Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ELEMENTOS LIMITED Regulatory Filings 2011

Feb 7, 2011

64837_rns_2011-02-07_e5a66261-6f56-4473-b70d-da2c6ba2b44c.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

==> picture [595 x 119] intentionally omitted <==

8 February 2011

MANANTIALES PHASE 2 DRILLING PROGRAM

Elementos Limited (ASX: ELT) (“Elementos” or the “Company”) is pleased report that the second phase of drilling at Manatiales will commence early next month.

The objectives of this diamond drilling program are:

  • Expand the size of the known mineralisation at the Manantial vein identified in the first phase of drilling. The system is open to the north and south along strike, and at depth;

  • Test at depth for extensions of the Julieta Norte vein system which intersected low-grade gold and silver mineralisation at shallow levels in the Phase 1 drilling program. Julieta Norte is the northern extension of Troy Resources’ main satellite vein system;

  • Identify mineralisation at La Puerta and La Puerta Este where surface channel sampling has intersected high-grade gold and silver in vein systems exposed on surface; and,

  • To continue testing for parallel blind vein structures at depth that have not been identified through surface mapping and for stockwork mineralisation in the alteration zone around the main vein systems.

The Phase Two drilling program is expected to comprise 25 holes totalling up to 4,000 metres including:

  • Manantial vein – 2,000 metres in 15 holes;

  • Julieta Norte vein – 500 metres in 5 holes; and

  • La Puerta group - 1,500 metres in 10 holes.

The company believes that this drill program has the potential to expand the known gold-silver mineralisation in the vein systems at Manantial and Julieta Norte. The program will also confirm the potential for the La Puerta group of vein systems which share similar geology characteristics to Manantial vein.

For more information, please contact: Corey Nolan Managing Director Phone: +61 (7) 3871 3985 Email: [email protected]

Please visit us at www.elementos.com.au

==> picture [584 x 30] intentionally omitted <==

==> picture [102 x 37] intentionally omitted <==

==> picture [797 x 499] intentionally omitted <==

Figure 1: Long-section of the Manantial vein showing Phase 1 drill and sawn-channel results. The Phase 2 planned holes are shown in green.

Page 2 of 2