Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EMERALD RESOURCES NL Capital/Financing Update 2007

Nov 14, 2007

64849_rns_2007-11-14_9f62d115-ce18-4ad1-bbbc-7ac7e5bc52e7.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [487 x 23] intentionally omitted <==

PANCONTINENTAL OIL & GAS NL

ASX Release

15 November 2007

==> picture [140 x 104] intentionally omitted <==

www.pancon.com.au

MARKET DATA

ASX: PCL

12 month high: $0.085 12 month low: $0.049 Market cap: $ 25M Cash at bank: $3.9M Issued shares: 444M

Stokes Bay-1 Exploration Well Drilling Update

Pancontinental Oil and Gas NL (ASX: PCL) wishes to advise that Joint Venture (JV) Operator Arc Energy (ASX: ARQ), advises that the EP104/R1 Joint Venture has re-commenced testing operations at the Stokes Bay-1 well at 09:45 Hrs on 14 November, 2007 .

Testing operations are utilising a specialised testing crew that is more cost efficient than having the Century Rig 18 on location, and this small crew is also more able to access the Stokes Bay location during the wet season, which is imminent.

PROJECTS

Australia Onshore Canning Basin Offshore Carnarvon Basin

Kenya Offshore Lamu Basin

Malta Offshore Chebba Marin Basin

Namibia Offshore

DIRECTORS & MANAGEMENT

David Kennedy Chairman Peter Munachen Finance Director

Barry Rushworth New Ventures Director Ian Cornelius Non-executive Director Andy Svalbe Non-executive Director Matthew Battrick General Manager

CONTACT DETAILS

Pancontinental Oil & Gas Ground Flr 288 Stirling St Perth Western Australia T: +61 8 9227 3220 F: +61 8 9227 3211 E: [email protected]

At completion of the initial test flow using Rig 18, the well was shut in and down hole pressure measurements taken. Interpretation of these pressure measurements together with surface shut in pressures provided encouragement that the well will flow and cleanup so that the nature of the reservoir fluid can be determined. Because of the vugular and cavernous nature of the porosity in the section and the amount of fluid lost to the formation, the well may take some time to flow and to cleanup. Wells in similar formations can take up to 30 days of flow before definitive reservoir fluids are observed.

Following initial setup and pressure testing of the wellhead, the first attempt to flow the fluids in the well to surface was not successful. The mobilisation of swabbing and other specialised equipment to the well-site will now take place to get the well to flow and assist with the clean-up of the well. Equity positions in the Stokes Bay-1 well are now:



ARC Energy Limited
Empire Oil and Gas NL
Emerald Oil & Gas NL
38.95% (Operator)
14.80%
12.75%

Pancontinental Oil & Gas NL
Phoenix Resources PLC
10.00%
10.00%

First Australian Resources Limited
Indigo Oil Pty Ltd
08.00%
05.50%

Further Reports will be made when new information about the testing operations is available.

Enquiries: Matthew Battrick, General Manager Tel: 08 9227 3220, Fax: 08 9227 3211, Email: [email protected]

The summary report on the oil and gas projects is based on information compiled by Mr M A Battrick, BSc, MAAPG, MPESA, MAICD, MPESGB, General Manager of Pancontinental Oil & Gas NL. Mr Battrick has the relevant degree in geology and has been practising petroleum geology for 26 years. Mr Battrick is a full-time employee of Pancontinental Oil & Gas NL and has consented in writing to the inclusion of the information stated in the form and context in which it appears.