AI assistant
ELIXIR ENERGY LIMITED — Capital/Financing Update 2008
Jan 29, 2008
64893_rns_2008-01-29_fe751f13-7a67-46d8-a841-ce1da6d72e17.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [562 x 89] intentionally omitted <==
ASX RELEASE ‐ 30 JANUARY 2008
DRILLING UPDATE ‐ POMPANO PROJECT
Buccaneer Energy Limited (“Buccaneer” or “the Company”) is pleased to announce progress of SL 103229 # 1. All reported depths are below the Rotary Table Kelly Bushing on the rig floor in Measured Depth (“MD”) and/or True Vertical Depth (“TVD”) since the well is being directionally drilled to a bottom location approximately 2,000 feet to the northwest of the surface location:
Report Date: 06.00am 28 January 2008 (US Central time) 23.00pm 28 January 2008 (NSW Daylight time)
Current Depth: 7,821 feet MD
Progress: Drilling operations completed. Well completion and platform / pipeline refurbishment operations to bring the well into production have commenced.
It is estimated that well completion operations will take approximately two weeks after which the well will be perforated and a flow rate determined. Platform and pipeline refurbishment operations will take approximately 30‐60 days, after which the well will be brought into production.
Hydrocarbon Indications: Logging and evaluation is ongoing. The Operator has advised that the preliminary indications are positive and warrant completion of the well for production.
Targets:
The well is designed to test and develop seven gas sands from 3,800 feet to a measured depth of 7,940 feet.
The Participants in this well are as follows:
| Participant | Working Interest |
|---|---|
| Buccaneer Resources* | 65.0% |
| Elixir Petroleum | 25.0% |
| Baron Petroleum+ | 7.5% |
| Streamline Exploration+ | 2.5% |
- A wholly owned subsidiary of Buccaneer Energy Limited
- Affiliated with AnaTexas Offshore, Inc. Baron Petroleum and Streamline Exploration are members of Millennium Explorer, LLC., the generator of the Pompano project.
==> picture [561 x 89] intentionally omitted <==
While operations are underway, the Company will issue routine releases every Tuesday or at any such time that material matters require an earlier release.
For further information please contact Dean Gallegos on 0416 220 007 or 02 9233 2520, alternatively visit the Company’s website at www.buccenergy.com.
Yours faithfully BUCCANEER ENERGY LIMITED
==> picture [119 x 48] intentionally omitted <==
Mr Dean Gallegos Director
About Buccaneer:
Buccaneer Energy’s wholly owned subsidiary Buccaneer Resources is based in Houston, Texas and is an upstream oil and gas company. It specialises in the development and expansion of behind‐pipe proved and probable reserves and low‐risk exploration plays with growth potential.
Buccaneer’s growth strategy is focused on the progressive expansion of oil and gas production and reserves by acquiring significant working interests in low‐cost, low‐risk development properties that possess significant undeveloped upside.
==> picture [560 x 89] intentionally omitted <==
==> picture [560 x 89] intentionally omitted <==
==> picture [560 x 88] intentionally omitted <==
==> picture [561 x 88] intentionally omitted <==
==> picture [404 x 304] intentionally omitted <==
A picture of the Hercules 152 rig positioned over the “B” Platform and drilling Pompano SL 103229 # 1 Well through the 36” caisson.
==> picture [561 x 88] intentionally omitted <==
==> picture [561 x 88] intentionally omitted <==
==> picture [561 x 86] intentionally omitted <==