Quarterly Report • May 5, 2023
Quarterly Report
Open in ViewerOpens in native device viewer
Q1 2023 Unaudited Interim Report
By 2026 we aim to be the largest renewable energy producer in the Baltics and a fast growing one in Poland
| Over 20 years renewableenergy experience |
Largest wind energy producer in Baltic countries |
186 employees in Estonia, Latvia, Lithuaniaand Poland |
|---|---|---|
| Production 2022 1.12 TWh (El) 565 GWh (Heat) |
2022 operatingrevenue €257.0m EBITDA €154.8m Net profit€110.2m |
60 000 ~ investors |
| 2 | Enefit Green at a glance |
|---|---|
| 4 | Letter from the Chairman of the Management Board |
| 5 | Strategy and development portfolio |
| 9 | 1Q key highlights |
| 10 | Operating environment |
| 13 | Significant events |
| 14 | Financial results of the group |
| 18 | Wind energy segment |
| 20 | Cogeneration segment |
| 22 | Solar energy segment |
| 23 | Investments |
| 24 | Financing |
| 25 | Risk management |
| 26 | Condensed consolidated interim financial statements |
| 32 | Notes to the condensed consolidated interim financial statements |
| 48 | Group structure |
The beginning of 2023 brought relief from exorbitant energy prices. Electricity prices dropped, mainly due to wind conditions that favoured the production of renewable energy but also due to warmer temperatures and higher hydropower output. Other contributing factors were lower natural gas prices and the Olkiluoto-3 nuclear reactor coming online.
It is important to note, however, that a more favourable level of electricity prices does not mean that the energy crisis is over. Electricity prices may again soar to excessive heights during the next winter, because we are still dependent on uncertain and expensive fossil fuel supplies. European countries are investing in renewable energy as a viable long-term solution. Supported by rapidly advancing wind, solar and energy storage technologies, the quantity and relative importance of green energy in the Baltic Sea region will grow significantly by the end of the decade.
The European Union has increased its renewable energy target for 2030 from 32% to 42.5% of the total energy mix. Estonia has set itself an even more ambitious target and is planning to cover its entire annual energy consumption in 2030 with renewable energy. The European Commission has unveiled its proposals for the redesign of the electricity market according to which the regulation is going to support buying electricity under long-term power purchase contracts and permit paying public support only via two-way contracts for difference that have both a price ceiling and floor. The Baltic countries have been taking measures to free the network resource from reservations of connection capacity.
Enefit Green has a clear roadmap for increasing the total capacity of its production assets across its main markets fourfold in the coming years. We invested nearly €92m in Q1 and continued development activities to expand our renewable power production. We are currently building six wind farms in Estonia, Finland and Lithuania (with a total capacity of 549 MW) and four solar farms in Estonia and Poland (with a total capacity of 50 MW).
Excellent cooperation between our team and the teams of our partners has enabled us to remain in the planned timeframe. In the unique Purtse hybrid farm, all five wind generators have been installed and have already started limited-scale electricity production. The work on the solar farm part is on schedule and the Akmene wind farm in Lithuania has also come online and supplied its first electricity.
The development of Estonia's largest wind farm, Sopi-Tootsi, in the northern part of Pärnu county is on track too. We have signed an agreement with the local authority that sees renewable energy as an opportunity to develop local life. Land improvement for the construction of roads and crane operation sites is under way. Pre-construction activities in the area of the Kelme I wind farm in Lithuania have also been successfully launched.
The development of offshore wind energy will play a decisive role in the coming years. The production of offshore wind power is more stable and just 50 offshore wind turbines could generate half of the electricity currently consumed in Estonia. We acquired the Gulf of Riga offshore wind farm development project from Eesti Energia and will continue the development activities with the goal of launching large-scale renewable electricity production before 2030. It is one of the most advanced offshore wind projects in the Baltics that has reached the phase of research required for the environmental impact assessment and preliminary analysis of the technical solution of the wind farm.
Enefit Green produced 406 GWh (+10%) of electricity in Q1. Although the wind conditions in January and February were less favourable than in the same period last year, our three new wind farms in Lithuania and Estonia, which have started partial production, made a considerable contribution to the total output. The availability of our wind farms was also higher than in the comparative period.
The group's Q1 total operating income was approximately €78m (+16%), EBITDA was around €41m (-10%) and net profit was around €31m (-13%). EBITDA and net profit decreased year on year due to lower market prices of electricity and electricity purchase costs incurred to balance the PPA portfolio.
We will continue implementing the growth plans announced a year ago in Q2. Our team is committed to making sure that the projects under construction are on track, all planned investments decisions are made, and our existing production assets produce the maximum amount of energy. Our purpose is to increase the supply of green energy for everyone's benefit.
Aavo Kärmas Chairman of the Management Board of Enefit Green
Operating capacity Under construction
Targeting renewable capacity growth to ~1900 MW by the end of 2026
Enefit Green Q1 2023 interim report 5
| Enefit Green Q1 2023 interim report | 6 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Projects under construction |
546 MW | 50 MW | |||||||||
| Operating capacity Under construction |
75MW | 9MW | 72MW | 21MW | 6MW | 32MW | 3MW | 80MW | 255MW | 1,053MW 596MW |
|
| 457MW | 43MW | 715MW | 457MW | ||||||||
| Operating capacity 1Q 2023 |
Šilale II | Akmene | Zambrow PV |
Tolpanvaara | Purtse | Debnik PV |
Purtse PV |
Estonia PV |
Kelme I | Sopi-Tootsi | Operating capacity + under |
| Country | construction | ||||||||||
| Final Investment Decision |
2Q 21 | 3Q 21 | 3Q 21 | 4Q 21 | 1Q 22 | 1Q 22 | 2Q 22 | 4Q 22 | 4Q 22 | 4Q 22 | |
| First electricity / % in testing phase |
92% (11/12) |
64% (9/14) |
100% | 3Q 23 | 100% | 3Q 23 | 100% | 4Q 23 | 4Q 24 | 1Q 25 | |
| COD * COD – Commercial |
3Q 23 Operating Date |
2Q 23 | 3Q 23 | 1Q 24 | 2Q 23 | 4Q 23 | 4Q 23 | 1Q 24 | 1Q 25 | 2Q 25 |
** On 2May 2023 there was an incident in Akmene wind farm resulting in a destruction of a wind turbine (see stock exchange announcement). The circumstances and causes of the incident and effect on timing of COD are being investigated.
NB! Development projects are in continuous change.
The presented information is management team's best assessment of the current status of the near-term development portfolio as of 30 April 2023
8
Complete view of the development portfolio
NB! Development projects are in continuous change.
* Various onshore wind and solar farm developments that are not expected to get final investment decision before 2024.
(up to 1GW capacity)
+38 GWh (electricity production from new wind farms under construction)
* (electricity sales revenue + renewable energy support and efficient cogeneration support + revenues from sale of guarantees of origin - day-ahead and intraday purchases on Nord Pool - balancing energy purchases) / production
Enefit Green's operations are strongly influenced by seasonality, weather conditions and electricity prices as well as regulations governing the energy industry and political decisions. Factors which affect the group's development projects also include market competition, the development and cost of renewable energy technologies, customers' willingness to enter into long-term green power purchase agreements (PPAs), and renewable energy support schemes.
Most of Enefit Green's production assets are either partly or fully exposed to fluctuations in the market price of electricity. We mitigate electricity price risk with PPAs. The share of various national support schemes on our operating income has decreased significantly compared with previous years. Assets eligible to support include mainly production assets in Estonia whose 12-year support period has not yet expired and which therefore receive Feed-in-Premium (FiP) in addition to the market price of electricity. FiP support to approximately 55 GWh and 363 GWh will expire in 2024 and 2025, respectively. After 2025, the amount of FiP received will be negligible. A more detailed overview of the mitigation of the risks associated with expected future electricity output with PPAs and other risk management measures (incl. Contracts for Difference (CfDs) in Poland and the new price floor measure in Estonia) is provided at the end of the management report.
| Average electricity price (€/MWh) |
1Q 2023 |
1Q 2022 |
Change |
|---|---|---|---|
| Estonia | 99.4 | 133.4 | (25.5)% |
| Latvia | 100.0 | 139.7 | (28.4)% |
| Lithuania | 101.7 | 141.4 | (28.1)% |
| Poland | 130.9 | 135.4 | (3.3)% |
| Finland | 77.6 | 91.7 | (15.4)% |
| Norway | 79.0 | 85.9 | (8.0)% |
| Denmark | 103.1 | 152.6 | (32.4)% |
| Sweden | 68.0 | 65.2 | 4.2% |
Nord Pool's intraday electricity prices have been highly volatile in recent years. Usually, the peak load electricity price is determined by the more expensive carbon-intensive power and the base load electricity price is determined by renewable power that has practically zero variable costs.
The electricity markets of the region where Enefit Green operates are well connected by means of interconnectors. Therefore, electricity generation and prices are affected by various factors in both our core markets and beyond.
Average electricity prices have decreased in recent months due to a combination of various factors such as lower natural gas prices, warmer and windier weather, higher hydropower production in the neighbouring countries and the coming online of the long-awaited Finnish Olkiluoto-3 nuclear reactor.
During peak hours, the electricity price in the region is typically determined by gas-fired power plants. As gas prices declined, peak hour electricity prices in Q1 2023 were lower than a year earlier. The average daily electricity price in Nord Pool Estonia market area in Q1 was the highest on 23 January, when it was 173.4 €/MWh (-75.4 €/MWh compared with Q1 2022) and the lowest on 15 January, when it was 17.9 €/MWh (a decrease of 6.3 €/MWh compared with Q1 2022). The average price of natural gas on the Dutch gas trading platform TTF was 50.6 €/MWh in Q1 2023 (50.8 €/MWh, 50.1% compared with Q1 2022). The steep fall in the price of natural gas is mainly attributable to relatively warm and windy weather, which reduced natural gas consumption and increased wind power production, as well as the levels of natural gas inventories in Europe, which are significantly higher than in previous years.
The average CO2 emission allowance price in Q1 2023 was 89.9 €/t, which is 8% (+6.7 €/t) higher than a year earlier. At the beginning of Q1, the allowance price continued rising due to higher coal power generation. In February 2023, the carbon allowance price broke the 100 €/t level for the first time, primarily because the EU ETS annual cycle ends after Q1. In connection with the decision of the European Parliament's Committee on Industry, Research and Energy to finance the achievement of renewable energy and energy efficiency targets with proceeds from the sale of CO2 emission allowances earlier than originally planned, the prices dropped to 92 €/t by the end of Q1.
Interconnectors supply the Baltic countries with Nordic hydropower, which is cheaper than other types of electricity. The average level of the Nordic hydro reservoirs in Q1 2023 was 46.0% of the maximum, which is 3.7 percentage points higher than in Q1 2022.
As the volume of snow and surface water accumulated in the reservoirs this year is 63 TWh higher than a year earlier, hydropower production in 2023 is expected to increase year on year. Higher hydropower production will lower electricity prices in the region because a larger share of the required electricity can be produced by facilities with lower variable costs.
Due to seasonal factors, wind conditions in Q1 and Q4 are more favourable for wind power production in our region than the rest of the year. The average measured wind speeds in Enefit Green's wind farms in Estonia and Lithuania were somewhat above average in Q1, but lower than in comparative period: 6.9 m/s in Estonia and 7.2 m/s in Lithuania (Q1 2022: 7.0 m/s and 7.5 m/s, respectively). The chart below provides an overview of average quarterly wind speeds in Estonia and Lithuania since the beginning of 2021.
On 14 March 2023, the European Commission published its proposals for amending the EU electricity market regulation. The amendments are likely to be adopted by the end of 2023. The proposals are aimed at improving the current regulation, for example by reducing the risks associated with long-term PPAs, increasing possibilities for reducing electricity consumption, and allowing public support to renewable energy producers to be paid only on the basis of CfDs which include both a price cap and a price floor. Network operators will have more options to make anticipatory investments, which should support faster development of electricity production. The proposals do not include plans to extend or make permanent the revenue cap policy which is applies until the end of June 2023.
At the end of March, the Council of the EU and the European Parliament reached a political agreement on amending the Renewable Energy Directive. Among other things, it was decided to raise the share of renewable energy in the EU's overall energy consumption from 32% to 42.5% by 2030.
An amendment to the Electricity Market Act which requires paying a security deposit of €38,000/MVA for connecting to the grid electricity production equipment of over 15 kW entered into force on 17 March. A deadline was set for the commencement of electricity production by new power plants. The security deposit will be refunded if the power plant starts producing electricity during the following minimum period after the completion of the connection point: one year for solar power plants, three years for offshore wind farms, and two years for equipment using other technologies.
The Act lays down an obligation to produce electricity at the maximum capacity specified in the connection contract at least once every two years. For connection capacity that has not been used by the producer for two years, the producer must either pay an underutilisation charge of €38,000/MVA or renounce the right to the connection.
Following these amendments, Estonia has become the country with the most restrictive electricity network connection conditions for electricity producers in Enefit Green's core markets.
Legislative changes facilitating the planning and construction of onshore and offshore wind farms entered into force.
Lithuania established new grid connection principles. There is now a possibility to build hybrid solutions for electricity generation and storage. Principles were also established for limiting electricity production in the event of overproduction, granting preferential treatment to offshore wind farms with a generating capacity of 1,400 MW which have not yet been connected to the network. Producers that connected to the network before the new connection principles were established and new producers whose connection terms and conditions not foresee any production limits will also enjoy special treatment. The remaining new power plants will be the first that will be subject to production limits in the event of overproduction.
As the total capacity of solar power plants connected to the Lithuanian electricity network exceeds 2 GW, the government introduced the possibility to limit the output of new power plants if necessary. Based on an assessment carried out by network operators and taking into account export opportunities, the government also established that 4.4 GW of solar power capacity and 3.6 GW of onshore wind power capacity can be connected to the Lithuanian electricity network until 2030. Once these limits have been reached, both connections to the grid and the output of power plants may be restricted. Out of the 4.4 GW solar power capacity limit, 1.6 GW will be reserved for prosumers that both produce and consume and energy cooperatives.
On 30 March, Lithuania announced an auction to find a developer for an offshore wind farm with a generating capacity of 580–700 MW. Lithuanian authorities estimate that the costs of the offshore wind farm and related connection will amount to €1.8 billion. The developer will not receive any support from the state. The auction will be won by the developer offering the highest development fee to the state. Participants in the auction must register within 60 days.
The ban on planning wind turbines closer to residential buildings than ten times the height of the wind turbine was lifted. The new restriction zone is 700 metres. This will significantly increase the possibilities of building wind turbines in Poland.
Enefit Green acquired from Eesti Energia the Liivi (Gulf of Riga) offshore wind farm development for around €6.2m. It is one for the most advanced offshore wind power projects in the Baltics, which we will continue to develop to launch offshore wind power production already before the end of the current decade.
The planned capacity of the Liivi offshore wind farm is 1 GWh and projected output is approximately 4 TWh per year. The development area is located between the island of Kihnu and the Häädmeeste coastline in southwest Estonia. The research required for the environmental impact assessment and the preliminary analysis of the technical solution of the wind farm are under way.
Enefit Green is currently building six wind farms and four solar farms. Out of wind farms under construction, Šilale II and Akmene in Lithuania and Purtse in Estonia have partially started production. In Q1 2023 these wind farms produced 38 GWh of electricity thereby contributing the whole year-over-year electricity production growth.
As of today, Purtse solar park also has started to produce electricity.
Considering Enefit Green's growing focus on the development of wind and solar energy, the Management Board has decided to explore strategic alternatives regarding the biomass assets owned by the Group. These assets include the Broceni CHP plant, the Broceni pellet plant and the Valka CHP plant in Latvia and the Paide CHP plant in Estonia.
Enefit Green's consolidated operating income for Q1 2023 grew by 16%, but 72% growth in operating expenses lowered EBITDA by 10%. Net profit for Q1 decreased by €4.4m, i.e. 13%, dropping to €30.5m. The key factors which influenced the group's financial performance are described below.
| Unit | Q1 2023 | Q1 2022 | Change | Change,% | |
|---|---|---|---|---|---|
| Electricity production | GWh | 406 | 368 | 38 | 10% |
| Incl. new wind farms | GWh | 38 | 0 | 38 | - |
| Electricity sales* | GWh | 495 | 393 | 102 | 26% |
| Heat energy production | GWh | 176 | 173 | 3 | 2% |
| Pellet production | kt** | 39 | 38 | 1 | 2% |
| Pellet sales | kt | 62 | 55 | 7 | 13% |
* The difference between sales and production quantities is attributable to forecasted but unrealised production sold under PPAs, which is covered with purchases from Nord Pool and/or the energy imbalance market.
** thousand tonnes
The group's electricity production in the first quarter of 2023 was 406 GWh (+10% in the reference period).
Total operating income increased by €10.8m, of which sales revenue contributed €10.6m and renewable energy support and other operating income €0.1m. Of the €10.6m increase in sales revenue, €7.5m derived from the sale of pellets. The average sales price of pellets increased by 69% y-o-y. In the first quarter of 2022, the price was 149.3 €/tonne, in the first quarter of 2023 it was 252.7 €/tonne. In the first quarter, 62k tonnes of pellets were sold (55k tonnes in reference period). First quarter pellet sales were affected by the timing shift from Q4 2022 to 1Q 2023.
From the increase in sales revenue €2.4m was attributable to electricity sales. The growth in electricity sales was most positively influenced by the amount of electricity produced in Lithuania, which increased by 27% y-o-y. In Lithuania, two wind farms under construction, Akmene and Šilale II, started producing electricity in Q1 2023.
Lower market prices for electricity had a negative impact compared to the first quarter of last year. The average electricity price*** on the group's core markets was 100.5 €/MWh in the first quarter (136.4 €/MWh in the reference period). The group's implied captured electricity price**** was 101.4 €/MWh in the reporting period (127.3 €/MWh in the reference period). The implied captured electricity price differs from the average market price in the core markets, as the calculation takes into account long-term electricity sales contracts (PPAs) at a fixed price, renewable energy subsidies and the fact that wind farms do not produce the same amount of electricity every hour.
The average price of electricity sold to the market by the Group was 82.4 €/MWh in the first quarter of 2023, compared to 119.9 €/MWh a year earlier.
In Q1 2023 260 GWh of group's electricity portfolio was covered by PPAs at an average price of 89.8 €/MWh. In the comparative period 129 GWh of electricity was sold via PPA and Feed-in-Tariff (FiT) based revenue model at an average price of 78.8 €/MWh.
Short-term production shortfalls arising from the difference between the realised wind profile and base load PPAs have to be covered with electricity purchases from the day-ahead market. The chart on the next page provides an example of purchases to cover PPA shortfalls during a 24-hour period due to fluctuations in wind power production. The chart also reflects the day-ahead volume forecast and the realised production volumes, which give rise to the so-called open supply transactions (both purchases and sales).
| € million | Q1 2023 | Q1 2022 | Change | Change, % |
|---|---|---|---|---|
| TOTAL OPERATING INCOME | 77.5 | 66.7 | 10.8 | 16% |
| Revenue | 68.8 | 58.1 | 10.6 | 18% |
| Renewable energy support and other op. income |
8.7 | 8.6 | 0.1 | 2% |
| TOTAL OPERATING EXPENSES (excl. D&A) | 36.4 | 21.1 | 15.2 | 72% |
| Raw materials, consumables and services used | 24.8 | 14.1 | 10.7 | 75% |
| Payroll expenses | 2.5 | 2.4 | 0.0 | 2% |
| Other operating expenses | 4.1 | 2.5 | 1.6 | 62% |
| Change in inventories | 5.1 | 2.1 | 3.0 | 145% |
| EBITDA | 41.1 | 45.6 | (4.5) | (10)% |
| Depreciation, amortisation and impairment (D&A) | 9.8 | 9.6 | 0.2 | 2% |
| OPERATING PROFIT | 31.3 | 35.9 | (4.6) | (13)% |
| Net finance income (costs) | 0.0 | (0.2) | 0.2 | (117)% |
| Income tax expense | 0.8 | 0.8 | 0.0 | (3)% |
| NET PROFIT | 30.5 | 34.9 | (4.4) | (13)% |
| TOTAL OPERATING EXPENSES (excl. D&A)) | 36.4 | 21.1 | 15.2 | 72% |
| Variable costs (incl. balancing energy purchases) | 21.6 | 11.1 | 10.5 | 95% |
| Fixed costs | 9.8 | 8.0 | 1.7 | 22% |
| Change in inventories | 5.1 | 2.1 | 3.0 | 145% |
*** Production volume weighted market price
**** Implied captured electricity price = (electricity sales revenue + renewable energy support and efficient cogeneration support + revenues from sale of guarantees of origin - day-ahead and intraday purchases on Nord Pool - balancing energy purchases) / production
The next two charts provide an overview of the quantities of electricity produced, purchased and sold as well as the formation of the realised sales, purchase and market prices and the average implied captured electricity price over the past five quarters.
In Q1 2023, we purchased from the market 92 GWh of electricity at an average price of 116.7 €/MWh. In Q1 2022, we purchased 29 GWh at an average price 128.1 €/MWh (the figures do not include the electricity purchased for pellet production). Electricity purchases from the market in Q1 2022 were significantly smaller because part of the output was covered by a fixed-price FiT support scheme and the volume of PPAs was small. The electricity price in Enefit Green's core markets, presented in the chart, is the average quarterly price in the Baltic and Polish markets, weighted by Enefit Green's production volumes. In Q1 2023, it was 100.5 €/MWh and in Q1 2022 136.4 €/MWh.
| Electricity prices €/MWh |
1Q 2022 |
2Q 2022 |
3Q 2022 |
4Q 2022 | 1Q 2023 |
|---|---|---|---|---|---|
| Price of electricity sold to the market | 119.9 | 127.6 | 285.2 | 179.0 | 82.4 |
| Core markets average* | 136.4 | 151.3 | 317.7 | 221.5 | 100.5 |
| Implied captured price** | 127.3 | 127.0 | 205.1 | 163.0 | 101.4 |
| Realised purchase price | 128.1 | 175.1 | 337.7 | 271.1 | 116.7 |
| PPA (until Q4 22 incl FiT) sale price |
78.8 | 79.1 | 72.1 | 126.2 | 89.8 |
Heat production remained stable compared with a year earlier but the price of heat sold grew by 38% due to growth in the price of biomass.
Revenue from solar services in Q1 2023 was €0.7m smaller than in Q1 2022 because we exited the provision of turnkey solar solutions in the middle of 2022.
Other operating income for Q1 2023 was affected the most by the change in renewable energy support received by Estonian wind farms, which decreased €1.1m year on year. The eligibility periods of the Tooma I, Vanaküla and Virtsu III wind farms expired in 2022. Other operating income was positively influenced by the decrease in the non-derivative contract liability incurred in 2021 by €0.9m in connection with the partial fulfilment of relevant PPAs. The non-derivative contract liability resulted from previous electricity derivatives (base load swaps) which were converted into fixed-price physical electricity sales contracts (PPAs). The decrease in the non-derivate contract liability does not affect cash flow and monetary settlement of electricity sales takes place on the basis of the PPAs.
* Production weighted average market price on group's core markets
** (electricity sales revenue + renewable energy support and efficient cogeneration support + revenues from sale of guarantees of origin - day-ahead and intraday purchases on Nord Pool - balancing energy purchases) / production
Expenses on raw materials, consumables and services grew by €10.7m, i.e. 75%. The biggest rise was in electricity costs, which grew by €6.8m due to electricity purchased to balance the NP intraday market portfolio and the electricity purchased to balance the PPA portfolio in hours of low wind speed. In Q1 2023, we purchased from the market 92 GWh of electricity at an average price of 116.7 €/MWh. In Q1 2022, we purchased 29 GWh at an average price of 128 €/MWh. Expenses on technological fuel grew by €4.1m due to an increase in the price of biomass. Average biomass expenses in pellet production grew by 108% year on year. The cost of biomass in Q1 2023 was 131.7 €/t compared with 63.4€/t in Q1 2022.
The group's payroll expenses grew by 2% compared with the same period last year due to an increase in the number of full-time employees from 169 to 186. New people were mostly hired to the development team to support the group's growth plan in all its markets. The growth resulting from the number of staff was counterbalanced by a decrease in performance-related and other bonuses, which in 2022 included a one-off larger amount of €0.2m.
Other operating expenses grew by 62%, i.e. €1.6m, driven by higher research and consulting expenses as well as somewhat higher IT and insurance expenses.
Change in inventories reflects the change in pellet stocks, summarising the quantities of pellets produced and sold in the period under review. In Q1 2023, the group produced 39 thousand tonnes (Q1 2022: 38 thousand tonnes) and sold 62 thousand tonnes (Q1 2022: 55 thousand tonnes) of pellets. The change in inventories was €5.1m (Q1 2022: €2.1m). The average sales price of pellets increased by 69% year on year, rising from 149.3 €/t in Q1 2022 to 252.7 €/t in Q1 2022. Sales for Q1 2023 were influenced by the shift of the sales of Q4 2022 to Q1 2023. Due to the increase in the price of pellets, sales of inventories have had a stronger impact because the cost price of pellets has been higher.
D&A expense remained stable compared with a year earlier. Although the volume of investments made in Q1 2023 was €91.9m, this did not affect D&A expense because investments were mostly made in wind and solar farm development projects which are still in the construction phase.
Fixed costs comprise costs not directly dependent on the production volume. Fixed costs grew by €1.7m, i.e. 22%, year on year. Most of the growth resulted from an increase in development projects' research and consulting expenses.
Net finance costs decreased by €0.2m year on year. Interest expense on bank loans grew by €1.6m compared with Q1 2022 but most of the interest expense incurred during the construction of wind farms is capitalised. The item of net finance income and costs was positively influenced by the addition of interest income on current accounts and term deposits in Q1 2023.
Income tax expense remained at the same level as a year earlier.
The group's net profit decreased by €4.4m, amounting to €30.5m for Q1 2023. The decrease is attributable to growth in electricity purchase expenses.
Based on total operating income and EBITDA, the group's largest segment is Wind energy, which accounted for 58% of operating income and 75% of EBITDA for Q1 2023. The Cogeneration segment contributed 41% to operating income and 31% to EBITDA. The smallest reportable segment is Solar energy, which accounted for 1% the group's operating income.
Among reportable segments, the Cogeneration segment delivered modest EBITDA growth while the EBIDTA of the Wind energy segment decreased the most. A more detailed analysis by segment is presented below.
The EBITDA of the segment Other mainly includes general administrative expenses, which is the largest item for the segment. The segment also includes the network construction services of the Paide CHP facility, the Keila-Joa hydroelectric facility, and the renewable energy solution on the island of Ruhnu. The loss of the segment Other increased by €0.3m.
The Wind energy segment comprises operating wind farms, wind farm developments and the management expenses of both wind farm developments and operating wind farms.
In Q1 2023, wind conditions in Estonia and Lithuania were somewhat less favourable for wind power production than a year earlier but the availability of our Estonian and Lithuanian wind farms was higher, being 96.3% and 97.6%, respectively
The electricity production of our wind farms grew by 2% in Estonia and by 27% in Lithuania. Two wind farms nearing completion in Lithuania – Akmene and Šilale II – started generating electricity during the period and at the end of March the Purtse wind farm in Estonia also produced its first electricity. Altogether, wind power production grew by 13% year on year, rising to 351 GWh. Practically all of the growth was attributable to the new wind farms.
In addition to the market price of electricity, our Estonian wind farms whose eligibility period has not expired receive renewable energy support in the form of Feed-in-Premium (FiP) at the rate of 53.7 €/MWh. Since March 2022, our Estonian wind farms have also been selling part of their electricity at fixed prices. As a result, their production is not fully exposed to fluctuations in the market price of electricity.
In Q3 2022, we replaced the previous Feed-in-Tariff (FiT) based income model with a model based on PPAs and the market price at all our Lithuanian wind farms. Since the implied captured electricity prices of both our Estonian and Lithuanian wind farms are based on a combination of the market price and PPAs (the share of the Estonian FiP in total operating income is decreasing), we are going to disclose the implied captured electricity price for the Wind energy segment as a whole starting from Q1 2023.
The wind energy segment's implied captured electricity price in Q1 2023 was 99.8 €/MWh (a 19% decline compared with Q1 2022). The implied captured electricity price was affected by lower prices on the Nord Pool market, the addition of long-term PPAs and electricity purchase expenses. Altogether, we sold 260.3 GWh of electricity at an average price of 89.8 €/MWh under PPAs in Q1 2023.
The Wind energy segment's operating income, which was positively affected by 13% higher output and negatively affected by lower implied captured electricity prices, grew by 8.2% year on year to €44.8m.
guarantees of origin - day-ahead and intraday purchases on Nord Pool - balancing energy purchases) / production
The operating expenses of the Wind energy segment (excl. D&A) grew by €7.3m year on year, rising to €14.0m. The growth resulted mainly from electricity purchases made to balance the PPA portfolio in hours of low wind speed. Other operating expenses (excl. electricity purchases, expenses on balancing energy and growth in D&A) grew by €0.5m compared with the same period last year.
In Q1 2023, our wind farm operators' (Enefit Wind OÜ and Enefit Wind UAB) operating expenses (excl. D&A, expenses on balancing energy and electricity purchased to balance the PPA portfolio ) per installed capacity (MW) increased by 7.5% year on year. The cost stability of new maintenance contracts has counterbalanced natural indexation-related growth in maintenance expenses.
The EBITDA of the Wind energy segment was €30.8m compared with €34.7m a year earlier. EBITDA decreased due to the downtrend in the market price of electricity and expenses on electricity purchased to balance the PPA portfolio.
+3.4 (+8.2%) -3.9 (-11.2%) Operating income and EBITDA, €m
+1,0 (+2,7%) Operating expenses per MW for last 4 quarters, €k/MW*
*(Total operating expenses - balancing energy purchase - D&A) / operating capacity. Only operating wind assets are included: Enefit Wind OÜ and Enefit Wind UAB
31% Share of EBITDA Q1 2023
Enefit Green Q1 2023 interim report 20
The Cogeneration segment comprises the Iru, Paide, Valka and Broceni CHP facilities and a pellet factory.
The Cogeneration segment's electricity production in Q1 2023 was 50.3 GWh, which is at the same level as a year earlier (Q1 2022: 50.2 GW). In addition to the market price of electricity, the Iru and Paide CHP facilities receive renewable energy support of 53.7 €/MWh for electricity produced from renewable sources and efficient cogeneration support of 32 €/MWh for electricity produced from non-renewable sources in efficient cogeneration mode. The Valka CHP has been selling electricity at the prices of the NP Latvia price area since mid-December 2022. Previously, it sold electricity at fixed prices ranging from 79.75 €/MWh to 105.6 €/MWh. The Broceni CHP facility lost its fixed electricity price of 143.6 €/MWh retrospectively from March 2021 due to the decision of the BVKB made in October 2021. Enefit Green's subsidiary SIA Technological Solutions has challenged the BVKB's decision in court. In April 2023, the court of the second instance ruled in favour of BVKB. The management of SIA Technological Solutions is considering the next steps. From November 2021 until the final ruling on the matter is made, the Broceni CHP facility will sell electricity at the prices of the NP Latvia price area.
Our cogeneration facilities' availability in Q1 was a high 99.3% (Q1 2022: 99.5%).
The Cogeneration segment's implied captured electricity price decreased by 13% year on year, dropping to 136.2 €/MWh in Q1 2023, due to lower market prices in the NP Estonia and NP Latvia price areas.
Heat production grew by 1.5% year on year to 176 GWh. The average sales price of heat per MWh increased by 38% year on year, rising to nearly 24 €/MWh in Q1 2023. The price cap for heat produced by the Iru CHP was the same in the reporting and the comparative period, i.e. 7.98 €/MWh, but the price of heat produced by the Paide and Valka CHPs grew considerably due to an increase in the cost of biomass purchased.
The Cogeneration segment's operating income grew by 34% year on year, rising to €32.0m. Pellet sales revenue grew the most (+€7.5m, +92%) due to a higher sales price and a larger sales volume. The average sales price of pellets increased to 252.7 €/t, i.e. by 69%. Pellet sales volume in Q1 2023 was 62 thousand tonnes compared with 55 thousand tonnes in the comparative period. Revenue from gate fees increased due to growth in waste received by €0.3m to €4.6m. Heat sales revenue grew year on year through larger output and a higher sales price by €0.9m to €3.3m. Other operating income grew by €0.1m to €0.7m. Electricity sales revenue decreased by €0.8m to €6.0m due to lower market prices. Electricity production support remained stable compared with a year earlier.
* (electricity sales revenue + renewable energy support and efficient cogeneration support + revenues from sale of guarantees of origin - day-ahead and intraday purchases on Nord Pool - balancing energy purchases) / production
The change in inventories of finished goods increased expenses for Q1 2023 by €5.1m because pellet sales exceeded pellet production. In Q1 2022, the situation was the same: pellet sales exceeded production and the change in finished goods inventories was €2.1m. Compared with the same period in Q1 2022, the Cogeneration segment's expenses from the change in finished goods inventories grew by €3.0m. The segments' variable costs for Q1 2023 grew by €4.3m due to an increase in the price of biomass. Average biomass expenses in pellet production grew by 108% year on year. The cost of biomass in Q1 2023 was 131.7 €/t compared with 63.4 €/t in Q1 2022. The segment's fixed costs grew by €0.3m to €2.5m. The main source of growth was payroll expenses, which grew by €0.2m year on year.
The Cogeneration segment's EBITDA for Q1 grew by €0.6m year on year, i.e. 5%, , rising to €12.9m. EBITDA growth was supported by higher EBITDA in the pellet business while higher biomass and lower electricity prices had a negative effect.
The Solar energy segment comprises the group's operating solar farms, solar farm developments and solar services.
The Solar energy segment produced 3.5 GWh of solar power in Q1 2023, 1.9 GWh (35%) less than in Q1 2022 because the weather conditions in Estonia and Poland were less favourable for solar power production. The availability of solar farms remained high, being 99.9% (Q1 2022: 99.8%).
Our solar farms in Estonia are partly exposed to movements in the market price of electricity. Our solar farms in Poland sell electricity at fixed prices which are adjusted for inflation on an annual basis – the price for Q1 2023 was 492–526 PLN/MWh (104 –112 €/MWh at the three-month average zloty (PLN) exchange rate). From Q1 2023, the solar segment includes the Purtse farm's PPA revenue. Since the farm itself began generating revenue at the end of April, the electricity was sold from the portfolio of other operating assets. The implied captured electricity price in Q1 2023 was supported by sales of guarantees of origin, which were not offered in Q1 2022.
The operating income of operating solar farms decreased by €0.8m year on year, mainly due to lower electricity production.
The Solar energy segment's EBITDA for Q1 2023 was negative at €0.4m, which is €0.8m lower than in the same period last year. This was mainly caused by increase in fixed costs related to development activities (including personnel and consultation expenses). To a lesser extent the result was influenced by exit from turnkey solaar solutions business last year.
Availabilities of solar farms (%)
efficient cogeneration support + revenues from sale of guarantees of origin - day-ahead and intraday purchases on Nord Pool - balancing energy purchases) / production
-1%
Share of EBITDA Q1 2023
Enefit Green Q1 2023 interim report 22
The group made capital investments of €91.9m in Q1 2023, which is €78.2m more than in Q1 2022. Growth resulted from development investments, which extended to €91.9m. Of the latter, €59.6m was invested in the development of three wind farms: €32.4m in the Sopi-Tootsi wind farm, €17.2m in the Kelme wind farm, €10.1m in the Purtse wind farm and €6.2m in the acquisition of the Liivi/Gulf of Riga offshore wind farm development from Eesti Energia. The largest investment in solar power development was made in the Purtse solar farm in the amount of €10.9m.
Base investments (expenditure on the maintenance and improvements of existing assets) amounted to €0.1m in Q1 2023, which is €0.3m less than in Q1 2022. Base investments were mainly made in the group's wind farms in Estonia. Base investments in wind farms may differ significantly quarter by quarter because they depend on the wind turbines' repair and maintenance needs in the relevant period.
The group's main sources of debt capital are investment loans and credit facilities raised from regional commercial banks, the Nordic Investment Bank (NIB) and the European Bank for Reconstruction and Development (EBRD).
The amortised cost of the group's interest-bearing liabilities at 31 March 2023 was €272.7m (31 December 2022: €279.6m). Loan liabilities to banks accounted for €267.9m of the total, including an outstanding loan balance of €6.7m denominated in Polish zloty.
In Q1 2023, Enefit Green signed a new 12-year loan agreement of €100m with NIB and seven-year loan agreements of €225m with SEB. The loans of €325m in total were fully undrawn at 31 March 2023.
Enefit Green has signed three revolving credit facility agreements of €50m in total, which mature in the period 2024–2026 (all credit limits were undrawn at 31 March 2023).
The interest rate risk of investment loans with the total outstanding balance of €164.0m has been hedged with interest rate swaps, which fix the interest rates of the loans in the range of 1.049% – 1.125% (plus the margin), until the loans mature.
The average interest rate of bank loans drawn down at 31 March 2023 was 2.75% (31 December 2022: 2.60%).
The group's loan and credit agreements include covenants which set certain limits to the group's consolidated financial indicators. At 30 September 2022, the group was in compliance with all loan terms and conditions, including the covenants.
The group's management determines the maximum level of debt by reference to financial leverage and the net debt to EBITDA ratio.
| € million | 31 Dec 2022 | 31 Mar 2023 |
|---|---|---|
| Interest-bearing liabilities | 279.6 | 272.7 |
| Minus cash and cash equivalents |
-131.5 | -80.5 |
| Net debt | 148.1 | 192.2 |
| Equity | 718.7 | 748.5 |
| Invested capital | 866.8 | 940.8 |
| EBITDA (LTM)* | 154.8 | 150.4 |
| Operating profit (LTM) | 117.1 | 112.4 |
| Net profit (LTM) | 110.2 | 105.8 |
| Financial leverage (1) | 17% | 20% |
| Net debt/LTM EBITDA |
0.96 | 1.28 |
| Return on invested capital (2) |
13.5% | 12.0% |
* LTM – last twelve months
(1) Financial leverage = net debt / (net debt + equity)
(2) Return on invested capital = LTM operating profit /
(net debt + equity)
(3) Return on equity = LTM net profit / equity
The group has identified two main market and financial risks that require active management – price risk of electricity sales and interest rate risk.
Price risk of electricity sales is mitigated by a combination of:
No new PPAs were signed during Q1 2023.
The total volume of PPAs signed is 10,266 GWh at the average price of 72.0 €/MWh.
Out of electricity produced after 2027, 3,677 GWh is covered with PPAs at an average price of 78.1 €/MWh.
The chart below provides an overview of the next few years' forecasted production volumes and their coverage with risk mitigation measures as at 31 March 2023.
The group manages its interest rate risk with interest swap (IRS) agreements.
Interest rate risk is the risk that the fair value or future cash flows of financial instruments will fluctuate because of changes in market interest rates. Cash flow interest rate risk arises from the group's floating-rate borrowings and is the risk that finance costs will grow when interest rates increase.
Interest rate risk is mitigated partly by raising debt at fixed interest rates and partly by hedging: fixing the interest expenses of floating-rate borrowings raised with IRS instruments. Information on IRS transactions is disclosed in note 5 to the financial statements.
| 2023 | 2024 | 2025 | 2026 | 2027 | 2023-2027 total |
|
|---|---|---|---|---|---|---|
| Share of production covered by FiT/CfD** | 2% | 1% | 1% | 1% | 1% | 1% |
| Volume (GWh) | 26 | 28 | 28 | 28 | 28 | 140 |
| FiT/CfD weighted average price, EUR/MWh |
94.1 | 94.2 | 96.1 | 98.1 | 100.1 | 96.6 |
| Share of production covered by FiP** | 31% | 24% | 9% | 3% | 3% | 12% |
| Volume (GWh) | 524 | 502 | 266 | 99 | 79 | 1 470 |
| Weighted average FiP, EUR/MWh (added to the market price) |
50.2 | 50.2 | 50.3 | 53.7 | 53.7 | 50.6 |
| Share of production covered by PPAs** | 56% | 64% | 51% | 51% | 51% | 54% |
| Volume (GWh) | 953 | 1 331 | 1 516 | 1 516 | 1 532 | 6 848 |
| PPA weighted average price, EUR/MWh | 86.9 | 67.6 | 64.7 | 64.7 | 69.0 | 69.3 |
* Price floor – state support in a form of a price floor received from reverse auction at price level of 34.9
€/MWh (maximum 20 €/MWh) with a duration of 12 years
** expected production contains forecasted production volumes of operational and under construction assets
26
| € thousand | Note | Q1 2023 | Q1 2022 |
|---|---|---|---|
| Revenue | 9 | 68,785 | 58,141 |
| Renewable energy support and other operating income | 10 | 8,719 | 8,579 |
| Change in inventories of finished goods and work in progress | (5,060) | (2,067) | |
| Raw materials, consumables and services used | 11 | (24,792) | (14,134) |
| Payroll expenses | (2,486) | (2,443) | |
| Depreciation, amortisation and impairment | (9,815) | (9,648) | |
| Other operating expenses | (4,055) | (2,504) | |
| OPERATING PROFIT | 31,296 | 35,924 | |
| Finance income | 407 | 170 | |
| Finance costs | (380) | (325) | |
| Net finance income (costs) | 27 | (155) | |
| Profit from associates under the equity method | 19 | 4 | |
| PROFIT BEFORE TAX | 31,342 | 35,773 | |
| Income tax expense | (820) | (849) | |
| PROFIT FOR THE PERIOD | 30,522 | 34,924 |
| Weighted average number of shares, thousand |
6 | 264,276 | 264,276 |
|---|---|---|---|
| Basic earnings per share, € |
6 | 0.12 | 0.13 |
| Diluted earnings per share, € |
6 | 0.12 | 0.13 |
| € thousand | Note | Q1 2023 | Q1 2022 |
|---|---|---|---|
| PROFIT FOR THE PERIOD | 30,522 | 34,924 | |
| Other comprehensive income | |||
| Items that may be reclassified subsequently to profit or loss: | |||
| Remeasurement of hedging instruments in cash flow hedges (2023: incl. reclassifications to profit or loss; 2022: no reclassifications to profit or loss) |
5, 7 | (689) | 937 |
| Exchange differences on the translation of foreign operations | 7 | (35) | (137) |
| Other comprehensive income (loss) for the period | (724) | 800 | |
| TOTAL COMPREHENSIVE INCOME FOR THE PERIOD | 29,798 | 35,724 |
| € thousand | Note | 31 Mar 2023 | 31 Dec 2022 | |
|---|---|---|---|---|
| ASSETS | EQUITY | |||
| Non-current assets | ||||
| Property, plant and equipment | 4 | 843,998 | 776,870 | parent |
| Intangible assets | 60,342 | 60,382 | ||
| Right-of-use assets | 4,528 | 4,239 | ||
| Prepayments for property, plant and equipment | 4 | 34,538 | 19,412 | |
| Deferred tax assets | 1,344 | 1,321 | ||
| Investments in associates | 524 | 506 | ||
| Derivative financial instruments | 5, 7 | 9,206 | 11,277 | |
| Non-current receivables | 40 | 40 | ||
| Total non-current assets | 954,520 | 874,047 | LIABILITIES | |
| Current assets | ||||
| Inventories | 8,628 | 14,227 | ||
| Trade and other receivables and prepayments | 46,777 | 41,091 | ||
| Cash and cash equivalents | 80,509 | 131,456 | ||
| Derivative financial instruments | 5 | 3,871 | 3,349 | |
| Total current assets | 139,785 | 190,123 | ||
| Total assets | 1,094,305 | 1,064,170 |
| € thousand | Note | 31 Mar 2023 | 31 Dec 2022 |
|---|---|---|---|
| EQUITY | |||
| Equity and reserves attributable to shareholders of the parent |
|||
| Share capital | 264,276 | 264,276 | |
| Share premium | 6 | 60,351 | 60,351 |
| Statutory capital reserve | 3,259 | 3,259 | |
| Other reserves | 5, 7 | 165,730 | 166,419 |
| Foreign currency translation reserve | 7 | (797) | (762) |
| Retained earnings | 255,712 | 225,190 | |
| Total equity | 748,531 | 718,733 | |
| LIABILITIES | |||
| Non-current liabilities | |||
| Borrowings | 8 | 252,470 | 255,755 |
| Government grants | 6,991 | 7,115 | |
| Non-derivative contract liability | 5, 7 | 18,086 | 18,086 |
| Deferred tax liabilities | 12,297 | 12,326 | |
| Other non-current liabilities | 3,000 | 3,000 | |
| Provisions | 9 | 9 | |
| Total non-current liabilities | 292,853 | 296,291 | |
| Current liabilities | |||
| Borrowings | 8 | 20,266 | 23,808 |
| Trade and other payables | 29,298 | 20,215 | |
| Provisions | 2 | 2 | |
| Non-derivative contract liability | 5 | 3,355 | 5,121 |
| Total current liabilities | 52,921 | 49,146 | |
| Total liabilities | 345,774 | 345,437 | |
| Total equity and liabilities | 1,094,305 | 1,064,170 |
| € thousand | Note | Q1 2023 | Q1 2022 |
|---|---|---|---|
| Cash flows from operating activities | |||
| Cash generated from operations | 12 | 44,337 | 46,035 |
| Interest and loan fees paid | (2,053) | (502) | |
| Interest received | 311 | 2 | |
| Income tax paid | (574) | (500) | |
| Net cash generated from operating activities | 42,021 | 45,035 | |
| Cash flows from investing activities | |||
| Purchase of property, plant and equipment and intangible assets |
4 | (85,747) | (12,326) |
| Proceeds from sale of property, plant and equipment | 0 | 3 | |
| Net cash used in investing activities | (85,747) | (12,323) | |
| Cash flows from financing activities | |||
| Repayments of bank loans | 8 | (7,137 | (4,643) |
| Repayments of lease principal | 8 | (84) | (82) |
| Net cash used in financing activities | (7,221) | (4,725) | |
| Net cash flow | (50,947) | 27,987 | |
| Cash and cash equivalents at the beginning of the period | 131,456 | 80,454 | |
| Cash and cash equivalents at the end of the period | 80,509 | 108,441 | |
| Increase in cash and cash equivalents | (50,947) | 27,987 |
| € thousand | Share capital | Share premium |
Statutory capital reserve |
Other reserves |
Foreign currency translation reserve |
Retained earnings |
Total equity |
|---|---|---|---|---|---|---|---|
| Equity as at 31 December 2021 | 264,276 | 60,351 | 479 | 151,793 | (965) | 157,673 | 633,607 |
| Profit for the period | 0 | 0 | 0 | 0 | 0 | 34,924 | 34,924 |
| Other comprehensive income for the period | 0 | 0 | 0 | 937 | (137) | 0 | 800 |
| Total comprehensive income for the period | 0 | 0 | 0 | 937 | (137) | 34,924 | 35,724 |
| Equity as at 31 March 2022 | 264,276 | 60,351 | 479 | 152,730 | (1,102) | 192,597 | 669,331 |
| Equity as at 31 December 2022 | 264,276 | 60,351 | 3,259 | 166,419 | (762) | 225,190 | 718,733 |
| Profit for the period | 0 | 0 | 0 | 0 | 0 | 30,522 | 30,522 |
| Other comprehensive loss for the period | 0 | 0 | 0 | (689) | (35) | 0 | (724) |
| Total comprehensive income for the period | 0 | 0 | 0 | (689) | (35) | 30,522 | 29,798 |
| Equity as at 31 March 2023 | 264,276 | 60,351 | 3,259 | 165,730 | (797) | 255,712 | 748,531 |
32
These condensed consolidated interim financial statements (interim financial statements) have been prepared in accordance with International Accounting Standard (IAS) 34 Interim Financial Reporting and they do not include all the notes normally included in the annual financial statements. Thus, they should be read in conjunction with the group's annual financial statements as at and for the year ended 31 December 2022, which have been prepared in accordance with IFRS as adopted by the European Union.
These interim financial statements have been prepared using the same accounting policies as those applied in the preparation of the group's annual financial statements as at and for the year ended 31 December 2022.
The preparation of interim financial statements requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, and income and expenses. Actual results may differ from those estimates. Significant judgements made by management in applying the group's accounting policies and the key sources of estimation uncertainty were mainly the same as those described in the group's annual financial statements as at and for the year ended 31 December 2022.
These interim financial statements have not been audited or otherwise checked by auditors.
Through its activities, the group is exposed to various financial risks: market risk (incl. currency risk, fair value and cash flow interest rate risk and price risk), credit risk and liquidity risk. Condensed interim financial statements do not contain all the information about the group's financial risk management which is required to be disclosed in the annual financial statements. Therefore, these interim financial statements should be read in conjunction with group's annual financial statements as at and for the year ended 31 December 2022.
The group uses interest rate swaps for interest rate risk management. Interest rate risk is the risk that the fair value or future cash flows of financial instruments will fluctuate because of changes in market interest rates. Cash flow interest rate risk arises from the group's floating-rate borrowings and is the risk that finance costs will increase when interest rates rise. Interest rate risk is mitigated partly by raising debt at fixed interest rates and partly by hedging: fixing the interest expenses of floating-rate borrowings raised with IRS instruments. Information on IRS transactions is disclosed in note 5.
The group regards equity and borrowings (debt) as capital. In order to maintain or change its capital structure, the group may change the dividend distribution rate, repay capital contributions to shareholders, issue new shares or sell assets to reduce its financial liabilities, and raise debt capital in the form of loans. On raising loans, management assesses the group's ability to service the principal and interest payments with operating cash flow and, where necessary, starts timely negotiations to refinance existing loans before their maturity. For further information about financing ratios and borrowings, see the Financing chapter in the management report.
Enefit Green's management board assesses the group's financial performance and makes management decisions on the basis of segment reporting where the group's reportable operating segments have been identified by reference to the main business lines of its business units. All production units operated by the group have been divided into operating segments based on the way they produce energy. Other internal structural units have been divided between operating segments based on their core activity.
The group has identified three main business lines, which are presented as separate reportable segments, and less significant business activities and functions, which are presented within Other:
The segment Other comprises activities whose individual contribution to the group's revenue and EBITDA is insignificant. None of those activities exceeds the quantitative thresholds for separate disclosure.
Segment revenues and other operating income include revenues and other operating income from external customers only, generated by the sale of respective products or services. As the segments are based on externally sellable products and services, there are no intragroup transactions between segments to be eliminated.
Management assesses segment results mainly on the basis of EBITDA, but also monitors operating profit. Finance income and costs, income tax expense and profits and losses on investments in equity-accounted investees are not allocated to operating segments.
The group's non-current assets are allocated to segments based on their purpose of use. Liabilities and current assets are not allocated to segments.
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| REVENUE | ||
| Wind energy | 37,946 | 34,617 |
| Cogeneration | 30,141 | 22,118 |
| Solar energy | 494 | 1,279 |
| Total reportable segments | 68,581 | 58,013 |
| Other | 205 | 128 |
| Total | 68,785 | 58,141 |
| RENEWABLE ENERGY SUPPORT AND OTHER INCOME | ||
| Wind energy | 6,889 | 6,838 |
| Cogeneration | 1,810 | 1,691 |
| Solar energy | 16 | 32 |
| Total reportable segments | 8,714 | 8,561 |
| Other | 5 | 18 |
| Total | 8,719 | 8,579 |
| EBITDA | ||
| Wind energy | 30,825 | 34,720 |
| Cogeneration | 12,870 | 12,286 |
| Solar energy | -435 | 413 |
| Total reportable segments | 43,260 | 47,419 |
| Other | (2,148) | (1,851) |
| Total | 41,112 | 45,568 |
| Depreciation, amortisation and impairment losses | 9,815 | 9,648 |
| Net finance costs | 0 | 155 |
| Profit from associates under the equity method | 0 | (4) |
| Profit before tax | 31,296 | 35,768 |
| OPERATING PROFIT | ||
| Wind energy | 23,891 | 27,908 |
| Cogeneration | 10,293 | 9,708 |
| Solar energy | (661) | 185 |
| Total reportable segments | 33,523 | 37,801 |
| Other | (2,227) | (1,877) |
| Total | 31,296 | 35,924 |
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| INVESTMENTS IN NON-CURRENT ASSETS | ||
| Wind energy | 77,852 | 11,816 |
| Cogeneration | 93 | 149 |
| Solar energy | 12,182 | 1,161 |
| Total reportable segments | 90,127 | 13,126 |
| Other | 1,810 | 621 |
| Total | 91,938 | 13,746 |
| € thousand | 31 Mar 2023 | 31 Dec 2022 |
| NON-CURRENT ASSETS | ||
| Wind energy | 733,564 | 668,422 |
Cogeneration 132,026 134,510 Solar energy 73,184 55,035 Total reportable segments 938,775 857,968 Other 15,746 16,079 Total 954,520 874,047
| Enefit Green | |
|---|---|
| € thousand | Land | Buildings | Facilities and structures |
Machinery and equipment |
Assets under construction |
Prepayments | Total |
|---|---|---|---|---|---|---|---|
| Property, plant and equipment as at 31 December 2022 | |||||||
| Cost | 63,953 | 25,573 | 42,218 | 751,521 | 203,637 | 19,412 | 1,106,314 |
| Accumulated depreciation | 0 | (10,385) | (25,014) | (274,615) | (18) | 0 | (310,032) |
| Carrying amount | 63,953 | 15,188 | 17,204 | 476,906 | 203,619 | 19,412 | 796,282 |
| Total property, plant and equipment as at 31 December 2022 | 63,953 | 15,188 | 17,204 | 476,906 | 203,619 | 19,412 | 796,282 |
| Movements in the reporting period | |||||||
| Additions | 0 | 0 | 0 | 51 | 76,724 | 15,162 | 91,937 |
| Exchange differences | 0 | 0 | 1 | 21 | 1 | 0 | 23 |
| Transfers | 0 | 1 | 2 | 1,951 | (1,918) | (36) | 0 |
| Depreciation and impairment | 0 | (158) | (317) | (9,231) | 0 | 0 | (9,706) |
| Total movements during the period | 0 | (157) | (314) | (7,208) | 74,807 | 15,126 | 82,254 |
| Property, plant and equipment as at 31 March 2023 |
|||||||
| Cost | 63,953 | 25,574 | 42,221 | 753,544 | 278,444 | 34,538 | 1,198,274 |
| Accumulated depreciation | 0 | (10,543) | (25,331) | (283,846) | (18) | 0 | (319,738) |
| Carrying amount as at 31 March 2023 | 63,953 | 15,031 | 16,890 | 469,698 | 278,426 | 34,538 | 878,536 |
At 31 March 2023, the group had committed to capital expenditures of €440,428k (31 December 2022: €89 623k and 31 March 2022: €212,890k).
Derivatives are initially recognised at fair value on the date the derivative contract is entered into and are subsequently measured at their fair value. The method for recognising the resulting gain or loss depends on whether the derivative is designated as a hedging instrument, and if it is, the nature of the item being hedged. As at 31 March 2023, the group used cash flow hedging instruments in order to hedge the exposure to interest rate risk resulting from floating-rate borrowings.
The group documents at the inception of the transaction the relationship between the hedging instruments and the hedged items, and its risk management objectives and strategy for undertaking various hedge transactions. The group also documents whether there is an economic relationship between the derivatives that are used in hedging transactions and the changes in the cash flows of the hedged items. At inception of the hedge, the group documents the sources of hedge ineffectiveness. Hedge ineffectiveness is quantified in each reporting period and recognised in profit or loss.
The full fair value of hedging derivatives is classified as a non-current asset or liability when the remaining maturity of the hedging instrument is more than 12 months and as a current asset or liability when the remaining maturity of the hedging instrument is less than 12 months.
The effective portion of changes in the fair value of derivatives that are designated and qualify as cash flow hedges is recognised in other comprehensive income. The gain or loss relating to the ineffective portion is recognised immediately in profit or loss as a net amount within other operating income or other operating expenses. The day one fair value of derivative instruments entered into with the parent is recognised directly in equity when its economic substance is a distribution to the parent of resources embodying economic benefits.
Amounts accumulated in equity are reclassified to profit or loss in the periods when the hedged item affects profit or loss (for instance, when the forecasted sale that is hedged takes place).
When a hedging instrument expires or is sold, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is recognised when the forecasted transaction is ultimately recognised in profit or loss. When a forecasted transaction is no longer expected to occur, the cumulative gain or loss that was reported in equity is immediately recognised in other operating income or other operating expenses in profit or loss.
The different levels for the determination of the fair value of financial instruments have been defined as follows:
• Level 1: quoted prices (unadjusted) in active markets for identical assets or liabilities;
• Level 2: inputs other than quoted prices included within level 1 that are observable for the asset or liability, either directly or indirectly;
• Level 3: inputs for the asset or liability that are not based on observable market data.
The fair value of financial instruments that are not traded in an active market is determined using valuation techniques. The valuation techniques maximise the use of observable market data where it is available and rely as little as possible on the group's own estimates. An instrument is included in level 3 if one or more significant inputs are not based on observable market data.
In 2021, the group used cash flow hedging instruments in order to hedge the exposure to variability in the price of electricity.
A part of the renewable electricity production assets operated by the group which is not subject to a subsidy scheme under a feed-in-tariff is exposed to the risk of electricity price fluctuations as the electricity is sold on the Nord Pool power exchange. To hedge the risk of electricity price volatility, the group has used base load swap derivative contracts. Under the given derivatives, the group is the payer of the floating price and the counterparty the payer of the fixed price.
Transactions designed to hedge the risk of variability in electricity prices are designated as hedging instruments in cash flow hedges. The underlying hedged item is the market price risk of highly probable forecasted renewable electricity sales transactions that are exposed to market price fluctuations. The hedge ratio of the hedging relationships is one to one.
The fair values of the level 3 instruments have been estimated using a combination of market prices, mathematical models, and assumptions based on historical and forward-looking market and other relevant data. The most significant input of the fair value of the derivatives is the long-term electricity price. The group determined the underlying price for the calculation of fair value based on the long-term price curve for the Lithuanian and Estonian electricity markets, which was between 34 €/MWh and 59 €/MWh. Derivative financial instruments were remeasured to fair value as at 17 August 2021.
At the trade date the fair value of derivatives designated as hedging instruments was negative at €(10,781)k, which was recognised directly in equity as it reflected a transaction with the parent, Eesti Energia AS. The balance at 31 March 2023 was €(10,781)k.
Enefit Green AS and its parent Eesti Energia AS entered into an EFET General Agreement Concerning the Delivery and Acceptance of Electricity (EFET General Agreement) on 17 August 2021, simultaneously terminating all open derivative contracts existing between them. By signing the agreement, the parties entered into a fixed-price physical electricity sales contract for the period 2023–2027. The contract was entered into for the same quantities of electricity and at the same fixed prices as had been agreed for the originally recognised derivatives.
The group continued to apply hedge accounting to the open derivatives position until 17 August 2021, recognising changes in the fair value of the derivatives until the date of signature of the EFET General Agreement. The negative value of the derivative financial instruments classified as liabilities increased from €(10,781)k at the trade date to €(23,207)k at 31 December 2021 due to the change in the electricity price in the period from the trade date to 17 August 2021. The negative fair value change of €(12,426)k has been recognised in other comprehensive income as no material sources of hedge ineffectiveness were identified in the hedging relationships in the period between the trade date and 17 August 2021. Since the derivative financial instruments had been measured to fair value by the date of conclusion of the EFET General Agreement, (measurement date 17 August 2021), their value, which has been classified as a liability, will not change before the arrival of the supply period determined in the EFET General Agreement, which is 2023– 2027.
The electricity supply period under the EFET agreements began on 1 January 2023. Accordingly, the balance of the liability decreased by €860k in Q1 2023 and was €(11,566)k at 31 March 2023.
The EFET General Agreement meets the own use exemption and, therefore, is not considered to be a financial instrument that is required to be measured at fair value under IFRS 9. Rather, it is to be accounted for as an executory contract under IFRS 15 Revenue from Contracts with Customers with the revenue being recognised at a fixed per-unit value only when the delivery of electricity takes place in the years 2023–2027. No gains or losses were recognised at the date the derivative contracts were replaced with the EFET General Agreement. Upon entering into the EFET General Agreement, the carrying amount of the derivatives classified as a liability at that date, which was €(23,207)k, was reclassified as a non-derivative contract liability, which will gradually increase recognised revenue until the EFET General Agreement is fulfilled. Such an increase in revenue will be partially offset by the reclassification of the €(12,426)k accumulated in the electricity cash flow hedge reserve to profit or loss due to the discontinuance of hedge accounting. The amount is the difference between the fair value of the derivative financial instruments at 17 August 2021 of €(23,207)k and the trade date fair value of the derivatives of €(10,781)k, which is recognised directly in equity. See note 7 for further information about reserves.
As at 31 December 2022, the liability of €23,207k was classified into a current portion of €5,121k and a noncurrent portion of €18,086k.
In connection with the beginning of the supply period under the EFET agreements, the following changes will be made to the group's reserves and the income statement in 2023.
| € thousand | Note | Q1 2023 | Q2 2023 | Q3 2023 | Q4 2023 | Total |
|---|---|---|---|---|---|---|
| Non-derivative contract liability |
(1,766) | (756) | (1,033) | (1,566) | (5,121) | |
| Electricity cash flow hedge reserve |
7 | 860 | 552 | 632 | 754 | 2,798 |
| Gain on derivative financial instruments |
10 | 905 | 204 | 401 | 813 | 2,323 |
At 31 March 2023, the group had three interest rate swap agreements to hedge the exposure to the interest rate risk of three loans (no interest rate swaps in the comparative period):
─ An interest rate swap with a notional amount of €76,522k whereby the group receives interest at a rate equal to 6 month EURIBOR and pays a fixed rate of interest of 1.1%. The swap is designed to hedge the exposure to the interest rate risk of a floating-rate loan taken out on 30 September 2022.
─ An interest rate swap with a notional amount of €50,000k whereby the group receives interest at a rate equal to 3 month EURIBOR and pays a fixed rate of interest of 1.049%. The swap is designed to hedge the exposure to the interest rate risk of a floating-rate loan taken out on 24 September 2022.
─ An interest rate swap with a notional amount of €37,500k whereby the group receives interest at a rate equal to 6 month EURIBOR and pays a fixed rate of interest of 1.125%. The swap is designed to hedge the exposure to the interest rate risk of a floating-rate loan taken out on 30 June 2022.
The interest rate swaps have been designated as hedging instruments in cash flow hedges. There is an economic relationship between the hedging instruments (interest rate swaps) and the hedged items (the loan agreements) because at 31 March 2023 the main terms of the interest rate swaps matched the terms of the loans (i.e. their notional amounts, currencies, and maturity, payment and other dates). The forward hedges have a hedge ratio of one to one. To test the hedge effectiveness, the group uses the hypothetical derivative method and compares the changes in the fair values of the interest rate swaps against the changes in the fair values of the loan agreements. Hedge ineffectiveness can arise from the following sources:
─ A change in the credit risk of the group or the counterparty of the interest rate swap. The effect of credit risk may cause an imbalance in the economic relationship between the hedging instrument and the hedged item so that the values of the hedging instrument and the hedged item no longer move in opposite directions. According to the assessment of the group's management, it is highly unlikely that credit risk will cause significant hedge ineffectiveness.
At 31 March 2023, the effect of the hedging instruments on the group's statement of financial position was as follows (€ thousand):
| € thousand | Notional amount |
Carrying amount (Asset) |
Carrying amount (Liability) |
Line item in the statement of financial position |
Change in fair value* |
Hedge ineffectiveness recognised in profit or loss |
Amounts transferred from hedge reserve to profit or loss |
|---|---|---|---|---|---|---|---|
| Interest rate swaps | 168,334 | 13,077 | 0 | Derivatives | (996) | 0 | 553 |
* Change compared to 31 December 2022, recognised in other comprehensive income
At 31 March 2023, the effect of the hedged items on the group's statement of financial position was as follows (€ thousand):
| € thousand | Change in fair value used to measure ineffectiveness |
Amounts recognised in hedge reserve |
Amounts recognised in hedge reserve to which hedge accounting is no longer applied |
|---|---|---|---|
| Floating rate loans | 13,077 | 13,077 | 0 |
Fair value has been measured based on a model from a third party, which was supported by the confirmation of the counterparty to the trade. In its internal calculations, the group determines the fair value of interest rate swaps by estimating the present value of the expected future cash flows based on the interest rate curves of EURIBOR observable in the market. The fair value measurement takes into account the credit risk of the group and the counterparty, which is calculated based on current credit spreads derived from credit default swaps or bond prices. The fair value of interest rate swaps qualifies as a level 2 measurement.
At 31 March 2023, the number of the registered shares of Enefit Green AS amounted to 264,276,232 (31 December 2022: 264,276,232 shares). The nominal value of a share is €1.
Basic earnings per share (EPS) have been calculated by dividing profit for the period attributable to shareholders of the parent by the weighted average number of ordinary shares outstanding during the period. Since the group has no potential ordinary shares, diluted earnings per share for all periods presented equal basic earnings per share.
The group's management board has proposed to the general meeting of the shareholders that the company distribute a dividend of €54,969k for the year ended 31 December 2022 (€0.208 per share). The dividend will be paid out in Q2 2023 after the general meeting has adopted the relevant resolution.
Basic and diluted earnings per share based on the weighted average number of shares
| Unit | Q1 2023 | Q1 2022 | |
|---|---|---|---|
| Profit attributable to shareholders of the parent |
€ thousand | 30,522 | 34,924 |
| Weighted average number of shares |
thousand | 264,276 | 264,276 |
| Basic earnings per share |
€ | 0.12 | 0.13 |
| Diluted earnings per share |
€ | 0.12 | 0.13 |
| € thousand | 31 Mar 2023 | 31 Dec 2022 |
|---|---|---|
| Other reserves at the beginning of the period | 165,657 | 150,828 |
| of which currency translation reserve | (762) | (965) |
| of which interest rate swap transactions (IRS) | 14,626 | 0 |
| of which electricity cash flow hedge reserve | (12,426) | (12,426) |
| of which fair value on initial recognition of a derivative financial instrument transaction with the parent |
(10,781) | (10,781) |
| of which other reserves | 175,000 | 175,000 |
| Change in fair value of cash flow hedges | 860 | 0 |
| of which electricity cash flow hedge reserve | 860 | 0 |
| Interest rate swap transactions (IRS) | (996) | 14,529 |
| Recognised as an increase in interest expense | (553) | 97 |
| Exchange differences on the translation of foreign operations | (35) | 203 |
| Other reserves at the end of the period | 164,933 | 165,657 |
| of which currency translation reserve | (797) | (762) |
| of which interest rate swap transactions (IRS) | 13,077 | 14,626 |
| of which electricity cash flow hedge reserve | (11,566) | (12,426) |
| of which fair value on initial recognition of a derivative financial instrument transaction with the parent |
(10,781) | (10,781) |
| of which other reserves | 175,000 | 175,000 |
8. Borrowings at amortised cost
| Current borrowings | Non-current borrowings | ||||
|---|---|---|---|---|---|
| € thousand | Bank loans | Lease liabilities | Bank loans | Lease liabilities | Total |
| Borrowings at amortised cost as at 31 December 2022 | 23,396 | 412 | 251,577 | 4,178 | 279,563 |
| Movements in the reporting period | |||||
| Monetary movements | |||||
| Borrowings received | 0 | 18 | 0 | 358 | 376 |
| Repayments of borrowings | (7,137) | (84) | 0 | 0 | (7,221) |
| Non-monetary movements | |||||
| Transfers | 3,659 | 0 | (3,659) | 0 | 0 |
| Other movements | 2 | 0 | 14 | 2 | 18 |
| Total movements during the period | (3,476) | (66) | (3,645) | 360 | (6,827) |
| Borrowings at amortised cost as at 31 March 2023 |
19,920 | 346 | 247,932 | 4,538 | 272,736 |
Line item ´Transfers´ comprises the change in the current portions of the principal amounts of the loans due to the changes in the repayment schedule.
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| Revenue by activity | ||
| Sale of goods | ||
| Pellets | 15,676 | 8,174 |
| Scrap metal | 263 | 291 |
| Other goods | 90 | 45 |
| Total sale of goods | 16,029 | 8,510 |
| Sale of services | ||
| Heat | 3,276 | 2,355 |
| Electricity | 44,544 | 42,108 |
| Waste reception and resale | 4,593 | 4,291 |
| Rental and maintenance of assets | 248 | 853 |
| Other services | 95 | 24 |
| Total sale of services | 52,756 | 49,631 |
| Total revenue | 68,785 | 58,141 |
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| Renewable energy support | 7,268 | 8,282 |
| Government grants | 123 | 135 |
| Gain on derivative financial instruments | 906 | 0 |
| Other income | 422 | 162 |
| Total renewable energy support and other operating income |
8,719 | 8,579 |
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| Maintenance and repairs | 3,102 | 2,985 |
| Technological fuel | 8,359 | 4,279 |
| Electricity | 11,461 | 4,685 |
| Services related to ash treatment | 563 | 795 |
| Transport services for sale of finished goods | 569 | 461 |
| Materials and spare parts for production | 411 | 698 |
| Transmission services | 115 | 27 |
| Waste handling | 80 | 79 |
| Resource charges for natural resources | 1 | 2 |
| Other raw materials, consumables and services used | 50 | 44 |
| Environmental pollution charges | 81 | 79 |
| Total raw materials, consumables and services used | 24,792 | 14,134 |
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| Profit before tax | 31,342 | 35,773 |
| Adjustments | ||
| Depreciation and impairment of property, plant and equipment | 9,706 | 9,620 |
| Amortisation and impairment of intangible assets | 109 | 28 |
| Amortisation of government grants related to assets | (123) | (135) |
| Interest expense on borrowings | 380 | 319 |
| Profit from associates using the equity method | (19) | (4) |
| Gain on disposal of property, plant and equipment | 0 | (2) |
| Interest and other finance income | (311) | (3) |
| Foreign exchange (gain) loss loans granted and taken out | 15 | (91) |
| Realised gain on derivative financial instruments | (905) | 0 |
| Adjusted profit before tax | 40,194 | 45,505 |
| Net change in current assets related to operating activities | ||
| Change in receivables related to operating activities | 339 | 79 |
| Change in inventories | 5,600 | 1,740 |
| Net change in other current assets related to operating activities | (5,812) | (2,049) |
| Total net change in current assets related to operating activities | 127 | (230) |
| Net change in liabilities related to operating activities |
||
| Change in provisions | 0 | (1) |
| Change in trade payables | 1,217 | 1,658 |
| Net change in other current liabilities related to operating activities |
2,799 | (897) |
| Total net change in current liabilities related to operating activities |
4,016 | 760 |
| Cash generated from operations | 44,337 | 46,035 |
The parent of Enefit Green AS is Eesti Energia AS. At 31 March 2023, the sole shareholder of Eesti Energia AS was the Republic of Estonia.
For the purposes of the condensed consolidated interim financial statements of Enefit Green, related parties include the shareholders, other companies belonging to the same group (group companies), members of the executive and higher management, and close family members of the above persons and companies under their control or significant influence. Related parties also include entities under the control or significant influence of the state.
The Group has applied the exemption from disclosure of individually insignificant transactions and balances with the government and other related parties where the state has control or joint control of, or significant influence over, such parties.
Enefit Green AS and its subsidiaries produce renewable energy that is sold directly to third parties (incl. to the Nord Pool power exchange). The parent, Eesti Energia AS, provides Enefit Green AS with back-office services to assist in those sales procedures. The costs related to the services are presented in the table within purchases of services.
The group also discloses transactions with companies under the control or significant influence of the state. In the reporting period and the comparative period, the group conducted significant purchase and sales transactions with the Estonian transmission system operator Elering AS, which is wholly owned by the state.
At 31 March 2023, Enefit Green AS had signed long-term physical electricity sales contracts of 9,111 GWh with Eesti Energia AS for the supply of electricity in the Lithuanian, Estonian, Finnish and Polish electricity networks in the period 2023–2033. The contracts are for the supply of both annual and monthly base load energy. The weighted average price of the physical electricity sales contracts signed with the related party is 69.1 €/MWh.
At the beginning of 2021, the group used base load swap derivative contracts in order to hedge the exposure to variability in the price of electricity. The initial fair value of the derivatives designated as hedging instruments of €(10,781)k was recognised directly in equity. The group continued to apply hedge accounting to the open derivatives position until 17 August 2021 when an EFET General Agreement Concerning the Delivery and Acceptance of Electricity (EFET General Agreement) was signed and all open derivative contracts were simultaneously terminated. The negative value of the derivative financial instruments classified as liabilities increased from €(10,781)k at the trade date to €(23,207)k due to the change in the electricity price in the period from the trade date to 17 August 2021. The cumulative change in the fair value of the derivative financial instruments of €(12,426)k was recognised through other comprehensive income and the cash flow hedge reserve in equity (see also note 5). As at 31 March 2023, the balance of the electricity cash flow hedge reserve was €(11,566)k (see also notes 5 and 7).
| TRANSACTIONS | BALANCES | ||
|---|---|---|---|
| PARENT | |||
| Sale of services | 23,457 | 2,334 | Of which non-derivative |
| OTHER GROUP COMPANIES | |||
| Sale of goods | 0 | 0 | |
| Sale of services | 420 | 1,976 | |
| OTHER RELATED PARTIES (INCL. ASSOCIATES) |
|||
| ELERING AS | |||
| € thousand | Q1 2023 | Q1 2022 |
|---|---|---|
| TRANSACTIONS | ||
| PARENT | ||
| Purchase of services | 4,464 | 2,589 |
| Sale of goods | 0 | 0 |
| Sale of services | 23,457 | 2,334 |
| OTHER GROUP COMPANIES | ||
| Purchase of goods | 0 | 6 |
| Purchase of services | 857 | 970 |
| Sale of goods | 0 | 0 |
| Sale of services | 420 | 1,976 |
| OTHER RELATED PARTIES (INCL. ASSOCIATES) |
||
| Purchase of services | 456 | 367 |
| Sale of services | 0 | 0 |
| ELERING AS | ||
| Purchase of services | 1,587 | 31 |
| Sale of services | 7,330 | 8,368 |