Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ENCOUNTER RESOURCES LIMITED Investor Presentation 2012

Nov 26, 2012

64856_rns_2012-11-26_4b339052-c393-4f17-b0a6-42ce48ec709b.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 38] intentionally omitted <==

ASX : ENR

==> picture [720 x 419] intentionally omitted <==

----- Start of picture text -----

Greenfields Copper Discovery in WA
Investor Update
November 2012
----- End of picture text -----

==> picture [720 x 38] intentionally omitted <==

The Investment Opportunity

  • Greenfields copper discovery in WA – 11km long and growing

  • Multiple prospects with mineralised intersections

  • Major land position secured

  • Experienced team of former WMC executives

  • 30,000m drill program in 2012

==> picture [328 x 379] intentionally omitted <==

----- Start of picture text -----

Yeneena
Project
----- End of picture text -----

2

==> picture [720 x 38] intentionally omitted <==

Corporate Information

Board Board

Issued Capital: Issued Capital

Market Cap. Cash (30/9/12)

Paul Chapman - Chairman Will Robinson - Managing Director Peter Bewick - Exploration Director Jon Hronsky - Non-Executive Director Kevin Hart / Dan Travers - Company Sec. 114.2m Ordinary Shares 8.1m Employee Options A$21.7m @ A$0.19/share A$3.2m

3

==> picture [720 x 38] intentionally omitted <==

Major land position amongst giant mineral deposits

==> picture [599 x 410] intentionally omitted <==

4

==> picture [720 x 38] intentionally omitted <==

BM1 - BM7 Prospects

Copper mineral system 11km long and growing

BM1 - coherent zone of near surface copper oxide mineralisation

  • 10m @ 6.8% Cu from 32m

  • 20m @ 2.0% Cu from 22m

  • 8m @ 3.6% Cu from 18m

  • 4m @ 5.5% Cu from 66m

BM7 - New copper discovery 3km south of BM1

  • 34m @ 0.6% Cu incl. 10m @ 1.6% Cu

  • 73m @ 0.4% Cu incl. 8m @ 1.0% Cu

  • 22m @ 0.4% Cu incl. 2m @ 2.9% Cu

==> picture [109 x 38] intentionally omitted <==

  • 34m @ 0.5% Cu incl. 14m @ 0.8% Cu

5

==> picture [720 x 38] intentionally omitted <==

BM7 Prospect

Concealed large scale copper discovery

  • Giant near surface footprint

  • Mineral system widens and is strengthening to the south

  • 34m @ 0.6% Cu incl. 10m @ 1.6% Cu

  • 73m @ 0.4% Cu incl. 8m @ 1.0% Cu

  • 22m @ 0.4% Cu incl. 2m @ 2.9% Cu

  • 34m @ 0.5% Cu incl. 14m @ 0.8% Cu

  • 16m @ 0.4% Cu incl. 7m @ 0.7% Cu

  • 3.5km long target zone coincident with a major flexure in the McKay Fault

==> picture [720 x 78] intentionally omitted <==

==> picture [720 x 38] intentionally omitted <==

Extensive ‘End of Hole’ Copper at BM7

  • Results from first four lines of aircore drilling include:

  • 9m @ 1.54% Cu and 1.0% Co from 42m to EOH (end of hole)

  • 6m @ 0.41% Cu and 438ppm Co from 26m to EOH

  • 8m @ 0.52% Cu and 364ppm Co from 76m to EOH

  • 34m @ 0.43% Cu and 238ppm Co from 32m to EOH

  • 24m @ 0.35% Cu and 554ppm Co from 28m to EOH

  • 15m @ 0.46% Cu and 412ppm Co from 28m to EOH

  • Gossanous ex-sulphide textures identified in EOH samples

  • BM7 copper system over 2.3km long and remains open

  • Further aircore assay results early December 2012

  • 2,400m RC drill program completed, assays December 2012

RC drill hole EPT 1689 62-64m located 200m south of EPT 1557

7

==> picture [720 x 38] intentionally omitted <==

BM7 Aircore - ‘End of Hole’ Cu – Line 1

==> picture [585 x 402] intentionally omitted <==

8

==> picture [720 x 38] intentionally omitted <==

BM7 Aircore - ‘End of Hole’ Cu – Line 3

==> picture [585 x 401] intentionally omitted <==

9

==> picture [720 x 38] intentionally omitted <==

Regional Long Section BM6 to BM7

Copper mineral system 11km long and open

==> picture [626 x 340] intentionally omitted <==

10

==> picture [720 x 38] intentionally omitted <==

Major land position amongst giant mineral deposits

==> picture [599 x 410] intentionally omitted <==

11

==> picture [720 x 38] intentionally omitted <==

==> picture [434 x 420] intentionally omitted <==

----- Start of picture text -----

EPT799 - Zinc sulphide (sphalerite)
----- End of picture text -----

BM2 Base Metal Prospect

800m long +0.25% copper regolith anomaly

  • WA Govt. co-funded drilling program completed in April

  • 26m @ 0.60% Cu from 100m

  • 201m @ 0.61% Zn from 233m to end of hole

  • Mineralisation remains open to the west and at depth

  • Modelled EM conductor down dip west of copper sulphide mineralisation

12

==> picture [720 x 38] intentionally omitted <==

T4 – Copper Prospect

Electromagnetics

Magnetics

Gravity

Diamond holes April 2012

EPT801 – Copper Sulphides intersected in 2011

==> picture [409 x 321] intentionally omitted <==

----- Start of picture text -----

Diamond holes Diamond holes
April 2012 April 2012
EPT801 EPT801
----- End of picture text -----

13

==> picture [720 x 38] intentionally omitted <==

==> picture [333 x 446] intentionally omitted <==

T4 Copper Prospect

  • Stratigraphic hole EPT 801 intersected disseminated copper sulphides including 0.9m @ 0.84% Cu

  • Drilling located at the southern end of a +4km long gravity & magnetic anomaly

  • 5,700m track mounted aircore program completed August 2012

  • Copper anomalism adjacent to magnetic anomaly

14

==> picture [720 x 38] intentionally omitted <==

Yeneena Copper Discovery Timeline

==> picture [170 x 108] intentionally omitted <==

==> picture [41 x 42] intentionally omitted <==

2011 Discovery of copper sulphides at BM1 & T4 New copper oxide discoveries at BM6 & 2010 BM7 Greenfields Primary zinc discovered 2008-09 copper oxide at BM2 Airborne EM discoveries at BM1 & BM2 BM7 copper sulphides Regional geochem Target generation

2012 Objectives

Large scale, high grade copper sulphide discovery at BM1, BM7

Drill testing of large scale T4 copper prospect Follow up base metal discovery at BM2 Regional target testing

15

0
2
4
6
8
10
12
14
16
18
20
MT Cu (pre mined resources)
Sed
iment Hosted Copper Deposits
iment Hosted Copper Deposits
Paterson
Central Africa Copper Deposits
Mt I
sa
Province
Endowment
Endowment
150MT Copper
2.3MT Copper
Deposit style produces giant orebodies
Is Nifty the giant of the Paterson?
*includes basement hosted deposits

==> picture [442 x 66] intentionally omitted <==

==> picture [106 x 62] intentionally omitted <==

16

==> picture [720 x 38] intentionally omitted <==

Yeneena Copper Discovery

  • New greenfields copper discovery made in 2010

  • Base metal sulphides discovered at four prospects in 2011

  • Early stage indications of a potential new copper province

  • High drilling success rate

  • Large mineralisation footprints

  • Thick, high grade intersections

  • Land position secured (1400km[2] , 100% owned)

  • 30,000m drill program completed in 2012

17

==> picture [720 x 38] intentionally omitted <==

Disclaimer & Compliance Statement

This presentation has been prepared by Encounter Resources Limited (“Encounter”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though Encounter has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by Encounter.

Any forward-looking statements included in this document involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to Encounter. In particular, they speak only as of the date of this document, they assume the success of Encounter’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document (“Recipients”) are cautioned to not place undue reliance on such forward-looking statements.

Encounter makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued.

To the extent permitted by law, Encounter and its officers, employees, related bodies corporate and agents (“Agents”) disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Encounter and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.

The information in this report that relates to Exploration Results is based on information compiled by Mr. Peter Bewick who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Bewick is a full time employee of Encounter Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2004 Edition of the 'Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Bewick consents to the inclusion in the presentation of the matters based on his information in the form and context in which it appears.

Drill hole information for EPT 1689 referenced on Slide 7 tabulated below. Assays from this hole are pending.

Hole ID Northing (m) Easting (m) RL (m) EOH (m) Dip Azi
EPT1689 7,539,700 367,350 320 174 -60 090

18