28 November 2016

==> picture [189 x 93] intentionally omitted <==

ACN 092 471 513

ASX Release

PENNY’S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION

Empire Resources Limited (‘Empire’, ASX code: ERL) is pleased to give an update on the progress of underground mining studies currently being undertaken on the Penny’s Find gold deposit located 50km northeast of Kalgoorlie, Western Australia.

In parallel with its maiden mine start, Empire has also initiated independent assessment of the deposit’s ability to extend the project’s mine life through a new underground mining operation on completion of the open-pit operation. This is based on a JORC compliant Indicated and Inferred gold resource of 170,000t @ 5.40g/t Au beneath the scheduled pit floor (Refer ASX announcement, 2 September 2015 and summarised in Table 1 below).

This assessment, initially consisting of a recently completed geotechnical pre-feasibility study undertaken by MineGeoTech Pty Ltd, has shown underground mining to be geotechnically viable based on the mine design shown in Figure 1.

The executive summary from the MineGeotech report is attached below with the complete report available on the Empire Resources website: www.resourcesempire.com.au

Having completed the geotechnical assessment, a pre-feasibility study is now being undertaken to assess the economic viability of mining the underground resource.

David Sargeant, Empire’s Managing Director, said “The results of the geotechnical study are very encouraging and indicate the real possibility of extending the mine life to at least three years. Any further exploration success could see an even longer mine life.”

Despite the road diversion taking longer than initially anticipated it is expected to be finalised with all necessary approvals within days, allowing mining of the open pit to proceed.

Table 1 : Penny’s Find Resources - September 2015

Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015 Table 1 : Penny’s Find Resources- September 2015
Reportable In Situ Mineral Resource by location and cut-off
Open Cut (0.5g/t) Underground (1.5g/t) Combined
Class Tonnes Au g/t Tonnes Au g/t Tonnes Au g/t
Measured - - - - - -
Indicated 218,000 4.64 84,000 4.90 302,000 4.71
Inferred 82,000 1.79 86,000 5.89 168,000 3.89
TOTAL 300,000 3.86 170,000 5.40 470,000 4.42

A preliminary underground mine design had already been initiated to ensure it is able to mesh smoothly with the open pit mining operation. Figures 1 and 2 are long sections under the proposed open pit showing the preliminary underground mine design based on the resource block model in Figure 3.

==> picture [476 x 333] intentionally omitted <==

Figure 1 : Penny’s Find Preliminary Underground Mine Design

==> picture [381 x 337] intentionally omitted <==

Figure 2 : Penny’s Find Open Pit and Underground Design (Looking northwest)

==> picture [467 x 276] intentionally omitted <==

Figure 3 : Long Section (looking west) showing all blocks by classification. Blue – Indicated, Yellow – Inferred

MineGeoTech Pty Ltd recommends that readers of the Executive Summary below read the complete Geotechnical Pre-Feasibility Study Report to understand the limitations and recommendations made with regards to the geotechnical study for the Penny’s Find Underground Project. MineGeoTech Pty Ltd accepts no liability or responsibility for decisions made by readers that have not read the complete report.

Empire has posted the complete MineGeoTech Pre-Feasibility Report on its website which may be reached at the following web address: www.resourcesempire.com.au

DAVID SARGEANT MANAGING DIRECTOR November 2016

For further information on the Company, Tel: +61 8 9361 3100 www.resourcesempire.com.au

Competent Persons Statements

The information is this release concerning the Mineral Resources for the Penny’s Find deposit has been estimated by Mr Peter Ball B.Sc who is a director of DataGeo Geological Consultants and is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Ball has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and qualifies as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Ball consents to the inclusion in this public release of the matters based on his information in the form and context in which it appears.

The scientific and technical information in this report that relates to the Geotechnical Prefeasibility Study for the Penny’s Find Deposit is based on information compiled by Dr John Player, Principal of MineGeoTech Pty Ltd. Dr Player is a Member of the Australasian Institute of Mining and Metallurgy. Dr Player has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Player consents to the inclusion in the report of the matters related to the geotechnical assessment of the Penny’s Find Deposit in the form and context in which it appears.