Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EMERALD RESOURCES NL Capital/Financing Update 2007

Oct 31, 2007

64849_rns_2007-10-31_8ad48b42-2d54-4fd0-9cce-03a690433ffb.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [563 x 115] intentionally omitted <==

1 November 2007

ASX ANNOUNCEMENT AND MEDIA RELEASE

STOKES BAY-1 ACTIVITY UPDATE

- Stokes Bay 1, Onshore Canning Basin, Western Australia (FAR 8%) Preparing to Complete the Well Prior to Testing

FAR has been advised by Arc Energy Limited that since our last report on Thursday October 25th, 178 mm (7 inch) casing has been run to a depth of 2585m measured depth (MD), and the well deepened a further 22 m from the previous 2755 m to 2777 m MD.

In view of persistent ongoing mud losses, that are now under control, and the accumulating evidence of gas presence in the Nullara, the Operator has recommended to the JV to complete the well (rather than the previously proposed open hole DST) in order to test this interval. The current plan is to complete the well during the next two days, and commence testing operations.

Current operations at the well comprise pulling out of the hole to run completion.

A Drilling Report on the Stokes Bay-1 well is contained in the attached well summary sheet.

Operator Comment:

“The loss of mud to the Nullara Fm has continued to create operational difficulties that have delayed testing the interval. However, we remain very encouraged by the presence of both porosity and significant permeability in the Nullara reef section, and the more recent intermittent gas shows when mud circulation is established are also viewed positively.”

==> picture [596 x 48] intentionally omitted <==

FAR Ltd ASX Release 1Nov07 P.2

STOKES BAY-1 DRILLING REPORT CANNING BASIN, WESTERN AUSTRALIA

Date: 1stNovember 2007
Permit: R1
Well Location: Lat : 17o08’ 23.46”S
Long : 123o42’ 32.40”E
Directional offset to target: 1024 metres
Elevation: Ground Level is 12.4mAMSL
Rotary Table is 18.1mAMSL
Proposed Total Depth
(measured KB):
2800 metres
Prognosed drilling time: 15 days
Spud Date: 0930 hrs, WST 3rdOctober 2007
Present Depth at 0600 hrs: 2777m MD
Time of Reporting: 0600 hrs, WST 1stNovember 2007
Operations Since Last
Report:
Since last report on Thursday, October 25th, 178 mm (7 inch)
casing has been run to a depth of 2585m measured depth (MD),
and the well deepened a further 22 m from the previous 2755 m
to 2777 m MD.
In drilling the additional 22 m, further losses of mud at a rate of
approximately 250 bbl/hr were experienced. This resulted in no
fluid or cuttings returns to surface. In drilling the 22 m of additional
hole, several metre-scale intervals of very high penetration rates
were encountered, these being interpreted to be due to additional
large scale vuggy porosity.
Since reaching a total depth of 2777 m MD, efforts have focussed
on curing the ongoing fluid losses in the Nullara Fm. This has
resulted in intermittent establishment of circulation, and returns to
surface with associated intermittent mud gas peaks of up to 10%.
In view of the persistent ongoing losses that are now under
control, and the accumulating evidence of gas presence in the
Nullara, the Operator has recommended to the JV to complete
the well (rather than the previously proposed open hole DST) in
order to test this interval. The current plan is to complete the well
during the next two days, and commence testing operations.

==> picture [596 x 48] intentionally omitted <==

FAR Ltd ASX Release 1Nov07 P.3

As previously reported, all JV partners are participating in the
shallow part of Stokes Bay-1 (above 2589 m MD). However, less
than all parties have participated in the well below 2589 m MD
such that equity levels in this part of the Stokes Bay-1 well (below
2589m MD) are:

ARC Energy Limited
69.25% (Operator)

Emerald Oil & Gas NL
12.75%

Pancontinental Oil & Gas NL
10.0%

First Australian Resources Limited
8.0%
Under the Joint Venture Operating Agreement, the non-
participating parties in the deeper part of the well (Empire,
Phoenix and Indigo) retain a future right to earn back into their
respective participating interests by the payment of penalties out
of future production.
Current Operations: POOH to run Completion
Hydrocarbon indications: Mud gas readings of up to 10% have been recorded at surface
from intermittent circulation during attempts to cure lost
circulation
Comment: The loss of mud to the Nullara Fm has continued to create
operational difficulties that have delayed testing the interval.
However, we remain very encouraged by the presence of both
porosity and significant permeability in the Nullara reef section,
and the more recent intermittent gas shows when mud circulation
is established are also viewed positively.
The planned test of the Nullara Fm will determine fluid content
and potential flow characteristics of the reservoir. The Stokes
Bay-1 intersection of the Nullara Fm is 80m up dip of the Pt
Torment-1 intersection which did not have the vugular porosity
developed, but nevertheless tested gas at low rates.
Participants in the Permit
(post earning):
ARC Energy Limited
38.95% (Operator)
Empire Oil and Gas NL
14.80%
Emerald Oil & Gas NL
12.75%
Pancontinental Oil & Gas NL
10.00%
Phoenix Resources PLC
10.00%
First Australian Resources Limited
8.00%
Indigo Oil Pty Ltd
5.50%

A time versus depth chart follows:

==> picture [596 x 48] intentionally omitted <==

FAR Ltd ASX Release 1Nov07 P.4

==> picture [449 x 658] intentionally omitted <==

For information on FAR’s drilling activities visit our website at www.far.com.au

==> picture [596 x 48] intentionally omitted <==