30 August 2007
ASX ANNOUNCEMENT AND MEDIA RELEASE
ACTIVITY UPDATE
Lindsey 109A #1R, Dawson County, Texas (FAR 4.64%) Tests confirm oil – sidetrack planned.
The Lindsey 109A #1R well has reached planned total depth of 12,280 feet and has been logged and subject to a drill stem test over the target Siluro-Devonian formation. The test recovered oil and no water over a 6 foot net interval with good porosity but is associated with low permeability.
The operator has determined the formation may be difficult to produce in the current wellbore without a very large fracture stimulation and has recommended the well be sidetracked closer to the original producing well.
Forward plans are to utilise the rig now on location to run pipe to 11,700 feet which will be the kick off point for the proposed side track. A workover rig will then be contracted to perform the actual sidetrack. FAR has elected to participate.
The well is effectively a re-drill of the original discovery well in which FAR was a participant. The discovery well was drilled in 1997 and came on line at 186 barrels of oil per day before ceasing prematurely due to down hole mechanical issues. The operator is estimating 270,000 barrels of oil in total recoverable reserves for this location.
In the event of success the well can be quickly tied into existing production facilities.
The operator is RIM Operating, Inc. of Englewood, Colorado.
Kicker Prospect, Vermillion Parish, South Louisiana (FAR 5%) Sales commence on Marceaux #1 well – monitoring continues.
Central Crude has commenced trucking oil from the Marceaux #1 well which has produced approximately 4500 barrels of oil over a period of 6 days. The well has not yet stabilised and is being monitored to optimise future production.
The Operator is Neumin Production Company of Lafayette, Louisiana. FAR’s working interest reduces to 3.75% after payout. All other participants are North American entities.
==> picture [596 x 48] intentionally omitted <==
FAR ASX Release 30Aug 2007 P.2
Valentine-1, Onshore Canning Basin, Western Australia (FAR 8%) – Drilling ahead at 2,340 metres elevated gas readings in Anderson Formation
FAR has been advised by ARC Energy Limited that current operations at the well comprise drilling ahead at 2,340mMD in 8 ½ inch diameter hole.
Valentine 1 is located approximately 20 kilometres north of the township of Derby in northwest Western Australia’s Kimberley region.
==> picture [425 x 278] intentionally omitted <==
The primary reservoir objective is the Late Devonian aged Virgin Hills Formation. Valentine 1 is designed to intersect the interpreted Virgin Hills sandstones and carbonates near the structural crest of the prospect. The well will be drilled deviated to the 244mm (9 5/8”) casing point at approximately 800 metres measured depth, building to a maximum hole angle of 20[O] . The Valentine 1 well will then be drilled to return to vertical at the top of the main objective section at approximately 3,220 metres measured depth. The deviation at 800m will accommodate the planned subsequent sidetracking operations required to drill the Stokes Bay 1 well, which will be drilled immediately after Valentine 1.
The Valentine prospect is a large lowside fault closure that is mapped in both the EP104 and R1 permits and extends over an area of some 66 square kilometres along the Pinnacle fault system. The Valentine reservoir objective is interpreted to be a slope fan / marine sand body which has a very distinctive seismic signature. The principal risk on the prospect is interpreted to be the stratigraphic updip seal mechanism, but the distinctive seismic signature of the objective section and the proven good petroleum source potential of the underlying Gogo Formation shales, together with the large potential hydrocarbon volumes, make it an attractive target.
==> picture [596 x 48] intentionally omitted <==
FAR ASX Release 30Aug 2007 P.3
==> picture [425 x 245] intentionally omitted <==
The Stokes Bay 1 well is planned to be drilled by sidetracking from the Valentine 1 wellbore after the completion of drilling operations at Valentine 1. Stokes Bay 1 is planned as a test of the extent and reservoir development of the gas accumulation intersected by the Point Torment 1 well and will be drilled as a deviated well with a total depth of approximately 2,500 metres. Point Torment 1 was drilled in 1992 and subsequently flowed gas at a rate of up to 4.3 million cubic feet of gas per day from the Carboniferous aged Anderson Formation sandstones. Subsequent tests of these sands produced ambiguous information on potential volumes and reservoir quality and the Stokes Bay 1 well is designed to provide a definitive test of the reservoir quality and extent of the accumulation.
Final interests in R1 and EP104 post the Valentine 1 well farmin earning program are:
| ARC Energy Limited (Operator) | 38.95% |
|---|---|
| Empire Oil and Gas NL | 14.8% |
| Emerald Oil & Gas NL | 12.75% |
| Pancontinental Oil & Gas NL | 10% |
| Phoenix Resources PLC | 10% |
| First Australian Resources Limited | 8% |
| Indigo Oil Pty Ltd | 5.5% |
A Drilling Report on the well is contained in the attached well summary sheet.
==> picture [596 x 48] intentionally omitted <==
FAR ASX Release 30Aug 2007 P.4
VALENTINE-1 DRILLING REPORT CANNING BASIN, WESTERN AUSTRALIA
| Date: | 30 August 2007 | 30 August 2007 |
|---|---|---|
| Permit: | R1 | |
| Well Location: | Lat : 17o08’ 23.46”S Long : 123o42’ 32.40”E |
|
| Directional offset to target: |
0 metres | |
| Elevation: | Ground Level is 12.4mAMSL Rotary Table is 18.1mAMSL |
|
| Prognosed Depths (measured KB): |
Top primary objective | Total depth |
| 3,222 metres | 3,407 metres | |
| Prognosed drilling time: | 25 days | |
| Spud Date: | 1230 hrs, | WST 12 August 2007 |
| Present Depth: | 2,340mMD | |
| Time of Reporting: | 0600 hrs, | WST 30 August 2007 |
| Operations Since Last Report: |
Drilled 8 ½” hole from 1,566 to 2,340mMD | |
| Current Operations: | Drilling ahead in 81/2” hole at 2,340mMD | |
| Hydrocarbon indications: | Elevated gas levels above background gas levels were detected over a 2 to 3 metre interval at approximately 2,250mMD whilst drilling interbedded Claystone and dense well cemented sandstones of the marine member of the Anderson Formation. The significance of these gas readings will be determined once the well has reached total depth and wireline logging has been completed |
A time versus depth chart follows:
==> picture [596 x 48] intentionally omitted <==
FAR ASX Release 30Aug 2007 P.5
==> picture [473 x 596] intentionally omitted <==
For information on FAR’s drilling activities visit our website at www.far.com.au