AI assistant
ENCOUNTER RESOURCES LIMITED — Interim / Quarterly Report 2016
Apr 28, 2016
64856_rns_2016-04-28_380556cc-4145-49d5-b8fb-faebb57b4adc.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
QUARTERLY REPORT MARCH 2016
A highly active, wellfunded exploration company advancing a suite of greenfield discoveries in the Paterson Province of Western Australia
ASX Code
ENR
Market Cap (28/04/16)
~A$19m ($0.125/share) Issued Capital (31/03/16)
155.6 million ordinary shares 12.7 million options
Cash (31/03/16)
~A$4.0M
Board of Directors & Management
Mr. Paul Chapman Non-Executive Chairman
Mr. Will Robinson Managing Director
Mr. Peter Bewick Exploration Director
Dr. Jon Hronsky Non-Executive Director
Mr. Kevin Hart / Mr. Dan Travers Joint Company Secretary
www.enrl.com.au
Level 7, 600 Murray Street West Perth WA 6005
P: 08 9486 9455 F: 08 6210 1578
HIGHLIGHTS
YENEENA - Paterson Province, WA
The Yeneena Region (“Yeneena”) consists of a major ground position between the Nifty copper mine, the Telfer gold-copper mine and the Kintyre uranium deposit where Encounter has made a series of greenfield base metal discoveries that demonstrate the potential of the area for large tonnage, high quality deposits.
Field operations have recommenced at Yeneena with diamond drilling planned at the BM1-BM7 and Lookout Rocks Copper Projects and the Millennium Zinc Project in the coming months:
BM1-BM7 Copper Project (100% ENR)
-
A cover corrected gravity model has been produced over 6km of the BM1-BM7 copper trend. The model has highlighted three, previously untested density anomalies situated along strike of bedrock geochemical alteration anomalies and copper mineralisation that are consistent with a halo to a potential high grade copper system.
-
Drill testing of these targets is to commence in early May 2016. This drilling will be 50% funded (up to $150,000) under the WA Government Exploration Incentive Scheme.
Millennium Zinc Project (Hampton earning up to 25%)
-
A passive seismic survey trial was recently completed at Millennium. The objective of this survey is to map cover depth and potentially provide additional structural information at the project to assist with drill planning.
-
Based on the encouraging outcomes at BM1-BM7, an exercise of removing cover interference from the gravity modelling at Millennium is in progress and will be completed in May 2016.
-
Drilling at Millennium is scheduled to re-commence in June 2016.
Lookout Rocks Copper Project (Antofagasta earning in)
-
Late in 2015, Encounter identified a sub-cropping gossan adjacent to broad zones of copper anomalism drilled in aircore/RC drilling at Lookout Rocks South. These gossanous outcrops together with strongly leached Broadhurst sediments intercepted in shallow drilling at Lookout Rocks South and Lookout Rocks East indicate the presence of copper sulphides within the Broadhurst Formation sequence.
-
• An initial 1-2 diamond hole program is scheduled to commence in May 2016. Exploration at Lookout Rocks is currently 100% funded by Antofagasta.
CORPORATE
- ~A$4.0 million cash balance as at 31 March 2016.
1
1
QUARTERLY REPORT MARCH 2016
EXPLORATION
PATERSON PROVINCE
YENEENA COPPER / ZINC PROJECT
-
100% Encounter - E45/2500, E45/2502, E45/2503, E45/2657, E45/2658, E45/2805, E45/2806, E45/3768, E45/4091, E45/4230 and E45/4408
-
90% Encounter / 10% HHM - E45/2501, E45/2561 and the four eastern sub-blocks of E45/2500 with HHM earning up to 25%
-
Antofagasta earning into E45/3768, E45/4091, E45/4230 and E45/4408
Yeneena covers a 1,950km[2] of granted exploration licenses in the Paterson Province of WA located between the Nifty copper mine, the Woodie Woodie manganese mine, the Telfer gold-copper mine and the Kintyre uranium deposit (Figure 1).
==> picture [468 x 322] intentionally omitted <==
Figure 1: Yeneena tenements: Projects and Earn-In areas with major regional faults
2
QUARTERLY REPORT MARCH 2016
Millennium Zinc Project – Encounter 90%/HHM 10% in E45/2501, E45/2561 and the four eastern subblocks of E45/2500. HHM may earn up to 25% interest.
Background
The Millennium Project is located in the north-east Yeneena (see Figure 1) and is subject to an Earn In Agreement with Hampton Hill Mining (“ HHM ”) (refer ASX release 23 April 2015).
The Millennium Project lies on the north eastern margin of Yeneena at the intersection of the NNW trending Tabletop Fault and the NE orientated Tangadee structural lineament. This intersection of two metallogenically important structural corridors is a first order target and typical of the style of setting that is associated with large scale metal deposits.
Previous aircore and RC drilling by Encounter has defined a +3km long zinc regolith anomaly that remains open to the SE. Diamond drilling at Millennium has intersected a thick zinc gossan at the contact between a brecciated carbonate and a thick sequence of carbonaceous shales of the Broadhurst Formation. Previous assay results from the gossan include, (refer ASX release 9 July 2015):
- 38.7m @ 0.9% Zn in EPT2201 from 255.8m; and 91.8m @ 1.6% Zn in EPT2203 from 344.4m
High tenor zinc sulphide mineralisation, in the form of sphalerite, has been intersected below the gossanous unit and returned assays of, (refer ASX releases 12 January 2015 and 13 December 2013):
- 0.7m @ 36.7% Zn in EPT1854 from 430m; and 7m @ 4.8% Zn in EPT 2198 from 233m.
Three high priority target zones have been identified for follow up in 2016 (see Figure 3):
-
Target Zone Central – large untested target area south-east of the strongly mineralised gossan intersection EPT2260
-
Target Zone South-East - interpreted zone of coherent zinc sulphide mineralisation including EPT 2198 (7m @ 4.8% Zn) that is open and strengthening to the southeast
-
Target Zone North West – high-grade zinc sulphide mineralisation intersected in EPT1854 (0.7m @ 36.7% Zn) that remains open downdip and along strike to the north and west.
Target Zone Central - EPT2260 contained a broad interval of weathered zinc mineralisation that has extended the gossan zone at Millennium. This interval returned an assay of 70m @ 2.3% Zn from 182 metres down hole to end of hole. This is the strongest mineralised gossan intersection to date.
To follow up on this exciting result, a diamond drill hole EPT2278 was completed to test for a steep plunge targeting approximately 150 metres further down dip. This hole did not intersect significant zinc mineralization on the carbonate shale contact which indicates that any in depth extension to the strong zinc mineralization intersected in EPT2260 most likely has a relative flat plunge to the south-east. Supporting this interpretation, EPT2264 located approximately 600 metres south-east of EPT2260 also intersected a strongly mineralised gossan of 18m @ 1.1% Zn from 148 metres down hole to end of hole.
Accordingly, the large untested target area located south-east of the strongly mineralised intersection EPT2260 will be a key focus of exploration at Millennium in 2016.
Target Zone South-East - EPT2261 contained a sulphide intersection of 14m @ 1.8% Zn from 223 metres down hole. EPT2261 is located 100 metres north-west of an earlier hole, EPT 2198, which recorded 7m @ 4.8% Zn from 233 metres down hole (refer ASX release 12 January 2015). EPT2261 established the continuity of an interpreted zone of coherent zinc sulphide mineralisation located in the south-east of the Millennium Project that requires further drill testing.
3
QUARTERLY REPORT MARCH 2016
EPT2262 was drilled to test a steep plunge position below EPT2198 and intersected the carbonate-shale contact but was not well mineralised. The contact area was heavily brecciated and altered and it is interpreted that this hole intersected a position where later faulting has offset the mineralised contact.
A ground gravity survey was completed in October 2015 in this area to extend gravity coverage to the south-east of the known mineralised trend at Millennium and to assist in drill planning. A follow up aircore or RC program is planned to provide initial subsurface information of this structurally compelling, shallow drill target.
Target Zone North West - EPT2257 was pre-collared with the RC rig and completed with diamond drilling during the December 2015 quarter. The hole was designed to test the hypothesis of a shallow south-east plunge of the zinc rich gossan intersected in EPT2201 and EPT2203. However, EPT2257 did not intersect any significant zinc at the carbonate shale contact which was heavily brecciated and altered. Accordingly, it is interpreted that EPT2257 either intersected a position where later faulting has offset the mineralised contact, or that the mineralised unit intersected in EPT2201 and EPT2203 is plunging in a north-westerly direction. The potential remains to define additional mineralisation down dip and up dip of the postulated late fault as well as along strike to the north-west towards EPT1854 (0.7m @ 36.7% Zn).
Next Steps
At the south-east of Millennium, gravity data collected in the December 2015 quarter, is being interpreted in conjunction with other geophysical and geochemical datasets previously collected by Encounter.
A passive seismic trial was completed in April 2016 at Millennium. The objective of this survey was to map cover depth and potentially provide additional structural information to assist with drill planning.
An exercise of removing cover noise from the gravity model at Millennium has commenced. The objective is to produce a cover corrected gravity image similar to the encouraging work recently completed at BM1BM7.
The comprehensive geochemical, structural and geophysical review of Millennium is progressing. The results of this review will be used to design a program of systematic drill testing of the three high priority target zones identified at Millennium.
Drilling based on the outcomes of the review at Millennium is scheduled to commence in early June 2016.
4
QUARTERLY REPORT MARCH 2016
==> picture [458 x 361] intentionally omitted <==
- Figure 2: Drill hole collar location – Millennium
==> picture [458 x 262] intentionally omitted <==
Figure 3: Drill hole long section (B – B’) – Millennium showing diamond and recent RC holes only
5
QUARTERLY REPORT MARCH 2016
BM1–BM7 Copper Project
A 14km long copper system, discovered and wholly owned by Encounter, that contains high grade Cu sulphide at BM7 and a coherent zone of near surface Cu oxide mineralisation at BM1.
Background
Between 2013 to 2015, a total of 13 diamond drill holes were completed at BM7. These holes provide a broad spaced, 3D dataset covering an area that extends over 3km of strike.
A study of the Nifty copper sulphide deposit, located 65km to the north, identified siderite (Fe carbonate) and apatite (phosphorous mineral) alteration in association with trace copper sulphide mineralisation as the diagnostic halo that extends laterally from the Nifty sulphide deposit. This provides a template of key mineralisation vectors to high grade copper mineralisation in the Paterson Province. An evaluation of the drill data from Yeneena highlighted that a number of the key features of the Nifty alteration signature are evident within the BM1–BM7 project.
==> picture [480 x 327] intentionally omitted <==
Figure 4: Cross section through Nifty copper deposit after Anderson (1999)
March 2016 Quarter Activity.
A cover corrected gravity model has been produced over 6km of the BM1-BM7 copper trend. The model has highlighted three new, previously untested and significant density anomalies. The gravity anomalies are situated along strike of bedrock geochemical alteration anomalies and copper mineralisation that are consistent with a halo to a potential high grade copper system (see Figure 5). The anomalies also have the scale and amplitude that is consistent with the targeted large tonnage copper sulphide body. Drill testing of these targets is scheduled to commence in early May 2016. This drilling will be 50% funded (up to $150,000) under the WA Government Exploration Incentive Scheme.
6
QUARTERLY REPORT MARCH 2016
==> picture [434 x 408] intentionally omitted <==
Figure 5: BM1-BM7 cover corrected gravity image (residual filter applied)
Target 1 - BM1 Prospect
The BM1 Northern Zone contains a significant accumulation of near surface, high grade copper oxide mineralisation over an area approximately 500m by 250m. Intersections from this zone include:
-
10m @ 6.8% Cu from 32m*
-
16m @ 3.2% Cu from 26m
-
50m @ 1.1% Cu from 12m
-
20m @ 2.0% Cu from 22m*
-
8m @ 3.6% Cu from 18m*
(refer ASX announcements 15 July 2014 & 30 January 2015)
(*Reported pursuant to the 2004 Edition of the JORC Code )
Diamond drill hole EPT2096, drilled to east of the BM1 Northern Zone intersected a complex brecciated zone containing strongly altered clasts and evidence of pre-depositional alteration. The breccia trends along a north south structural orientation and appears to be associated with a zone of massive pyrite approximately 1km south at the BM1 Central Zone. EPT2096 also included the first intersections of copper sulphide mineralisation associated with the BM1 Northern Zone oxide position with 3.3m @ 0.5% Cu from 56m and 5.8m @ 0.45% Cu from 70m. This copper sulphide mineralisation remains open to the south-east. (refer ASX announcement 31 October 2014)
The recent cover corrected gravity modelling has highlighted a discrete density anomaly located approximately 500m south east of the copper oxide zone. This density anomaly will be drill tested in the upcoming diamond drilling program.
7
QUARTERLY REPORT MARCH 2016
Target 2 - BM7 Prospect
BM7 is a large mineral system containing high grade Cu sulphide intersections including:
-
5m @ 2.5% Cu from 388m*
-
52m @ 0.6% Cu from 42m*
-
9m @ 1.5% Cu from 42m*
-
74m @ 0.4% Cu from 74m*
-
140m @ 0.2% Cu from 144m
Additional gravity data was collected at BM7 during the December 2015 quarter. Modelling of this new data was completed in the March 2016 quarter and has refined the structural interpretation of the BM7 area.
This modelling has improved the understanding of key structural architecture at BM7 and has also highlighted a density anomaly located north-east of the existing drilling at BM7 where broad zones of low grade copper sulphide mineralisation and important alteration signatures considered diagnostic of the Nifty model have been previously intersected.
The initial drilling will focus on a density anomaly located at the intersection of north-east structures and an important north-north-west structure at BM7 (see Figure 5).
Target 3 - BM7 East Prospect
The BM7 East Prospect was identified in 2013 with wide-spaced aircore drilling followed by a short RC drill program in late 2014. Fe-Mg carbonate (siderite) and phosphorus alteration haloes (associated with apatite), which have been shown to be proximal alteration signatures to the Nifty hypogene high grade mineralisation, are found in high concentrations at BM7 East. The alteration halo underlies the core of a laterally extensive copper oxide blanket found at BM7 East that extends over 2km in strike (see Figure 6).
The alteration and mineralisation intersected in the shallow drilling completed at BM7 East is similar to what is seen in the immediate hangingwall of the Nifty copper deposit.
Two, 200m spaced, vertical RC holes (EPT2269 and EPT2270) were completed in October 2015 across the core of the regolith anomaly (see Figure 6). High water inflows resulted in the holes being terminated short of their planned depth. The eastern of the two holes, EPT2270, returned anomalous copper values below the base of oxidation, with associated high phosphorous assays.
The recent gravity survey and remodelling has highlighted a discrete density anomaly located coincident with the centre of the 2km long geochemical anomaly previously identified at BM7 East. This target will be drill tested in the upcoming diamond drill program scheduled to commence in May 2016.
==> picture [335 x 235] intentionally omitted <==
Figure 6: Plan view of alteration and mineralisation through BM7 East – background image Ch40 VTEM
8
QUARTERLY REPORT MARCH 2016
Lookout Rocks Project - Encounter 100% in E45/3768, E45/4091, E45/4408 and E45/4230. Antofagasta may earn up to 70%.
Background
Lookout Rocks includes four tenements (~450km[2] ) of highly prospective exploration ground located in the north-west of Yeneena. Exploration at Lookout Rocks is being conducted as part of the US$6m earn-in agreement with a wholly-owned subsidiary of Antofagasta plc (“ Antofagasta ”) (refer ASX release 30 July 2015).
The Lookout Rocks project is in the north-west of Yeneena and covers over 30 strike kms of interpreted Broadhurst Formation sediments, the geological unit that hosts the Nifty copper deposit. Interpretation of the detailed airborne electromagnetic data indicates the prospective structures and Broadhurst lithologies extend into the project in an area that has seen minimal exploration activity.
In September 2015, an initial reconnaissance aircore and RC drilling program was completed at Lookout Rocks to test a number of key structural targets. The aim of this program was to test cover depth, refine the bedrock geological interpretation and test for any copper regolith anomalism within the defined targets.
The program included seven reconnaissance holes at a structural target along a covered belt of conductive stratigraphy situated at the western margin of a block of Coolbro Sandstone at the Lookout Rocks South Prospect (Figure 7 and 8). Drilling confirmed the presence of deeply oxidised Broadhurst Formation.
The drilling also intersected broad intervals of moderate copper and lead anomalism with a strengthening geochemical vector to the east and towards the bottom of hole. This included drill hole EPT 2256 which intersected 116m @ 290ppm Cu and 457ppm Pb from 16m to end of hole (refer ASX announcement 17 December 2015). The final end of hole sample returned 942ppm copper and importantly, iron oxide minerals interpreted to be derived from the weathering of disseminated copper sulphides.
The oxidised Broadhurst sediments in this area are heavily weathered and leached, indicating strongly acidic meteoric fluids were present. Intense leaching of the regolith material indicates it may have been significantly depleted primary copper mineralisation.
In addition, a surface gossan with boxwork textures after sulphide minerals has recently been identified to the east of the reconnaissance drilling at Lookout Rocks South. Iron rich shallow outcrop and gossanous float occurs in an area approximately 300m by 200m immediately to the east of EPT2220 (Figure 7). Samples taken from this gossan returned copper assays up to 0.2% copper (refer ASX announcement 17 December 2015) and exhibit similarities to iron rich surface samples taken at Nifty (refer to WAMEX historical reports).
These gossanous outcrops together with strongly leached Broadhurst sediments intercepted in shallow drilling at Lookout Rocks South and Lookout Rocks East (see ASX announcement 9 Dec 2015), indicate the presence of sulphides within the Broadhurst Formation sequence. A surface mapping program along a 12km zone between the Lookout Rocks East and Lookout Rocks South prospects was completed in April 2016, together with Antofagasta personnel.
An initial 1-2 diamond hole program at Lookout Rocks South is scheduled to commence in May 2016.
9
QUARTERLY REPORT MARCH 2016
==> picture [515 x 409] intentionally omitted <==
Figure 7: Lookout Rocks – Prospect locations (VTEM ch35 background)
Figure 8: Lookout Rocks South – Collar locations and hole IDs
(VTEM 1VDTRP magnetics background)
PATERSON GOLD PROJECTS
Encounter continues to add to its strategic ground holding in the Yeneena region.
Telfer West ELA45/4613 (100% Encounter): In April 2014, Encounter secured a project located 25km north-west of Newcrest’s Telfer gold/copper operation. The project covers an area of ~121km[2] . Historical exploration was completed by WMC and Newmont from 1983-1993 targeting Telfer style gold/copper mineralisation. The last on-ground exploration was completed in 1993 where limited shallow drilling intersected gold mineralisation over a 4km long trend.
Dora E45/4564 (100% Encounter): In addition, the Dora gold/copper tenement, located approximately 40km south-east of the Telfer gold/copper operation, was granted in December 2015 (see Figure 1).
Initial field reconnaissance at the two Paterson gold projects is scheduled to commence in July 2016.
10
QUARTERLY REPORT MARCH 2016
CORPORATE
Encounter held cash reserves of approximately $4.0 million at 31 March 2016.
During the March quarter the Company issued 600,000 options pursuant to the Company’s employee option plan.
NEXT QUARTER HIGHLIGHTS
Activities planned for the June 2016 quarter include:
BM1-BM7 Copper Project (100% ENR)
- Drill testing of the BM1, BM7 and BM7 East targets is scheduled to commence in early May 2016.
Millennium Zinc (Hampton earning up to 25%)
-
A comprehensive review of the gossan geochemistry is progressing and will be completed.
-
A passive seismic trial including modelling and interpretation will be completed. The objective of this survey is to map cover depth and potentially provide additional structural information at the project to assist with drill planning.
-
A new gravity model will be prepared removing cover noise.
-
Drilling based on the outcomes of the above work is scheduled to commence in early June 2016.
Lookout Rocks Copper Project (Antofagasta earning in)
-
A surface mapping program along a 12km zone between the Lookout Rocks East and Lookout Rocks South prospects will be completed.
-
An initial 1-2 diamond hole program is scheduled to commence in May 2016.
TENEMENT INFORMATION
| Area km 2 |
Interest at start of quarter (01/01/2016) |
Interest at end of quarter (31/03/2016) |
|||
|---|---|---|---|---|---|
| Lease | Location | Project Name | |||
| E51/1570 | 50km SSE of Meekatharra | Hillview | 89.0 | 100% | 0% |
| E70/4667 | 45km Eof Moora | Bindi Bindi | 316.9 | 100% | 100% |
| E45/2500 | 266km NE of Newman | Paterson–Hampton Earning-in* | 163.4 | 90-100% | 90-100% |
| E45/2501 | 277km NE of Newman | Paterson–Hampton Earning-in | 41.4 | 90% | 90% |
| E45/2502 | 261km NEof Newman | Paterson | 216.3 | 100% | 100% |
| E45/2503 | 253km NE of Newman | Paterson | 76.3 | 100% | 100% |
| E45/2561 | 276km NEof Newman | Paterson – Hampton Earning-in | 86.0 | 90% | 90% |
| E45/2657 | 246km NE of Newman | Paterson | 222.8 | 100% | 100% |
| E45/2658 | 245km NE of Newman | Paterson | 222.8 | 100% | 100% |
| E45/2805 | 242km NEof Newman | Paterson | 209.7 | 100% | 100% |
| E45/2806 | 251km NE of Newman | Paterson | 63.7 | 100% | 100% |
| E45/4230 | 246km NEof Newman | Lookout Rocks - Antofagasta Earning-in |
92.4 | 100% | 100% |
| Lookout Rocks / Throssell Range - AntofagastaEarning-in |
|||||
| E45/3768 | 241km NEof Newman | 187.8 | 100% | 100% | |
| Lookout Rocks - Antofagasta Earning-in |
|||||
| E45/4091 | 253km NE of Newman | 257.7 | 100% | 100% | |
| Throssell Range - Antofagasta Earning-in |
|||||
| E45/4408 | 262km NE of Newman | 41.7 | 100% | 100% | |
| E45/4564 | 315km NE of Newman | Paterson Au/Cu-Dora | 194.2 | 100% | 100% |
* Hampton earning into the four eastern block of E45/2500
11
QUARTERLY REPORT MARCH 2016
==> picture [437 x 421] intentionally omitted <==
Figure 9: Yeneena Project Location Plan
==> picture [86 x 26] intentionally omitted <==
________
Will Robinson Managing Director
The information in this report that relates to Exploration Results is based on information compiled by Mr. Peter Bewick who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Bewick holds shares and options in and is a full time employee of Encounter Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the 'Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Bewick consents to the inclusion in the report of the matters based on the information compiled by him, in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the relevant ASX releases and the form and context of the announcement has not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcements.
12
Appendix 5B Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10
| Name of entity |
Quarter ended (“current quarter”) 31 March 2016 |
Quarter ended (“current quarter”) 31 March 2016 |
||
|---|---|---|---|---|
| Encounter Resources Limited | ||||
| ABN 47 109 815 796 Consolidated statement of cash flows |
||||
| 31 March 2016 | ||||
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration and evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 - R&D tax concession refund - Other (incl. EIS drilling grant) Net Operating Cash Flows |
Current quarter $A’000 |
Year to date (9 months) $A’000 |
||
| - (708) - - (124) - 23 - - - - |
- (3,038) - - (495) - 47 - - 541 227 |
|||
| (809) | (2,718) | |||
| Cash flows related to investing activities 1.8 Payment for purchases: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a)prospects (b)equity investments (c)other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other – Farm-in cash calls received Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
- - - - - - - - - |
- - - - - - - - 2,417 |
||
| - | 2,417 | |||
| (809) | (301) |
- See chapter 19 for defined terms.
Appendix 5B Page 13
17/12/2010
Appendix 5B Mining exploration entity quarterly report
| 1.13 Total operating and investing cash flows (brought forward) |
(809) | (301) |
|---|---|---|
| Cash flows related to financing activities 1.14 Proceeds/(refunds) from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other – capital raising costs Net financing cash flows |
- - - - - - |
2,954 - - - - (24) |
| - | 2,930 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end of quarter |
(809) 4,810 - |
2,629 1,372 - |
| 4,001 | 4,001 |
Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities
| 1.23 1.24 |
Aggregate amount of payments to the parties included in item 1.2 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A'000 |
|---|---|---|
| 164 | ||
| - | ||
| 1.25 | Explanation necessaryfor an understandingof the transactions | |
| Item 1.23 - Remuneration of Directors. |
Non-cash financing and investing activities
-
2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
-
2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
Expenditure for the quarter of $153,068 ($1,922,945 year to date) has been incurred by other entities Pursuant to farm-in agreements on projects held by the Company.
Financing facilities available
- See chapter 19 for defined terms.
Appendix 5B Page 14
17/12/2010
Appendix 5B Mining exploration entity quarterly report
Add notes as necessary for an understanding of the position.
| 3.1 Loan facilities 3.2 Credit standby arrangements |
Amount available $A’000 |
Amount used $A’000 |
|---|---|---|
| - | - |
|
| - | - |
Estimated cash outflows for next quarter
| 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration |
$A’000 |
|---|---|
| 500 | |
| - | |
| - | |
| 200 | |
| Total | 700 |
Estimated exploration costs of the proposed farm-in work programs for the next quarter have been included in 4.1.
Reconciliation of cash
| Reconciliation of cash | ||
|---|---|---|
| Reconciliation of cash at the end of the quarter (as | Current quarter | Previous quarter |
| shown in the consolidated statement of cash flows) to | $A’000 | $A’000 |
| the related items in the accounts is as follows. | ||
| 5.1 Cash on hand and at bank |
3,926 | 4,736 |
| 5.2 Deposits at call |
75 | 74 |
| 5.3 Bank overdraft |
- | - |
| 5.4 Other (provide details) |
- | - |
| Total: cash at end of quarter(item 1.22) | 4,001 | 4,810 |
- See chapter 19 for defined terms.
Appendix 5B Page 15
17/12/2010
Appendix 5B Mining exploration entity quarterly report
Changes in interests in mining tenements
| 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased |
Tenement reference |
Nature of interest (note (2)) |
Interest at beginning ofquarter |
Interest at end of quarter |
|---|---|---|---|---|
| Nil | - | - | - | |
| Nil | - | - | - |
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy- backs, redemptions |
- | - | ||
| - - |
- - |
|||
| 7.3 +Ordinary securities 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs (c) Released from Escow |
155,644,044 | 155,644,044 | ||
| - - - |
- - - |
|||
| 7.5 +Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
- | - | ||
| - - |
- - |
- See chapter 19 for defined terms.
Appendix 5B Page 16
17/12/2010
Appendix 5B Mining exploration entity quarterly report
| 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
400,000 1,450,000 550,000 750,000 200,000 595,000 1,250,000 750,000 700,000 5,441,429 600,000 |
- - - - - - - - - - |
Exercise price $0.40 $0.30 $0.39 $0.21 $0.31 $0.22 $0.23 $0.31 $0.16 $0.21 $0.14 |
Expiry date 31/5/2016 30/11/2016 30/11/2017 31/5/2017 31/1/2018 31/5/2018 27/11/2018 27/11/2019 31/1/2019 30/9/2018 28/2/2020 |
||
|---|---|---|---|---|---|---|
| 600,000 | - | $0.14 | 28/2/2020 | |||
| - | - | |||||
| 50,000 50,000 75,000 100,000 |
- - - - |
$0.40 $0.21 $0.22 $0.16 |
31/5/2016 31/5/2017 31/5/2018 31/1/2019 |
|||
| 7.11 Debentures (totals only) |
- | - | ||||
| 7.12 Unsecured notes (totals only) |
- | - |
Compliance statement
-
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).
-
2 This statement does give a true and fair view of the matters disclosed.
==> picture [118 x 48] intentionally omitted <==
Sign here: Date: 29 April 2016 (Company secretary)
Print name: Kevin Hart
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
See chapter 19 for defined terms.
Appendix 5B Page 17
17/12/2010
Appendix 5B Mining exploration entity quarterly report
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .
-
4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Cash Flow Statements apply to this report.
-
5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
== == == == ==
- See chapter 19 for defined terms.
Appendix 5B Page 18
17/12/2010