Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EMERALD RESOURCES NL Capital/Financing Update 2007

Sep 23, 2007

64849_rns_2007-09-23_ff519302-c733-44af-9fa2-c5a954d0a1c3.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [179 x 55] intentionally omitted <==

Level 2, 16 Altona Street West Perth WA 6005 Ph: 08 9482 0500 Fax: 08 9482 0505 Email: [email protected] www.emeraldoilandgas.com

24 September 2007

Centralised Company Announcements Platform Australian Stock Exchange 10[th] floor, 20 Bond Street Sydney NSW 2000

VALENTINE 1 EXPLORATION WELL UPDATE

Please find attached a report on the progress of drilling of the Valentine-1 exploration well at EP104/R1 in the Canning Basin, Western Australia.

For more information please contact:

Emerald Oil & Gas NL Tel: +618 9482 0510 www.emeraldoilandgas.com [email protected]

JOHN HANNAFORD Executive Director – Finance [email protected]

BOB BERVEN Executive Director – Technical [email protected]

VALENTINE-1 DRILLING REPORT CANNING BASIN, WESTERN AUSTRALIA

CANNING BASIN, WESTERN AUSTRALIA BASIN, WESTERN AUSTRALIA
Date: 24 September 2007
Permit: R1
Well Location: Lat : 17o08’ 23.46”SLong : 123o42’ 32.40”E
Directional offset to target: 0 metres
Elevation: Ground Level is 12.4mAMSLRotary Table is 18.1mAMSL
Prognosed Depths(measured KB): Top primary objective Total depth
3,222 metres 3,407 metres
Prognosed drilling time: 25 days
Spud Date: 1230 hrs, WST 12 August 2007
Present Depth at 0600 hrs: 3,377mMD
Time of Reporting: 0600 hrs, WST 24 September 2007
Operations Since LastReport: Directionally drilled from 3241m as of 20/9/07 to 3,377mon 22/9/07 when drilling stopped due to break-down oftop drive hydraulic unit.
Current Operations: At 0600 hrs this morning(24/9/07), repairs were almost complete and by 0700hrsthe well was drilling ahead at 3382m MD.
Hydrocarbon indications: None
Comment: Lithologies are predominantly tight dolomites and minordolomitic sandstones and claystones, of Devonian age;with minor mud gas shows observed. The primaryreservoir objective; porous sandstones of the Virgin HillsFormation have not been intersected in the well to date.
Participants in the well(post earning): Empire Oil and Gas NL - 14.8%ARC Energy Limited - 38.95% (Operator) Emerald Oil & Gas NL - 12.75%Pancontinental Oil & Gas NL - 10.0%Phoenix Resources PLC - 10.0%First Australian Resources Limited - 8.0%Indigo Oil PtyLtd - 5.5%

About Emerald Oil & Gas NL

Emerald Oil & Gas NL (ASX: EMR; EMRO) was listed on the ASX in June 2006, raising $4 million. Emerald is an oil and gas exploration and production company with project interests in North Dakota and Texas in the USA and in the Canning Basin of Western Australia. Emerald’s focus is on conventional reservoir targets for oil and gas prospects and its primary objective is to achieve near term production and cashflow to build shareholder value and provide funds to fuel further growth. Emerald’s strategy is to take modest but meaningful positions in low risk exploration projects that can be swiftly brought into production.

Information in this announcement pertaining to exploration potential was compiled by Robert Berven, Emerald Oil & Gas NL’s Technical Director who is a Member of the Australasian Institute of Mining and Metallurgy and the American Association of Petroleum Geologists CPG # 2498.

Statements regarding Emerald’s plans with respect to its petroleum properties are forwardlooking statements. There can be no assurance that Emerald’s plans for development of its petroleum properties will proceed as currently expected. There can be no assurance that Emerald will be able to confirm the presence of additional petroleum deposits, that any discovery will prove to be economic or that an oil or gas field will successfully be developed on any of Emerald’s petroleum properties.