ASX Announcement & Media Release
31 October 2022
Fast Facts
ASX Code: EMR Shares on issue: 593,350,983 Market Cap: ~A$647 million Cash: A$48.1 million (at 30 Sep 2022) Bullion: A$12.8 million (at 30 Sep 2022)
==> picture [195 x 46] intentionally omitted <==
Quarterly Report for the period ended 30 September 2022
Highlights
Operational Activities - Okvau Gold Project
Board & Management
Simon Lee AO, Non-Executive Chairman Morgan Hart, Managing Director Mick Evans, Executive Director Ross Stanley, Non-Executive Director Billie Slott, Non-Executive Director Jay Hughes, Non-Executive Director Michael Bowen, Non-Executive Director Mark Clements, Non-Executive Director and Company Secretary Bernie Cleary, Operations Manager
Company Highlights
-
First mover in an emerging gold province in Cambodia;
-
Okvau Deposit: Indicated and Inferred Mineral Resource Estimate of 1.06Moz at 1.91g/t Au;
-
Project built in 2021 on time on budget and now in operation;
-
Forecast economics demonstrates high grade, low cost, compelling project;
-
Ore Reserve of 13.5Mt & 1.9g/t Au for 0.82Mozs in a single open pit with waste:ore ratio of 5.0:1;
-
LOM average annual production of 106,000ozs pa;
-
AISC US$754/oz over LOM (at a US$1,450 gold price assumption);
-
Mineral Investment Agreement governs significant tax and duty concessions for first 5 years and includes offshore arbitration process;
-
Highly credentialed gold project operational and development team;
-
Significant resource growth potential;
-
Focussed on a net positive impact on near-mine environmental and social values by targeting strict compliance with corporate governance, international guidelines (IFC PS’s) and local law by engaging and collaborating with all stakeholders.
-
Gold production of 23,217oz for September quarter with 23,457oz gold poured, in line with updated forecast following SAG mill gearbox failure;
-
Mining operations remain on schedule to deliver process plant feed and meet guidance despite operating during a 99th percentile wet season;
-
AISC of US$824/oz for quarter, slightly above forecast due to reduced ounces following the SAG mill gearbox failure;
-
AISC of US$768/oz for 111 , 388oz of gold production from September 2021 to end of quarter (124,222oz project to date, including commissioning);
-
AISC forecast for the 2023 financial year remains at US$740 – US$810/oz with guidance for gold production remaining at 25-30koz per quarter; and
-
Okvau fresh rock orebody continuing to achieve strong positive reconciliation to reserve to end of quarter
Exploration Activities – Okvau Gold Project
-
Significant gold mineralisation from near-mine exploration RC and diamond drill programme with strong potential to increase Okvau resources and reserves:
-
10m @ 14.17g/t Au from 258m with 5m @ 23.26g/t from 258m (RCDD22OKV449) ; and
-
3m @ 15.17g/t Au from 358m (RCDD22OKV448)
Exploration Activities – Memot Gold Project
-
Significant gold mineralisation from infill RC resource programme on the Memot Prospect:
-
1m @ 11.40g/t from 29m (RC22MMT031); and
-
1m @ 14.25g/t from 122m (RC22MMT033)
Bullseye (~60%) – North Laverton Gold Project – Neptune and Boundary Prospect Resource Drill Programme
-
Significant gold mineralisation from Bullseye’s RC resource exploration programme on the Boundary and Neptune Prospects are an encouraging result this early in the drill campaign:
-
12m @ 4.94g/t from 62m including 1m @ 9.07g/t from 69m and 1m @ 42.9g/t from 72m (RC22NPT003);
-
15m @ 2.48g/t from 108m including 1m @ 7.39g/t from 116m and 2m @ 7.79g/t from 118m (RC22NPT004); and
-
13m @ 2.54g/t from 76m including 1m @ 19.30g/t from 81m (RC22BDY001).
Registered Office 1110 Hay Street West Perth WA 6005
T: +61 8 9286 6300 F: +61 8 6243 0032
==> picture [137 x 33] intentionally omitted <==
Corporate
-
Consolidated cash and gold bullion on hand at 30 September 2022 of A$60.9m (30 Jun 22: A$58.8m) with A$48.1m in cash (30 Jun 22: A$43.0m) and A$12.8m gold bullion (30 Jun 22: A$15.8m);
-
Debt repayment to date of US$13.0m with US$52.0m remaining debt at the end of quarter;
-
Gold deliveries to the refinery resulting in total gold sales of US$43.4m (US$48.6m) during the quarter;
-
Emerald appointed 2 highly experienced and highly regarded directors to the Board, Mr Michael Bowen and Mr Jay Hughes;
-
Earn-in agreement reached with Antrong Metals Co., Ltd for two exploration tenements, covering 400km[2] located between Emerald’s Okvau and Ochhung tenements. Taking total exploration tenure in Cambodia to ~1600km[2] and Group tenure to (inclusive of Bullseye Mining Limited) ~3000 km[2] ; and
-
Cessation of Blue Cap Bullseye Joint Venture whereby Bullseye to acquire Blue Cap’s 30% interest.
Figure 1 | Okvau Open Pit 20 September 2022 (nearing completion of wet season)
==> picture [546 x 259] intentionally omitted <==
Emerald’s Managing Director, Morgan Hart, said:
"Pleasingly, the Okvau Gold mine has continued to perform strongly during its fourth full quarter of production, despite several months of well above average rainfall and a mechanical issue with the SAG Mill gearbox. The rainfall event did not significantly impact mining and milling operations during the quarter which is a credit to the operational management of the team at Okvau. Unfortunately, a gear failure on the SAG Mill gear box late in the quarter restricted gold production to 23,217 ounces for the quarter but the Company remains confident that full year production forecasts are still robust.
“The continued strong performance of the Okvau Gold mine is underpinning the Company’s financial position to progress towards our stated aim to become a multi-mine gold producer.
“Additionally, the Company continues to be encouraged by its very prospective tenure package in Cambodia. The results of the near mine extensional drilling at Okvau will be used in the coming months to update the resource and reserves at Okvau. Drilling of the high grade Memot gold project are expected to ramp up in the coming months (dry season) with a maiden resource estimate expected in June-July 2023. The addition of the highly prospective Antrong Joint Venture licences in close proximity to the Okvau Gold processing plant are also expected to add to the Company’s production profile in coming years.
“The resource definition drilling program continued at Bullseye’s Dingo Range project during the Quarter which will be used to present an updated resource and maiden reserve for the Boundary through Bungarra mineralised zone by the end of FY23.”
Page 2 of 29
==> picture [137 x 33] intentionally omitted <==
Activities during the quarter
Okvau Gold Mine
Operating Overview
During the Quarter, the Okvau Gold mine produced 23,217 ounces. All-In Sustaining costs for the quarter were US$824/oz, slightly above forecast due to reduced ounces following the SAG mill gearbox failure. The forecast for the remainder of FY23 is to achieve an annualised AISC per ounce of between US$740 to US$810/oz.
Mining
Mining operations continued to advance during the Quarter in Stages 1 through 3. Minimal activities took place within Stage 1 during the wet season, with mining accelerating in Stage 2 exposing high-grade sulphide ore for the current and future quarters. Minimal oxide and fresh ore was mined from Stage 3 along the northern pit wall allowing for the integration of the Stage 2 and Stage 3 designs. Mining continues to track ahead of schedule and in line with milling requirements. The positive reconciliation has allowed the Company the flexibility of preferentially milling the highest-grade ore zones whilst maintaining a substantial circa 1.4g/t stockpile (+711kt), with a further 1.53Mt of low grade stockpiled at +0.6g/t Au. Total surveyed movement for the Quarter was 1,420,360 BCM of ore and waste against a scheduled 1,350,000 BCM with 1,340,220 BCMs blasted.
Figure 2 | Okvau Gold Mine Open Pit at Quarter end
==> picture [323 x 308] intentionally omitted <==
The Company intends to complete an updated Okvau Project Resource and Reserve estimate in the coming months, utilising the numerous significant drill results reported during recent months. The update is expected to extend both open cut and potential underground mine plans. In addition drilling is planned to increase at the near mine prospects such as Samnang (inside the Okvau Mining licence refer to announcement 27 December 2017), Prek Khlong NW and Gossan (Preak Khlong Licence refer to announcement 29 April 2022) and other near mine targets. The combination of Okvau and near mine gold mineralisation in satellite deposits is expected to add significantly to mine life in future years.
Processing
The Company is continually focusing on improving mill feed quality and metallurgical understanding at the Okvau Gold mine. During the Quarter there was an assessment of sulphide species and percentages in relation to gold grade and recoveries. In particular, attention to ore hardness and its optimisation through blending for steady process plant operations. The site completed its first SAG mill reline in July (after 13 months in operation) with a 4 day shut down, the reline was completed by a small crew of specialists and the in house team. As announced on 21 September 2022, a developing vibration in the SAG mill gearbox was identified as a failed drive gear (broken tooth), the impact of which resulted in a combined 10 days of mill performance reduction.
Page 3 of 29
==> picture [137 x 33] intentionally omitted <==
Figure 3 | Inaugural SAG mill reline
==> picture [409 x 308] intentionally omitted <==
Ore milled for the quarter was 445,793 dry tonnes at an average milling rate of 221tph and mill availability of 91.1%. Sulphide ore gold recoveries averaged circa 80%, optimisation test work has led to the reintroduction of the flotation tail to the CIL circuit and the splitting of the carbon circuits, this has resulted in a reduction of the carbon fouling caused by flotation reagents and has improved gold adsorption rates. Optimisation studies are continuing into improving the leach kinetics and recovery in both the flotation concentrate circuit and the flotation tail circuit.
Figure 4 | Okvau Gold Mine Processing Plant July 2022 (SAG Mill Reline Preparation)
==> picture [420 x 315] intentionally omitted <==
Page 4 of 29
==> picture [137 x 33] intentionally omitted <==
Gold Production
During the Quarter, 13 shipments totalling 25,124 ounces of gold have been received by the refinery. All of these shipments have been sold during the Quarter at an average price of US$1,725 per ounce. A further 4,552 ounces of gold doré have been poured ahead of mint outturn.
| Operating Physicals | 2022 – Q3 | 2022 – Q4 | 2023 - Q1 | |
|---|---|---|---|---|
| Ore mined | ‘000 BCM | 256 | 286 | 213 |
| Waste mined | ‘000 BCM | 1,124 | 1,130 | 1,207 |
| Stripping ratio | w:o | 4.39 | 3.95 | 5.65 |
| Ore mined | ‘000 t | 840 | 870 | 692 |
| Ore milled | ‘000 t | 538 | 545 | 446 |
| Head grade milled | g/t | 1.98 | 1.91 | 2.03 |
| Recovery | % | 80% | 79% | 80% |
| Gold production | Oz | 27,216 | 26,654 | 23,217 |
| AISC | US$/oz | 748 | 794 | 824 |
The final production numbers from commercial production in September 2021 to end of the Quarter show that the Okvau Gold mine has produced 111,388 ounces of gold at an average AISC of US$768 per ounce. Total project to date gold produced is 124,222 ounces with 119,119 ounces poured.
Environment and Social
The Company is focussed on a net positive impact on near-mine environmental and social values with the Company engaging and collaborating with all stakeholders in the Okvau Gold Project area and the Company’s wider exploration tenure and advancing the Company’s climate strategy with reference to international guidelines.
Early in the Quarter, a team from the Ministry of Environment inspected the Okvau Gold mine and was pleased with the level of environmental compliance being maintained. The Ministry of Mines & Energy Extractive Industry Governance Forum was hosted by Renaissance Minerals (Cambodia) in September 2022. Company staff gave an opening address, an Okvau Gold Project update and two presentations - Compliance to the Closure Stage and the Biodiversity Offset Programme. The presentations were well-received.
Community Liaison Officers conducted local village surveys to maintain contact with local village leaders, conduct a census and understand more about the ethnicity and challenges each community has. It was also an opportunity to for leaders to speak about real or perceived impacts the mine may be having on their community. A total of 7,648 people live in the two nearby communes, across 8 villages; 40% are female and an average of 90% of residents are ethnic.
During the Quarter, 1,500 Beng trees were planted across 95ha of suitable offset site. The Company employed three Community Protected Area (CPA) Rangers (also local resin collectors) to assist. 928 trees were supplied from three schools participating in the School Nursery Programme.
==> picture [534 x 134] intentionally omitted <==
----- Start of picture text -----
Figure 5 | Ranger Planting Trees Figure 6 | Chong Plas Commune Security Team Figure 7 | Village Surveys
Figure 8 | EIGF presentations Figure 9 | EIGF presentations Figure 10 | Stakeholder Biodiversity Workshop
----- End of picture text -----
==> picture [137 x 102] intentionally omitted <==
==> picture [140 x 103] intentionally omitted <==
==> picture [254 x 102] intentionally omitted <==
Page 5 of 29
==> picture [137 x 33] intentionally omitted <==
Carbon Neutrality Targets
Environmental consultancy, Earth Systems continued to provide technical support to develop the Company’s climate strategy, including carbon neutrality targets and pathways and a carbon offset concept. Initial concepts have been shared with further work continuing on a preferred concept including identifying suitable locations and conducted a simplified cost-analysis assessment.
Earth Systems have completed the Environmental and Social Audit against IFC Performance Standards, ISO14001, local legislation and licencing commitments with recommendations currently being actioned. The Environmental Management System was analysed and meaningful targets and measurements aligned to the United Nations Sustainable Development Goals identified and reported in the 2022 Annual Report. Earth Systems facilitated a stakeholder workshop on the Biodiversity Offset programme delivering preliminary results and workshopping opportunities for enhanced performance. The Company continues to consult with stakeholders to implement programme improvements. A complete Biodiversity Offset monitoring report is due 2Q23.
Environmental Monitoring
An extensive environmental monitoring programme of physical, biological, and social aspects is well-established to ensure the Company is meeting all required environmental standards and commitments.
The Company continues to make regular financial contributions to Environmental, Social and Endowment funds with the aim of achieving a net-gain in both biodiversity and social values.
Exploration Activities
Emerald’s exploration tenements, which comprise of a combination of 100% owned granted licences and joint venture agreements now cover a combined area of 1,639 km² following the recent earn-in agreement signed with Antrong Metals Co., Ltd for two exploration tenements, covering 400km[2] , located between Emerald’s Okvau and Ochhung tenements (refer ASX announcement 19 October 2022).
Figure 11 | Cambodian Gold Project | Exploration Licence Areas
==> picture [528 x 321] intentionally omitted <==
Page 6 of 29
==> picture [137 x 33] intentionally omitted <==
Okvau Near Mine Exploration (100%)
During the Quarter, an exploration drill programme focusing on infilling and extending the mineralisation proximally within and beyond the reserve pit shell continued. The drilling to date includes 24 drill holes for 7,866m (3,066m RC and 4,800m diamond) (refer to Figure 14).
The programme identified significant mineralisation (refer to announcements dated 7 October 2022, and Figure 14) outside the current Indicated resource including:
-
10m @ 14.17g/t Au from 258m with 5m @ 23.26g/t from 258m (RCDD22OKV449)[ 1]
-
1.37m @ 16.70g/t from 386m (RCDD22OKV447A)[ 1] ;
-
3m @ 7.18g/t from 510m (RCDD22OKV445)[ 1] ;
-
3m @ 15.17g/t Au from 358m (RCDD22OKV448)[ 2] ; and
-
3m @ 6.23g/t from 516m (RCDD22OKV448)[ 2] .
1 Refer to announcement 7 October 2022; 2 Refer to Appendix One
The Company has commenced a review of the 2017 Resource and Reserve, with the recent results to be included alongside the ~16,000m of drilling (77 collars) completed since 2017. Other previously reported, high-grade intersections (refer Figure 13), located outside the current Indicated Resource include:
-
3m @ 14.28g/t Au from 432m (DD16OKV372); (refer ASX release 28 April 2017);
-
6m @ 9.70g/t Au from 520m (DD16OKV373); (refer ASX release 28 April 2017);
-
15m @ 11.92g/t Au from 143m (RC19OKV390); (refer ASX release 2 July 2019);
-
8m @ 19.98g/t Au from 172m (RC19OKV397); (refer ASX release 2 July 2019);
-
6m @ 11.40g/t Au from 258m (RCDD20OKV424); (refer ASX release 29 January 2021);
-
3m @ 15.61g/t from 48m (RCDD22OKV436); (refer ASX release 28 July 2022); and
-
6m @ 14.10g/t Au from 323m (RCDD22OKV444), (refer ASX release 28 July 2022).
Most of these results are proximal to the existing current reserve pit shell and are expected to be mined in an extension to the open cut pit design.
Figure 12 | High grade sulphide (arsenopyrite) mineralisation in RCDD22OKV449 at 262.5m from intersection 10m @ 14.17g/t Au from 258m at Okvau Gold Project
==> picture [424 x 239] intentionally omitted <==
Page 7 of 29
==> picture [137 x 33] intentionally omitted <==
Figure 13 | Long Section (Oblique) – Drill Hole Pierce Points of Eastern Fault Zone with Okvau Indicated Reserve Block
==> picture [495 x 283] intentionally omitted <==
Figure 14 | Completed collars of the current Okvau Resource Drill programme (Plan view)
==> picture [497 x 344] intentionally omitted <==
Page 8 of 29
==> picture [137 x 33] intentionally omitted <==
Memot Project (100%)
Significant gold mineralisation has been identified on the Memot Project from the infill RC resource programme which commenced during the Quarter.
To date, 12 collars (2,050m) has been completed with 1,047 Au assays (663 Multielement results) returned with significant intersections such as 1m @ 11.40g/t from 29m (RC22MMT031) and 1m @ 14.25g/t from 122m (RC22MMT033) (refer to Appendix One and Figure 15). Due to the difficulties associated with drilling in the wet season through artisanal back filled material, the initial drilling focused on the less prospective south-western side of the extensive artisanal workings. The remaining infill holes are expected to be completed as conditions improve towards the end of the year.
Figure 15 | Memot artisanal workings with >2 gram metre intersections projected to surface as well as collar points of previously announced drilling completed by the Company and historic drilling
==> picture [512 x 346] intentionally omitted <==
A maiden Resource calculation is planned upon completion of the current drill programme utilising both the recent results and previously announced significant intersections, such as, 1m @ 37.20 g/t Au from 33m (DD21MMT005); 1m @ 31.70g/t Au from 49m (DD21MMT010); and 0.45m @ 37.10g/t Au from 74.55m, 0.4m @ 17.70 g/t Au from 190m (DD22MMT013), 3.54m @ 10.3g/t Au from 0m (ZK8-1); 0.3m @ 145g/t Au from 14.2m (ML3); 0.3m @ 96g/t Au from 12.7m (ML7); and 0.3m @ 76.5g/t Au from 10.7m (ML6).
The mineralisation is associated with a quartz hosted, stacked, massive sulphide vein sets dipping shallowly to the North-East (refer Figure 15) with current interpreted strike length of 650m and open in all directions (refer to ASX announcement dated 28 July 2022).
A contractor has been engaged to complete ground magnetics and IP geophysical surveys over the prospective areas with anomalous Au and Cu geochemical signatures (refer to announcement 28 July 2022), located within a ~6km radius of the Memot artisanal workings. The geophysical surveys will assist with the regional structural interpretation, as well as potentially identifying prospective exploration targets similar to intrusive centred, sediment hosted Au-Cu (Sepon) style mineralisation.
Antrong North and South Joint Venture (earning up to 80%)
On 19 October 2022, the Company announced the signing of an agreement with Antrong Metals Co. to earn up to 80% in two exploration licences located between Emerald’s Ochhung and Okvau tenements, 10 kilometres to the north-east of the 100% owned 1.14Moz Okvau Gold Project (refer Figure 16).
Page 9 of 29
==> picture [137 x 33] intentionally omitted <==
Historical drilling results within the Antrong Licences, which have had limited follow up, demonstrate potential for significant new gold discoveries and include (refer to ASX announcement dated 19 October 2022):
-
5.7m @ 5.06g/t gold from 30.5m (OTSDD002);
-
3m @ 6.91g/t gold from 25.2m (OTSDD001);
-
2m @ 4.16g/t gold from 42m (OTMDD002); and
-
3.1m @ 6.23g/t Au from 20m (ANTDD001).
The Antrong Licences cover multiple diorite intrusions with high grade rock chip samples such as 120, 76.10, 54.20 and 50.30g/t gold in previous work completed.
Figure 16 | Antrong North and South Licence historical data including significant rock chips and drill results
==> picture [455 x 312] intentionally omitted <==
Bullseye Mining Limited (Bullseye, EMR 59.32%)
The North Laverton Gold Project consists of 34 exploration licences (including 4 applications) and 4 mining licences controlling the entire Dingo Range greenstone belt which covers more than 800km² of tenure (refer Figure 17) and has the potential to host multiple standalone deposits or satellite deposits to supply additional ore to a conceptual central mill . It includes the Boundary, Neptune, Stirling, Hurleys and Bungarra Prospects over a 6.4km greenstone strike length.
The planned ~98km resource definition drilling programme across the Boundary, Neptune, Stirling, Hurleys and Bungarra prospects, began in July 2022. Once completed will total circa 150,000m of new drilling available to estimate an updated North Laverton resource and a maiden reserve estimate.
During the Quarter the Company announced recent drilling results from the Boundary and Neptune Prospects. To date, 23 collars (4,545m) have been completed drilled (refer Appendix Three) and 3,940 samples returned (with 147 assays pending). The significant results are reported below (refer ASX announcement dated 7 October 2022 and Appendix Three):
-
12m @ 4.94g/t from 62m including 1m @ 9.07g/t from 69m and 1m @ 42.90g/t from 72m (RC22NPT003)[ 2]
-
15m @ 2.48g/t from 108m including 1m @ 7.39g/t from 116m and 2m @ 7.79g/t from 118m (RC22NPT004)[ 2] ;
-
13m @ 2.54g/t from 76m including 1m @ 19.30g/t from 81m (RC22BDY001)[ 2] .
-
11m @ 1.64g/t from 80m (RC22BDY006)[1] ;
-
2m @ 8.08g/t from 119m (RC22BDY003)[1] ;
-
5m @ 2.98g/t from 166m (RC22BDY004) including 1m @ 11.46g/t from 170m[1] ;
-
9m @ 1.51g/t from 44m (RC22NPT013)[ 1]
1 Refer to ASX announcement dated 7 October 2022; 2 Refer to Appendix Three
Page 10 of 29
==> picture [137 x 33] intentionally omitted <==
Figure 17 | North Laverton Tenement Map with the prospect locations
==> picture [415 x 300] intentionally omitted <==
The initial drill results, continue to delineate high-grade mineralised structures from the Boundary and Neptune prospects (refer Figure 18). Drilling on all prospects to date has only tested to ~120m vertical depth (average) and on significant portions across all prospects, mineralisation remains open at depth (refer Figure 19). Drilling is expected to increase in 2Q23 through the introduction of additional drill capacity including diamond drilling with a plan to deliver a maiden resource calculation on the Boundary and Neptune Prospects by the end of FY23.
Figure 18 | Boundary and Neptune Drill collars and significant results (Plan view)
==> picture [421 x 291] intentionally omitted <==
Page 11 of 29
==> picture [137 x 33] intentionally omitted <==
Figure 19 | Typical Cross section of Neptune prospect showing wide, high grade zones of continuous mineralisation, with existing drilling limited to ~80m depth.
==> picture [481 x 318] intentionally omitted <==
Other Exploration and Development
Other exploration activities such as geochemical surveys programmes soil geochemistry programmes are continuing on the Oktung and Phnom Ktung licences. The Company remains vigilant on opportunities to expand its regional footprint in Cambodia by identifying prospective tenure and advancing discussions with potential joint venture partners. The Company continues to assess additional gold development opportunities both in Australia and internationally with the aim to create a multi asset gold producing company.
Corporate
Board Composition
In September 2022, the Company announced the appointment of Mr Michael Bowen and Mr Jay Hughes as Non-executive directors of the Company.
Mr Bowen is a partner of the national law firm Thomson Geer. He practices primarily corporate, commercial and securities law with an emphasis on mergers, acquisitions, capital raisings and resources. Mr Bowen advises both bidders and targets in various hostile and friendly takeovers and advises on schemes of arrangements for reconstructions and mergers and also has extensive experience in negotiating the terms of joint venture arrangements for major projects.
Mr Bowen holds a Bachelor of Laws, Jurisprudence and Commerce from the University of Western Australia. He has been admitted as a barrister and solicitor of the Supreme Court of Western Australia since 1979 and is also admitted as a solicitor of the High Court of Australia. He is a Certified Public Accountant and member of the Australian Society of Accountants. Mr Bowen is also Non-executive Chairman of Lotus Resources Limited (ASX:LOT) and Non-executive director of Genesis Minerals Limited (ASX:GMD) and Omni Bridgeway Limited (ASX:OBL).
Mr Hughes started his career on the Perth Stock Exchange trading floor in 1986. In 2000 he was one of the founders of Euroz Limited and he is currently an Executive Director of Euroz Hartleys Group Limited (ASX:EZL) and Non-Executive Chairman of Westoz Funds Management Pty Ltd. He was the Non-Executive Chairman of Westoz Investment Company Limited and Ozgrowth Limited until the successful completion of their takeover schemes in April 2022. He was recognised as an Affiliate of the ASX in December 2000 and was admitted in May 2004 as a Master Practitioner Member (MSAFAA) of the SAFAA. Mr Hughes holds a Graduate Diploma in Applied Finance and Investment from the Financial Services Institute of Australasia (FINSIA).
These two highly experienced and highly regarded directors complement the trusted and respected development credentials of the Emerald team whilst enhancing the independence of the Board and sub-committees.
Page 12 of 29
==> picture [137 x 33] intentionally omitted <==
Cash and Debt Position
Emerald’s consolidated cash at 30 September 2022 was A$48.1m (30 June 2022: A$43.0m) with an additional A$12.8m (30 June 2022: A$15.8m) of gold bullion on hand. The Company continued to pay down debt during the Quarter and add to ore stockpiles at Okvau in addition to funding the costs associated with ongoing exploration and the takeover of Bullseye Mining Limited. Debt repaid to date totals US$13.0m, with a US$52.0m balance of the Sprott Private Resource Lending II debt facility at the end of the quarter.
The Okvau Project finance facility provides the Company with access to a US$100m Acquisition and Development Facility to fund future development and acquisition opportunities (refer ASX announcement dated 26 June 2019). Emerald continues to assess value adding assets for subsequent developments to create a multi asset gold producing company.
In accordance with ASX Listing Rule 5.3.5 the Company advises that payments made to related parties and their associates during the Quarter included director fees, salaries and superannuation ($298k), rental payments to a director related party for the Company premises ($77k) and payments to a director related party for the provision of company secretarial services ($30k).
Safety
There were no serious incidents or injuries during the Quarter.
Bullseye Legal Matters
During the Quarter, the Company provided an update on litigation relating to Bullseye (EMR: 59.32%) and the cessation of the Blue Cap Bullseye Joint Venture (Bullseye 70%):
Matter COR 83 of 2020 (Initial Proceedings)
The trial in the Supreme Court of Western Australia (“Supreme Court”) of matter COR 83 of 2020 has continued with a further block of trial dates heard in August 2022 before his Honour Justice Marcus Solomon (“Initial Proceedings”). This action was initiated against Bullseye and certain current and former directors of Bullseye[1] , as part of a long running dispute with Bullseye’s second largest shareholder Hongkong Xinhe International Investment Company Limited (“Xinhe”). A further final block of court dates has been scheduled for 10 trial days between 9 – 22 November 2022 for closing submissions. Justice Solomon will then proceed to make a determination of the oppression claims in the Initial Proceedings on their merits, before dealing with the remedies claimed. Those remedies may be dealt with straight away, or following the outcome of the Second Proceedings referred to below.
Recommended Judicial Mediation of Initial Proceedings
During the Quarter, Justice Solomon recommended that the parties to the Initial Proceedings engage in a Supreme Court judicial mediation process to be presided over by his Honourable Justice Kenneth Martin (“Judicial Mediation”). All parties agreed to proceed with the recommended Judicial Mediation process which was held between the dates of 15 to 22 September 2022. Whilst Bullseye was seeking to resolve an acceptable commercial outcome via this process, no final outcome has been reached from the Judicial Mediation which has been adjourned to a further date, not yet set.
Matter COR 159 of 2022 (Second Proceedings)
Emerald advises that in advance of the scheduled Judicial Mediation of the Initial Proceedings, Xinhe and its related entity Au Xingao Investment Pty Limited (“Xingao”) (together the “Plaintiffs”) have commenced further proceedings in the Supreme Court via matter COR 159 of 2022, against Bullseye, Emerald, certain current and former directors of Bullseye[2] and the Australian Securities and Investments Commission (the “Second Proceedings”). The Second Proceedings have been filed in the Supreme Court and recently served on Emerald.
The Second Proceedings are in addition to the ongoing litigation brought by Xinhe against Bullseye via the Initial Proceedings. The Second Court Proceedings involve claims of oppressive conduct and alleged contraventions of the Corporations Act in relation to the affairs of Bullseye by Bullseye, Emerald and certain current and former directors of Bullseye[2] and contravention by Bullseye of its Constitution.
Emerald notes that a substantial number of the remedies claimed by the Plaintiffs in the Second Proceedings relate to matters which have previously been considered by the Takeovers Panel with various orders having been made and complied with by the relevant parties (Refer to Bullseye Mining Limited 03 [2022] ATP 4, Bullseye Mining Limited 04 [2022] ATP 8 and Bullseye Mining Limited 05 [2022] ATP 14).
The Second Proceedings have been launched in the wake of an unsuccessful rival takeover bid for Bullseye by Xingao, which expired last month whilst it was still subject to various defeating conditions, including Foreign Investment Review Board (FIRB) approval. Based on information publicly disclosed by Xingao, as at the close of Xingao’s takeover offer, it had only received acceptances for 0.6% of the issued shares in Bullseye (which acceptances have now been unwound as the offer did not proceed).
Notes:
1 Peter G Burns (current), Peter J Burns (former), Dariena Mullan (former)
2 Peter G Burns (current), Anthony Short (current), Peter J Burns (former), Dariena Mullan (former), and Ian Ladyman (former).
Page 13 of 29
==> picture [137 x 33] intentionally omitted <==
Emerald is continuing to consider its rights and will seek to have the Second Proceedings dealt with efficiently and otherwise in a manner reflective and respecting of its best interests and those of its stakeholders. Emerald has appointed Murcia Pestell Hillard Lawyers to file an appearance and represent Emerald on this matter.
Matter CIV 1989 of 2020
As announced on 8 December 2021, Mr Sam Cheng and Mr Eddy Cheng, as trustees of the NEZA Trust (the Plaintiffs) have brought an action in the District Court of Western Australia, CIV 1989 of 2020, against Bullseye, seeking payment of capital raising fees from Bullseye in the amount of $366,000.
Bullseye has filed a defence and counterclaim in the proceedings, denying any amount is owing to the Plaintiffs, and claiming:
-
(i) reimbursement of fees paid by Bullseye to the Plaintiffs in the sum of $120,000; and
-
(ii) the transfer to Bullseye of 900,000 shares in Bullseye, or alternatively reimbursement of fees in the sum of $117,000.
The trial of this matter commenced on 31 January 2022 and proceeded for four sitting days. On 4 February 2022, the trial was adjourned part-heard until 17 October 2022 for a further four trial days. The trial is complete and pending judgement. This matter is not deemed material to Bullseye or Emerald.
Dispute with Inca Minerals Limited
Bullseye and Inca Minerals Limited (“Inca”) are in dispute in relation to nickel rights on two of Bullseye’s non-core tenements within Bullseye’s North Laverton Gold Project. The parties have agreed to enter into a mediation process and look forward to resolving the matter in due course. The date for mediation has been scheduled for 6 December 2022. This matter is not deemed material to Bullseye or Emerald.
Cessation of the Blue Cap Bullseye Joint Venture (Bullseye: 70%)
Consistent with Bullseye’s strategy to manage the development of the North Laverton Gold Project located on Bullseye’s Dingo Range greenstone belt, on 21 September 2022 the Company announced that Bullseye had entered into a binding agreement with Blue Cap Equities Pty Ltd ATF Blue Capital Trust No.2 (BCE) to acquire their 30% interest in the Blue Cap Bullseye Joint Venture (BCBJV).
Upon settlement of the transaction, Bullseye will assume 100% ownership of all on-site Bungarra gold ore stockpiles and retain 100% rights to the Bungarra gold project and Neptune gold deposit which are currently being drilled and developed as part of Bullseye’s 98,000m resource definition drilling program, targeting the 6.4km Boundary through to Bungarra mineralised trend.
As part of the BCBJV over $2m in development works has been spent on the Neptune gold deposit, including grade control drilling, which Bullseye will now receive the full benefit as and when they consider the future production profile.
The key terms of the binding agreement, which remains subject to taxation advice, are as follows:
Bullseye will acquire BCE’s 30% interest in the following:
-
i) the shares of Blue Cap Bullseye Joint Venture Pty Ltd;
-
ii) the units in Blue Cap Bullseye Joint Venture Trust; and iii) the shares in Dingo Range Pty Ltd.
Bullseye to contribute funds of circa $2m to the BCBJV to pay, in full, loan and interest owing to BCE as per below:
-
i) 40% payable upon settlement; and
-
ii) 60% payable upon the earlier of; Bullseye completing a non-renounceable pro-rata entitlements issue or within 60 days.
-
Upon payment of 40% of BCE loan, BCE to release all security over the BCBJV.
-
Bullseye to contribute circa $2m to payout all creditors and liabilities of the BCBJV (and all associated entities), as well as acquire certain BCE owned heavy machinery, infrastructure and on-site chattels.
As part of the settlement process, the Company advanced Bullseye $106k during the Quarter.
Annual General Meeting
The Annual General Meeting (AGM) of the Company will be held on 24 November 2022 at 11:00am (WST). The Notice of Meeting and Proxy Form was made available to all shareholders and released to the ASX on 24 October 2022.
This ASX release was authorised on behalf of the Emerald Board by: Morgan Hart, Managing Director.
For further information please contact Emerald Resources NL
Morgan Hart Managing Director
Page 14 of 29
==> picture [137 x 33] intentionally omitted <==
About Emerald Resources NL
Overview
Emerald is a developer and explorer of gold projects. Emerald’s Okvau Gold Project, Cambodia was commissioned in June 2021 and in full production by September 2021. Emerald has now poured over 4,000kgs of gold bullion from its operations.
Emerald also holds a number of other projects in Cambodia which are made up of a combination of granted mining licences (100% owned by Emerald), and interests joint venture agreements. Together, Emerald’s interest in its Cambodian Projects covers a combined area of 1,639km[2] .
Emerald has a controlling interest in Bullseye Mining Limited (59.32%), an unlisted Australian public company with three Western Australian gold projects totalling in excess of 1,200km[2] of highly prospective gold tenure including the North Laverton Gold Project which covers in excess of 800km[2] of the entire Dingo Range greenstone belt.
Okvau Gold Mine
The Okvau Gold Mine is the most advanced of Emerald’s projects. The Okvau Gold Mine is located approximately 275km north-east of Cambodia’s capital city of Phnom Penh in the province of Mondulkiri (refer Figures 20 and 21). The town of Kratie is located on the Mekong River approximately 90km to the west and the capital of Mondulkiri, Saen Monourom is located approximately 60km to the south-east.
==> picture [447 x 10] intentionally omitted <==
----- Start of picture text -----
Figure 20 | Cambodian Gold Project | Location Figure 21 | Cambodian Gold Project | Exploration Licence Areas
----- End of picture text -----
==> picture [199 x 200] intentionally omitted <==
==> picture [328 x 200] intentionally omitted <==
Table 1 | Okvau Mineral Resource Estimate
| Okvau March 2022 Mineral Resource Estimate | Okvau March 2022 Mineral Resource Estimate | Okvau March 2022 Mineral Resource Estimate | Okvau March 2022 Mineral Resource Estimate | Okvau March 2022 Mineral Resource Estimate | Okvau March 2022 Mineral Resource Estimate | ||||
|---|---|---|---|---|---|---|---|---|---|
| Measured Resources(i) | Indicated Resources(ii) | Inferred Resources(ii) | Total Resources | ||||||
| Tonnage Grade Contained |
Tonnage | Grade Contained |
Tonnage | Grade | Contained | Tonnage | Grade | Contained | |
| (Mt) (g/t Au) Au (Koz) |
(Mt) | (g/t Au) Au (Koz) |
(Mt) | (g/t Au) | Au (Koz) | (Mt) | (g/t Au) | Au (Koz) | |
| 1.67 0.94 51 |
12.93 | 2.10 872 |
2.55 | 1.62 | 133 | 17.15 | 1.91 | 1,056 | |
| (i) Oxide stockpiles are reported at > 0.4g/t | Au, Fresh stockpiles are reported at >0.5g/t Au | ||||||||
| (ii) Mineral Resource is reported at>0.7g/t | Au |
Table 2 | Okvau Ore Reserve Estimate
|Table 2 | Okvau Ore Reserve Estimate||||
|---|---|---|---|
||Okvau March 2022 Ore Reserve Estimate|||
||Tonnage|Grade|Contained|
||(Mt)|(g/t Au)|Au (Koz)|
|Proven Ore Reserve|1.67Mt|0.94g/t Au|51koz|
|Probable Ore Reserve|11.80Mt|2.02g/t Au|765koz|
|Total Ore Reserve|13.48Mt|1.88g/t Au|816koz|
Page 15 of 29
==> picture [137 x 33] intentionally omitted <==
Appendix One | Tenements
Mining and exploration tenements held at the end of September 2022 quarter
| Project | Location | Tenement | Licence type | Interest |
|---|---|---|---|---|
| Okvau Project | Cambodia | Okvau | Exploration Licence | 100.00% |
| Okvau Project | Cambodia | Okvau | Industrial Mining Licence | 100.00% |
| Ochhung Project | Cambodia | Ochhung | Exploration Licence | 100.00% |
| Memot Project | Cambodia | Memot | Exploration Licence | 100.00% |
| Preak Klong Project | Cambodia | Preak Klong | Exploration Licence | 100.00% |
| Oktung Project | Cambodia | Oktung | Exploration Licence | 100.00% |
| North Laverton Gold Project | Leonora | E37/0801 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/0983 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1007 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1017 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1018 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1051 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1052 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1067 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1121 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1130 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1198 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1208 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1229 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1243 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1249 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1262 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1263 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1264 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1265 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1290 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1291 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E37/1301 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1377 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1380 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1407 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1482 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1611 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1880 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/1918 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | E53/2125 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2087 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2118 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2119 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2120 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2149 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2178 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2254 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2258 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2340 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2341 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2342 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2343 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2351 | Exploration Licence | 59.32% |
| Southern Cross | Southern Cross | E77/2362 | Exploration Licence | 59.32% |
| North Laverton Gold Project | Leonora | L37/0144 | Miscellaneous Licence | 59.32% |
| North Laverton Gold Project | Leonora | L37/0145 | Miscellaneous Licence | 59.32% |
| North Laverton Gold Project | Leonora | L37/0234 | Miscellaneous Licence | 59.32% |
| North Laverton Gold Project | Leonora | M37/0108 | Mining Licence | 59.32% |
| North Laverton Gold Project | Leonora | M37/0349 | Mining Licence | 59.32% |
| North Laverton Gold Project | Leonora | M37/0519 | Mining Licence | 59.32% |
| North Laverton Gold Project | Leonora | M37/1167 | Mining Licence | 59.32% |
| North Laverton Gold Project | Leonora | M37/1309 | Mining Licence | 59.32% |
Page 16 of 29
==> picture [137 x 33] intentionally omitted <==
| Project | Location | Tenement | Licence type | Interest |
|---|---|---|---|---|
| Southern Cross | Southern Cross | M77/0551 | Mining Licence | 59.32% |
| Southern Cross | Southern Cross | M77/0734 | Mining Licence | 59.32% |
| Southern Cross | Southern Cross | M77/0834 | Mining Licence | 59.32% |
| Southern Cross | Southern Cross | P77/4349 | Prospecting Licence | 59.32% |
Mining and exploration tenements and licenses acquired and disposed during the September 2022 quarter
| Project | Location | Tenement | Interest at | Interest at end of |
|---|---|---|---|---|
| beginning of | quarter | |||
| quarter | ||||
| Tenements Disposed | ||||
| Nil | ||||
| Tenements Acquired | ||||
| Nil |
Quarter Beneficial percentage interests in joint venture and earn-in agreements at the end of the September 2022 quarter
| Project | Location | Tenement | Licence type | Interest |
|---|---|---|---|---|
| Phnom Ktung(i) | Cambodia | Phnom Ktung | Exploration Licence | 25.5% |
| Snuol(i) | Cambodia | Snuol | Exploration Licence | 25.5% |
| North Laverton Gold Project(ii) | Leonora | M37/1167 | Mining Licence | 59.32% |
| (i) Emerald Resources NL is earning up to a 70% interest in the projects | ||||
| (ii) Bullseye Mining Limited has a 70% Joint Venture interest with Blue Cap Mining for the | mining rights |
Beneficial percentage interests in joint venture and earn-in agreements acquired or disposed of during the September 2022 quarter
| Project | Location | Tenement | Interest at | Interest at end of |
|---|---|---|---|---|
| beginning of | quarter | |||
| quarter | ||||
| Joint Venture Interest Disposed | ||||
| Nil | ||||
| Joint Venture Interest Acquired | ||||
| Nil |
Interests in royalties
The Company has a 5% overriding royalty interest in all gas production from various oil and gas interests located in Magoffin County, Kentucky. During the quarter, there was no product recovered and sold from the Leases and the royalty received for the period was Nil.
Bullseye Mining Limited (EMR:59.32%) has a Net Smelter Royalty (NSR) of 1.5% payable to Resolute (Treasury), relating to the Hopes Hill Gold Mine (M77/0551). The NSR is only payable if the Hopes Hill Gold Mine is recommences production.
Page 17 of 29
==> picture [137 x 33] intentionally omitted <==
Forward Looking Statement
This document contains certain forward looking statements. These forward-looking statements are not historical facts but rather are based on the Company’s current expectations, estimates and projections about the industry in which Emerald Resources operates, and beliefs and assumptions regarding the Company’s future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”’ “estimates”, “potential” and similar expressions are intended to identify forward-looking statements. These statements are not guarantees of future performance and are subject to known or unknown risks, uncertainties and other factors, some of which are beyond the control of the Company, are difficult to predict and could cause actual results to differ materially from those expressed or forecasted in the forward looking statements, which reflect the view of Emerald Resources only as of the date of this announcement. The forward looking statements made in this release relate only to events as of the date on which the statements are made. Emerald Resources will not undertake any obligation to release publicly any revisions or updates to these forward-looking statements to reflect events, circumstances or unanticipated events occurring after the date of this announcement except as required by law or by any appropriate regulatory authority. This document has been prepared in compliance with the current JORC Code 2012 Edition and the ASX listing Rules.
The Company believes that is has a reasonable basis for making the forward-looking statements in this announcement, including with respect to any production targets and financial estimates, based on the information contained in this announcement. Reference is made to ASX Announcements dated 1 May 2017 and 26 November 2019. All material assumptions underpinning the production target, or the forecast financial information continue to apply and have not materially changed. 100% of the production target referred to in this announcement is based on Probable Ore Reserves.
Emerald has a highly experienced management team, undoubtedly one of the best credentialed gold development teams in Australia with a proven history of developing projects successfully, quickly and cost effectively. They are a team of highly competent mining engineers and geologists who have overseen the successful development of gold projects in developing countries such as the Bonikro Gold Project in Cote d’Ivoire for Equigold NL and more recently, Regis Resources Ltd.
Competent Persons Statements
The information in this report that relates to Exploration and Drill Results is based on information compiled by Mr Keith King, who is an employee to the Company and who is a Member of The Australasian Institute of Mining & Metallurgy. Mr Keith King has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Keith King has reviewed the contents of this release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.
The information in this report that relates to work including Exploration and Drill Results of Bullseye Mining Limited completed before on or before 21 February 2022 (refer ASX announcement dated 15 July 2022) is based on information compiled by Mr Rob Cooke, a Competent Person who is an employee of Bullseye Mining Limited and a Member of the Australian Institute of Geoscientists (Membership No. 3054840). Mr Cooke has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the Competent Person’s findings presented have not been materially modified. Mr Cooke has reviewed the contents of this release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.
Work including drilling completed after 21 February 2022 (refer ASX announcement dated 15 July 2022) was completed under the supervision of Mr Rob Cooke, who is an employee of Bullseye Mining Limited and is a Member of The Australasian Institute of Mining & Metallurgy. Mr Cooke has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Cooke has reviewed the contents of this release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.
Drill assay results received after 21 February 2022 (refer ASX announcement dated 15 July 2022) have been reviewed for QAQC and data integrity by Mr Keith King, who is an employee of the Company and is a Member of The Australasian Institute of Mining & Metallurgy. Mr King has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr King has reviewed the contents of this release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.
The information in this report that relates to Mineral Resources for the Okvau Gold Deposit was prepared by EGRM Consulting Pty Ltd, Mr Brett Gossage, who is a consultant to the Company, who is a Member of the Australasian Institute of Mining & Metallurgy (AIG), and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 edition of the
Page 18 of 29
==> picture [137 x 33] intentionally omitted <==
"Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Gossage has reviewed the contents of this news release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.
Information in this announcement that relates to Ore Reserves for the Okvau Gold Deposit is based on, and fairly represents, information and supporting documentation prepared by Mr Glenn Williamson, an independent specialist mining consultant. Mr Williamson is a Member of the Australasian Institute of Mining & Metallurgy. Mr Williamson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person (or ‘CP’) as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Williamson has reviewed the contents of this news release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.
No New Information
To the extent that announcement contains references to prior exploration results and Mineral Resource estimates, which have been cross referenced to previous market announcements made by the Company, unless explicitly stated, no new material information is contained. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
Page 19 of 29
==> picture [137 x 33] intentionally omitted <==
Appendix One | New Drill Significant Intercepts Okvau Mine Site (RCDD22OKV448) and Memot Prospect (RC22MMT*) (>2 gram metre)
| Hole Name | Local Easting |
Local Northing |
RL | Local Azi |
Dip | End Depth |
From | To | Interval | Gold g/t |
|---|---|---|---|---|---|---|---|---|---|---|
| RCDD22OKV448 | 694,056 | 1,396,741 | 140 | 308 | -64 | 618 | 358 | 361 | 3 | 15.17 |
| RCDD22OKV448 | 694,056 | 1,396,741 | 140 | 308 | -64 | 618 | 516 | 519 | 3 | 6.23 |
| RC22MMT027 | 633,404 | 1,318,111 | 52 | 225 | -55 | 27 | 10 | 12 | 2 | 1.13 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 21 | 22 | 1 | 1.60 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 78 | 81 | 3 | 1.31 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 98 | 99 | 1 | 1.87 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 112 | 118 | 6 | 1.93 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 131 | 134 | 3 | 1.56 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 139 | 140 | 1 | 1.61 |
| RC22MMT029 | 633,521 | 1,317,812 | 61 | 225 | -60 | 159 | 145 | 147 | 2 | 2.47 |
| RC22MMT030 | 633,466 | 1,317,879 | 52 | 225 | -70 | 156 | 45 | 47 | 2 | 1.50 |
| RC22MMT030 | 633,466 | 1,317,879 | 52 | 225 | -70 | 156 | 60 | 61 | 1 | 6.89 |
| RC22MMT030 | 633,466 | 1,317,879 | 52 | 225 | -70 | 156 | 130 | 131 | 1 | 1.94 |
| RC22MMT030 | 633,466 | 1,317,879 | 52 | 225 | -70 | 156 | 143 | 144 | 1 | 8.37 |
| RC22MMT031 | 633,424 | 1,317,843 | 53 | 225 | -70 | 159 | 12 | 13 | 1 | 1.57 |
| RC22MMT031 | 633,424 | 1,317,843 | 53 | 225 | -70 | 159 | 29 | 30 | 1 | 11.40 |
| RC22MMT031 | 633,424 | 1,317,843 | 53 | 225 | -70 | 159 | 47 | 48 | 1 | 7.74 |
| RC22MMT031 | 633,424 | 1,317,843 | 53 | 225 | -70 | 159 | 133 | 134 | 1 | 7.37 |
| RC22MMT031 | 633,424 | 1,317,843 | 53 | 225 | -70 | 159 | 154 | 159 | 5 | 2.11 |
| RC22MMT033 | 633,336 | 1,318,013 | 60 | 45 | -70 | 159 | 22 | 23 | 1 | 1.68 |
| RC22MMT033 | 633,336 | 1,318,013 | 60 | 45 | -70 | 159 | 49 | 51 | 2 | 2.86 |
| RC22MMT033 | 633,336 | 1,318,013 | 60 | 45 | -70 | 159 | 66 | 67 | 1 | 7.89 |
| RC22MMT033 | 633,336 | 1,318,013 | 60 | 45 | -70 | 159 | 122 | 123 | 1 | 14.25 |
| RC22MMT034 | 633,354 | 1,317,942 | 45 | 225 | -77 | 151 | 18 | 23 | 5 | 1.51 |
| RC22MMT035 | 633,328 | 1,317,904 | 44 | 225 | -70 | 160 | 137 | 141 | 4 | 1.10 |
| RC22MMT035 | 633,328 | 1,317,904 | 44 | 225 | -70 | 160 | 142 | 145 | 3 | 1.16 |
| RC22MMT036 | 633,291 | 1,318,143 | 44 | 45 | -70 | 28 | 3 | 4 | 1 | 2.53 |
Page 20 of 29
==> picture [137 x 33] intentionally omitted <==
Appendix Two | JORC Code, 2012 Edition | ‘Table 1’ Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections).
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. • Aspects of the determination of mineralisation that are Material to the Public Report. • In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3kg was pulverised to produce a 30g charge for fire assay’). In other cases, more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information. |
• Standards are inserted in sample batches to test laboratory performance. • For the recent Okvau and Memot RC drill, reverse circulation (RC) drilling is used to collect both a 4m composite and 1m samples in the precollar. The 4m programme composited are taken from the excess bagged material off the cone splitter taken every 1m. A spear sampling technique is then used to produce a 3-5kg composite sample. The 1m samples are split with a cone splitter at the drill rig to produce a 3-5kg sub-sample. These 1m samples are submitted after the results of the 4m composites are received to identify the zones of mineralisation. • Diamond core was sampled using half-core where the core is cut in half down the longitudinal axis and sample intervals were determined by the geologist based on lithological contacts, with 80% of the sample intervals being 1 metre in length. In areas of no mineralised (negligible amounts of alteration/sulphides typically present with mineralisation) a 2m composite was submitted. • The Exploration drill samples preparation is carried out at a commercial off-site laboratory (ALS Phnom Penh). Gold assays are conducted at ALS Vientiane, Laos utilising a 50gram subsample of 85% passing 75µm pulped sample using Fire Assay with AAS finish on and Aqua Regia digest of the lead collection button. Multi- element assay is completed at ALS, Perth, Australia on a 1g pulp subsample digested by Aqua Regia and determined by ICP-AES or ICP-MS for lowest available detection for the respective element. |
| Drilling techniques |
• Drill type (eg core, reverse circulation, open- hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so, by what method, etc). |
• A track mounted UDR650 rig is used to drill 5.5-inch RC precollar holes and a LF90 rig is used to drill NQ2 Diamond Core. • Recent drilling used a REFLEX survey tool to survey hole deviation. A typical downhole survey was taken at 12m depth and then every 30m to the end of hole. Surveying of RC holes utilises 6m of stainless drill rod to negate the magnetic interference from the rod string and hammer assembly. All readings showed that down hole deviation was negligible. |
| Drill sample recovery |
• Method of recording and assessing core and chip sample recoveries and results assessed. • Measures taken to maximise sample recovery and ensure representative nature of the samples. • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. |
• All RC 1m samples and sub-samples (pre- and post- split) are weighed at the rig, to check that there is adequate sample material for assay. Any wet or damp samples are noted and that information is recorded in the database; samples are usually dry. |
| Logging | • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography. • The total length and percentage of the relevant intersections logged. |
• All RC chips and diamond core is routinely logged (qualitatively) by a geologist, to record details of regolith (oxidation), lithology, structure, mineralization and/or veining, and alteration. In addition, the magnetic susceptibility of all samples is routinely measured. All logging and sampling data are captured into a database, with appropriate validation and security features. |
Page 21 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | JORC Code explanation | Commentary |
| Standard field data are similarly recorded (qualitatively) routinely by a geologist for all soil samplingsites. |
||
| Sub-sampling techniques and sample preparation |
• If core, whether cut or sawn and whether quarter, half or all core taken. • If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry. • For all sample types, the nature, quality and appropriateness of the sample preparation technique. • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling. • Whether sample sizes are appropriate to the grain size of the material beingsampled. |
• Most samples are dry and there is no likelihood of compromised results due to moisture. • All samples were prepared for assay at the NATA accredited ALS Cambodia sample preparation facility in Phnom Penh; and that facility has been inspected, at the request of Renaissance, numerous times and most recently by Mr Keith King in April 2022. Samples are dried for a minimum of 12 hours at 105˚C. • This sample technique is industry norm and is deemed appropriate for the material. |
| Quality of assay data and laboratory tests |
• The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. • Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established. |
• All samples are sent to the NATA accredited ALS Laboratory in Vientiane, Laos, for single Aqua Regia digest with a 50g charge with an ICP-MS finish. Samples are sent to the similarly accredited ALS Lab in Brisbane, Australia and ALS Lab Perth, Australia, for multi-element ICP analysis, after partial extraction by aqua regia digest then via a combination of ICP-MS and ICP-AES. This method has a lower detection limit of 1ppm gold. • Industry-standard QAQC protocols are routinely followed for all sample batches sent for assay, which includes the insertion of commercially available pulp CRMs and pulp blanks into all batches - usually 1 of each for every 20 field samples. Additional blanks used are home-made from barren quarry basalt. QAQC data are routinely checked before any associated assay results are reviewed for interpretation, and any problems are investigated before results are released to the market - no issues were raised with the results reported here. • All assay data, including internal and external QA/QC data and control charts of standard, replicate and duplicate assay results, are communicated electronically. |
| Verification of sampling and assaying |
• The verification of significant intersections by either independent or alternative company personnel. • The use of twinned holes. • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. • Discuss any adjustment to assay data. |
• All field data associated with sampling, and all associated assay and analytical results, are archived in a relational database, with industry-standard verification protocols and security measures in place. • The calculations of all significant intercepts (for drill holes) are routinely checked by senior management. • All field data associated with drilling and sampling, and all associated assay and analytical results, are archived in a relational database, with industry- standard verification protocols and security measures inplace. |
| Location of data points |
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. • Specification of the grid system used. • Quality and adequacy of topographic control. |
• Whilst, all sample locations are first surveyed with a hand-held GPS instrument (which generates relatively inaccurate RL values), not all samples were insitu. All locations are surveyed to the Indian 60 grid (Okvau) or WGS 84 (Memot). • Okvau Drill hole collar locations are first surveyed with a hand-held GPS instrument (which generates relatively inaccurate RL values). The locations of all holes used in Mineral Resource estimates are verified or amended bysurveyusinga differential GPS byand |
Page 22 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | JORC Code explanation | Commentary |
| external contractor with excellent accuracy in all dimensions using a local base station reference). • To date the newly reported collars of holes drilled have been picked up by a hand GPS. Although it is the intention to use a licenced surveyor with DGPS equipment to pick up the collars before any resource calculation. • Down-hole surveys are routinely undertaken at 30m intervals for all types of drilling, using a single-shot or multi-shot REFLEX survey tool (operated by the driller and checked bythe supervising geologist). |
||
| Data spacing and distribution |
• Data spacing for reporting of Exploration Results. • Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. • Whether sample compositing has been applied. |
• This drill spacing is considered to be sufficient to establish geological and grade continuity appropriate for the declaration of estimates of resources. |
| Orientation of data in relation to geological structure |
• Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. • If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. |
• Drill holes are usually designed to intersect target structures with a “close-to-orthogonal” intercept. • Drilling has been done at various orientations. • Most of the drill holes intersect the mineralised zones at sufficient angle for the risk of significant sampling orientation bias to be low. |
| Sample security | • The measures taken to ensure sample security. |
• The chain of custody for all drill samples from the drill rig and soil/auger samples from the field to the ALS Sample Preparation facility in Phnom Penh is managed by Renaissance personnel. Drill samples are transported from the drill site to the Okvau exploration core farm, where they are logged and all samples are batched up for shipment to Phnom Penh. • Sample submission forms are sent to the ALS Sample Prep facility in paper form (with the samples themselves) and also as an electronic copy. Delivered samples are reconciled with the batch submission form prior to the commencement of any sample preparation. • ALS is responsible for shipping sample pulps from Phnom Penh to the analytical laboratories in Vientiane, Brisbane and Perth and all samples are tracked via their Global Enterprise Management System. • All bulk residues are stored permanently at the ALS laboratoryin Vientiane. |
| Audits or reviews | • The results of any audits or reviews of sampling techniques and data. |
• All QAQC data are reviewed routinely, batch by batch, and on a quarterly basis to conduct trend analyses, etc. Any issues arising are dealt with immediately and problems resolved before results are interpreted and/or reported. • Comprehensive QAQC audits have been conducted on this project by Duncan Hackman (August 2009, February 2010 & November 2011), SRK (February 2013) and Nola Hackman (January 2014), Wolfe (July 2015). • Mr Brett Gossage reviewed the data used in the Okvau Resource up to December 2016 and concluded that there are no concerns about data quality. • Keith King completed his most recent site visit and lab audit of the ALS Phnom Penh facilities in 1st April 2022. |
Page 23 of 29
==> picture [137 x 33] intentionally omitted <==
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
| Criteria | Explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
• Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. • The security of the tenure held at the time of reporting along with any known impediments to obtaininga licence to operate in the area. |
• The licences are held (100%) in the name of Renaissance Minerals (Cambodia) Limited which is a wholly owned subsidiary of Emerald Resources NL. • The tenure is considered to be secure. |
| Exploration done by other parties |
• Acknowledgment and appraisal of exploration by other parties. |
• Exploration has been completed by previous explorers; Oxiana and Oz Minerals including soil sampling, geophysical data collection and drilling. |
| Geology | • Deposit type, geological setting and style of mineralisation. |
• Gold occurrences within the licences is interpreted as either a “intrusion-related gold system” or “Porphyry” related mineralisation. Gold mineralization is hosted within quartz and/or sulphide veins and associated within or proximal distance to a Cretaceous age diorite. |
| Drill hole Information |
• A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: - easting and northing of the drill hole collar; - elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar; - dip and azimuth of the hole; - down hole length and interception depth; - hole length. If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. |
• Details of significant drilling in Appendix One. |
| Data aggregation methods |
• In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated. • Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. • The assumptions used for any reporting of metal equivalent values should be clearly stated. |
• No high grade top cuts have been applied. • The reported significant intersections in Appendix One are above 2 gram metre intersections and allow for up to 4m of internal dilution with a lower cut trigger values of greater than 0.5g/t. |
| Relationship between mineralisation widths and intercept lengths |
• These relationships are particularly important in the reporting of Exploration Results. • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole length, true width not known’). |
• All reported intersections are down hole lengths. True widths are unknown and vary depending on the orientation of target structures. |
| Diagrams | • Appropriate maps and sections (with scales) and tabulations of intercepts should be |
• Appropriate maps and sections are included in the bodyof this release. |
Page 24 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | Explanation | Commentary |
| included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. |
||
| Balanced reporting | • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. |
• All significant drilling results being intersections with a minimum 2 gram metre values are reported in Appendix One. |
| Other substantive exploration data |
• Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminatingsubstances. |
• All mineralisation is associated with visible amounts of pyrrhotite or arsenopyrite. This is typical for the Okvau Deposit. |
| Further work | • The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling). • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commerciallysensitive. |
• Further soil sampling programmes are being planned on the identified regional targets. • Additional drilling programmes are being planned across all exploration licences. |
Appendix Three | Bullseye Drill Results from Neptune and Boundary Resource Drill Program (>2 gram metre)
| Prospect | Hole Name | Easting | Northing | RL | Azi | Dip | End Depth (m) |
From (m) |
To (m) | Interval (m) |
Gold g/t |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Boundary | RC22BDY006 | 345,324 | 6,971,866 | 495 | -60 | 265 | 107 | 80 | 91 | 11 | 1.64 |
| Boundary | RC22BDY003 | 345,319 | 6,971,695 | 495 | -60 | 265 | 180 | 119 | 121 | 2 | 8.08 |
| Boundary | RC22BDY004 | 345,285 | 6,971,709 | 495 | -60 | 265 | 191 | 166 | 171 | 5 | 2.98 |
| including | 170 | 171 | 1 | 11.46 | |||||||
| Neptune | RC22NPT013 | 345,605 | 6,971,136 | 509 | -60 | 236 | 150 | 44 | 53 | 9 | 1.51 |
| Neptune | RC22NPT014 | 345,350 | 6,971,276 | 500 | -60 | 225 | 180 | 115 | 125 | 10 | 1.09 |
| Neptune | RC22NPT012 | 345,546 | 6,971,188 | 505 | -60 | 230 | 137 | 83 | 88 | 5 | 1.78 |
| Neptune | RC22NPT011 | 345,503 | 6,971,255 | 500 | -60 | 224 | 300 | 142 | 147 | 5 | 1.54 |
| Neptune | RC22NPT015 | 345,437 | 6,971,224 | 500 | -60 | 225 | 222 | 157 | 163 | 6 | 1.16 |
Appendix Four | JORC Code, 2012 Edition | ‘Table 1’ Report
Section 1 Sampling Techniques and Data from Bullseye Drilling
(Criteria in this section apply to all succeeding sections).
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. |
• Standards are inserted in sample batches to test laboratory performance. • All Bullseye RC samples were put through a fixed cone splitter at 1m intervals with the sample reduced to between a 2kg to 4kg sample. • Bullseye drill programme used SGS Laboratories, Kalgoorlie for RC samples: • SGS – samples crushed and milled to <75µm and assayed using fire assay (50g) with additional AAS. |
Page 25 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | JORC Code explanation | Commentary |
| • Aspects of the determination of mineralisation that are Material to the Public Report. • In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30g charge for fire assay’). In other cases, more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information. |
||
| Drilling techniques |
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc). |
• A Schramm 685 drill rig is used to drill 5.5-inch RC holes. • All Bullseye RC holes at Neptune were downhole surveyed using a gyroscopic survey tool (a REFLEX GYRO SPRINT-IQ™). A typical downhole survey was taken at 10m depth to the end of hole. Surveying of RC holes utilises 6m of stainless drill rod to negate the magnetic interference from the rod string and hammer assembly. All readings showed that down hole deviation was negligible. |
| Drill sample recovery |
• Method of recording and assessing core and chip sample recoveries and results assessed. • Measures taken to maximise sample recovery and ensure representative nature of the samples. • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. |
• RC drill sample recovery averaged better than 99%. |
| Logging | • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography. • The total length and percentage of the relevant intersections logged. |
• All RC chips and diamond core is routinely logged (qualitatively) by a geologist, to record details of regolith (oxidation), lithology, structure, mineralization and/or veining, and alteration. All logging and sampling data are captured into a database, with appropriate validation and security features. |
| Sub-sampling techniques and sample preparation |
• If core, whether cut or sawn and whether quarter, half or all core taken. • If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry. • For all sample types, the nature, quality and appropriateness of the sample preparation technique. • Quality control procedures adopted for all sub- sampling stages to maximise representivity of samples. • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling. • Whether sample sizes are appropriate to the grain size of the material beingsampled. |
• Most samples are dry and there is no likelihood of compromised results due to moisture. • This sample technique is industry norm and is deemed appropriate for the material. • All RC samples were put through a fixed cone splitter at 1m intervals with the sample reduced to between a 2kg to 4kg sample. • The drilling used SGS Laboratories, Kalgoorlie for RC samples: SGS– samples dried at 105° Celsius, crushed and milled to 85% passing -75µm. Assay was 50g fire assay with AAS finish for gold. |
| Quality of assay data and laboratory tests |
• The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. • Nature of quality control procedures adopted (eg standards,blanks,duplicates,external laboratory |
• All samples are sent to the accredited SGS Laboratories, Kalgoorlie 50g fire assay with AAS finish for gold. This method has a lower detection limit of 0.01ppm gold. • Industry-standard QAQC protocols are routinely followed for all sample batches sent for assay, which includes the insertion of commercially available pulp CRMs at rate of 1 for every 20 field samples and pulp blanks at a rate of 1 for every 50 field samples. Field duplicates were collected at the |
Page 26 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | JORC Code explanation | Commentary |
| checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established. |
rig, directly from the cyclone at a rate of one in every 50 samples for the entire programme. • QAQC data are routinely checked before any associated assay results are reviewed for interpretation. • All assay data, including internal and external QA/QC data and control charts of standard, replicate and duplicate assay results, are communicated electronically. |
|
| Verification of sampling and assaying |
• The verification of significant intersections by either independent or alternative company personnel. • The use of twinned holes. • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. • Discuss any adjustment to assay data. |
• All field data associated with sampling, and all associated assay and analytical results, are archived in a relational database, with industry-standard verification protocols in place. • The calculations of all significant intercepts (for drill holes) are routinely checked by senior management. • Data verification and validation procedures undertaken included checks on collar position against design and site survey collar pick-ups by Licensed on site surveyors. Hole depths were cross- checked in the geology logs, down hole surveys, sample sheets and assay reports to ensure consistency. All down hole surveys were exposed to rigorous QAQC and drill traces were plotted in 3D for validation and assessment of global deviation trends. |
| Location of data points |
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. • Specification of the grid system used. • Quality and adequacy of topographic control. |
• The grid system used is MGA_94. The creation of the topographic surface is based on a site survey pick-up in March 2014 by GEMS (Glockner Engineering and Mining Services, licensed Australian surveyors) and again in July 2014, August 2015 and August 2017 of all drill holes and surface contour points in GDA_94. • To date the collars of holes drilled have been picked up by a hand GPS. Although it is the intention to use a licenced surveyor with DGPS equipment to pick up the collars before any resource calculation. • All Bullseye RC holes at Neptune were downhole surveyed using a gyroscopic survey tool (a REFLEX GYRO SPRINT-IQ™) and are routinely undertaken at ~5m intervals for the drilling |
| Data spacing and distribution |
• Data spacing for reporting of Exploration Results. • Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. • Whether sample compositinghas been applied. |
• This drill spacing is considered to be sufficient to establish geological and grade continuity appropriate for the declaration of estimates of resources. • The drill programme adopted a standard sample length of 1.0m. |
| Orientation of data in relation to geological structure |
• Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. • If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. |
• Drill holes are usually designed to intersect target structures with a “close-to-orthogonal” intercept. • Most of the drill holes intersect the mineralised zones at sufficient angle for the risk of significant sampling orientation bias to be low. |
| Sample security | • The measures taken to ensure sample security. |
• All RC samples were sampled as single 1m calico samples, each with a unique sample number. These calicos were collected from the drill sites in allotments of 1 tonne bulka bags. These bulka bags were loaded by Bullseye field staff and delivered to SGS Kalgoorlie byroad transport supplied bySGS. |
| Audits or reviews | • The results of any audits or reviews of sampling techniques and data. |
• All QAQC data are reviewed routinely, batch by batch,and on aquarterlybasis to conduct trend |
Page 27 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | JORC Code explanation | Commentary |
| analyses, etc. Any issues arising are dealt with immediately and problems resolved before results are interpreted and/or reported. |
Section 2 Reporting of Exploration Results from Neptune 2022 Drilling
(Criteria listed in the preceding section also apply to this section)
| Criteria | Explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
• Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. • The security of the tenure held at the time of reporting along with any known impediments to obtaininga licence to operate in the area. |
• The Neptune and Boundary Gold Prospects is 100% held by Bullseye Mining Limited. The tenure is considered to be secure. |
| Exploration done by other parties |
• Acknowledgment and appraisal of exploration by other parties. |
• Historical drilling was conducted between 1989 – 2005 by companies Julia Mines NL, Eagle Mining NL,DeepYellow NL and Korab Resources Ltd. |
| Geology | • Deposit type, geological setting and style of mineralisation. |
• Geology comprises a basalt country rock and BIF. The Neptune deposit is associated with an approximately 45 degree plunging mineralised lode (or sheets) that have formed in association with the basalt/BIF contact, a large antiform structure and a large cross cutting structure. Gold Mineralisation is as shallow as a few metres below surface, extends to some 100m below surface and is open at depth. • The weathering profile displays a surface laterite, followed by clay/saprolite weathering predominately in association with the weathered basalt. Saprock is encountered earlier in association with weathered BIF. Global fresh rock is encountered from 70m down hole, but weathering is not well advanced at Neptune and hard saprock and fresh rock are encountered in more shallow horizons. |
| Drill hole Information |
• A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: - easting and northing of the drill hole collar; - elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar; - dip and azimuth of the hole; - down hole length and interception depth; - hole length. If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. |
• Details of significant drilling results are shown in Appendix Three. |
| Data aggregation methods |
• In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated. • Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical |
• No high grade top cuts have been applied. • The reported significant intersections in Appendix Three are above 2 gram metre intersections and allow for up to 4m of internal dilution with a lower cut trigger values of greater than 0.5g/t. |
Page 28 of 29
==> picture [137 x 33] intentionally omitted <==
| 29 April 2022 | ||
|---|---|---|
| Criteria | Explanation | Commentary |
| examples of such aggregations should be shown in detail. • The assumptions used for any reporting of metal equivalent values should be clearlystated. |
||
| Relationship between mineralisation widths and intercept lengths |
• These relationships are particularly important in the reporting of Exploration Results. • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole length, true width not known’). |
• All reported intersections are down hole lengths. True widths are unknown and vary depending on the orientation of target structures. |
| Diagrams | • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. |
• Appropriate maps and sections are included in the body of this release. |
| Balanced reporting | • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. |
• All significant drilling results being intersections with a minimum 2 gram metre values are reported in Appendix Three. |
| Other substantive exploration data |
• Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminatingsubstances. |
• Surface geological mapping and detailed structural interpretation have helped inform the geological models. |
| Further work | • The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling). • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commerciallysensitive. |
• Additional drilling programmes are being planned across all exploration licences. |
Page 29 of 29
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Name of entity Emerald Resources NL ABN Quarter ended (“current quarter”) 72 009 795 046 30 September 2022
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (3 months) $A’000 |
|---|---|---|
| 1. Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) staff costs (e) administration, corporate costs and insurances 1.3 Dividends received (see note 3) 1.4 Interest received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Government grants and tax incentives 1.8 Other (provide details if material) 1.9 Net cash from / (used in) operating activities |
63,458 (3,850) (58) (39,146) (657) (2,735) - 150 - (621) - 10 |
63,458 (3,850) (58) (39,146) (657) (2,735) - 150 - (621) - 10 |
| 16,551 | 16,551 | |
| 2. Cash flows from investing activities 2.1 Payments to acquire or for: (a) entities (b) tenements (c) property, plant and equipment |
- - (1,021) |
- - (1,021) |
ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (3 months) $A’000 |
|---|---|---|
| (d) exploration & evaluation mine development expenditure: - gold revenue during pre- production - mine development - capitalised interest (e) investments (f) other non-current assets 2.2 Proceeds from the disposal of: (a) entities (b) tenements (c) property, plant and equipment (d) investments (e) other non-current assets 2.3 Cash flows from loans to other entities 2.4 Dividends received (see note 3) 2.5 Other 2.6 Net cash from / (used in) investing activities |
- - (471) - (226) - - - - - - (106) - - |
- - (471) - (226) - - - - - - (106) - - |
| (1,824) | (1,824) | |
| 3. Cash flows from financing activities 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities 3.3 Proceeds from exercise of options 3.4 Transaction costs related to issues of equity securities or convertible debt securities 3.5 Proceeds from borrowings 3.6 Repayment of borrowings 3.7 Transaction costs related to loans and borrowings 3.8 Interest paid on borrowings 3.9 Payments for lease liabilities 3.10 Dividends paid 3.11 Other (Withholding tax) 3.12 Net cash from / (used in) financing activities |
- - 90 (3) - (2,371) - (6,149) (2,583) - (1,090) (12,106) |
- - 90 (3) - (2,371) - (6,149) (2,583) - (1,090) (12,106) |
ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (3 months) $A’000 |
|---|---|---|
| 4. Net increase / (decrease) in cash and cash equivalents for the period |
||
| 4.1 Cash and cash equivalents at beginning of period 4.2 Net cash from / (used in) operating activities (item 1.9 above) 4.3 Net cash from / (used in) investing activities (item 2.6 above) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 4.5 Effect of movement in exchange rates on cash held 4.6 Cash and cash equivalents at end of period |
43,047 16,551 (1,824) (12,106) 2,450 |
43,047 16,551 (1,824) (12,106) 2,450 |
| 48,118 | 48,118 | |
| 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts |
Current quarter $A’000 |
Previous quarter $A’000 |
| 5.1 Bank balances 5.2 Call deposits 5.3 Bank overdrafts 5.4 Other (provide details) 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) |
48,048 70 - - |
48,048 70 - - |
| 48,118 | 48,118 | |
| 6. Payments to related parties of the entity and their associates |
Current quarter $A'000 |
|
| 6.1 Aggregate amount of payments to related parties and their associates included in item 1 405 6.2 Aggregate amount of payments to related parties and their associates included in item 2 - Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments. - Directors fees, salaries and superannuation ($298k); and - Rental payments to a Director related party for the Company premises ($77k); and - Payments to a Director for the provision of Company secretarial services ($30k). |
405 | |
| - |
ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| 7. 7.1 7.2 7.3 7.4 7.5 7.6 |
Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity. Total facility amount at quarter end $A’000 Amount drawn at quarter end $A’000 Loan facilities 80,004 80,004 Credit standby arrangements - - Other (please specify) - - Total financing facilities 80,004 80,004 Unused financing facilities available at quarter end - Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well. |
Total facility amount at quarter end $A’000 |
Amount drawn at quarter end $A’000 |
|---|---|---|---|
| 80,004 | 80,004 | ||
| - | - | ||
| - | - | ||
| 80,004 | 80,004 | ||
| 1Credit Agreement with Sprott Private Resource Lending II (“Sprott”) for US$60.0 million plus capitalised interest. The financial close of the Sprott facility occurred on 27 April 2020 (refer to ASX announcement dated 28 April 2020). As at 30 September 2022, the Sprott facility outstanding balance is US$52.0 million. Term – 5 years Interest - 6.5% pa plus the greater of (i) USD 3 month LIBOR, and (ii) 2.50% pa, payable monthly with 75% of the interest capitalised during construction Gold Price Participation Agreement – Commenced in September 2021, a gold price participation payment on 1,449oz per month to a total of 62,307oz. Payment is calculated based on the differential between the average LBMA Gold Price for the month subject to a minimum gold price of US$1,127/oz, and a gold reference price of US$1,100/oz Security – Sprott to have first ranking security over all undertakings, properties and assets of Emerald including the Okvau Gold Project, to be released upon full repayment of all obligations. |
| 8. | Estimated cash available for future operating activities | $A’000 |
|---|---|---|
| 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 |
Net cash from / (used in) operating activities (item 1.9) 16,551 Payments for exploration & evaluation classified as investing activities and mine development expenditure (item 2.1(d)) (471) Total relevant outgoings (item 8.1 + item 8.2) 16,080 Cash and cash equivalents at quarter end (item 4.6) 48,118 Unused finance facilities available at quarter end (item 7.5) - Total available funding (item 8.4 + item 8.5) 48,118 Estimated quarters of funding available (item 8.6 divided by item 8.3) n/a Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7. If item 8.7 is less than 2 quarters, please provide answers to the following questions: 8.8.1 Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not? |
16,551 (471) 16,080 48,118 - |
| 48,118 | ||
| Answer: n/a |
ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
- 8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful?
Answer: n/a
-
8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?
-
Answer: n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
-
1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
-
2 This statement gives a true and fair view of the matters disclosed.
Authorised by the Emerald Board
Mark Clements Company Secretary 31 October 2022
Notes
-
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
-
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
-
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
-
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committee – eg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.
-
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.
Page 5