AI assistant
EMPEROR ENERGY LIMITED — Capital/Financing Update 2010
Oct 20, 2010
64848_rns_2010-10-20_e19fcd6b-2179-4d15-b1e3-9acab67514cd.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [220 x 84] intentionally omitted <==
==> picture [224 x 46] intentionally omitted <==
21 October 2010
Company Announcements Office Australian Stock Exchange Limited 10[th] Floor, 20 Bond Street Sydney NSW 2000
Dear Sirs
CANNING BASIN OPERATIONS UPDATE BACKREEF-1 DRILLING REPORT NO.5
The Directors of Oil Basins Limited ( OBL , ASX codes OBL , OBLOA and OBLOB, or the Company) wish to make the following ASX announcement relating to the drilling operations at Backreef-1, Backreef Area, Canning Basin, onshore Western Australia (WA) :
-
The installation and testing the well blow-out preventors (BOP’s) was completed at 6:00pm WST 20 October.
-
As at 6:00am WST 21 October, operations were drilling with a 216mm (8-1/2 inch) diameter bit at 744m to prepare for the a formation integrity test (FIT) .
-
As at 7:30am WST drilling operations have recommenced (refer to Figure 1 – Time versus Depth curve).
In accordance with ASX Listing Rules, during the conduct of Backreef-1 drilling operations, OBL will advise the market weekly (on Thursdays), or after concluding an important well drilling operation and/or obtaining an important assessment or result.
By funding 100% of the drilling and completion costs of Backreef-1, OBL is earning upto 90% of Backreef-1 and the Backreef Area.
==> picture [144 x 71] intentionally omitted <==
Kim McGrath Chairman
==> picture [524 x 743] intentionally omitted <==
----- Start of picture text ----- 2----- End of picture text -----