Enea S.A. Interim / Quarterly Report 2017

Sep 7, 2017

5597_rns_2017-09-07_d108bef4-a424-4c81-9880-4ffe62f2a60a.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

Selected separate financial data of Enea S.A.

In PLN '000 In EUR '000
6 months
ended
30.06.2017
6 months
ended
30.06.2016
6 months
ended
30.06.2017
6 months
ended
30.06.2016
Net sales revenue 2 825 513 2 735 612 665 234 624 498
Operating profit 78 751 21 666 18 541 4 946
Profit before tax 920 755 549 410 216 781 125 422
Net profit for the reporting period 899 734 538 742 211 832 122 986
Net cash flows from operating activities 603 130 240 169 142 000 54 827
Net cash flows from investing activities (1 883 423) (582 337) (443 430) (132 938)
Net cash flows from financing activities 417 457 612 043 98 285 139 720
Total net cash flows (862 836) 269 875 (203 145) 61 608
Weighted average number of shares 441 442 578 441 442 578 441 442 578 441 442 578
Net earnings per share (in PLN / EUR) 2.04 1.22 0.48 0.28
Diluted earnings per share (in PLN / EUR) 2.04 1.22 0.48 0.28
Balance as at
30.06.2017
Balance as at
31.12.2016
Balance as at
30.06.2017
Balance as at
31.12.2016
Total assets 20 137 406 18 217 925 4 764 558 4 117 976
Total liabilities 8 420 231 7 277 446 1 992 247 1 644 992
Non-current liabilities 6 415 439 5 972 038 1 517 908 1 349 918
Current liabilities 2 004 792 1 305 408 474 339 295 074
Equity 11 717 175 10 940 479 2 772 312 2 472 983
Share capital 588 018 588 018 139 126 132 915
Book value per share (in PLN / EUR) 26.54 24.78 6.28 5.60
Diluted book value per share (in PLN / EUR) 26.54 24.78 6.28 5.60

The above financial data for I half of 2017 and 2016 were translated into EUR in line with the following principles:

  • individual assets and liabilities – at the average exchange rate as of 30 June 2017 – 4.2265 PLN/EUR (as at 31 December 2016 – 4.4240 PLN/EUR),

  • individual items from the statement of profit or loss and other comprehensive income and the statement of cash flows – as per the arithmetic mean of the average exchange rates determined by the National Bank of Poland as at the last day of each month of the financial period from 1 January to 30 June 2017 – 4.2474 PLN/EUR (for the period from 1 January to 30 June 2016 – 4.3805 PLN/EUR).

Poznań, 5 September 2017 r.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Index to the separate financial statements

Separate statement of financial position 4
Separate statement of profit or loss and other comprehensive income 6
Separate statement of changes in equity 7
Separate statement of cash flows 8
1. General information about Enea S.A. 9
2. Statement of compliance 9
3. Accounting principles 10
4. Material estimates and assumptions 10
5. Composition of the Group - list of subsidiaries, associates and jointly-controlled entities 11
6. Property, plant and equipment 12
7. Intangible assets 12
8. Investments in subsidiaries, associates and jointly-controlled entities 13
9. Intercompany bonds 14
10. Allowance on trade and other receivables: 16
11. Inventory 16
12. Cash and cash equivalents 16
13. Financial assets measured at fair value through profit or loss 17
14. Financial instruments 17
15. Loans, borrowings and debt securities 18
16. Other financial liabilities 21
17. Deferred income tax 21
18. Provisions for liabilities and other charges 21
19. Dividend 22
20. Related party transactions 22
21. Future liabilities under contract concluded at the end of the reporting period 24
22. Contingent liabilities and proceedings before court, bodies competent to conduct arbitration
proceedings or public administration bodies 24
22.1. Sureties and guaranties 24
22.2. Pending proceedings before courts of general jurisdiction 25
22.3. Motions for settlement of not balanced energy trading in 2012 25
22.4. Dispute concerning energy origin certificate prices. 26
23. The participation in the construction of the atomic power plant programme 26
24. Acquisition of shares of Polimex–Mostostal S.A. 27
25. Acquisition of shares of ENGIE Energia Polska S.A. (currently Enea Elektrownia Połaniec S.A.) 28
26. Realization of the Investment Agreement with Energa S.A. and Elektrownia Ostrołęka S.A. on the
construction and operation of a power unit in Ostrołęka Power Plan 28
27. Recapitalization in Polska Grupa Górnicza Sp. z o.o. 29
28. Initial offer for acquisition of EDF's assets in Poland 31
29. Subsequent events 31

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

These condensed interim separate financial statements have been prepared in accordance with International Financial Reporting Standard IAS 34 Interim Financial Reporting, as endorsed by the European Union (EU), and approved by the Management Board of ENEA S.A.

Members of the Management Board

President of the Management Board Mirosław Kowalik ……………………………
Member of the Management Board Piotr Adamczak ……………………………
Acting Member of the Management Board Rafał Szymański ……………………………

Enea Centrum Sp. z o.o. The entity responsible for keeping the accounting records and the preparation of financial statements .…………………………………….. Enea Centrum Sp. z o.o. ul. Górecka 1, 60-201 Poznań KRS 0000477231, NIP 777-000-28-43, REGON 630770227

Poznań, 5 September 2017 r.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Separate statement of financial position

Balance as at
Note 30.06.2017 31.12.2016
ASSETS
Non-current assets
Property, plant and equipment 6 27 865 29 063
Perpetual usufruct of land 1 956 1 970
Intangible assets 7 4 675 4 814
Investment properties 15 132 15 405
Investments in subsidiaries, associates and jointly-controlled entities 8 11 060 446 9 448 433
Deferred tax assets 17 33 954 48 562
Financial assets available for sale 41 902 41 902
Intercompany bonds 9 5 456 242 5 136 547
Financial assets measured at fair value through profit or loss 13 46 121 -
Derivatives 26 995 40 267
Trade and other receivables 162 387 145 111
16 877 675 14 912 074
Current assets
Inventories 11 70 276 84 984
Trade and other receivables 1 835 573 1 119 479
Current income tax receivables 92 727 -
Intercompany bonds 9 509 169 486 566
Cash and cash equivalents 12 751 986 1 614 822
3 259 731 3 305 851
TOTAL ASSETS 20 137 406 18 217 925

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Balance as at
EQUITY AND LIABILITIES Note 30.06.2017 31.12.2016
EQUITY
Share capital 588 018 588 018
Share premium 4 627 673 4 627 673
Reserve capital from valuation of hedging instruments 23 384 33 826
Reserve capital 3 150 240 2 640 358
Retained earnings 3 327 860 3 050 604
Total equity 11 717 175 10 940 479
LIABILITIES
Non-current liabilities
Loans, borrowings and debt securities 15 6 363 874 5 918 322
Finance lease liabilities 378 510
Liabilities due to employee benefits 51 172 49 060
Provisions for other liabilities and charges 18 15 4 146
6 415 439 5 972 038
Current liabilities
Loans, borrowings and debt securities 15 197 372 136 206
Trade and other liabilities 780 425 667 226
Finance lease liabilities 253 262
Current income tax liabilities - 31 564
Liabilities due to employee benefits 15 836 20 050
Liabilities due to an equivalent of the right to acquire shares
free of charge
281 281
Derivatives 32 -
Other financial liabilities 16 780 200 166 653
Provisions for other liabilities and charges 18 230 393 283 166
2 004 792 1 305 408
Total liabilities 8 420 231 7 277 446
TOTAL EQUITY AND LIABILITIES 20 137 406 18 217 925

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Separate statement of profit or loss and other comprehensive income

For the period
6 months
ended
30.06.2017
3 months
ended
30.06.2017
6 months
ended
30.06.2016
3 months
ended
30.06.2016
Sales revenue 2 954 901 1 396 320 2 860 781 1 314 375
Excise tax (129 388) (60 908) (125 169) (56 707)
Net sales revenue 2 825 513 1 335 412 2 735 612 1 257 668
Other operating revenue 10 176 7 029 7 639 5 048
Depreciation (1 422) (668) (1 784) (860)
Costs of employee benefits (24 939) (11 992) (27 134) (12 484)
Consumption of materials and supplies and
costs of goods sold
(1 231) (709) (972) (502)
Energy and gas purchase for sale (1 766 901) (828 644) (1 842 413) (835 393)
Transmission and distribution services (805 305) (384 806) (753 028) (349 104)
Other external services (87 858) (47 299) (78 772) (41 091)
Taxes and charges
Profit/(Loss) on sale and liquidation of
property, plant and equipment
(2 089)
249
(497)
183
(2 012)
(8)
(464)
-
Other operating expenses (67 442) (30 684) (15 462) (8 249)
Operating profit 78 751 37 325 21 666 14 569
Financial expenses (93 958) (48 676) (116 051) (80 750)
Financial revenue 138 235 35 602 94 921 46 255
Dividend income 797 727 797 727 548 874 548 874
Profit before tax 920 755 821 978 549 410 528 948
Income tax (21 021) (1 947) (10 668) (5 356)
Net profit for the reporting period 899 734 820 031 538 742 523 592
Items that are or may be reclassified to profit
or loss
- valuation of hedging instruments (12 892) (6 683) (29 094) (295)
- income tax 2 450 1 270 5 528 56
Items that will not be reclassified to profit or
loss
- remeasurement of defined benefit plan (2 759) (2 759) 2 415 2 415
- income tax 524 524 (459) (459)
Net other comprehensive income (12 677) (7 648) (21 610) 1 717
Total comprehensive income for the
reporting period
887 057 812 383 517 132 525 309
Earnings attributable to the Company's
shareholders
899 734 820 031 538 742 523 592
Weighted average number of ordinary shares 441 442 578 441 442 578 441 442 578 441 442 578
Net earnings per share (in PLN per share) 2.04 1.86 1.22 1.19
Diluted earnings per share (in PLN per share) 2.04 1.86 1.22 1.19

The separate statement of profit or loss and other comprehensive income should be analyzed together with the notes which constitute and integral part of these condensed interim separate financial statements.

(all amounts in PLN '000, unless specified otherwise)

Separate statement of changes in equity

No
te
S
ha
re
l
ita
ca
p
(
fac
e
)
lue
va
lua
f
Re
tio
va
n o
ha
l
ita
s
re
ca
p
l s
ha
To
ta
re
l
ita
ca
p
ha
S
re
ium
p
rem
l
Re
ita
ser
ve
ca
p
fro
lua
f
ion
t
m v
a
o
he
dg
ing
ins
tru
nts
me
Re
ser
ve
l
ita
ca
p
d
Re
ine
ta
ing
ea
rn
s
l
To
ta
ity
eq
u
lan
Ba
01
.01
.20
at
17
ce
as
44
1
44
3
14
6 5
75
58
8
01
8
62
67
4
7
3
33
82
6
2
64
0
35
8
3
05
0 6
04
10
94
0 4
79
fit
Ne
t p
ro
Ne
he
he
t o
t
nsi
r c
om
p
re
ve
89
9
4
73
89
9 7
34
inc
om
e
(
)
10
44
2
(
)
2 2
35
(
)
12
67
7
l co
he
To
ive
inc
ta
mp
re
ns
om
e
(
)
10
44
2
89
7 4
99
88
7 0
57
bu
f t
he
fit
Dis
tri
tio
t p
n o
ne
ro
50
9 8
82
(
)
50
9 8
82
-
de
ds
Div
i
n
19 (
)
11
0 3
61
(
)
11
0 3
61
lan
Ba
at
30
.06
.20
17
ce
as
44
1
44
3
14
6 5
75
58
8
01
8
4
62
7
67
3
23
38
4
3
15
0 2
40
3
32
7 8
60
11
71
7 1
75
ha
S
re
l
ita
ca
p
(
fac
e
)
lue
va
lua
f
Re
tio
va
n o
ha
l
ita
s
re
ca
p
l s
ha
To
ta
re
l
ita
ca
p
ha
S
re
ium
p
rem
ita
l
Re
ser
ve
ca
p
fro
lua
f
ion
t
m v
a
o
he
dg
ing
ins
tru
nts
me
Re
ser
ve
l
ita
ca
p
d
Re
ine
ta
ing
ea
rn
s
l
To
ta
ity
eq
u
lan
Ba
at
01
.01
.20
16
ce
as
44
1
44
3
14
6 5
75
58
8
01
8
4
62
7
67
3
3
98
0
2
64
0
35
8
2
42
7
97
6
10
28
8 0
05
fit
Ne
t p
ro
he
he
Ne
nsi
t o
t
r c
om
p
re
ve
53
8 7
42
53
8 7
42
inc
om
e
(
)
23
56
6
1 9
56
(
)
21
61
0
l co
he
To
ive
inc
ta
mp
re
ns
om
e
(
)
23
56
6
54
0 6
98
51
7 1
32
lan
Ba
at
30
.06
.20
16
ce
as
44
1
44
3
14
6 5
75
58
8
01
8
4
62
7
67
3
(
)
19
58
6
2
64
0 3
58
2
96
8 6
74
10
80
5 1
37

The separate statement of changes in equity should be analyzed together with the notes which constitute and integral part of these condensed interim separate financial statements

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Separate statement of cash flows

6 months
ended
30.06.2017
6 months
ended
30.06.2016
Separate statement of cash flows
Net profit for the reporting period 899 734 538 742
Adjustments:
Income tax disclosed in the profit and loss 21 021 10 668
Depreciation 1 422 1 784
(Gain)/loss on sale and liquidation of property, plant and
equipment
(249) 8
(Gain)/loss on disposal of financial assets (39 126) (3 404)
Interest income (79 501) (76 487)
Dividend income (797 727) (548 874)
Interest expense 87 671 72 454
Impairment loss on shares - 42 000
(806 489) (501 851)
Income tax paid (172 628) (158 192)
Inflows due to settlements within Tax Group 133 289 139 077
Changes in working capital
Inventories 14 708 (74 264)
Trade and other receivables (3 278) 90 360
Trade and other liabilities 599 559 166 340
Liabilities due to employee benefits (4 861) (5 017)
Provisions for other liabilities and charges (56 904) 44 974
549 224 222 393
Net cash flows from operating activities 603 130 240 169
Cash flows from investing activities
Acquisition of property, plant and equipment and intangible assets (170) (2 140)
Proceeds from disposal of property, plant and equipment
and intangible assets
254 9
Proceeds from disposal of financial assets 54 960 19 694
Acquisition of financial assets (426 500) (477 770)
Acquisition of subsidiaries, associates and jointly-controlled entities (1 593 178) -
Additional paid-in capital (redistributable) to the share capital of the
subsidiary
(128) (199 899)
Proceeds related to the acquisition of financial assets 1 567 3 350
Interests received 79 772 74 419
Net cash flows from investing activities (1 883 423) (582 337)
Cash flows from financing activities
Loans and borrowings received 250 000 386 974
Bonds issue 290 000 300 000
Repayment of loans and borrowing (33 913) -
Payment of finance lease liabilities (141) (28)
Expenses related to future issue of bonds (2 108) (2 719)
Interests paid (86 381) (72 184)
Net cash flows from financing activities 417 457 612 043
Net increase/ (decrease) in cash (862 836) 269 875
Opening balance of cash 1 614 822 1 397 632
Closing balance of cash 751 986 1 667 507

The separate statement of cash flows should be analyzed together with the notes which constitute and integral part of these condensed interim separate financial statements. 8

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

1. General information about Enea S.A.

Name (business name): Enea Spółka Akcyjna
Legal form: joint-stock company
Country: Poland
Registered office: Poznań
Address: 1 Górecka Street, 60-201 Poznań
National Court Register - District Court in Poznań KRS 0000012483
Telephone: (+48 61) 884 55 44
Fax: (+48 61) 884 59 59
E-mail: [email protected]
Website: www.enea.pl
Statistical number (REGON): 630139960
Tax identification number (NIP): 777-00-20-640

Enea S.A., operating previously under the company name Energetyka Poznańska S.A., was registered in the National Court Register at the District Court in Poznań under KRS number 0000012483 on 21 May 2001.

As at 30 June 2017 the shareholding structure of Enea S.A. was as follows: the State Treasury of the Republic of Poland - 51.5% of shares, PZU TFI 9.96% of shares and other shareholders – 38.54%.

As at 30 June 2017 the statutory share capital of Enea S.A. equaled to PLN 441,443 thousand (PLN 588,018 thousand upon adoption of IFRS-EU and considering hyperinflation and other adjustments) and was divided into 441,442,578 shares.

Trade in electricity is the core business of Enea S.A. (Enea, the Company).

Enea S.A. is the parent company in the Enea Group (the Group). As at 30 June 2017 the Group comprised of 13 subsidiaries, 9 indirect subsidiaries, 2 associates and 3 jointly controlled entities.

These condensed interim separate financial statements have been prepared on the going concern basis for foreseeable future. There are no circumstances indicating that the ability of Enea S.A. to continue as a going concern might be at risk.

2. Statement of compliance

These condensed interim separate financial statements have been prepared in accordance with International Financial Reporting Standard IAS 34 Interim Financial Reporting, as endorsed by the European Union, and approved by the Management Board of ENEA S.A.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

The Management Board of the Company has used its best knowledge as to the application of standards and interpretations as well as measurement methods and principles applicable to individual items of the condensed interim separate financial statements of ENEA S.A. in accordance with IFRS-EU as of 30 June 2017. The presented statements and explanations have been prepared using due diligence. These condensed interim separate financial statements have been reviewed by a certified auditor.

The Company prepares condensed interim consolidated financial statements of ENEA Group in accordance with IFRS EU as at 30 June 2017 and for the six-month period then ended. These condensed interim separate financial statements ought to be read together with those condensed interim consolidated financial statements and with the separate financial statements of ENEA S.A. for the financial year ended 31 December 2016.

3. Accounting principles

These condensed interim separate financial statements have been prepared in accordance with accounting principles consistent with those applied during the preparation of the most recent annual separate financial statements for the year ended 31 December 2016.

Polish zloty has been used as a reporting currency of these condensed interim separate financial statements. The data in the condensed interim separate financial statements have been presented in PLN thousand (PLN '000), unless specified otherwise.

4. Material estimates and assumptions

The preparation of condensed interim separate financial statements in accordance with IAS 34 requires that the Management Board makes certain estimates and assumptions that affect the adopted accounting policies and the amounts disclosed in the condensed interim separate financial statements and notes thereto. The adopted assumptions and estimates are based on the Management Board's best knowledge of the current and future activities and events. he actual figures, however, can be different from those assumed. The estimates adopted for the needs of preparation of these condensed interim separate financial statements are consistent with the estimates adopted during preparation of the separate financial statements for the previous financial year. The estimates presented in the previous financial years do not exert any significant influence on the current interim period.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

5. Composition of the Group - list of subsidiaries, associates and jointly-controlled entities

Name and address of the Company Share of
Enea S.A. in the
total number
of votes in%
30.06.2017
Share of
Enea S.A. in the
total number
of votes in %
31.12.2016
1. Enea Operator Sp. z o.o.
Poznań, Strzeszyńska 58
100 100
2. Enea Wytwarzanie Sp. z o.o.
Świerże Górne, Kozienice, Kozienice 1
100 100
3. Enea Elektrownia Połaniec S.A. 6 100 -
4. Połaniec, Zawada 26
Enea Oświetlenie Sp. z o.o.
100 100
5. Szczecin, Ku Słońcu 34
Enea Trading Sp. z o.o.
100 100
6. Świerże Górne, Kozienice, Kozienice 1
Enea Logistyka Sp. z o.o.
100 100
7. Poznań, Strzeszyńska 58
Enea Serwis Sp. z o.o.
100 100
8. Lipno, Gronówko 30
Enea Centrum Sp. z o.o.
100 100
9. Poznań, Górecka 1
Enea Pomiary Sp. z o.o.
100 100
10. Poznań, Strzeszyńska 58
ENERGO-TOUR Sp. z o.o. w likwidacji
Poznań, Marcinkowskiego 27
1005 1005
11. Enea Innovation Sp. z o.o.
Warszawa, Jana Pawła II 25
100 100
12. Lubelski Węgiel BOGDANKA S. A.
Bogdanka, Puchaczów
65.99 65.99
13. Annacond Enterprises Sp. z o.o.
Warszawa, Jana Pawła II 25
61 61
14. ElectroMobility Poland S.A.
Warszawa, Mysia 2
25 25
15. Elektrownia Ostrołęka S.A.
Ostrołęka, Elektryczna 5
23.797 -
16. Polimex – Mostostal S.A.
Warszawa, Jana Pawła II 12
16.48 -
17. Polska Grupa Górnicza Sp. z o.o.
Katowice, Powstańców 30
5.818 -
18. Enea Bioenergia Sp. z o.o.
Połaniec, Zawada 26
1004 -
19. Przedsiębiorstwo Energetyki Cieplnej Zachód Sp. z o.o.
Białystok, Starosielce 2/1
1001 1001
20. Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
Oborniki, Wybudowanie 56
99.931 99.931
21. Miejskie Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
Białystok, Warszawska 27
91.141 91.021
22. Miejska Energetyka Cieplna Piła Sp. z o.o.
Piła, Kaczorska 20
71.111 71.111
23. EkoTRANS Bogdanka Sp. z o.o.
Bogdanka, Puchaczów
65.992 65.992
24. RG Bogdanka Sp. z o.o.
Bogdanka, Puchaczów
65.992 65.992
25. MR Bogdanka Sp. z o.o.
Bogdanka, Puchaczów
65.992 65.992
26. Łęczyńska Energetyka Sp. z o.o.
Bogdanka, Puchaczów
58.532 58.532

(all amounts in PLN '000, unless specified otherwise)

27. Centralny System Wymiany Informacji Sp. z o.o.
Poznań, Strzeszyńska 58
203 1003

1 – an indirect subsidiary held through shares in Enea Wytwarzanie Sp. z o.o.

On 17 September 2015, by Resolution no. 547/2015 adopted by the Management Board of Enea Wytwarzanie Sp. z o.o., a project titled "Purchase of employee shares of MPEC sp. z o.o. in Białystok" was launched. On 17 November 2015, by Resolution no. 661/2015, powers of attorney were granted in terms of concluding of the preliminary contracts and final agreements. The number of shares available for purchase is 75 thousand. The concluding of the Preliminary Agreements was planned for the period between 7 December 2015 and 27 January 2016. The Final Contracts shall be concluded after 16 September 2016. By the end of December 2015, Preliminary Agreements on Sale of shares worth in total PLN 747 thousand were concluded. In 2016, Enea Wytwarzanie Sp. z o.o. purchased 67,209 shares of MPEC Sp. z o.o. in Białystok for the amount of PLN 7,688 thousand, and as at the end of the year it owned 91.02% of shares in share capital. In the first half of 2017 Enea Wytwarzanie Sp. z o.o. purchased 1,749 shares of MPEC sp. z o.o. in Białystok for the amount of PLN 217 thousand and on 30 June 2017 it owned 91.14% of shares in share capital.

2 – an indirect subsidiary held through shares in Lubelski Węgiel BOGDANKA S.A.

3– an indirect subsidiary held through shares in Enea Operator Sp. z o.o., 30 June Enea Operator Sp. z o.o. completed the sale of 16 shares in price PLN 2.500 each worth in total PLN 40 thousand.

4– an indirect subsidiary held through shares in Enea Elektrownia Połaniec S.A. On 16 March 2017, the Extraordinary General Meeting of Shareholders of the ENGIE Bioenergia Sp. z o.o. company adopted a resolution concerning Change of Company's Agreement by changing company's name to Enea Bioenergia Sp. z o.o. On 26 April 2017 the change of Company's Agreement was registered in the National Court Register.

5 – On 30 March 2015, the Extraordinary General Meeting of Shareholders of the company adopted a resolution concerning the dissolution of the company, after conducting a liquidation proceeding. The resolution entered into force on 1 April 2015. An application for removing the company from the register was submitted to the National Court Register on November 5, 2015. As of the date of these condensed interim consolidated financial statements procedural steps relating to the deletion of the company from the National Court Register are ongoing.

6 – On 10 April 2017, the company's name was changed from ENGIE Energia Polska S.A. to Enea Elektrownia Połaniec S.A. in the National Court Register.

7 – On 1 February 2017 Enea S.A. concluded with Energa S.A. an Agreement for the Purchase of 24,980,926 Shares in Elektrownia Ostrołęka S.A. and thereby acquiring an 11.89 % interest in the Company's share capital. On 13 April 2017, the Extraordinary General Meeting of Shareholders of Elektrownia Ostrołęka S.A. adopted a resolution on increasing the Company's share capital in the private subscription way from PLN 210.100 thousand to PLN 229,100 thousand i.e. by amount PLN 19 000 thousand by issuing new D series shares with a nominal value PLN 1 each. Shares issued in the private subscription were directed to Enea S.A. and ENERGA S.A. On the 27 April 2017 Enea S.A. signed a contract with Elektrownia Ostrołęka S.A. concerning coverage 9,500,000 shares. Increase the company's share capital was registered in the National Court Register on 30 May 2017. On 27 June 2017 Enea S.A. concluded an Agreement on the Purchase of 20,017,269 Shares in Elektrownia Ostrołęka S.A. and thereby acquiring an 23.79 % shares in the Company's share capital.

8 – On 3 April 2017 Enea S.A. acquired 1,500,000 new shares with nominal value of PLN 100 each and total value of PLN 150,000 thousand in Polska Grupa Górnicza Sp. z o.o. On 14 June, the Extraordinary General Meeting of Shareholders of Polska Grupa Górnicza Sp. z o.o. adopted a resolution on increasing the Company's share capital by amount PLN 200,000 thousand, from PLN 3,416,718 thousand to PLN 3,616,718 thousand issuing 2,000,000 new shares with a nominal value of PLN 100 each. As a result Enea S.A. acquired 600,000 shares with total nominal value of PLN 60,000 thousand. The increase in the Company's share capital was registered in the National Court Register on 7 July 2017.

6. Property, plant and equipment

During the 6-month period ended 30 June 2017, the Company did not acquire any property, plant and equipment (during the period of 6 months ended 30 June 2016 respectively: PLN 183 thousand).

During the 6-month period ended 30 June 2017, the Company completed the sale and liquidation of property, plant and equipment in the total net book value of PLN 5 thousand (during the period of 6 months ended 30 June 2016 respectively: PLN 16 thousand).

As at 30 June 2017 there were no indicators of impairment of property, plant and equipment identified.

7. Intangible assets

During the 6-month period ended 30 June 2017, the Company did not acquire any intangible assets (during the period of

(all amounts in PLN '000, unless specified otherwise)

6 months ended 30 June 2016 respectively: PLN 757 thousand).

During the 6-month period ended 30 June 2017, the Company did not complete significant liquidations of intangible assets (during the period of 6 months ended 30 June 2016 respectively: PLN 0 thousand).

8. Investments in subsidiaries, associates and jointly-controlled entities

30.06.2017 31.12.2016
Opening balance 9 448 433 8 323 493
Acquisition of investments 1 609 829 9 412
Additional paid-in capital (redistributable) 128 1 138 227
Other 3 612 19 301
Abandoned investment (1 556) -
Change in impairment loss - (42 000)
Closing balance 11 060 446 9 448 433

Impairment loss on investments

30.06.2017 31.12.2016
Opening balance 2 159 775 2 117 775
Addition - 42 000
Closing balance 2 159 775 2 159 775

On 20 January 2017, Enea S.A. accepted the offer submitted by Polimex-Mostostal S.A. of private subscription for 37,500,000 shares at the issue price of PLN 2 per share, i.e. for the total issue price of PLN 75,000 thousand and acquired 1,500,000 shares in Polimex-Mostostal S.A. from its existing shareholder. The purchase price of all shares amounted to PLN 80,640 thousand. Having taken up the shares Enea S.A. holds a 16.48% interest in the company's share capital.

On 1 February 2017, Enea S.A. acquired 24,980,926 shares in Elektrownia Ostrołęka S.A. from ENERGA S.A. The purchase price of all shares amounted to PLN 24,000 thousand. On 28 April 2017, the Company acquired 9,500,000 shares with nominal value PLN 1 each issued on the private subscription. On 27 June 2017 Enea S.A. concluded an Agreement on the Purchase of 20,017,269 shares in Elektrownia Ostrołęką S.A., the purchase price of all shares amounted to PLN 19,231 thousand.

Having taken up the shares Enea S.A. holds an 23.79% interest in the company's share capital.

On 14 March 2017, Enea S.A. acquired 100% of shares in ENGIE Energia Polska S.A. from ENGIE International Holdings B.V., i.e. 7,135,000 shares for a total price of PLN 1,264,159 thousand.

On 3 April 2017 Enea S.A. acquired 1,500,000 new shares with nominal value of PLN 100 each and total value of PLN 150,000 thousand in Polska Grupa Górnicza Sp. z o.o. On 14 June, the Extraordinary General Meeting of Shareholders of Polska Grupa Górnicza Sp. z o.o. adopted a resolution on increasing the Company's share capital. As a result Enea S.A. acquired 600,000 shares with total nominal value of PLN 60,000 thousand.

(all amounts in PLN '000, unless specified otherwise)

On 11 May 2017 the Management Board of Enea S.A. adopted a resolution regarding the Company's resignation from participation in the transaction of acquiring Polish assets belonging to EDF International SAS and EDF Investment II B.V.

9. Intercompany bonds

Enea Group adopted a model of intra-group financing of investments conducted by subsidiaries. Enea S.A. raises on a financial market long-term funds through borrowing or issuing bonds, and then distributes them within the Group. The table below presents currently ongoing programs of intra-group bonds issue pending as at 30 June 2017 and as at 31 December 2016:

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Date of contracts Issuer Final
redemption
Credit
limit
PLN '000
Amount
used in
PLN '000
Bonds issued
as at
30.06.2017
(principal)
PLN '000
Bonds issued
as at
31.12.2016
(principal)
PLN '000
10 March 2011 Enea Wytwarzanie Sp. z o.o. 31 March 2023 26 000 26 000 26 000 26 000
29 September 2011 Enea Wytwarzanie Sp. z o.o. 29 September 2019 14 500 14 500 6 000 6 000
23 July 2012 Enea Wytwarzanie Sp. z o.o. 22 July 2019 158 500 158 500 46 750 57 850
8 September 2012,
agreement for the
amount
of PLN 4 000 000
thousand
reduced by annex No. 2
dated 21 January 2015
to
the amount
of PLN 3 000 000
thousand
Enea Wytwarzanie Sp. z o.o. From 15 June 2020
to 15 December
2020 depending on
dates of bond series
issue, the remaining
amounts at the
latest 15 June 2022
3 000 000 2 091 000 2 091 000 1 951 000
20 June 2013 as
amended
by Annex No. 1 dated 9
October 2014 and
Annex
No.2 dated 7 July 2015
Enea Operator Sp. z o.o. Depending on dates
of bond series issue,
but not later than 17
June 2030
1 425 000 1 425 000 1 391 087 1 425 000
12 August 2014 in the
amount of PLN 260 000
thousand, increased to
PLN
1 000 000 thousand by
Annex No. 1 dated 11
February 2015 and
reduced
by Annex No. 2 dated 30
December 2015 to the
amount of PLN 260 000
thousand
Enea Wytwarzanie Sp. z o.o. Redemption in
installments
– final maturity
15 December 2026
260 000 260 000 260 000 260 000
17 November 2014 Enea Wytwarzanie Sp. z o.o. 31 March 2020 740 000 350 000 350 000 350 000
17 February 2015 in the
amount of PLN 760 000
thousand, increased by
Annex No. 1 dated 3
June
2015 to amount of PLN
1 000 000 thousand.
Enea Wytwarzanie Sp. z o.o. 10 February 2020 1 000 000 1 000 000 1 000 000 1 000 000
7 July 2015 amended
by annexes no. 1 from
28 march 2017
Enea Operator Sp. z o.o. Depending on dates
of bond series issue,
but not later than
15 December 2031
946 000 450 000 450 000 200 000
30 October 2015 Miejskie Przedsiębiorstwo
Energetyki Cieplnej Sp. z
o.o.
Redemption in
installments
– final maturity
31 March 2020
18 000 18 000 11 000 13 000
18 July 2016 Enea Operator Sp. z o.o. Final maturity
December
2017
360 000 360 000 360 000 360 000
Total 5 991 837 5 648 850
Transaction costs and the result of the effective
interest rate measurement
(26 426) (25 737)
Total 5 965 411 5 623 113

(all amounts in PLN '000, unless specified otherwise)

In January 2017 Enea S.A. acquired the series III of bonds amounting to PLN 250,000 thousand issued by Enea Operator Sp. z o.o. under the Bond Issue Programme Agreement of 7 July 2015. The interest of the bonds is based on a floating interest rate plus margin. The bonds will be redeemed in equal installments, and the final date of redemption is planned for December 2031.

In April 2017 Enea S.A. acquired the series IX of bonds amounting PLN 140,000 thousand issued by Enea Wytwarzanie Sp. z o.o. under the Bond Issue Programme Agreement of 8 September 2012. The interest of the bonds is based on floating interest rate, and the bond redemption date is 15 June 2022.

10.Allowance on trade and other receivables:

30.06.2017 31.12.2016
Opening balance of receivables allowance 56 111 52 697
Addition 5 799 13 353
Utilization (4 987) (9 939)
Closing balance of receivables allowance 56 923 56 111

During the 6-month period ended 30 June 2017 the allowance on the carrying amount of trade and other receivables increased by PLN 812 thousand (during the period of 6 months ended 30 June 2016 the impairment allowance increased by PLN 2,950 thousand).

11.Inventory

Certificates of energy origin

30.06.2017 31.12.2016
Opening balance 84 984 152 318
Acquisition 113 442 330 497
Redemption (126 691) (397 544)
Sale (1 459) (287)
Closing balance 70 276 84 984

The costs of certificates of energy origin' redemption are presented in profit or loss in energy and gas purchase for sale.

12.Cash and cash equivalents

30.06.2017 31.12.2016
Cash at bank 48 306 56 020
Other cash 703 680 1 558 802
- bank deposits 702 240 1 554 631
- other 1 440 4 171
Total cash and cash equivalents 751 986 1 614 822
Cash disclosed in the statement of cash flows 751 986 1 614 822

As at 30 June 2017 and as at 31 December 2016 Enea S.A. had no restricted cash.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

13.Financial assets measured at fair value through profit or loss

As at 30 June 2017, in "Financial assets measured at fair value through profit or loss" the Company presented call options on shares in Polimex-Mostostal S.A. On the basis of the call options contract dated 18 January 2017, Enea S.A. acquired call options from Towarzystwo Finansowe Silesia Sp. z o.o. This contract provides for the purchase (in three tranches) of total 9,125 thousand of shares, at a nominal price of PLN 2 per share, on specific dates, i.e.: 30 July 2020, 30 July 2021 and 30 July 2022. The call options were measured at fair value using the Black-Scholes model. The book value of the options amounted to PLN 46,121 thousand as at 30 June 2017.

14.Financial instruments

The table below presents the fair values as compared to carrying amounts:

30.06.2017 31.12.2016
Carrying
amount
Fair
value
Carrying
amount
Fair
value
Non-current financial assets available for sale 41 902 41 902 41 902 41 902
Long-term intercompany bonds 5 456 242 5 504 884 5 136 547 5 206 010
Non-current financial assets measured at fair value
through profit or loss 46 121 46 121 - -
Derivatives 26 995 26 995 40 267 40 267
Short-term intercompany bonds 509 169 509 169 486 566 486 566
Trade and others receivables 1 896 286 (*) 1 143 424 (*)
Cash and cash equivalents 751 986 751 986 1 614 822 1 614 822
Long-term bank loans, borrowings and debt
securities 6 363 874 6 414 889 5 918 322 5 972 289
Derivatives 32 32 - -
Short-term bank loans, borrowings and debt
securities 197 372 197 372 136 206 136 206
Finance lease liabilities 631 631 772 772
Other financial liabilities 780 200 780 200 166 653 166 653
Trade and other liabilities 611 845 (*) 521 535 (*)

(*) - the carrying amounts of trade and other receivables, trade and other liabilities approximates their fair values

Financial assets available for sale include shares in unrelated parties for which the ratio of interest in equity is lower than 20%. The positions comprises also shares in PGE EJ1 Sp. o.o. in the amount of PLN 26,902 thousand for which there is no quoted market price in an active market and whose fair value - because of the initial phase of the company's activity – is based on incurred cost.

Long-term intercompany bonds include acquired debt instruments – bonds with an original maturity exceeding 1 year.

Non-current financial assets measured at fair value through profit or loss is share call options of Polimex-Mostostal S.A.

Derivatives comprise the valuation of interest rate hedging transactions (Interest Rate Swap) and valuation of currency risk hedging transactions (forward).

The fair value of derivatives is determined by calculating the net present value based on two yield curves, i.e. the curve to determine the discount factor and curve used to estimate future rates of variable reference rates.

Short-term intercompany bonds include acquired debt instruments – bonds with an original maturity not exceeding 1 year.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

The table below presents the analysis of financial instruments measured at fair value and classified into the following three levels:

Level 1 – fair value based on stock exchange prices (unadjusted) offered for identical assets or liabilities in active markets,

Level 2 – fair value determined based on market observations instead of market quotations (e.g. direct or indirect reference to similar instruments traded in the market),

Level 3 – fair value determined using various valuation methods, but not based on any observable market information.

30.06.2017
Level 1 Level 2 Level 3 Total
Financial assets measured at fair value through profit or
loss
Call option - 46 121 - 46 121
Interest Rate Swap used for hedging - 26 995 26 995
Total - 73 116 - 73 116
Financial liabilities measured at fair value through profit
or loss
Interest Rate Swap used for hedging - 32 - 32
Total - 32 - 32
31.12.2016
Level 1 Level 2 Level 3 Total
Financial assets measured at fair value through profit or
loss
Interest Rate Swap used for hedging - 40 267 - 40 267
Total - 40 267 - 40 267
15.Loans, borrowings and debt securities
30.06.2017 31.12.2016
Long-term
Bank loans 1 756 156 1 552 654
Bonds 4 607 718 4 365 668
Total 6 363 874 5 918 322
Short-term
Bank loans 83 321 70 767
Bonds 114 051 65 439
Total 197 372 136 206
Total loans, borrowings and debt securities 6 561 246 6 054 528

Loans

At present Enea S.A. has loan agreements concluded with EIB for a total amount of PLN 2,371,000 thousand (agreement A for PLN 950,000 thousand, agreement B for PLN 475,000 thousand and agreement C for PLN 946,000 thousand).

The funds from EIB are designated for financing of long-term investment plan for the modernization and extension of the power grids of Enea Operator Sp. z o.o. Funds from Agreement A and B are fully utilized and the availability period for Agreement C is December 2017. (Enea S.A. obtained the consent of the EIB to extend the availability period till the end of 2017). Interest rate on loans can be fixed or floating.

In January 2017, Enea S.A. drawn the third tranche of a loan within C Agreement with the European Investment Bank in the amount of PLN 250,000 thousand. The loan is denominated in PLN with a floating interest rate based on the WIBOR

(all amounts in PLN '000, unless specified otherwise)

6-month plus the Bank's margin. The tranche will be repaid in installments, and the final loan repayment is planned for December 2031.

No. Lender Date of
agreement
Total
amount
Outstanding as
at 30.06.2017
Outstanding as
at 31.12.2016
Term of
agreement
1. Europejski Bank Inwestycyjny 18 October
2012 and 19
June 2013 r. (A
and B)
1 425 000 1 391 087 1 425 000 31 December
2030
2. Europejski Bank Inwestycyjny 29 May 2015 r.
(C)
946 000 450 000 200 000 31 March
2032
3. Bank PKO BP S.A. 28 January
2014, Annex no.
1 from 25
January 2017
300 000 - - 31 December
2019
4. Bank PEKAO S.A. 28 January
2014, Annex no.
1 from 25
January 2017
150 000 - - 31 December
2019
TOTAL 2 821 000 1 841 087 1 625 000
Transaction costs and the valuation
effect according to the effective
interest rate
(1 610) (1 579)
TOTAL 2 821 000 1 839 477 1 623 421

Bond issue programmes

Enea S.A. concludes agreements for bonds issue programs to finance current operations and investments of Enea S.A. and its subsidiaries.

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

No. Name of bonds issue
programme
Date of the
conclusion of
programme
Amount of
the
programme
Amount issued as
at 30.06.2017
Amount issued
as at
31.12.2016
Redemption date
1. Bonds Issue Programme
Agreement with PKO BP S.A.,
Bank Pekao S.A., BZ WBK S.A.
and Bank Handlowy w
Warszawie S.A.
21 June 2012 3 000 000 2 091 000 1 951 000 Redemption
from June 2020
till June 2022
2. Bonds Issue Programme
Agreements with
Bank Gospodarstwa
Krajowego
15 May
2014
1 000 000 1 000 000 1 000 000 Redemption in
installments,
final maturity is
December 2026
3. Bonds Issue Programme
Agreements with
ING Bank Śląski S.A., PKO BP
S.A., Bank PEKAO S.A. and
mBank S.A.
30 June 2014 5 000 000 1 500 000 1 500 000 Redemption of a
given series in
February 2020
and September
2021
4. Bonds Issue Programme
Agreement with
Bank Gospodarstwa
Krajowego
3 December
2015
700 000 150 000 - Redemption in
installments,
final maturity is
September
2027.
TOTAL 9 700 000 4 741 000 4 451 000
Transaction costs and the result of the
effective interest rate measurement
(19 231) (19 893)
TOTAL 9 700 000 4 721 769 4 431 107

In first half of the 2017 Enea S.A. did not amend the program agreements, and did not enter into new agreements.

Bonds Issue Programme Agreements up to PLN 700,000 thousand

In March 2017 Enea S.A. issued first tranche of bonds of PLN 150,000 thousand under this Programme.

Bonds Issue Programme Agreements up to PLN 3,000,000 thousand

In April 2017 Enea S.A. under the Programme issued IX series of bonds of PLN 140,000 thousand. Bonds interest rate is based on a variable interest rate, and the bond redemption date is 15 June 2022.

Transactions hedging interest rate risk

During the 6-month period ended 30 June 2017 Enea S.A. did not conclude transactions to hedge interest rate risk (Interest Rate Swap). As at 30 June 2017, the total value of the IRS transactions amounted to PLN 4,435,000 thousand. Concluded transactions will substantially affect the predictability of cash flows and financial costs. The valuation of these financial instruments is presented in "Derivatives".

As at 30 June 2017 the valuation of derivatives amounted to PLN 26,995 thousand (as at 31 December 2016: PLN 40,267 thousand).

(all amounts in PLN '000, unless specified otherwise)

Transactions hedging currency risk

During the 6-month period ended 30 June 2017 the Company entered into FX FORWARD transactions for the total volume EUR 497 thousands. Settlement date of the last transaction falls on December 2017. As at 30 June 2017 the valuation of instruments amounted PLN 32 thousand (as at 31 December 2016 PLN 0 thousand)

Financing conditions – covenants

Financing agreements assume compliance by the Company and the Group with certain financial ratios. As at 30 June 2017 and the date of these condensed interim separate financial statements, the Company did not breach the regulations of loan agreements, on the basis of which the Company would be required to early repayment of long-term debt.

16.Other financial liabilities

Cash management in Enea Group is performed by Enea S.A., allowing efficient cash surplus management (economies of scale) and reduction of external financing costs. Cash management covers subsidiaries which constitute Enea Tax Group and is based on "Cash management system between groups of bank accounts" – cash pooling.

Under this service at the end of each day cash surplus from a bank accounts of a participant is transferred to a bank account of the Pool Leader – Enea S.A. On the next day account balances are reversed and cash transferred back to the bank account of the participant.

17.Deferred income tax

Changes in the deferred tax asset (after the net-off of the asset and liability):

30.06.2017 31.12.2016
Opening balance 48 562 63 316
Change recognized in profit or loss (17 582) (7 193)
Change recognized in other comprehensive income 2 974 (7 561)
Closing balance 33 954 48 562

During 6-month period ended 30 June 2017 , the Company's profit before tax was debited with PLN 17,582 thousand as a result of decrease in net deferred tax asset (during the period of 6 months ended 30 June 2016, the Company's profit before tax was debited with PLN 1,924 thousand as a result of decrease in net deferred tax asset).

18. Provisions for liabilities and other charges

Non-current and current provisions for liabilities and other charges::

30.06.2017 31.12.2016
Non-current 15 4 146
Current 230 393 283 166
Total 230 408 287 312

(all amounts in PLN '000, unless specified otherwise)

Provision for
non-contractual
use of
property
Provision for other
lodged claims
Provisions for
certificates of
origins
Total
Balance as at 01.01.2017 9 220 6 872 271 220 287 312
Provisions applied 263 46 654 141 101 188 018
Provisions used (16) (561) (238 389) (238 966)
Reversal of provisions (5 319) (637) - (5 956)
Balance as at 30.06.2017 4 148 52 328 173 932 230 408

A description of material claims and contingent liabilities has been presented in note 22.2.

During the 6-month period ended 30 June 2017 the provision for other liabilities and charges decreased by the net amount of PLN 56,904 thousand, mainly due to fulfilling the obligation related to sale to end users of electricity generated in a renewable source or in cogeneration – decision of the President of the Energy Regulatory office regarding the obligation for 2016 obligation (in the period of 6-months ended 30 June 2016, the provisions for other liabilities and charges increased by PLN 44,974 thousand).

In the first half of 2017, Enea S.A. recognized provision in the amount of PLN 44,177 thousand for potential claims related to the termination by Enea S.A. contracts for the purchase of certificates of origin energy from renewable sources.

19. Dividend

On the 26 June 2017 the General Shareholders' Meeting of Enea S.A. adopted resolution no. 6 concerning net profit distribution for the financial period from 1 January 2016 to 31 December 2016 under which the dividend for the shareholders amount to PLN 110,361 thousand. Dividend per share amounted to PLN 0.25.

The Company did not pay out the dividend for the financial year from 1 January 2015 to 31 December 2015 due to the net loss incurred in that period. On 27 June 2016, the Extraordinary General Meeting of Shareholders of ENEA S.A. adopted Resolution no. 7 on the coverage of the net loss of PLN 1,116,888 thousand for the financial year from 1 January 2015 to 31 December 2015 from retained earnings.

20.Related party transactions

The Company concludes transactions with the following related parties:

1. Companies of the Enea Group

01.01.2017 - 30.06.2017 01.01.2016 - 30.06.2016
Purchases, including: 2 337 131 2 178 918
materials 309 245
services 852 157 785 454
other (including energy and gas) 1 484 665 1 393 219
Sales, including: 149 008 143 309
energy 134 358 127 604
services 880 623
other 13 770 15 082

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

Interest income, including: 84 431 73 899
bonds 84 341 73 792
loans 90 107
Dividend income 797 727 548 874
30.06.2017 31.12.2016
Receivables 874 421 201 837
Financial assets - bonds 5 965 411 5 623 113
Loans granted 173 115 150 827
Liabilities 478 889 505 681

In accordance with Corporate Income Tax Act regulations concerning conclusion on transactions under arm's length do not apply to legal entities comprising tax group. Transactions with group entities which are not part of the Tax Group are concluded under arm's length terms and their conditions do not differ from those applied in transactions with other entities.

2. Transactions concluded between the Company and members of its governing bodies fall within two categories

  • those related to the appointment of Members of Supervisory Boards,
  • resulting from other civil law agreements.

The value of the above transactions has been presented below:

Item Management Board of the
Company
Supervisory Board of the
Company
01.01.2017 -
30.06.2017
01.01.2016 -
30.06.2016
01.01.2017 -
30.06.2017
01.01.2016 -
30.06.2016
Remuneration under managerial and
consultancy agreements
3 099** 8 844* - -
Remuneration relating to appointment of
members of management or supervisory
bodies
- - 402 228
TOTAL 3 099 8 844 402 228

* Remuneration includes bonuses for 2015 and compensation resulting from non – competition agreements for former members of the Management Board in the amount PLN 7,105 thousand

** Remuneration includes bonuses for 2016 in the amount PLN 1,749 thousand

During the 6-month period ended 30 June 2017 there were no loans granted from the Company's Social Benefits Fund to the members of the Supervisory Board (PLN 0 thousand during the 6-month period ended 30 June 2016). During this period repayments of these loans amounted to PLN 2 thousand (PLN 8 thousand during the 6-month period ended 30 June 2016).

Other transactions resulting from civil law agreements concluded between the Company and Members of its governing bodies relate only to private use of company cars by Members of the Company's Management Board.

(all amounts in PLN '000, unless specified otherwise)

3. Transactions with entities controlled by the State Treasury

Enea S.A. also concludes business transactions with entities of the central and local administration and entities whose shares are held by the State Treasury of the Republic of Poland.

The transactions concern mainly:

  • purchase of electricity and property rights resulting from certificates of origin as regards renewable energy and energy cogenerated with heat from companies whose shares are held by the State Treasury and;
  • sale of electricity, distribution services and other related fees, provided by the Company both to central and local administration bodies (sale to end users) and entities whose shares are held by the State Treasury (wholesale and retail sale to end users).

Such transactions are concluded under arm's length terms and their conditions do not differ from those applied in transactions with other entities. As the Company does not keep a record of the aggregate value of all transactions concluded with all state institutions and entities controlled by the State Treasury, the turnover and balances of transactions with related parties disclosed in these separate financial statements do not include data related to transactions with entities controlled by the State Treasury.

21. Future liabilities under contract concluded at the end of the reporting period

As at 30 June 2017 and 31 December 2016, the company did not have any contractual obligations related to the acquisition of property, plant and equipment and intangible assets, which were not recognized in the statement of financial position.

22. Contingent liabilities and proceedings before court, bodies competent to conduct arbitration proceedings or public administration bodies

22.1. Sureties and guaranties

In the first half of 2017 Enea S.A. did not conclude any surety agreement as the Guarantor.

The table below presents actual relevant bank guarantees issued by Enea S.A. under the agreement concluded with BZ WBK S.A. up to the limit specified therein as at 30 June 2017.

Date of
guarantee
Guarantee
period
Company from
Enea Group
Guarantee for Bank - issuer Guarantee
value
in PLN
thousand
12.06.2015 31.05.2018 Enea Wytwarzanie
Sp. z o.o.
Izba Rozliczeniowa Giełd
Towarowych S.A.
BZ WBK S.A. 7 000
29.06.2015 31.05.2018 Enea Trading
Sp. z o.o.
Izba Rozliczeniowa Giełd
Towarowych S.A.
BZ WBK S.A. 15 000
01.01.2016 11.08.2018 Enea S.A. Górecka Projekt
Sp. z o.o.
BZ WBK S.A. 1 662
21.12.2016 30.01.2018 Enea S.A. Urząd Marszałkowski
Województwa
Zachodniopomorskiego
w Szczecinie
BZ WBK S.A. 1 325
Total of guarantees issued 24 987

Condensed interim separate financial statements Enea S.A. for the period from 1 January to 30 June 2017

(all amounts in PLN '000, unless specified otherwise)

The value of remaining guarantees granted by Enea S.A as at 30 June 2017 amounted to PLN 3,750 thousand. The total value of guarantees granted by ENEA S.A. to secure liabilities of ENEA Capital Group companies as at 30 June 2017 amounted to PLN 236,336 thousand.

22.2. Pending proceedings before courts of general jurisdiction

Pending proceedings before courts of general jurisdiction

Actions which Enea S.A. brought to common courts of law refer to claims for receivables due to supply of electricity and claims for other receivables – illegal consumption of electricity, connections to the power grid and other specialist services rendered by the Company.

As at 30 June 2017, the total of 13,966 cases brought by the Company were pending before common courts for the total amount 56,784 thousand (12,350 cases for the total amount of PLN 55,196 thousand as at 31 December 2016).

None of these cases can significantly affect the Company's net profit.

Actions brought against the Company

Actions against the Company are brought both by natural and legal persons. They mainly refer to such issues as compensation for interrupted delivery of electricity, identification of illegal electricity consumption and compensation for the Company's use of real property where electrical devices are located. The Company considers actions concerning non-contractual use of real property not owned by the Company as particularly important.

As at 30 June 2017, the total of 187 cases against the Company were pending before common courts for the total amount PLN 173,165 thousand (190 cases for the total amount of PLN 54,218 thousand as at 31 December 2016). Provisions related to the court cases are presented in note 18.

None of these cases can significantly affect the Company's net profit.

22.3. Motions for settlement of not balanced energy trading in 2012

On 30 and 31 December 2014 Enea S.A. submitted motions for settlement to::

Claimed amounts
in PLN thousand
PGE Polska Grupa Energetyczna S.A. 7 410
PKP Energetyka S.A. 1 272
TAURON Polska Energia S.A. 17 086
TAURON Sprzedaż GZE Sp. z o.o. 1 826
FITEN S.A. 207
Total 27 801

(all amounts in PLN '000, unless specified otherwise)

The subject of motions was claim for the payment of electric energy consumed under the system of energy balancing in 2012. Claimed companies earned unjustified benefits by refusing Enea S.A. to issue invoice corrections for 2012. Till the reporting date some proceedings were conducted but claims of Enea S.A. were not accepted.

In the absence of amicable settlement of the above case, Enea S.A. filed the following lawsuits against entities mentioned above:

  • FITEN S.A. lawsuit of 24 November 2015,
  • TAURON Polska Energia S.A. lawsuit of 10 December 2015,
  • TAURON Sprzedaż GZE Sp. z o. o. lawsuit of 10 December 2015,
  • PKP Energetyka S.A. lawsuit of 28 December 2015,
  • PGE Polska Grupa Energetyczna S.A. lawsuit of 29 December 2015.

In the case against FITEN S.A. the court in the second instance dismissed the Enea S.A. appeal. Currently the Company expects a written justification of the verdict. In other proceedings, there have been no settlement of disputes.

22.4. Dispute concerning energy origin certificate prices.

Before the District Court in Poznań the proceeding brought by PGE Górnictwo i Energetyka Konwencjonalna S.A. is pending against the Company for the payment of PLN 42,351 thousand concerning the payment for purchased certificates of origin (lawsuit of 30 May 2016). Enea S.A. made a deduction from the payment part of labilities for certificates of origin (resulting from invoices for certificates of origin) in respect of a damage caused by PGE GiEK S.A. to Enea S.A. The damage resulted from the fact that PGE GiEK S.A. did not fulfill the contractual obligation to accede to renegotiate long-term contracts for certificates of origin in accordance with the adaptive clause applicable to both Parties..

A reply to the action brought by PGE GIEK S.A. was made on 11 August 2016. In response Enea S.A. filed to dismiss the lawsuit. Currently the parties are participating in mediation proceedings.

Before the District Court in Poznan, roll two more cases of identical nature. Furthermore, there are two cases proceeded by the District Court in Poznan to determine the ineffectiveness of termination (withdrawal) by Enea S.A. of contracts of sale of property rights.

23.The participation in the construction of the atomic power plant programme

On 3 September 2014, a Shareholders' Agreement was concluded by and between PGE Polska Grupa Energetyczna, Tauron Polska Energia, Enea and KGHM Polska Miedź (the Business Partners). On 15 April 2015, in accordance with the Shareholders' Agreement, an agreement on the sale of shares in PGE EJ 1 Sp. z o.o. was concluded, as a result of which each Business Partner purchased 10% of shares in PGE EJ 1. As a result of the sale of the shares in PGE EJ 1 by PGE Polska Grupa Energetyczna to the Business Partners, PGE Polska Grupa Energetyczna holds a 70% interest in the share capital of PGE EJ 1, and the other Business Partners (Tauron Polska Energia, Enea and KGHM Polska Miedź) hold 30% thereof, i.e. each of them holds 10%.

(all amounts in PLN '000, unless specified otherwise)

According to the assumptions, PGE Polska Grupa Energetyczna performs the role of the leader of the project to construct and operate the first Polish atomic power plant, and PGE EJ 1 is to perform the function of the operator of the power plant in the future.

According to the Shareholders' Agreement, the Parties undertake to finance the activities as part of the initial phase of the Project (the Development Stage) jointly, in proportion to the interests they hold. Enea's financial commitment during the Development Stage will not exceed approx. PLN 107 million.

During the first half of 2017, PGE EJ 1 continued their work on the preparation to the construction of the atomic power plant in Poland project.

The Shareholders Agreement parties predict that subsequent decision on the declaration of further participation of the Parties in the next phase of the project will be taken after the completion of the Initial Phase.

24. Acquisition of shares of Polimex–Mostostal S.A.

On 6 December 2016, negotiations were commenced between Enea S.A. and the following companies: Energa S.A., PGE Polska Grupa Energetyczna S.A., PGNiG S.A. (Investors) and between the Investors and Polimex-Mostostal S.A. (Polimex). The aim of the negotiations was to develop the structure of a possible capital involvement of the Investor in Polimex (Investment) and develop a possible model of co-operation between the Investors when carrying out the Investment.

On 27 December 2016, Enea S.A. concluded a letter of intent with the Investors and Polimex, in which the Investors expressed their intention to consider a possible investment in Polimex and based on which they commenced talks with Polimex, aimed at developing detailed parameters of the transaction.

At the same time, on that day, the Company along with the Investors submitted a request to the Office of Competition and Consumer Protection (UOKiK) for the consent of the President of the UOKiK to concentration consisting in the acquisition, by the Investors, of joint control of Polimex. The consent to the concentration consisting in the acquisition, by the Investors, of the joint control of Polimex referred to above was issued on 18 January 2017.

At the same time, also on 18 January 2017, the Company entered into an investment agreement with the Investors and Polimex, under which the Investors undertook to invest in Polimex. The investment shall consist in the Investors' subscribing, in total, for 150 million shares issued by Polimex. The company undertook to subscribe for 37.5 million shares of the new issue for the total issue price of PLN 75 million. The agreement was concluded under conditions precedent described in detail in Current Report 2/2017. Along with the above mentioned agreement, agreements specifying the principles of co-operation as well as mutual rights and obligations of the Investors when carrying out the above mentioned investment were concluded, as well as additional agreements related to the implementation of the investments, concluded with the creditors and hitherto shareholders of Polimex.

On 20 January 2017, due to the fulfilment of the conditions precedent contained in the investment agreement referred to above the Company accepted the offer, submitted by the management board of Polimex, of private subscription for 37.5 million shares at the issue price of PLN 2 per share, i.e. for the total issue price of PLN 75 million. In addition, under one of the above additional agreements, on 20 January 2017, the Company acquired 1.5 million shares of Polimex from its hitherto shareholder. The purchase price of all shares amounted of PLN 80.6 million. Enea S.A. acquired 16.48 % stake in share capital of the company.

(all amounts in PLN '000, unless specified otherwise)

On 21 March 2017 Investors announced a tender offer for shares of Polimex as a result of exceeding the 33% threshold of the total number of votes at the general meeting of Polimex. Tender offer is of secondary nature and Investors intend to acquire in tender offer shares in excess of number of shares currently held by Investors (i.e. in total 65.93% of the total number of votes in Polimex) and get no more than 66% of total votes at the general meeting of Polimex. As a result of tender offer each of Investors (including Enea) intends to get no more than approximately 0.018% of total votes at the general meeting of Polimex. The call was settled on 28 April 2017 and, as a result, each Investor purchased 24 shares in Polimex. At present, the Company holds 39,000,024 shares in Polimex, representing a 16.48% interest in the share capital of Polimex.

25. Acquisition of shares of ENGIE Energia Polska S.A. (currently Enea Elektrownia Połaniec S.A.)

On 30 September 2016 Enea S.A. submitted an offer for the purchase of 100% of shares in ENGIE Energia Polska S.A. The offer was submitted according to the description in the process initiated by ENGIE, the owner of 100% of the shares in ENGIE Energia Polska On 2 December 2016 the Company obtained exclusivity rights to further negotiations of the purchase of 100% of shares in ENGIE Energia Polska S.A., owned by ENGIE.

On 23 December 2016, the Company signed with ENGIE Energia Polska S.A. a conditional agreement on sale of 100% of shares of ENGIE Energia Polska S.A. (Agreement), and indirectly also 100% of shares in ENGIE BioenergiaSp. z o.o.

The closure of the transaction is subject to the fulfilment of the following significant conditions precedent:

  • obtaining consent of the Minister of Energy, pursuant to the Act on Control of Certain Investments,
  • obtaining consent of the President of OUKiK for the concentration,
  • waiving of the pre-emption right by the President of the Agricultural Market Agency, and
  • performing the conversion of debt of ENGIE Energia Polska S.A. towards entities of the ENGIE group into equity in ENGIE Energia Polska S.A.

On 28 February 2017, the Company received the information on the satisfaction of the last of the said conditions, which means that all the conditions precedent have been satisfied.

On 2 March 2017 the Company received the calculation of the initial selling price of 100% of shares in ENGIE Energia Polska SA in the amount of PLN 1,264,159,355 from ENGIE International Holdings B.V.

On 14 March 2017 Enea S.A. acquired 100% of shares in ENGIE Energia Polska S.A., i.e. 7,135,000 shares entitled to the same amount of votes for the initial price of PLN 1,264,159,355.

Transaction is consistent with Enea Capital Group's Development Strategy until 2030 approved in September 2016. With this transaction the Company will increase its share in domestic electricity production and will be vice-leader of Polish market of electricity producers.

26. Realization of the Investment Agreement with Energa S.A. and Elektrownia Ostrołęka S.A. on the construction and operation of a power unit in Ostrołęka Power Plan

On 19 September 2016 Enea S.A. signed a letter of intent with Energa S.A. on engaging in cooperation in preparing, completing and utilizing a modern 1,000 MW coal-fired unit in Elektrownia Ostrołęka (the Investment, Ostrołęka C).

(all amounts in PLN '000, unless specified otherwise)

The Parties' intention is to jointly develop an effective business model for Ostrołęka C, verify its documentation and optimize the technical and economic parameters of the new power generation unit. Cooperation also includes conducting a tender to appoint a general contractor for the Project.

The Parties have agreed that the completion of the Project will have a positive impact on Poland's energy security, will meet the highest environmental standards and will ensure yet another stable, highly efficient and low-emission source of energy within the National Grid.

On 8 December 2016, the Company concluded the Investment Agreement on the implementation of the project Ostrołęka C. The subject of the Agreement is to prepare, construct, and operate the power unit referred to above. Pursuant to the Agreement signed, the co-operation will proceed, as a rule, as part of three stages: Development Stage – until the general contractor is instructed to commence the work; Construction Stage – until Ostrołęka C is commissioned for the purposes of commercial operation, and Operation Stage – commercial operation of Ostrołęka C.

After the Development Stage is completed, Enea S.A. is obliged to participate in the Construction Stage, provided, however, that the condition of profitability of the Project is met, and financing the Project does not infringe bank covenants of the Company. It is estimated that the total investment outlays of Enea S.A. until the completion of the Development Stage will total approx. PLN 128 million. For the purposes of the implementation of the investment, Energa S.A. shall dispose of shares of Elektrownia Ostrołęka S.A., constituting 50% in the share capital, in favor of Enea S.A., in price PLN 101 million. The condition precedent for the entry into force of the Investment Agreement was obtaining the consent of the President of UOKiK for the concentration consisting in the acquisition of shares of the special purpose vehicle established to implement the Project. The condition was fulfilled on 11 January 2017.

On 19 December 2016, the special purpose vehicle announced a tender procedure to select the general contractor for the construction of the Ostrołęka C power plant with capacity of approx. 1000 MW and net fuel efficiency of at least 45 %, operating on supercritical steam parameters. Elektrownia Ostrołęka S.A., if certain assumptions are implemented (including an adequate share of Enea S.A., Energa S.A. and possible Financial Investors), and assuming that Capacity Market or other assistance mechanisms are introduced, will be able to undertake the comprehensive implementation of the Project.

On 1 February 2017, Enea S.A. concluded with ENERGA S.A. an Agreement on the Purchase of 24,980,926 Shares in Elektrownia Ostrołęka S.A. for a total of PLN 24 million, thereby acquiring an 11.89% interest in the company's share capital.

On 13 April 2017, the Extraordinary General Shareholders' Meeting of Elektrownia Ostrołęka S.A. adopted a resolution on increasing the company's share capital from PLN 210,100 thousand to PLN 229,100 thousand by issuing new shares. In a private subscription, Enea S.A. acquired 9,500,000 shares in consideration for the contribution in cash which was made on 28 April 2017. After taking up new issue shares, Enea increased its share in the share capital of Elektrownia Ostrołęka S.A. to 15.1%. On 27 June 2017, Enea S.A. concluded an Agreement on the Purchase of 20,017,269 shares in Elektrownia Ostrołęka S.A. with Energa S.A. for a total of PLN 19.2 million and increasing its share in the share capital in Elektrownia Ostrołęka S.A. to 23.79%.

27. Recapitalization in Polska Grupa Górnicza Sp. z o.o.

In relation to the process of acquiring capital investors by Katowicki Holding Węglowy S.A., in July 2016 Enea S.A. started talks with possible investors on the possibility of implementation of the Investment and its possible parameters.

(all amounts in PLN '000, unless specified otherwise)

On 28 October 2016, Enea S.A. signed with Węglokoks S.A. and Towarzystwo Finansowe Silesia Sp. z o.o. (Investors) a letter of intent expressing preliminary interest in financial involvement in Katowicki Holding Węglowy S.A. or KHW's assets.

Due to the interest of Polska Grupa Górnicza Sp. z o.o. (PGG) in acquiring selected assets of Katowicki Holding Węglowy S.A. and the commencement of the process of recapitalization in PGG, Enea S.A. conducted the necessary analyses of the Business Plan presented by PGG with the existing PGG Shareholders and expressed its interest in capital commitment in Polska Grupa Górnicza Sp. z o.o.

On 30 March 2017, the Supervisory Board of Enea S.A. approved the Company's entering into Polska Grupa Górnicza Sp. z o.o. and taking up new shares in PGG's capital with a nominal value of PLN 300 million in consideration for the contribution in cash of PLN 300 million.

On 31 March 2017, the Company concluded:

  • an investment agreement specifying the conditions for the financial investment in PGG (Investment Agreement);
  • an arrangement relating to the exercise of a joint control over PGG (the Investors' Arrangement).

Investment Agreement

The Parties to the Investment Agreements are: Enea S.A., ENERGA Kogeneracja Sp. z o.o., PGE Górnictwo i Energetyka Konwencjonalna S.A., PGNiG TERMIKA S.A., Węglokoks S.A., Towarzystwo Finansowe Silesia Sp. z o.o., Fundusz Inwestycji Polskich Przedsiębiorstw Fundusz Inwestycyjny Zamknięty Aktywów Niepublicznych) (the Investors) and PGG. The Investment Agreement provided that PGG would acquire selected mining assets from Katowicki Holding Węglowy S.A. on the basis of the final agreement which was concluded on 1 April 2017.

The Investment Agreement regulates the course of the Investment and the Company's entering into PGG, principles of operation of PGG and its authorities, and also the terms under which the parties may exit from the investment in PGG. As part of PGG recapitalization the Company undertook to subscribe for new shares in PGG with the total nominal value of PLN 300 million in consideration for the contribution in cash amounting to PLN 300 million, in three stages:

  • a) as the first stage the Company subscribed for the new shares in PGG totaling to PLN 150 million in consideration for the contribution in cash amounting to PLN 150 million. After taking up the shares the Company holds a 4.39% share in PGG's share capital. The first recapitalization was performed in April 2017;
  • b) as the second stage the Company subscribed for the news shares in PGG totaling to the PLN 60 mln in consideration for the contribution in cash amounting 60 million. After taking up the shares the Company holds 5.81% share in PGG's share capital. The second recapitalization was performed in June 2017;
  • c) as the third stage the Company will subscribe for the new shares in PGG totaling to PLN 90 million in consideration for the contribution in cash amounting to PLN 90 million. After taking up the shares the Company will hold a 7.66% share in PGG's share capital. The third recapitalization is to be performed in the first quarter 2018.

The Agreement regulates the principles of appointing members of the Supervisory Board, according to which each of the Investors and the State Treasury will be entitled to nominate one member of the Supervisory Board composed of eight members maximally.

The Investment is in line with Enea Capital Group's Development Strategy whose one element is securing the base of commodities for the conventional power engineering.

(all amounts in PLN '000, unless specified otherwise)

Investors' Arrangement

According to the Investors' Arrangement, the Company jointly with ENERGA Kogeneracja Sp. z o.o., PGE Górnictwo i Energetyka Konwencjonalna S.A., PGNiG TERMIKA S.A. and Fundusz Inwestycji Polskich Przedsiębiorstw, Fundusz Inwestycyjny Zamknięty Aktywów Niepublicznych (the Controlling Shareholders) took over control over PGG. The Investors' Arrangement regulates the principles of determining a common position of the Controlling Shareholders as regards the decisions relating to PGG.

Furthermore, on 31 March 2017 a letter of intent signed on 16 October 2016 by Enea S.A., Węglokoks S.A. and Towarzystwo Finansowe Silesia Sp. z o.o., concerning the previously analyzed capital investment in Katowicki Holding Węglowy S.A. was terminated.

28.Initial offer for acquisition of EDF's assets in Poland

On 16 September 2016, Enea S.A., together with PGE S.A., Energa S.A., and PGNiG Termika S.A. (Business Partners), jointly submitted to EDF International SAS (EDF) a preliminary non-binding offer for the purchase of shares in companies belonging to EDF in Poland, holding conventional generation assets and carrying out service activities.

On 30 November 2016, the Company along with Business Partners submitted to EDF a new offer for the purchase of shares in companies belonging to EDF in Poland, holding conventional generation assets and carrying out service activities. The Business Partners submitted the new offer in connection with the upcoming end of the period of validity of the offer submitted on 16 September this year.

On 27 January 2017, the Company along with Business Partners signed an agreement with EDF Investment SAS on negotiations related to the purchase of EDF assets in Poland as well as due diligence process in this scope. The transaction consists of the acquisition of all shares of EDF in EDF Polska S.A. which is, in particular, the owner of 4 combined heat and power plants i.e. Cracow, Gdańsk, Gdynia, and Toruń and heat distribution networks in Toruń, Elektrownia Rybnik, and the acquisition of all shares of EDF in ZEC "Kogeneracja" S.A., which is the owner of 4 combined heat and power plants, i.e. Wrocław, Zielona Góra, Czechnica, and Zawidawie, and heat distribution networks in Zielona Góra, Siechnice, and Zawidawie.

On 15 March 2017 Business Partners amended the structure of the transaction in the following way:

  • withdrawal of PGNiG Termika S.A. from the transaction;
  • takeover of the so far declared share of PGNiG Termika S.A. in the transaction by PGE S.A., which results in the growth in PGE S.A.'s share in the transaction to 60%,
  • maintaining the shares of Enea S.A. and Energa S.A. in the transaction on the same level of 20% for each of the Companies.

The aforementioned amendments in the transaction structure require confirmation of filing no objections by EDF. On 11 May 2017 the Management Board of Enea S.A. adopted a resolution regarding the Company's resignation from participation in the transaction of acquiring Polish assets belonging to EDF International SAS and EDF Investment II B.V.

29.Subsequent events

Subsequent to June 30, 2017, there were a number of regulatory changes, which could have impact on future performance of the Company. The most important changes are as follows:

(all amounts in PLN '000, unless specified otherwise)

  • the adoption of the amendment to the Act on Renewable Energy Sources ("RES Act") on 20 July 2017. The objective of the amendment is to change the way in which the substitution fee is calculated so that the unit substitution fee will be 125% of the annual average price of property rights resulting from certificates of origin,
  • the adoption of the amendment to the Act on Water Law ("Water Law") on 20 July 2017. Water Law introduced additional fees in the form of so-called fixed costs paid on quarterly basis to the State Water Company for using water and discharging wastewater. Water Law provides upper maximum rates of fees that may be reduced by regulation.

At present it is not possible to assess influence of changes in legislation on the financial result and the valuation of Group's assets due to, among others, unfinished legislative process and possible agreements with European Commission. In the near future the Group will conduct analysis of the impact of the above changes on the financial statements.

Changes in the composition of the Management Board

On 24 August 2017 the Supervisory Board of ENEA S.A. adopted resolutions to dismiss Mr Wiesław Piosik from the position of the Member of the Management Board responsible for Corporate Affairs and Mr Mikołaj Franzkowiak from the position of the Member of the Management Board responsible for Financial Affairs. Resolutions came into force on the day they were taken.

The Supervisory Board also delegated, effective immediately, Mr Rafał Szymański –the Member of the Supervisory Board to temporarily perform duties of the Member of the Management Board responsible for Corporate Affairs of ENEA S.A. for the period no longer than 3 months, till appointment of the Member of the Management Board responsible for Corporate Affairs.