Quarterly Report • Nov 2, 2023
Quarterly Report
Open in ViewerOpens in native device viewer


| Letter from the CEO | 3 |
|---|---|
| Path towards 4X growth | 4 |
| Projects under construction | 5 |
| Near term development portfolio | 6 |
| Complete view of the development portfolio | 7 |
| 3Q 2023 Key highlights | 8 |
| 9 months 2023 Key highlights | 9 |
| Operating environment | 10 |
| Regulatory environment | 12 |
| Significant events in Q3 | 14 |
| Financial results of the group | 15 |
| Financial results by segments | 19 |
| Wind energy segment | 20 |
| Cogeneration segment | 22 |
| Solar energy segment | 24 |
| Investments | 25 |
| Financing | 26 |
| Risk management | 28 |
| Unaudited condensed consolidated interim financial statements Q3 2023 | 30 |
| Notes to the condensed consolidated interim financial statements | 36 |
| Group structure | 47 |

Electricity prices stabilised somewhat in Q3 this year. Although comparisons with last year's exceptionally high levels reflect a steep fall in prices, the Baltic markets saw a slight increase and other Nord Pool markets saw a slight decrease in electricity prices relative to Q2. The main factors that influence electricity prices are lower natural gas prices, higher wind power production, and strong hydropower production.
Intraday electricity prices on the Nord Pool power exchange have fluctuated widely in recent years and will also remain volatile in the future. The highest average daily electricity price in Q3 was 243.7 €/MWh while the lowest 4.9 €/MWh. Enefit Green's average implied captured electricity price was 84.9 €/MWh, which is 58% lower than a year earlier when it was 205.1 €/MWh.
As in previous periods, our new wind and solar farms, including those still under construction, made a strong 53 GWh contribution to our quarterly electricity production (+38.1 GWh and + 14.9 GWh, respectively). Electricity production in Q3 grew by 37% year on year, rising to 259 GWh. Heat production grew by 37% to 115 GWh.
The Tolpanvaara wind farm (72 MW) in northern Finland, which is still under construction, began producing electricity. After being offline for four months, 11 of the 14 wind turbines in the Akmene wind farm (75 MW) were again brought online. A thorough investigation revealed that the collapse of a turbine in May was caused by a malfunctioning sensor that sent incorrect information to the turbine controller, which led to an excessive load being placed on the tower structure. We are going to continue the construction work so that all 14 wind turbines would be ready for network and other tests as well as power production by the end of November. The Akmene wind farm should be fully complete and operational by the end of Q1 2024.
Enefit Green's Q3 energy production was undermined by availability and reliability issues at our operating wind farms, particularly in Lithuania. Several unplanned production interruptions at the Šilute wind farm, including the repair of the distribution equipment of a substation, had the strongest effect. Although the Šilute wind farm has an operating and maintenance agreement with availability guarantee with General Electric which is effective until 2036, we have decided to commission an independent expert opinion to identify the technical risks associated with the operation of the wind farm as well as relevant risk mitigation activities. At the Mockiai wind farm, the main bearings of a wind turbine had to be replaced. At our Estonian wind farms, planned overhaul of turbine blades was carried out and two gearboxes were replaced.
The factors which affected electricity production and prices, lowered operating income for Q3 by 26% to €44.5m. Although new wind and solar farms contributed strongly, electricity production did not meet the target. Due to the suspension of operations at the Akmene wind farm, the commitments taken under long-term power purchase agreements signed to hedge price risk had to be fulfilled in another way. Electricity purchased at higher prices in order to balance the electricity portfolio lowered EBITDA to €15.9m.
Fixed costs grew by €2.2m, driven by higher operating and development costs. The main cost drivers were maintenance, payroll, research, and consulting expenses, which are essential for the group's growth and long-term operation.
We invested nearly €87m in Q3. The largest amounts were allocated to the construction of the Sopi-Tootsi (255 MW), Kelme I (80 MW) and Tolpanvaara (72 MW) wind farms. We also continued developing our long-term portfolio. Good progress was made with the Risti wind farm project where the Lääne-Nigula local authority approved phase 1 of a special spatial plan.
In order to build the Sopi-Tootsi wind farm, which the largest wind power production facility in the Baltics to date, we entered into a partnership with the European Investment Bank (EIB). The €180m loan agreement signed with EIB not only provides the required funding but also confirms the sustainability of the project and our shared commitment to the achievement of climate goals.
In the current geopolitical and macroeconomic environment, the transition to clean sources of energy requires all stakeholders to make an effort. Surging prices and interest rate spikes also affect the renewable energy sector (through growth in the cost of technologies, construction and capital). However, the decisions made and the steps taken by the European Union reflect unequivocally that our energy system will switch to renewable energy and wind power will grow the most. According to the forecasts of the International Energy Agency, renewable power plants will account for 80% of new electricity production capacities by 2030.
The last quarter of the year, which is about to start, is the most important for us and we are ready for it. Enefit Green is a growth-oriented company with a strong short- and long-term development portfolio with which we will move forward. In the light of developments the operating environment, particularly the uptrend in the cost of capital and wind power investments, we will focus on ensuring the promised return on capital. The risks inherent in the variability of power production and their impact on the results of long-term power purchase agreements will also affect our performance in the future. We monitor price risks in the electricity market with due care and regularly test our portfolio models to make sure that our risk mitigation measures will produce the desired results.

Aavo Kärmas CEO

Enefit Green | Q3 2023 interim report | 4

Operating Under construction


* Following projects have been categorized as operating: Purtse WF (21MW), Purtse PV (32MW), Zambrow PV (9MW). Grid tests are being carried out in Purtse. In Zambrow grid tests are completed, waiting for official production permit.
** COD – Commercial Operating Date


NB! Development projects are in continuous change.
The presented information is management team's best assessment of the status of the near-term development portfolio as of 31 October 2023


NB! Development projects are in continuous change.
* Various onshore wind and solar farm developments that are not expected to get final investment decision before 2024.
** Also known as Hiiumaa offshore wind farm


*(Electricity sales revenue + renewable energy support and efficient cogeneration support – electricity purchases on the Nord Pool day-ahead and intraday market – balancing energy purchases) / production


€180m New 12-year loan facility from EIB

+53 GWh Production from new wind and solar farms


*(Electricity sales revenue + renewable energy support and efficient cogeneration support – electricity purchases on the Nord Pool day-ahead and intraday market – balancing energy purchases) / production

+62 MW New operating capacity Purtse & Zambrow)

+147 GWh Production from new wind and solar farms under construction


€505m New loan agreements (SEB, NIB, EIB)

74MW Sopi solar farm FID


Enefit Green's operations are strongly influenced by seasonality, weather conditions and electricity prices as well as regulations governing the energy industry and political decisions. Factors which affect the group's development projects also include market competition, the development and cost of renewable energy technologies, customers' willingness to enter into long-term green power purchase agreements (PPAs), and renewable energy support schemes.
Most of Enefit Green's production assets are either partly or fully exposed to fluctuations in the market price of electricity. We mitigate electricity price risk with long-term PPAs. The share of various national renewable energy support schemes in our operating income has decreased significantly compared with previous years. Assets currently eligible to support include mainly production assets in Estonia whose 12-year support period has not yet expired and which therefore receive Feed-in Premium (FiP) in addition to the market price of electricity. The FiP support for the production of approximately 55 GWh and 363 GWh of electricity will expire in 2024 and 2025, respectively. After 2025, the amount of FiP received will be negligible. A more detailed overview of the coverage of the next years' expected electricity output with PPAs and other risk mitigation measures (incl. Contracts for Difference (CfDs) in Poland and the new price floor measure in Estonia) is provided at the end of the management report.
The electricity markets of the region where Enefit Green operates are well connected by means of interconnectors. Therefore, electricity generation and prices are affected by various factors in both our core markets and beyond.
Intraday electricity prices on the Nord Pool (NP) power exchange have been highly volatile in recent years. Usually, the peak load electricity price is determined by the more expensive carbon-intensive power and the base load electricity price is determined by renewable power.
Electricity prices in our core markets decreased in Q3 due to lower natural gas prices, growing wind power production, and strong hydropower production in the neighbouring countries.
The International Energy Agency (IEA) expects electricity demand in the European Union (EU) to drop by 3% for the second consecutive year and to hit the past 20 years' lowest level in 2023. The main reason is weaker demand from the industrial sector, which has scaled back production. Electricity demand in the markets where Enefit Green operates has also decreased.
| Average electricity price (€/MWh) |
Q3 2023 |
Q3 2022 |
Change |
|---|---|---|---|
| Estonia | 95.6 | 275.0 | (65.2)% |
| Latvia | 101.0 | 374.8 | (73.0)% |
| Lithuania | 101.0 | 382.1 | (73.6)% |
| Poland | 110.7 | 213.1 | (48.0)% |
| Finland | 44.2 | 220.3 | (79.9)% |
| Norway | 23.6 | 167.6 | (85.9)% |
| Denmark | 78.7 | 347.9 | (77.4)% |
| Sweden | 27.3 | 118.9 | (77.0)% |
In addition to shrinking demand, Q3 electricity prices on the Nord Pool power exchange were affected by maintenance operations at the region's nuclear power plants. The prices in the NP Estonia price area were influenced the most by the maintenance of the Finnish Olkiluoto 2 nuclear reactor which began in the second half of August. While higher wind power production lowered Baltic electricity prices at the beginning of the quarter, the maintenance of the Finnish nuclear power plant drove up the prices, enabling producers to also generate electricity from natural gas.
In peak hours, the electricity price in the region is typically determined by gas-fired power plants. As natural gas prices have declined significantly, peak hour electricity prices in Q3 2023 were lower than a year earlier. The average daily electricity price in Q3 was the highest on 21 August, when it was 243.7 €/MWh (438.4 €/MWh lower than in Q3 2022) and the lowest on 2 July, when it was 4.9 €/MWh (69.8 €/MWh lower than in Q3 2022).
The average price of natural gas on the Dutch gas trading platform TTF was 33.8 €/MWh in Q3 2023 (173.1 €/MWh, 83.7% lower than in Q3 2022). The price increased slightly compared with Q2 2023, mainly due to factors related to LNG production in Australia which reduced the global LNG supply by 6%. The share of LNG imports to Asia has grown as well, rising from 21% of overall LNG sales in the first half of 2023 to 35% in Q3. While the decrease in LNG supply in Europe is putting upward pressure on the price of natural gas, historically high levels of gas inventories in Europe are keeping the prices of natural gas relatively stable.
Interconnectors supply the Baltic countries with Nordic hydropower, which is cheaper than other types of electricity. The average level of hydro resources in the Nordic hydro reservoirs in Q3 2023 was 75.7% of the maximum, which is 4.6 percentage points higher than in Q3 2022.
As the volume of snow and surface water accumulated in the reservoirs this year is 17 TWh higher than a year earlier, hydropower production in 2023 is expected to increase year on year. Higher hydropower production will lower electricity prices in the region because a larger share of the required electricity can be produced by facilities with lower variable costs.

Consistent with the purpose of the EU Emissions Trading System, in recent years the competitiveness of renewable energy in the EU has been supported by the relatively high price of CO2 emission allowances. The average CO2 emission allowance price in Q3 2023 was 85.7 €/t, which is 7% (5.6 €/t) higher than in Q3 2022, but 2.9 €/t lower than in Q2 2023. The decline compared with Q2 is attributable to larger quantities of allowances traded, unusually warm weather, and forecasts of growth in renewable energy production.
Due to seasonal factors, wind conditions in Q2 and Q3 are less favourable for wind power production in our region than the rest of the year. In Q3 2023, the average measured wind speeds in Enefit Green's wind farms in Estonia and Lithuania were at recent years' average level: 5.7 m/s and 5.6 m/s, respectively, but slightly better than in the same period last year (Q3 2022: 5.2 m/s and 5.5 m/s, respectively). The chart below provides an overview of the average quarterly wind speeds in Estonia and Lithuania since the beginning of 2021.


The European Parliament approved amendments to the Renewable Energy Directive, setting a new target of raising the share of renewable energy in the EU's overall energy consumption to at least 42.5%, with the aspiration to reach 45%, by 2030. Permit procedures for renewable energy projects are going to be simplified and the rules for the production of new renewable fuels for the transport sector (incl. hydrogen) were established.
In the coming months, the European Commission will be working on a package of measures designed to support the development of the wind industry by accelerating permitting, improving wind power auction systems, and increasing the availability of skilled labour, access to finance, and supply chain resilience.
In October, the EU energy ministers agreed the general approach to the EU electricity market reform. The deadlock over Contracts for Difference (CfDs) was finally broken and it was agreed that they can be used to support both the construction of new renewable power plants and mitigating the risks of renovating existing nuclear power plants. The decision may affect the renewable energy investment environment in the markets where Enefit Green operates. The wording of the EU electricity market reform is expected to be finalised by the end of 2023.
Estonia's new government has launched changes to legislation and published:
The Competition Authority conducted a public consultation in connection with the approval of the new network charges of the transmission system operator Elering. According to the changes, power plants will be established monthly network charges based on their contractual capacity and consumption points, and the charges for generating electricity from wind and solar will increase relatively more. Elering's new network charges will take effect from 1 January 2024.
Latvia's transmission system operator took an exceptional step and temporarily suspended issuing technical specifications to new electricity producers wishing to connect to the grid in places where the 330 kV grid needs to be reconstructed to ensure successful connection.
The Latvian government supplemented the Cabinet regulation which grants Latvijas Vēja Parki, a joint venture of Latvenergo and Latvia's state forest management company, an exclusive preemptive right to select sites suitable for wind farms before the rights to develop wind farms on state-owned land are auctioned off to other wind farm developers.
The European Commission approved a €193m scheme to support the construction of a 700 MW offshore wind farm in Lithuania's coastal waters. The beneficiary will be selected through a competitive bidding process. The support will be provided through the two-way CfD scheme for a period of 15 years.
The government published a draft Property Tax Act, which setsthe land tax rate for wind power producers at 0.5% until the end of 2031. This would reduce the land tax risk as the current law allows local authorities to set the property tax rate for wind farms at up to 3%.
Since July, producers of electricity from renewable energy sources have also received guarantees of origin for electricity produced and delivered to the grid during the testing period of the power plant. This has made the rules on guarantees of origin fairer for producers.
Poland's Energy Act was amended to allow additional power production installations to be connected to the grid using the connection point of an existing power production facility: for example, to connect a wind turbine via the connection point of a solar power plant. Allowing hybrid solutions (infrastructure sharing) will reduce the construction costs of new power plants.
Amendments made to the Planning Act prohibit the construction of solar power plants on land plots with class IV soil starting from the beginning of 2025 when fast-track permitting is used. This will reduce the land available for rapid expansion of solar power production and will increase the need to use significantly longer planning proceedings.

The EU held its first cross-border renewable energy tender in which Finland and Luxembourg participated as the host and the contributing country, respectively. Based on the results, investment support will be awarded for developing in Finland photovoltaic (PV) projects ranging from 5 MW to 100 MW and with a total combined capacity of up to 400 MW.
In September, the Finnish wind discount was 61%, an all-time high. However, the Finnish district heating market regulation, which does not administratively regulate the price of heat, allows efficient use of power to heat. The investment decisions already made on power-to-heat solutions in Finland suggest that in a market regulated in such a manner, wind power producers' minimum sales price will be determined by the price of heat.

We laid the cornerstone for the Sopi-Tootsi renewable energy production area. We are going to use the abandoned Tootsi peat production field to repurpose the currently low-value land by building a hybrid facility consisting of a wind and a solar farm, which will meet nearly a tenth of Estonia's current electricity consumption.
We are going to install 38 wind turbines with a total capacity of 255 MW and build a solar power plant with around 112,000 bifacial solar panels and a total capacity of 74 MW. The projected combined annual output of the Sopi-Tootsi facility is 750 GWh.
Our Tolpanvaara wind farm in northern Finland has delivered its first electricity to the grid. All 13 wind turbines have been installed and their testing and commissioning is under way. The Tolpanvaara wind farm should come fully online by the year-end. When completed, it will produce nearly 250 GWh of electricity per year, which is sufficient to meet the annual electricity consumption of nearly 40,000 Finnish households.
Enefit Green's total investment in the wind farm extends to nearly €83m. Most of the expenditure will be covered with long-term PPAs signed with consumers interested in using green energy and fixing their contract terms and conditions.
Enefit Green and the European Investment Bank signed a €180m loan agreement for the construction of the Sopi-Tootsi wind farm. It is the largest single investment in onshore wind power in Estonia to date. The loan term is 12 years.
The new funding accounts for a major share of the financing of our ongoing investment programme. It will also contribute to the implementation of climate measures and social cohesion, the reduction Estonia's CO2 emissions, and the achievement of climate neutrality.
The Lääne-Nigula local authority approved phase 1 of a special spatial plan for the development of wind power in Lääne-Nigula municipality. The decision enables Enefit Green to proceed with the development of the Risti wind farm.
We reached agreement with the local authority and community that we will install up to 25 wind turbines with a height of up to 270 metres. A more detailed solution, including the precise locations of the turbines, will be determined in phase 2 of the special spatial plan process.
Enefit Green's internal audit investigations revealed two separate incidents of potential misconduct in Q3. When sufficient evidence had been obtained, the information was handed over to the law enforcement authorities of the countries involved. Both incidents were related to the performance of procurement proceedings. The Estonian law enforcement authorities detained two employees of Enefit Green's Iru power plant and the Lithuanian law enforcement authorities detained an employee of a Polish company that participated in procurement proceedings arranged by Enefit Green.
Enefit Green has zero tolerance for unethical and fraudulent behaviour among employees and business partners.
Enefit Green has issued stock exchange announcements in respect of both incidents but cannot release further information or comments because the investigation is still ongoing.
After a through four-month analysis aimed at determining the root cause of the incident which occurred at the Akmene wind farm at the beginning of May, the management board of Enefit Green decided at the beginning of September that wind turbines not affected by the incident would be gradually brought online. By the end of October, 11 of the wind farm's 14 wind turbines were back in operation.
Enefit Green's goal is to complete the construction of the Akmene wind farm by the end of Q1 2024.

The Enefit Green group's operating income for Q3 2023 decreased by 26% while operating expenses for the period grew by 4% compared with the same period last year. As a result, EBITDA dropped by 51% to €15.9m. Net profit for the period decreased by €17.9m to €5.0m. The key factors which influenced the group's financial performance are described below.
| Q3 2023 |
Q3 2022 |
Change | Change, % |
||
|---|---|---|---|---|---|
| Electricity production (net) |
GWh | 259 | 189 | 70 | 37% |
| Of which by new wind and solar farms |
GWh | 53 | - | 53 | - |
| Electricity sales* | GWh | 364 | 201 | 164 | 82% |
| Heat production |
GWh | 115 | 84 | 31 | 37% |
| Pellet production | kt** | 38 | 39 | (1) | (2)% |
| Pellet sales | kt | 17 | 39 | (22) | (56)% |
Total operating income decreased by €15.8m year on year, the figure comprising a decrease in revenue of €18.0m and an increase in renewable energy support and other operating income of €2.2m. Out of the €18.0m decrease in revenue, €11.0m was attributable to electricity sales which weakened mainly because the market prices of electricity were lower than a year earlier. The average electricity price*** in the group's core markets in Q3 2023 was 97.8 €/MWh (Q3 2022: 317.7 €/MWh). The group's average implied captured electricity price**** for the period was 84.9 €/MWh (Q3 2022: 205.1 €/MWh). The implied captured electricity price differs from the average market price in the core markets, because it is calculated by taking into account long-term fixed-price PPAs, renewable energy support, purchases of balancing energy, electricity purchases from the Nord Pool day-ahead and intraday markets, and the fact that wind farms do not produce the same amount of electricity every hour.
The group's average price of electricity sold to the market in Q3 2023 was 82.2 €/MWh compared with 285.2 €/MWh a year earlier. The group sold to the market 163 GWh of electricity in Q3 2023 compared with 120 GWh in Q3 2022.
In Q3 2023, 202 GWh of the group's portfolio was covered with PPAs at an average price of 80.9 €/MWh. A year earlier, 81 GWh of electricity was sold under an income model based on PPAs and the Feed-in Tariff (FiT) at an average price of 72.1 €/MWh. The share and prices of production covered with PPAs in future periods are disclosed in the risk management chapter.
| Q3 2023 |
Q3 2022 |
Change | Change % |
|
|---|---|---|---|---|
| TOTAL OPERATING INCOME | 44.5 | 60.3 | (15.8) | (26)% |
| Revenue | 39.3 | 57.3 | (18.0) | (31)% |
| Renewable energy support | ||||
| and other operating income | 5.2 | 3.0 | 2.2 | 74% |
| TOTAL OPERATING EXPENSES | ||||
| (excl. D&A) | 28.6 | 27.5 | 1.1 | 4% |
| Raw materials, consumables | ||||
| and services used | 26.0 | 25.0 | 1.0 | 4% |
| Payroll expenses | 2.6 | 2.0 | 0.6 | 30% |
| Other operating expenses | 3.4 | 2.6 | 0.8 | 32% |
| Change in inventories | (3.4) | (2.0) | (1.4) | 69% |
| EBITDA | 15.9 | 32.7 | (16.8) | (51)% |
| Depreciation, amortisation | ||||
| and impairment (D&A) | 10.2 | 9.6 | 0.6 | 6% |
| OPERATING PROFIT | 5.7 | 23.1 | (17.4) | (75)% |
| Net finance income and costs | (0.4) | (0.3) | (0.1) | 44% |
| Profit from associates under | ||||
| the equity method | 0.0 | 0.1 | (0.1) | (63)% |
| Income tax expense |
0.3 | 0.0 | 0.3 | - |
| NET PROFIT | 5.0 | 22.9 | (17.9) | (78)% |
| TOTAL OPERATING EXPENSES | 28.6 | 27.5 | 1.1 | 4% |
| (excl. D&A) | ||||
| Variable costs (incl. balancing | 20.5 | 20.3 | 0.2 | 1% |
| energy purchases) | ||||
| Fixed costs | 11.5 | 9.3 | 2.2 | 24% |
| Change in inventories | (3.4) | (2.0) | (1.4) | 69% |
Pellet sales revenue decreased by €3.0m year on year. While the average sales price of pellets increased by 32%, rising from 182.6 €/t in Q3 2022 to 240.6 €/t in Q3 2023, pellet sales volume decreased from 39 thousand tonnes in the comparative period to 17 thousand tonnes in the reporting period.
Heat production grew by 31 GWh to 115 GWh (Q3 2022: 84 GWh) but the price dropped by 14% (1.8 €/MWh). Through the combined effect of higher production and a lower price, heat sales revenue grew by €1.3m.
Revenue for Q3 2022 was also €3.2m higher due the sale of the inventories of the turnkey solar solutions business. We decided to exit the turnkey solar solutions business and sold relevant inventories in the comparative period.

* The difference between the quantities of electricity sold and produced is attributable to differences between sales under base load PPAs and wind production profiles as well as day-ahead forecasts and unrealised production, which is covered with purchases from Nord Pool and/or the energy imbalance market. ** k = thousand tonnes
*** Production-weighted average market price in the group's core markets
**** Implied captured electricity price = (electricity sales revenue + renewable energy support and efficient cogeneration support + revenue from sale of guarantees of origin – day-ahead and intraday purchases on Nord Pool – balancing energy purchases) / production
An overview of the quantities of electricity produced, purchased and sold as well as the realised sales, purchase and market prices and the implied captured electricity price for the past five quarters is presented in the charts below.
We purchased from the market 110 GWh of electricity at an average price of 116.5 €/MWh in Q3 2023, compared with 16 GWh at an average price of 337.7 €/MWh in the same period last year (the prices and quantities exclude the electricity purchased for pellet production). In Q3 2022, purchases from the market were substantially smaller because part of the production was covered with the fixed-price FiT support scheme and the volume of PPAs was very small. Electricity purchases were also increased by lower than expected electricity production. The electricity price in Enefit Green's core markets, which is presented in the chart, is the average quarterly price in the Baltic and Polish markets, weighted by Enefit Green's production volumes. The price was 97.8 €/MWh in Q3 2023 and 317.7 €/MWh in Q3 2022.

| Q3 2022 | Q4 2022 |
Q1 2023 |
Q2 2023 |
Q3 2023 |
|
|---|---|---|---|---|---|
| Price of electricity sold to the market |
285.2 | 179.0 | 82.4 | 63.7 | 82.2 |
| PPA price (incl. FiT until Q4 2022) |
72.1 | 126.2 | 89.8 | 83.5 | 80.9 |
| Realised purchase price | 337.7 | 271.1 | 116.7 | 83.8 | 116.5 |
| Core markets' average electricity price* |
317.7 | 221.5 | 100.5 | 78.7 | 97.8 |
| Implied captured electricity price ** |
205.1 | 163.0 | 101.4 | 89.9 | 84.9 |
* Production-weighted average market price in the group's core markets
** Implied captured electricity price = (electricity sales revenue + renewable energy support and efficient cogeneration support + revenue from sale of guarantees of origin – day-ahead and intraday purchases on Nord Pool – balancing energy purchases) / production

Renewable energy support and other operating income for Q3 2023 were affected the most by renewable energy support, which grew by €1.4m year on year. The growth in renewable energy support was influenced by the support schemes of our solar farms in Poland: in Q3 2022 we had to repay renewable energy support of €0.7 million under the Polish CfD schemes. Renewable energy support received in Poland in Q3 2023 amounted to €16k. The renewable energy support received by our operating wind farms in Estonia and the Iru power plant grew by €0.3m and €0.4m, respectively. The amount of renewable energy support received is based on the quantity of energy produced. Although the eligibility periods of the Vanaküla and Virtsu III wind farms expired in Q3 2022 (contribution to operating income for the comparative period: €0.2m), the output of wind farms eligible for support in both periods grew by 13.6 GWh year on year (impact on operating income: +€0.5m). The renewable energy output of the Iru power plant grew from 6.2 GWh a year earlier to 10.5 GWh, increasing operating income by €0.4m.
Other operating income was improved by the decrease in the non-derivative contract liability incurred in 2021 by €0.4m in connection with partial fulfilment of relevant PPAs and liquidated damages of €0.4m received for the low availability of the Šilute wind farm. The non-derivative contract liability results from earlier electricity derivatives (base load swaps) which were converted into fixed-price physical electricity sales contracts (PPAs). The decrease in the nonderivative contract liability does not affect cash flow and monetary settlement of electricity sales takes place on the basis of PPAs.

Expenses on raw materials, consumables and services grew by €1.0m (4%). The biggest rise was in electricity expenses, which grew by €5.6m due to growth in electricity purchased from the Nord Pool intraday market to balance the portfolio and the electricity purchased to balance the PPA portfolio in hours of low wind speed; a contributing factor was lower than expected production volume. The quantities and prices of electricity purchased from the market are disclosed in the operating income chapter. Other direct production costs decreased by €5.4m because in mid-2022 we exited the turnkey solar solutions business.
The group's payroll expenses grew by 30% year on year due to an increase in the number of fulltime employees from 172 to 192 and growth in the compensation of existing employees. New people were mostly hired to the development team to support the group's growth plan in all core markets.
Other operating expenses grew by €0.8m (32%), driven by growth in the research and consulting expenses of development projects as well as a slight increase in IT and insurance expenses.
The change in inventories reflects the change in pellet stocks, summarising the quantities of pellets produced and sold in the period under review. In Q3 2023, the group produced 38 thousand tonnes (Q3 2022: 39 thousand tonnes) and sold 17 thousand tonnes (Q3 2022: 39 thousand tonnes) of pellets. The change in inventories was negative at €3.4m (Q3 2022: negative at €2.0m). The average sales price of pellets increased by 32% compared with the same period last year, rising from 182.6 €/t in Q3 2022 to 240.6 €/t in Q3 2023.
The factor with the strongest impact on EBITDA development was the price of electricity sold, which fell steeply compared with Q3 2022 (negative impact: €25.1m). Due to PPAs the quantity of electricity sold grew considerably (positive impact: €15.5m), which also increased the volume of electricity purchased to balance the electricity portfolio (negative impact: €11.2m). The combined effect of the above factors on EBITDA development is influenced by the quantity and profile of electricity produced during the period. Electricity production grew by 37% compared with Q3 2022.
Excluding the effects of the electricity price and quantity, the Cogeneration segment had a positive impact on EBITDA. The calculation takes into account the effects of pellet sales revenue, the change in inventories, technological fuel, and heat sales revenue.
The change in the non-derivative liability increased EBITDA. See the renewable energy support and other operating income chapter for further information.
Fixed costs comprise costs not directly dependent on the production volume. Fixed costs grew by €2.2m (24%) year on year. The increase in fixed costs was attributable to higher maintenance costs, payroll expenses, and research and consulting expenses.
D&A expense grew by €0.6m (6%) compared with the same period last year. Major assets recognised during the period included the Purtse wind farm in Estonia and the Zambrow solar farm in Poland: each increased the group's Q3 depreciation expense by €0.3m.
Net finance costs for Q3 2023 grew by €0.1m year on year. Interest expense on bank loans grew by €3.6m but 98% of it was capitalised due to the construction period of the wind farms. Growth in interest income had a positive effect on net finance costs.


Income tax expense grew by €0.3m compared with the same period last year.
The group's net profit decreased by €17.9m year on year to €5.0m. The decline is attributable to lower electricity prices and higher expenses on electricity purchased to balance the electricity portfolio.


Based on total operating income and EBITDA, the group's largest segment is Wind energy, which accounted for 61% of operating income and 64% of EBITDA for Q3 2023. The Cogeneration segment contributed 33% to operating income and 41% to EBITDA. The smallest reportable segment is Solar energy, which accounted for 6% the group's operating income and 10% of the group's EBITDA for Q3 2023.
In terms of reportable segments, the EBITDA of the Wind energy segment and the Cogeneration segment decreased the most. A more detailed analysis by segment is presented below.
The EBITDA of the segment Other mainly includes general administrative expenses, which is the largest item for the segment. The segment also includes the network construction services of the Paide CHP facility, the Keila-Joa hydroelectric facility, and the renewable energy solution on the island of Ruhnu. The loss of the segment Other increased by €0.4m.

Group's EBITDA breakdown and change, €m

60.3

The Wind energy segment comprises operating wind farms, wind farm developments and the management expenses of both wind farm developments and operating wind farms.

In Q3 2023, the average measured wind speed in Estonia and Lithuania was at recent years' average level: 5.7 m/s in Estonia and 5.6 m/s in Lithuania (Q3 2022: 5.2 m/s and 5.5 m/s respectively). Thus, wind conditions were slightly better than in Q3 2022. However, there were some serious issues with the availability of our wind farms, particularly in Lithuania. The factor with the strongest effect on the Q3 availability indicator was the combined effect of several unplanned outages at the Šilute wind farm, which were caused by the failure of the mains cables of the substation that triggered the need to repair the power distribution equipment (lowered availability by 5 percentage points), failures of the wind turbines' central control equipment (lowered availability by 2.4 percentage points), and failures of the blade control systems (lowered availability by 2 percentage points). At the Mockiai wind farm, the main bearings of an Enercon wind turbine had to be replaced (lowered availability by 1 percentage point). The decline in the availability of the Lithuanian wind farms weakened Q3 wind power production by 16.5 GWh and operating income by €1.4m. Major maintenance and repairs of wind turbine blades carried out at several wind farms in Estonia lowered availability by 2 percentage points. The largest effect came from the work done on the blades of our oldest WinWinD wind turbines at Viru-Nigula.

Replacement of the gearboxes of two WinWinD turbines lowered availability by 1 percentage point and unusually long downtime caused by the failure of the automatic blade control systems and subsequent checks at the Paldiski wind farms lowered availability by 0.8 percentage points. The decline in the availability of our Estonian wind farms weakened Q3 wind power production by 5.1 GWh and operating income by €0.4m.
Our wind power production in Q3 2023 was 195.9 GWh, which is 46.7 GWh higher than in Q3 2022 due to new wind farms coming online. The Tolpanvaara wind farm in Finland, which is still under construction, began to produce electricity and the Akmene wind farm in Lithuania, which was temporarily closed after the incident at the beginning of May, was deployed again. New wind farms that are still in the construction phase contributed nearly 38 GWh to the period's wind power production.
In addition to the market price of electricity, our Estonian wind farms whose eligibility period has not expired receive renewable energy support in the form of Feed-in Premium (FiP) at the rate of 53.7 €/MWh. In Q3 2022, we replaced the previous Feed-in Tariff (FiT) based income model with an income model based on the combination of long-term fixed-price PPAs and the market price at all our Lithuanian wind farms. The implied captured electricity prices of both our Estonian and Lithuanian wind farms depend on the combination of the market price and PPAs.

The wind energy segment's implied captured electricity price including support in Q3 2023 was 78.1 €/MWh (58% lower than in Q3 2022). The implied captured electricity price was affected by lower prices on the Nord Pool market, the addition of long-term PPAs, and higher electricity purchase expenses. Altogether, the Wind energy segment sold 190.2 GWh of electricity under PPAs in Q3 2023
The Wind energy segment's operating income, which was improved by higher electricity production and substantially weakened by a lower implied captured electricity price, dropped by 16% year on year to €27.0m.
The operating expenses of the Wind energy segment (excl. D&A) grew by €8.2m year on year, rising to €16.9m. This was mainly due to electricity purchases made to balance the PPA portfolio in hours of low wind speed. Other operating expenses (excl. electricity purchases, expenses on balancing energy and growth in D&A) grew by €1.1m compared with the same period last year.

In Q3 2023, our wind farm operators' (Enefit Wind OÜ and Enefit Wind UAB) operating expenses (excl. D&A, balancing energy purchases and electricity purchased to balance the PPA portfolio) per installed capacity (MW) grew by 8.3% compared with Q3 2022 mainly due to indexation. Since Q3 2023, operated wind farms include the Purtse wind farm with an installed capacity of 21 MW.
The Wind energy segment's EBITDA for Q3 2023 was €10.1m compared with €23.6m a year earlier. The decrease was mainly attributable to the decline in the market price of electricity and higher expenses on electricity purchased to balance the PPA portfolio. Growth in repair and maintenance costs and research and consulting expenses lowered EBITDA by €0.5m and €0.3m, respectively.

Operating expenses per MW for last 4 quarters, €k/MW*
*(Total operating expenses - balancing energy purchase - D&A) / operating capacity. Only operating wind assets are included: Enefit Wind OÜ, Enefit Wind UAB and starting from Q3 2023 Purtse windpark.

The Cogeneration segment comprises the Iru, Paide, Valka and Broceni CHP facilities and a pellet factory.

The Cogeneration segment's electricity production in Q3 2023 was 37.0 GWh, which is higher than a year earlier (Q3 2022: 28.4 GWh). In addition to the market price of electricity, the Iru and Paide CHP facilities receive renewable energy support of 53.7€/MWh for electricity produced from renewable sources and efficient cogeneration support of 32 €/MWh for electricity produced from non-renewable sources in an efficient cogeneration mode. The Valka CHP has been selling electricity at the prices of the Nord Pool Latvia price area since mid-December 2022. Previously, it sold electricity at fixed prices ranging from 79.75 €/MWh to 105.6 €/MWh. From November 2021 until the final resolution of the legal dispute with the Latvian state construction control bureau BVKB, the Broceni CHP facility will sell electricity at the prices of the Nord Pool Latvia price area.
Our cogeneration facilities' availability in Q3 was 93.3%, which is lower than in the previous quarters but still significantly higher than in Q3 2022 (72.9%), when the indicator was affected by the unplanned maintenance outage of the Iru CHP which lasted for five weeks. Due to lower market prices in the Nord Pool Estonia and Nord Pool Latvia price areas, the Cogeneration

*(Electricity sales revenue + renewable energy support and efficient cogeneration support – electricity purchases on the Nord Pool day-ahead and intraday market – balancing energy purchases) / production
segment's implied captured electricity price in Q3 2023 was 127.5 €/MWh, which is 61% lower than a year earlier.
Heat production grew by 37% to 115 GWh. The average sales price of heat per MWh decreased by 14% compared with the same period last year, dropping to around 11 €/MWh in Q3 2023. The price cap for heat produced by the Iru CHP was 7.98 €/MWh in both the reporting and the comparative period, but the price of heat produced by the Paide and Valka CHPs decreased due to a decline in the price of biomass purchased by the facilities.
The Cogeneration segment's operating income decreased by 30% year on year, dropping to €14.5m. Pellet sales revenue decreased by €3.0m (42%) due to unusually warm weather in Europe, which affected Q3 sales volumes. As a result, pellet stocks increased. The average sales price of pellets increased to 240.6 €/t (by 32%). Pellet sales volume in Q3 2023 was 17 thousand tonnes compared with 39 thousand tonnes in Q3 2022. Revenue from gate fees increased by €1.4m to €3.6m due to growth in the quantity of waste received. Heat sales revenue grew by €0.3m to €1.0m, supported by larger production and a higher sales price. Other operating income remained stable at €0.4m. Electricity sales revenue decreased by €5.2m to €4.2m due to lower market prices. Electricity production support grew by €0.4m to €1.1m.


98.8
72.9
95.7
90.9
The change in finished goods inventories reduced expenses for Q3 2023 by €3.4m because pellet production exceeded pellet sales. In Q3 2022, the situation was the same: pellet production exceeded pellet sales and the change in inventories was €1.9m. Compared with the same period last year, the Cogeneration segment's expenses from the change in inventories decreased by €1.5m. The segments' variable costs decreased by €1.9m year on year, mainly due lower electricity purchase expenses. Average biomass expenses in pellet production grew by 12% compared with Q3 2022. The cost of biomass in Q3 2023 was 133.0€/t compared with 119.1 €/t in Q3 2022. The segment's fixed costs grew by €0.4m to €3.3m.


The Cogeneration segment's EBITDA for Q3 2023 was €6.4m, which is €3.0m (32%) lower than in the same period last year. The main reasons for the decrease were lower electricity prices and a smaller pellet sales volume. Growth in electricity and heat production had a positive impact on EBITDA.

The Solar energy segment comprises the group's operating solar farms, solar farm developments and solar services.

The Solar energy segment produced 26.0 GWh of solar power in Q3 2023, 14.6 GWh (128%) more than in the comparative period because two new solar farms came online in Q2: the Purtse solar farm in Estonia and the Zambrow solar farm in Poland. The availability of solar farms remained high at 99.6% (Q3 2022: 99.7%).
Our solar farms in Estonia are partly exposed to movements in the market price of electricity. Most of our solar farms in Poland sell electricity at fixed prices, which are adjusted for inflation on an annual basis – the price for Q3 2023 was 492–526 PLN/MWh (106 –113 €/MWh at the three-month average zloty (PLN) exchange rate). The Solar energy segment sold 11.4 GWh of electricity under PPAs in Q3 2023.
The operating income of operating solar farms grew by €1.0m compared with Q3 2022, mainly due to higher electricity production resulting from two new solar farms coming online in Q2 this year.
The Solar energy segment's EBITDA for Q3 2023 was €1.5m, which is at the same level as a year earlier. EBITDA was supported by the output and operating income of two new solar farms but €0.5m (132%) growth in fixed costs had a negative impact (payroll expenses have increased in connection with the implementation of the group's growth plan and land-related costs have increased in connection with new development projects).


*(Electricity sales revenue + renewable energy support and efficient cogeneration support – electricity purchases on the Nord Pool day-ahead and intraday market – balancing energy purchases) / production
The group invested €87.3m in Q3 2023, which is €7.5m more than in Q3 2022. Growth resulted from development investments, which extended to €85.6m. Of the latter, €79.0m was invested in the construction of three wind farms: €45.4m in the Kelme wind farm, €18.9m in the Sopi-Tootsi wind farm and €14.8m in the Tolpanvaara wind farm. The largest solar energy development investment was made in the Sopi solar project in the amount of €1.9m.
Expenditure on the maintenance and improvement of existing assets increased by €0.8m year on year, rising to €1.7m in Q3 2023. Maintenance expenditure of the period was mainly related to Estonian wind farms. Wind farm maintenance expenditures may fluctuate significantly quarter by quarter as they depend on the wind turbines' repair and maintenance needs. Maintenance expenditures on cogeneration facilities remained stable compared with the same period last year.

-40,0 -20,0 0,0 20,0 40,0 60,0 80,0 100,0
The group's main sources of debt capital are investment loans and credit facilities raised from regional commercial banks, the Nordic Investment Bank (NIB), the European Investment Bank (EIB), and the European Bank for Reconstruction and Development (EBRD).
The amortised cost of the group's interest-bearing liabilities at 30 September 2023 was €411.3m (31 December 2022: €279.6m). Loan liabilities to banks accounted for €407.0m of the total, including an outstanding loan balance of €6.6m denominated in Polish zloty.
In Q3, Enefit Green drew down €60m of an investment loan raised from NIB which matures in 2035 and signed an additional 12-year investment loan agreement of €180m with EIB.
The interest rate risk of investment loans with the total outstanding balance of €158.9m has been hedged with interest rate swaps, which fix the interest rates of the loans in the range of 1.049% – 1.125% (plus the margin) until the loans mature. The average interest rate of bank loans drawn down at 30 September 2023 was 3.80% (31 December 2022: 2.60%).
Investment loans raised but not drawn down at 30 September 2023 amounted to €405m.

Liquidity development Q3 2023, €m
-27.3 (-51.4%)
Loan repayment schedule, €m

The group's loan and credit agreements include covenants which set certain limits to the group's consolidated financial indicators. At 30 September 2023, the group was in compliance with all loan terms and conditions, including the covenants.
The group's management determines the maximum level of debt by reference to financial leverage and the net debt to EBITDA ratio.
| € million | 31 Dec 2022 |
30 Sept 2023 |
|---|---|---|
| Interest-bearing liabilities | 279.6 | 411.3 |
| Less cash and cash equivalents | -131.5 | -25.7 |
| Net debt | 148.1 | 385.6 |
| Equity | 718.7 | 701.7 |
| Invested capital | 866.8 | 1,087.3 |
| EBITDA (LTM)* | 154.8 | 122.1 |
| Operating profit (LTM) | 117.1 | 83.5 |
| Net profit (LTM) | 110.2 | 72.1 |
| Financial leverage (1) | 17% | 35% |
| Net debt / LTM EBITDA |
0.96 | 3.16 |
| Return on invested capital (2) | 13.5% | 7.7% |
| Return on equity (3) | 15.3% | 10.3% |
| Interest cover (4) | 42.8 | 12.4 |

Net debt/EBITDA Financial leverage
* LTM – last twelve months
(1) Financial leverage = net debt / (net debt + equity)
(2) Return on invested capital = LTM operating profit / (net debt + equity)
(3) Return on equity = LTM net profit / equity
(4) Interest cover = LTM EBITDA/ interest expense

The group has identified two main market and financial risks that require active management – the price risk of electricity sales and interest rate risk.
The price risk of electricity sales is mitigated by a combination of:
As of 30 September 2023, the group had signed PPAs on 9,899 GWh at an average price of 71.5 €/MWh. Outstanding PPA volume in Q4 2023 is 273 GWh with an average price of 91.2 €/MWh.
Out of electricity produced after 2027, 3,677 GWh is covered with PPAs at an average price of 78.1 €/MWh. The chart below provides an overview of the next years' forecasted production volumes and their coverage with risk mitigation measures as at 30 September 2023.

Forecasted production volumes of production assets (operating, under construction and planned) and their coverage with PPAs and renewable
Operating Under construction Investment decision not made PPA FiT/CfD FiP Floor*

Core markets electricity price forecast (consensus)*, €/MWh
* The 2024E – 2033E electricity prices have been estimated by averaging the forecasts of market analysis companies SKM and Volue (SKM Market Predictor Long-Term Power Outlook – August 2023, Volue Long Term Price Forecast – September 2023). The figures presented are nominal prices which have been estimated assuming a constant 2% rate of inflation.
| 2023 | 2024 | 2025 | 2026 | 2027 | Total for 2023-2027 |
|
|---|---|---|---|---|---|---|
| FiT/CfD schemes** | 2% | 1% | 1% | 1% | 1% | 1% |
| Volume (GWh) |
27 | 28 | 28 | 28 | 28 | 140 |
| Price***, €/MWh | 97,6 | 97,8 | 99,4 | 101,4 | 103,5 | 100,0 |
| FiP support** | 33% | 25% | 9% | 3% | 3% | 12% |
| Volume (GWh) |
502 | 502 | 266 | 99 | 79 | 1 449 |
| Price***, €/MWh (added to the market price) |
50,1 | 50,2 | 50,3 | 53,7 | 53,7 | 50,6 |
| PPAs** | 63% | 66% | 52% | 52% | 52% | 55% |
| Volume (GWh) |
953 | 1 331 | 1 533 | 1 534 | 1 550 | 6 901 |
| Price***, €/MWh | 86,9 | 67,6 | 64,8 | 64,8 | 69,0 | 69,3 |
* Price floor – state support (capped at 20 €/MWh) in the form of a price floor determined in a reverse auction at the level of 34.9 €/MWh for a period of 12 years
** Estimated share of production covered by the measure. Estimated production comprises the forecasted production of operational assets and assets under construction.
*** Weighted average sales price or support of production covered by the measure.
The group manages its interest rate risk with interest swap (IRS) agreements.
Interest rate risk is the risk that the fair value or future cash flows of financial instruments will fluctuate because of changes in market interest rates. Cash flow interest rate risk arises from the group's floating-rate borrowings and is the risk that finance costs will grow when interest rates increase.
Interest rate risk is mitigated partly by raising debt at fixed interest rates and partly by hedging: fixing the interest expenses of floating-rate borrowings with IRS instruments. Information on IRS transactions is disclosed in note 5 to the financial statements.
Enefit Green | Q3 2023 Interim report | 30
Unaudited condensed consolidated interim financial statements Q3 2023
| € thousand | Note | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|---|
| Revenue | 9 | 39,259 | 57,254 | 144,600 | 156,900 |
| Renewable energy support and other operating income | 10 | 5,233 | 3,011 | 18,562 | 17,363 |
| Change in inventories of finished goods and work in progress | 3,434 | 2,028 | 3,266 | 4,607 | |
| Raw materials, consumables and services used | 11 | (26,011) | (24,969) | (71,386) | (55,468) |
| Payroll expenses | (2,634) | (2,029) | (8,025) | (6,641) | |
| Depreciation, amortisation and impairment | (10,218) | (9,637) | (29,740) | (28,930) | |
| Other operating expenses | (3,388) | (2,574) | (10,716) | (7,721) | |
| OPERATING PROFIT | 5,675 | 23,084 | 46,561 | 80,110 | |
| Finance income | 747 | 468 | 2,345 | 718 | |
| Finance costs | (1,115) | (722) | (1,897) | (1,275) | |
| Net finance income and costs |
(368) | (255) | 448 | (558) | |
| Profit from associates under the equity method | 45 | 120 | 85 | 687 | |
| PROFIT BEFORE TAX | 5,352 | 22,949 | 47,094 | 80,239 | |
| Income tax expense | (326) | 0 | (10,405) | (5,441) | |
| PROFIT FOR THE PERIOD | 5,026 | 22,949 | 36,689 | 74,798 | |
| Basic and diluted earnings per share | |||||
| Weighted average number of shares, thousand | 6 | 264,276 | 264,276 | 264,276 | 264,276 |
| Basic earnings per share, € | 6 | 0.02 | 0.09 | 0.14 | 0.28 |
| Diluted earnings per share, € | 6 | 0.02 | 0.09 | 0.14 | 0.28 |

| € thousand | Note | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|---|
| PROFIT FOR THE PERIOD | 5,026 | 22,949 | 36,689 | 74,798 | |
| Other comprehensive income | |||||
| Items that may be reclassified subsequently to profit or loss: | |||||
| Remeasurement of hedging instruments in cash flow hedges (incl. reclassifications to profit or loss) |
5, 7 | 662 | 7,193 | 1,202 | 13,717 |
| Exchange differences on the translation of foreign operations | 7 | (349) | (436) | 53 | (680) |
| Other comprehensive income for the period | 313 | 6,757 | 1,255 | 13,037 | |
| TOTAL COMPREHENSIVE INCOME FOR THE PERIOD | 5,339 | 29,706 | 37,944 | 87,835 |

| € thousand | Note | 30 September 2023 |
31 December 2022 |
|---|---|---|---|
| ASSETS | |||
| Non-current assets | |||
| Property, plant and equipment | 4 | 978,497 | 776,870 |
| Intangible assets | 60,275 | 60,382 | |
| Right-of-use assets | 4,295 | 4,239 | |
| Prepayments for non-current assets | 4 | 42,522 | 19,412 |
| Deferred tax assets | 1,379 | 1,321 | |
| Investments in associates | 568 | 506 | |
| Derivative financial instruments | 5, 7 | 9,310 | 11,277 |
| Non-current receivables | 0 | 40 | |
| Total non-current assets | 1,096,846 | 874,047 | |
| Current assets | |||
| Inventories | 19,177 | 14,227 | |
| Trade and other receivables and prepayments | 59,765 | 41,091 | |
| Cash and cash equivalents | 25,731 | 131,456 | |
| Derivative financial instruments | 5 | 4,473 | 3,349 |
| Total current assets | 109,146 | 190,123 | |
| Total assets | 1,205,992 | 1,064,170 |
| € thousand | Note | 30 September 2023 | 31 December 2022 |
|---|---|---|---|
| EQUITY | |||
| Equity and reserves attributable to shareholders of the parent |
|||
| Share capital | 264,276 | 264,276 | |
| Share premium | 6 | 60,351 | 60,351 |
| Statutory capital reserve | 5,555 | 3,259 | |
| Other reserves | 5, 7 | 167,621 | 166,419 |
| Foreign currency translation reserve | 7 | (709) | (762) |
| Retained earnings | 204,613 | 225,190 | |
| Total equity | 701,707 | 718,733 | |
| LIABILITIES | |||
| Non-current liabilities | |||
| Borrowings | 8 | 334,639 | 255,755 |
| Government grants | 6,745 | 7,115 | |
| Non-derivative contract liability | 5, 7 | 18,086 | 18,086 |
| Deferred tax liabilities | 12,445 | 12,326 | |
| Other non-current liabilities | 3,000 | 3,000 | |
| Provisions | 8 | 9 | |
| Total non-current liabilities | 374,923 | 296,291 | |
| Current liabilities | |||
| Borrowings | 8 | 76,686 | 23,808 |
| Trade and other payables | 51,107 | 20,215 | |
| Provisions | 2 | 2 | |
| Non-derivative contract liability | 5 | 1,567 | 5,121 |
| Total current liabilities | 129,362 | 49,146 | |
| Total liabilities | 504,285 | 345,437 | |
| Total equity and liabilities | 1,205,992 | 1,064,170 |

| € thousand | Note | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|---|
| Cash flows from operating activities | |||||
| Cash generated from operations | 12 | 18,977 | 36,827 | 77,321 | 105,742 |
| Interest and loan fees paid | (2,999) | (845) | (7,136) | (1,842) | |
| Interest received | 127 | 6 | 645 | 12 | |
| Income tax paid | (9,970) | (4,716) | (11,175) | (6,217) | |
| Net cash generated from operating activities | 6,135 | 31,272 | 59,655 | 97,695 | |
| Cash flows from investing activities | |||||
| Purchase of property, plant and equipment and intangible assets |
4 | (86,191) | (82,902) | (235,672) | (129,950) |
| Paid on acquisition of subsidiaries | 0 | 0 | (6,174) | 0 | |
| Collection of finance lease receivables | 1 | 0 | 1 | 0 | |
| Proceeds from sale of property, plant and equipment | 0 | 0 | 0 | 3 | |
| Proceeds from sale of a business | 0 | 5 | 0 | 724 | |
| Dividends from investments in financial assets | 24 | 62 | 24 | 62 | |
| Net cash used in investing activities | (86,166) | (82,834) | (241,821) | (129,161) | |
| Cash flows from financing activities | |||||
| Proceeds from bank loans | 8 | 70,000 | 130,000 | 160,000 | 170,000 |
| Repayments of bank loans | 8 | (17,137) | (5,476) | (28,314) | (15,146) |
| Repayments of lease principal | 8 | (97) | (134) | (276) | (263) |
| Dividends paid | 0 | 0 | (54,969) | (39,906) | |
| Net change in intragroup debt | 0 | 38 | 0 | 38 | |
| Net cash generated from financing activities | 52,766 | 124,428 | 76,441 | 114,723 | |
| Net cash flow | (27,265) | 72,866 | (105,725) | 83,257 | |
| Cash and cash equivalents at the beginning of the period | 52,996 | 90,845 | 131,456 | 80,454 | |
| Cash and cash equivalents at the end of the period | 25,731 | 163,711 | 25,731 | 163,711 | |
| Change in cash and cash equivalents | (27,265) | 72,866 | (105,725) | 83,257 |

| € thousand | Share capital | Share premium | Statutory capital reserve |
Other reserves | Foreign currency translation reserve |
Retained earnings |
Total equity |
|---|---|---|---|---|---|---|---|
| Equity as at 31 December 2021 | 264,276 | 60,351 | 479 | 151,793 | (965) | 157,673 | 633,607 |
| Profit for the period | 0 | 0 | 0 | 0 | 0 | 74,798 | 74,798 |
| Other comprehensive income for the period |
0 | 0 | 0 | 13,717 | (680) | 0 | 13,037 |
| Total comprehensive income for the period |
0 | 0 | 0 | 13,717 | (680) | 74,798 | 87,835 |
| Increase of statutory capital reserve | 0 | 0 | 2,780 | 0 | 0 | (2,780) | 0 |
| Dividends paid | 0 | 0 | 0 | 0 | 0 | (39,906) | (39,906) |
| Total contributions by and distributions to shareholders of the company, recognised directly in equity |
0 | 0 | 2,780 | 0 | 0 | (42,686) | (39,906) |
| Equity as at 30 September 2022 | 264,276 | 60,351 | 3,259 | 165,510 | (1,645) | 189,785 | 681,536 |
| Equity as at 31 December 2022 |
264,276 | 60,351 | 3,259 | 166,419 | (762) | 225,190 | 718,733 |
| Profit for the period | 0 | 0 | 0 | 0 | 0 | 36,689 | 36,689 |
| Other comprehensive income for the period |
0 | 0 | 0 | 1,202 | 53 | 0 | 1,255 |
| Total comprehensive income for the period |
0 | 0 | 0 | 1,202 | 53 | 36,689 | 37,944 |
| Increase of statutory capital reserve | 0 | 0 | 2,296 | 0 | 0 | (2,296) | 0 |
| Dividends paid | 0 | 0 | 0 | 0 | 0 | (54,970) | (54,970) |
| Total contributions by and distributions to shareholders of the company, recognised directly in equity |
0 | 0 | 2,296 | 0 | 0 | (57,266) | (54,970) |
| Equity as at 30 September 2023 | 264,276 | 60,351 | 5,555 | 167,621 | (709) | 204,613 | 701,707 |

These condensed consolidated interim financial statements (interim financial statements) have been prepared in accordance with International Accounting Standard (IAS) 34 Interim Financial Reporting and they do not include all the notes normally included in the annual financial statements. Thus, they should be read in conjunction with the group's annual financial statements as at and for the year ended 31 December 2022, which have been prepared in accordance with IFRS as adopted by the European Union.
These interim financial statements have been prepared using the same accounting policies as those applied in the preparation of the group's annual financial statements as at and for the year ended 31 December 2022.
The preparation of interim financial statements requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, and income and expenses. Actual results may differ from those estimates. Significant judgements made by management in applying the group's accounting policies and the key sources of estimation uncertainty were mainly the same as those described in the group's annual financial statements as at and for the year ended 31 December 2022.
These interim financial statements have not been audited or otherwise checked by auditors.
Through its activities, the group is exposed to various financial risks: market risk (incl. currency risk, fair value and cash flow interest rate risk, and price risk), credit risk, and liquidity risk. Condensed interim financial statements do not contain all the information about the group's financial risk management which is required to be disclosed in the annual financial statements. Therefore, these interim financial statements should be read in conjunction with group's annual financial statements as at and for the year ended 31 December 2022.
The group uses interest rate swaps (IRS) for interest rate risk management. Interest rate risk is the risk that the fair value or future cash flows of financial instruments will fluctuate because of changes in market interest rates. Cash flow interest rate risk arises from the group's floatingrate borrowings and is the risk that finance costs will increase when interest rates rise. Interest rate risk is mitigated partly by raising debt at fixed interest rates and partly by hedging: raising floating-rate borrowings and fixing their interest expenses with IRS instruments. Information on IRS transactions is disclosed in note 5.
The group regards equity and borrowings (debt) as capital. In order to maintain or change its capital structure, the group may change the dividend distribution rate, repay capital contributions to shareholders, issue new shares or sell assets to reduce its financial liabilities, and raise debt capital in the form of loans. On raising loans, management assesses the group's ability to service the principal and interest payments with operating cash flow and, where necessary, starts timely negotiations to refinance existing loans before their maturity. For further information about financing ratios and borrowings, see the Financing chapter in the management report.
Enefit Green's management board assesses the group's financial performance and makes management decisions on the basis of segment reporting where the group's reportable operating segments have been identified by reference to the main business lines of its business units. All production units operated by the group have been divided into operating segments based on the way they produce energy. Other internal structural units have been divided between operating segments based on their core activity.
The group has identified three main business lines, which are presented as separate reportable segments, and less significant business activities and functions, which are presented within Other:
Other (hydropower, hybrid renewable energy solutions, and central development and management units).
The segment Other comprises activities whose individual contribution to the group's revenue and EBITDA is insignificant. None of those activities exceeds the quantitative thresholds for separate disclosure.
Segment revenues and other operating income include revenues and other operating income from external customers only, generated by the sale of respective products or services. As the segments are based on externally sold products and services, there are no intragroup transactions between segments to be eliminated.
Management assesses segment results mainly on the basis of EBITDA, but also monitors operating profit. Finance income and costs, income tax expense, and profits and losses on investments in equity-accounted investees (associates) are not allocated to operating segments.
The group's non-current assets are allocated to segments based on their purpose of use. Liabilities and current assets are not allocated to segments.

| € thousand | Q3 2023 | Q3 2022 | 9M 2023 |
9M 2022 |
|---|---|---|---|---|
| REVENUE | ||||
| Wind energy | 23,143 | 29,468 | 82,054 | 86,916 |
| Cogeneration | 13,345 | 19,841 | 56,124 | 56,722 |
| Solar energy | 2,662 | 7,772 | 5,929 | 12,832 |
| Total reportable segments | 39,150 | 57,082 | 144,107 | 156,470 |
| Other | 109 | 172 | 493 | 430 |
| Total | 39,259 | 57,254 | 144,600 | 156,900 |
| RENEWABLE ENERGY SUPPORT AND OTHER OPERATING INCOME |
||||
| Wind energy | 3,864 | 2,697 | 13,702 | 13,815 |
| Cogeneration | 1,150 | 800 | 4,382 | 4,020 |
| Solar energy | 213 | (489) | 463 | (501) |
| Total reportable segments | 5,228 | 3,007 | 18,547 | 17,334 |
| Other | 5 | 4 | 15 | 30 |
| Total | 5,233 | 3,012 | 18,562 | 17,363 |
| EBITDA | ||||
| Wind energy | 10,146 | 23,607 | 53,242 | 78,843 |
| Cogeneration | 6,446 | 9,440 | 27,123 | 32,334 |
| Solar energy | 1,527 | 1,525 | 2,753 | 3,351 |
| Total reportable segments | 18,119 | 34,572 | 83,118 | 114,528 |
| Other | (2,225) | (1,851) | (6,817) | (5,488) |
| Total | 15,894 | 32,721 | 76,301 | 109,039 |
| Depreciation, amortisation and impairment | ||||
| losses | 10,218 | 9,637 | 29,740 | 28,930 |
| Net finance income | (368) | (255) | 448 | (558) |
| Profit from associates under the equity method | 45 | 120 | 85 | 687 |
| Profit before tax | 5,353 | 22,949 | 47,094 | 80,239 |
| OPERATING PROFIT | ||||
| Wind energy | 3,033 | 16,784 | 32,380 | 58,367 |
| Cogeneration | 3,854 | 6,909 | 19,372 | 24,669 |
| Solar energy | 1,095 | 1,302 | 1,862 | 2,672 |
| Total reportable segments | 7,982 | 24,994 | 53,615 | 85,709 |
| Other | (2,306) | (1,910) | (7,054) | (5,599) |
| Total | 5,676 | 23,085 | 46,561 | 80,110 |
| € thousand | Q3 2023 | Q3 2022 | 9M 2023 |
9M 2022 |
|---|---|---|---|---|
| INVESTMENTS IN NON-CURRENT ASSETS |
||||
| Wind energy | 80,842 | 67,407 | 211,327 | 118,367 |
| Cogeneration | 665 | 322 | 1,423 | 935 |
| Solar energy | 2,503 | 11,666 | 33,383 | 14,117 |
| Total reportable segments | 84,010 | 79,395 | 246,133 | 133,419 |
| Other | 3,277 | 349 | 7,658 | 986 |
| Total | 87,287 | 79,744 | 253,791 | 134,404 |
| € thousand | 30 September 2023 |
31 December 2022 |
|
|---|---|---|---|
| NON-CURRENT ASSETS | |||
| Wind energy | 858,573 | 668,422 | |
| Cogeneration | 128,152 | 134,510 | |
| Solar energy | 88,576 | 55,035 | |
| Total reportable segments | 1,075,300 | 857,968 | |
| Other | 21,546 | 16,079 | |
| Total | 1,096,846 | 874,047 |

| € thousand | Land | Buildings | Facilities and structures |
Machinery and equipment |
Assets under construction |
Pre payments |
Total |
|---|---|---|---|---|---|---|---|
| Property, plant and equipment as at 31 December 2022 |
|||||||
| Cost | 63,953 | 25,573 | 42,218 | 751,521 | 203,637 | 19,412 | 1,106,314 |
| Accumulated depreciation | 0 | (10,385) | (25,014) | (274,615) | (18) | 0 | (310,032) |
| Total property, plant and equipment as at 31 December 2022 |
63,953 | 15,188 | 17,204 | 476,906 | 203,619 | 19,412 | 796,282 |
| Movements in the reporting period | |||||||
| Additions | 0 | 152 | 497 | 4,610 | 226,037 | 22,475 | 253,771 |
| Exchange differences | 0 | 2 | 5 | 72 | 299 | 2 | 380 |
| Transfers | 2 | 1 | 3,813 | 48,188 | (52,637) | 633 | 0 |
| Depreciation and impairment | 0 | (547) | (964) | (27,903) | 0 | 0 | (29,414) |
| Total movements in 9M 2023 | 2 | (392) | 3,351 | 24,967 | 173,699 | 23,110 | 224,737 |
| Property, plant and equipment as at 30 September 2023 |
|||||||
| Cost | 63,955 | 25,728 | 46,533 | 804,391 | 377,336 | 42,522 | 1,360,465 |
| Accumulated depreciation | 0 | (10,932) | (25,978) | (302,518) | (18) | 0 | (339,446) |
| Carrying amount as at 30 September 2023 | 63,955 | 14,796 | 20,555 | 501,873 | 377,318 | 42,522 | 1,021,019 |
At 30 September 2023, the group had committed to capital expenditures of €347,139k (31 December 2022: €89,623k and 30 September 2022: €140,594k).

Derivatives are initially recognised at fair value on the date the derivative contract is entered into and are subsequently measured at their fair value. The method for recognising the resulting gain or loss depends on whether the derivative is designated as a hedging instrument, and if it is, the nature of the item being hedged. At 30 September 2023, the group used cash flow hedging instruments in order to hedge the exposure to interest rate risk resulting from floatingrate borrowings.
The group documents at the inception of the transaction the relationship between the hedging instruments and the hedged items, and its risk management objectives and strategy for undertaking various hedge transactions. The group also documents whether there is an economic relationship between the derivatives that are used in hedging transactions and the changes in the cash flows of the hedged items. At inception of the hedge, the group documents the sources of hedge ineffectiveness. Hedge ineffectiveness is quantified in each reporting period and recognised in profit or loss.
The full fair value of hedging derivatives is classified as a non-current asset or liability when the remaining maturity of the hedging instrument is more than 12 months and as a current asset or liability when the remaining maturity of the hedging instrument is less than 12 months.
The effective portion of changes in the fair value of derivatives that are designated and qualify as cash flow hedges is recognised in other comprehensive income. The gain or loss relating to the ineffective portion is recognised immediately in profit or loss as a net amount within other operating income or other operating expenses. The day one fair value of derivative instruments entered into with the parent is recognised directly in equity when its economic substance is a distribution to the parent of resources embodying economic benefits.
Amounts accumulated in equity are reclassified to profit or loss in the periods when the hedged item affects profit or loss (for instance, when the forecasted sale that is hedged takes place).
When a hedging instrument expires or is sold, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is recognised when the forecasted transaction is ultimately recognised in profit or loss. When a forecasted transaction is no longer expected to occur, the cumulative gain or loss that was reported in equity is immediately recognised in other operating income or other operating expenses in profit or loss.
The different levels for the determination of the fair value of financial instruments have been defined as follows:
The fair value of financial instruments that are not traded in an active market is determined using valuation techniques. The valuation techniques maximise the use of observable market data where it is available and rely as little as possible on the group's own estimates. An instrument is included in level 3 if one or more significant inputs are not based on observable market data.
In 2021, the group used cash flow hedging instruments in order to hedge the exposure to variability in the price of electricity.
A part of the renewable electricity production assets operated by the group which is not subject to a subsidy scheme under a feed-in tariff is exposed to the risk of electricity price fluctuations as the electricity is sold on the Nord Pool power exchange. To hedge the risk of electricity price volatility, the group has used base load swap derivative contracts. Under the given derivatives, the group is the payer of the floating price and the counterparty the payer of the fixed price.
Transactions designed to hedge the risk of variability in electricity prices are designated as hedging instruments in cash flow hedges. The underlying hedged item is the market price risk of highly probable forecasted renewable electricity sales transactions that are exposed to market price fluctuations. The hedge ratio of the hedging relationships is one to one.
The fair values of the level 3 instruments have been estimated using a combination of market prices, mathematical models, and assumptions based on historical and forward-looking market and other relevant data. The most significant input of the fair value of the derivatives is the longterm electricity price. The group determined the underlying price for the calculation of fair value based on the long-term price curve for the Lithuanian and Estonian electricity markets, which was between 34 €/MWh and 59 €/MWh. Derivative financial instruments were remeasured to fair value as at 17 August 2021.
At the trade date the fair value of derivatives designated as hedging instruments was negative at €(10,781)k, which was recognised directly in equity as it reflected a transaction with the parent, Eesti Energia AS. The balance at 30 September 2023 was €(10,781)k.
Enefit Green AS and its parent Eesti Energia AS entered into an EFET General Agreement Concerning the Delivery and Acceptance of Electricity (EFET General Agreement) on 17 August 2021, simultaneously terminating all open derivative contracts existing between them. By signing the agreement, the parties entered into a fixed-price physical electricity sales contract for the period 2023–2027. The contract was entered into for the same quantities of electricity and at the same fixed prices as had been agreed for the originally recognised derivatives.
The group continued to apply hedge accounting to the open derivatives position until 17 August 2021, recognising changes in the fair value of the derivatives until the date of signature of the EFET General Agreement. The negative value of the derivative financial instruments classified as liabilities increased from €(10,781)k at the trade date to €(23,207)k at 31 December 2021 due to the change in the electricity price in the period from the trade date to 17 August 2021.

The negative fair value change of €(12,426)k has been recognised in other comprehensive income as no material sources of hedge ineffectiveness were identified in the hedging relationships in the period between the trade date and 17 August 2021. Since the derivative financial instruments had been measured to fair value by the date of conclusion of the EFET General Agreement, (measurement date 17 August 2021), their value, which has been classified as a liability, will not change before the arrival of the supply period determined in the EFET General Agreement, which is 2023–2027.
The electricity supply period under the EFET agreements began on 1 January 2023. Accordingly, the balance of the liability decreased by €632k in Q3 2023 and was €(10,383)k at 30 September 2023.
The EFET General Agreement meets the own use exemption and, therefore, is not considered to be a financial instrument that is required to be measured at fair value under IFRS 9. Rather, it is to be accounted for as an executory contract under IFRS 15 Revenue from Contracts with Customers with the revenue being recognised at a fixed per-unit value only when the delivery of electricity takes place in the years 2023–2027.
No gains or losses were recognised at the date the derivative contracts were replaced with the EFET General Agreement. Upon entering into the EFET General Agreement, the carrying amount of the derivatives classified as a liability at that date, which was €(23,207)k, was reclassified as a non-derivative contract liability, which will gradually increase recognised revenue until the EFET General Agreement is fulfilled. Such an increase in revenue will be partially offset by the reclassification of the €(12,426)k accumulated in the electricity cash flow hedge reserve to profit or loss due to the discontinuance of hedge accounting. The amount is the difference between the fair value of the derivative financial instruments at 17 August 2021 of €(23,207)k and the trade date fair value of the derivatives of €(10,781)k, which is recognised directly in equity. See note 7 for further information about reserves.
At 31 December 2022, the liability of €23,207k was classified into a current portion of €5,121k and a non-current portion of €18,086k.
In connection with the beginning of the supply period under the EFET agreements, the following changes will be made to the group's reserves and income statement in 2023:
| € thousand | Note | Q1 2023 | Q2 2023 | Q3 2023 | Q4 2023 | Total |
|---|---|---|---|---|---|---|
| Non-derivative contract liability | (1,766) | (756) | (1,033) | (1,566) | (5,121) | |
| Electricity cash flow hedge reserve | 7 | 860 | 552 | 632 | 754 | 2,798 |
| Gain on derivative financial instruments | 10 | 906 | 204 | 401 | 812 | 2,323 |
At 30 September 2023, the group had three interest rate swap agreements to hedge the exposure to the interest rate risk of three loans:
The interest rate swaps have been designated as hedging instruments in cash flow hedges. There is an economic relationship between the hedging instruments (interest rate swaps) and the hedged items (the loan agreements) because as at 30 September 2023 the main terms of the interest rate swaps matched the terms of the loans (i.e. their notional amounts, currencies, and maturity, payment and other dates). The forward hedges have a hedge ratio of one to one. To test the hedge effectiveness, the group uses the hypothetical derivative method and compares the changes in the fair values of the interest rate swaps against the changes in the fair values of the loan agreements.
Hedge ineffectiveness can arise from the following sources:
A change in the credit risk of the group or the counterparty of the interest rate swap. The effect of credit risk may cause an imbalance in the economic relationship between the hedging instrument and the hedged item so that the values of the hedging instrument and the hedged item no longer move in opposite directions. According to the assessment of the group's management, it is highly unlikely that credit risk will cause significant hedge ineffectiveness.
At 30 September 2023, the effect of the hedging instruments on the group's statement of financial position was as follows:

| Hedge | ||||||||
|---|---|---|---|---|---|---|---|---|
| € thousand | Carrying | Carrying | Change | ineffectiveness | Amounts transferred from | |||
| Notional | amount | amount | Line item in the statement |
in fair | recognised in | hedge reserve to profit or | ||
| amount | (Asset) | (Liability) | of financial position | value* | profit or loss | loss | ||
| Interest rate swaps | 158,877 | 13,784 | 0 | Derivatives | 1,098 | 0 | 1,068 |
* Change compared to 30 June 2023, recognised in other comprehensive income
At 30 September 2023, the effect of the hedged items on the group's statement of financial position was as follows:
| Change in fair value | Amounts recognised in hedge | ||
|---|---|---|---|
| € thousand | used to measure | Amounts recognised | reserve to which hedge accounting is |
| ineffectiveness | in hedge reserve | no longer applied | |
| Floating rate loans | 13,784 | 13,784 | 0 |
Fair value has been measured based on a model from a third party, which was supported by the confirmation of the counterparty to the trade.
In its internal calculations, the group determines the fair value of interest rate swaps by estimating the present value of the expected future cash flows based on the interest rate curves of EURIBOR observable in the market. The fair value measurement takes into account the credit risk of the group and the counterparty, which is calculated based on current credit spreads derived from credit default swaps or bond prices. The fair value of interest rate swaps qualifies as a level 2 measurement.

At 30 September 2023, Enefit Green AS had 264,276,232 registered shares (30 September 2022: 264,276,232 shares). The nominal value of a share is €1.
Basic earnings per share (EPS) have been calculated by dividing profit for the period attributable to shareholders of the parent by the weighted average number of ordinary shares outstanding during the period. Since the group has no potential ordinary shares, diluted earnings per share for all periods presented equal basic earnings per share.
Basic and diluted earnings per share based on the weighted average number of shares
| Unit | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 | |
|---|---|---|---|---|---|
| Profit attributable to shareholders of the parent |
€ thousand |
5,026 | 22,949 | 36,689 | 74,798 |
| Weighted average number of shares | thousand | 264,276 | 264,276 | 264,276 | 264,276 |
| Basic earnings per share | € | 0.019 | 0.09 | 0.14 | 0.28 |
| Diluted earnings per share | € | 0.019 | 0.09 | 0.14 | 0.28 |
| € thousand | 30 September 2023 |
31 December 2022 |
|---|---|---|
| Other reserves at the beginning of the period | 165,657 | 150,828 |
| of which currency translation reserve | (762) | (965) |
| of which interest rate swap (IRS) transactions | 14,626 | 0 |
| of which electricity cash flow hedge reserve | (12,426) | (12,426) |
| of which fair value on initial recognition of a derivative transaction with the parent |
(10,781) | (10,781) |
| of which other reserves | 175,000 | 175,000 |
| Change in fair value of cash flow hedges | 2,044 | 0 |
| of which electricity cash flow hedge reserve | 2,044 | 0 |
| Interest rate swap (IRS) transactions | 1,539 | 14,529 |
| Recognised as an increase in interest expense | (2,381) | 97 |
| Exchange differences on the translation of foreign operations | (53) | 203 |
| Other reserves at the end of the period | 166,912 | 165,657 |
| of which currency translation reserve | (709) | (762) |
| of which interest rate swap (IRS) transactions | 13,784 | 14,626 |
| of which electricity cash flow hedge reserve | (10,383) | (12,426) |
| of which fair value on initial recognition of a derivative transaction with the parent |
(10,781) | (10,781) |
| of which other reserves | 175,000 | 175,000 |

| Current borrowings | Non-current borrowings | ||||
|---|---|---|---|---|---|
| € thousand | Bank loans | Lease liabilities | Bank loans | Lease liabilities | Total |
| Borrowings at amortised cost as at 31 December 2022 |
23,396 | 412 | 251,577 | 4,178 | 279,563 |
| Movements in the reporting period | |||||
| Monetary movements | |||||
| Borrowings received | 60,000 | 59 | 100,000 | 466 | 160,525 |
| Repayments of borrowings | (28,314) | (316) | 0 | 0 | (28,630) |
| Non-monetary movements | |||||
| Transfers | 21,448 | 0 | (21,448) | 0 | 0 |
| Amortisation of borrowing costs | 0 | 0 | (223) | 0 | (223) |
| Other movements | 0 | 1 | 71 | 18 | 90 |
| Total movements in 9M 2023 | 53,134 | (256) | 78,400 | 484 | 131,762 |
| Borrowings at amortised cost as at 30 September 2023 |
76,530 | 156 | 329,977 | 4,662 | 411,325 |

| € thousand | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|
| Revenue by activity | ||||
| Sale of goods | ||||
| Pellets | 4,209 | 7,208 | 22,806 | 16,616 |
| Scrap metal | 137 | 116 | 592 | 756 |
| Other goods | 14 | 3,259 | 40 | 3,357 |
| Total sale of goods | 4,360 | 10,583 | 23,438 | 20,729 |
| Sale of services | ||||
| Heat | 1,008 | 750 | 5,931 | 4,672 |
| Electricity | 30,099 | 41,335 | 102,273 | 115,205 |
| Waste reception and resale | 3,596 | 2,152 | 12,048 | 10,390 |
| Rental and maintenance of assets | 77 | 2,379 | 614 | 5,623 |
| Other services | 119 | 55 | 296 | 281 |
| Total sale of services | 34,899 | 46,671 | 121,162 | 136,171 |
| Total revenue | 39,259 | 57,254 | 144,600 | 156,900 |
| € thousand | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|
| Renewable energy support | 4,227 | 2,855 | 15,850 | 16,751 |
| Government grants | 135 | 135 | 370 | 341 |
| Gain on derivative financial instruments |
401 | 0 | 1,511 | 0 |
| Other income | 470 | 21 | 831 | 271 |
| Total renewable energy support and other operating income |
5,233 | 3,011 | 18,562 | 17,363 |
| € thousand | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|
| Maintenance and repairs | 5,377 | 4,556 | 12,512 | 11,357 |
| Technological fuel | 5,614 | 5,822 | 20,344 | 14,805 |
| Electricity | 13,515 | 7,928 | 33,707 | 16,917 |
| Services related to ash treatment |
411 | 279 | 1,449 | 1,635 |
| Transport services for sale of finished goods |
465 | 450 | 1,337 | 1,261 |
| Materials and spare parts for production |
288 | 5,682 | 1,060 | 8,671 |
| Transmission services | 122 | 85 | 344 | 205 |
| Waste handling | 116 | 63 | 295 | 247 |
| Resource charges for natural resources |
1 | 2 | 4 | 6 |
| Other raw materials, consumables and services used |
40 | 67 | 128 | 177 |
| Environmental pollution charges | 62 | 35 | 206 | 187 |
| Total raw materials, consumables and services used |
26,011 | 24,969 | 71,386 | 55,468 |

| € thousand | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 |
|---|---|---|---|---|
| Profit before tax | 5,352 | 22,949 | 47,094 | 80,239 |
| Adjustments | ||||
| Depreciation and impairment of property, plant and equipment | 10,110 | 9,580 | 29,414 | 28,819 |
| Amortisation and impairment of intangible assets | 108 | 57 | 326 | 112 |
| Amortisation of government grants related to assets | (135) | (135) | (370) | (341) |
| Interest expense on borrowings | 132 | 501 | 573 | 1,033 |
| Gain on sale of a business | 0 | (5) | 0 | (644) |
| (Profit) loss from associates using the equity method | (21) | (52) | (62) | 20 |
| Gain on disposal of property, plant and equipment | 0 | 0 | 0 | (3 |
| Interest and other finance income | (127) | (6) | (645) | (12) |
| Other investment (gains) losses | (24) | 0 | (24) | 0 |
| Foreign exchange (gain) loss on loans granted and taken | (270) | (229) | 72 | (377) |
| Realised gain on derivative financial instruments | (401) | 0 | (1,510) | 0 |
| Adjusted profit before tax | 14,724 | 32,660 | 74,868 | 108,845 |
| Net change in current assets related to operating activities | ||||
| Change in receivables related to operating activities | (3,030) | 4,137 | 1,456 | 7,268 |
| Change in inventories | (4,912) | 923 | (4,950) | (5,815) |
| Net change in other current assets related to operating activities | (18,580) | (3,097) | (18,955) | (7,194) |
| Total net change in current assets related to operating activities | (26,522) | 1,963 | (22,449) | (5,741) |
| Net change in current liabilities related to operating activities | ||||
| Change in provisions | 0 | (30) | (1) | (32) |
| Change in trade payables | 19,111 | (428) | 22,446 | 2,179 |
| Net change in other current liabilities related to operating activities | 11,664 | 2,662 | 2,457 | 491 |
| Total net change in current liabilities related to operating activities | 30,775 | 2,204 | 24,902 | 2,638 |
| Cash generated from operations | 18,977 | 36,827 | 77,321 | 105,742 |

The parent of Enefit Green AS is Eesti Energia AS. At 30 September 2023, the sole shareholder of Eesti Energia AS was the Republic of Estonia.
For the purposes of the condensed consolidated interim financial statements of Enefit Green, related parties include the shareholders, other companies belonging to the same group (group companies), members of the executive and higher management, and close family members of the above persons and companies under their control or significant influence. Related parties also include entities under the control or significant influence of the state.
The Group has applied the exemption from disclosure of individually insignificant transactions and balances with the government and other related parties where the state has control or joint control of, or significant influence over, such parties.
Enefit Green AS and its subsidiaries produce renewable energy that is sold directly to third parties (incl. to the Nord Pool power exchange). The parent, Eesti Energia AS, provides Enefit Green AS with back-office services to assist in those sales procedures. The costs related to the services are presented in the table within purchases of services.
The group also discloses transactions with companies under the control or significant influence of the state. In the reporting period and the comparative period, the group conducted ordinary purchase and sales transactions with the Estonian transmission system operator Elering AS, which is wholly owned by the state.
At 30 September 2023, Enefit Green AS had signed long-term physical electricity sales contracts of 8,779 GWh with Eesti Energia AS for the supply of electricity in the Lithuanian, Estonian, Finnish and Polish electricity networks in the period October 2023 – December 2033. The contracts are for the supply of both annual and monthly base load energy. The weighted average price of the physical electricity sales contracts signed with the related party is 68.7 €/MWh.
At the beginning of 2021, the group used base load swap derivative contracts in order to hedge the exposure to variability in the price of electricity. The initial fair value of the derivatives designated as hedging instruments of €(10,781)k was recognised directly in equity. The group continued to apply hedge accounting to the open derivatives position until 17 August 2021 when an EFET General Agreement Concerning the Delivery and Acceptance of Electricity (EFET General Agreement) was signed and all open derivative contracts were simultaneously terminated. The negative value of the derivative financial instruments classified as liabilities increased from €(10,781)k at the trade date to €(23,207)k due to the change in the electricity price in the period from the trade date to 17 August 2021. The cumulative change in the fair value of the derivative financial instruments of €(12,426)k was recognised through other comprehensive income and the cash flow hedge reserve in equity (see also note 5). At 30 September 2023, the balance of the electricity cash flow hedge reserve was €(10,383)k (see also notes 5 and 7).
| € thousand | Q3 2023 | Q3 2022 | 9M 2023 | 9M 2022 | 30 Sept 2023 |
31 Dec 2022 |
|
|---|---|---|---|---|---|---|---|
| TRANSACTIONS | BALANCES | ||||||
| PARENT | |||||||
| Purchase of services | 5,057 | 4,211 | 12,471 | 9,570 | Receivables | 7,027 | 11,968 |
| Sale of goods | 0 | 0 | 0 | 0 | Payables | 21,212 | 26,412 |
| Sale of services | 15,418 | 6,221 | 54,986 | 12,820 | Of which non-derivative contract liability | 19,652 | 23,207 |
| OTHER GROUP COMPANIES | |||||||
| Purchase of goods | 0 | 0 | 0 | 8 | Receivables | 915 | 31 |
| Purchase of services | 912 | 2,528 | 2,473 | 4,544 | Payables | 354 | 731 |
| Sale of goods | 0 | 3,205 | 0 | 3,205 | |||
| Sale of services | 2,087 | 3,527 | 2,829 | 7,528 | |||
| OTHER RELATED PARTIES (INCL. ASSOCIATES) | |||||||
| Purchase of services | 577 | 507 | 1,461 | 1,249 | Receivables | 0 | 21 |
| Sale of services | 0 | 0 | 0 | 2 | Payables | 542 | 251 |
| ELERING AS | |||||||
| Purchase of services | 65 | 59 | 20,124 | 172 | Receivables | 1,222 | 2,064 |
| Sale of services | 4,261 | 3,619 | 16,016 | 17,947 | Payables | 23 | 29 |