ELIXIR ENERGY LIMITED Capital/Financing Update 2008

Apr 14, 2008

64893_rns_2008-04-14_f511f593-644e-4995-8d9c-ce9e4933dc49.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

15 April, 2008

==> picture [125 x 101] intentionally omitted <==

ASX RELEASE

POMPANO PROJECT – OPERATIONAL UPDATE – WELL #2

Elixir Petroleum Limited (“Elixir”), the international oil and gas exploration and production company (ASX:EXR, AIM:ELP), is pleased to provide an update on completion operations on Well SL 103230 #1 (“Well #2”) at the Pompano Gas Field at Brazos Block 446-L SE/4.

Since our last announcement, the operator has advised that the dual string completion has been run into the hole and that preparations to perforate the three reservoir intervals, being the B, C and E sands, are underway.

It is expected that on a trouble free basis the completion operations will be finalised and the well placed on production towards the end of April.

The Participants in Well #2 and their respective working interests are:

Elixir Petroleum Ltd * 25.0%
Buccaneer Energy Ltd * 65.0%
Baron Petroleum Inc. 7.5%
Streamline Exploration Inc. 2.5%
100%
  • Interests held indirectly via their respective shareholdings in wholly-owned subsidiaries.

Elixir’s 25% working interest in Well #2 will be reduced by 5.5% pursuant to a ‘back-in’ arrangement with the Operator once Elixir has recouped 120% of its total investment in the well.

Yours sincerely,

Alex Neuling Company Secretary Elixir Petroleum Ltd

Golden Cross House 8 Duncannon Street London WC2N 4JF Tel: +44 207 484 5019 Fax: +44 207 484 4992 Website: www.elixirpetroleum.com

Level 20 77 St George’s Terrace Perth WA 6000 Western Australia +61 8 9440 2650 +61 8 9440 2699 ABN 51 108 230 995

Pompano Project – Background

The Pompano gas field lies offshore in the Gulf of Mexico, in Brazos Block 446-L SE/4, which is approximately 90 miles southwest of Houston Texas. The field is approximately 7 miles offshore in 55 feet of water.

==> picture [88 x 36] intentionally omitted <==

==> picture [88 x 36] intentionally omitted <==

Schematic: Pompano Field Layout

The Pompano gas field was discovered in 1966 and produced over 120 billion cubic feet of gas prior to being shut-in in 2003. The Pompano Project is essentially a re-development of the Pompano gas field with new well locations based on modern 3D seismic data.

Well #1 was directionally drilled in January 2008 from the field’s existing “B” satellite platform to 7,825 feet measured depth. Well #1 intersected three gas bearing sands located between 6,700 feet and 7,426 feet measured depth which were successfully flow tested. Production commenced from this well in early March 2008 from the B and 6700A sands.

Well #2 spudded in late February 2008 and was directionally drilled from the field’s existing “A” Production Platform. Well #2 encountered a number of gas bearing sands and is being completed over the B, C and E sands.

The Pompano Project is using the field’s extensive existing production and pipeline facilities, which has achieved a significant capital cost saving and a reduction in time to production for the project.

2