January 2021 | 24 907 | 190 843 | -16 687 | 837 857 | 1 036 920 | -956 | 1 035 964 |
| Net profit for the year | -18 310 | -18 310 | - 3 | -18 314 | |||
| Other comprehensive income | 2 970 | 3 125 | 6 095 | -66 | 6 029 | ||
| Total comprehensive income | 2 970 | -15 186 | -12 215 | -69 | -12 284 | ||
| Transactions with shareholders | |||||||
| Non-controlling interest araised at aquisition of group | 25 | 25 | |||||
| companies | |||||||
| Dividend | -49 814 | -49 814 | -49 814 | ||||
| At 30 June 2021 | 24 907 | 190 843 | -13 717 | 772 857 | 974 891 | -1 000 | 973 891 |