Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ELEMENTOS LIMITED Capital/Financing Update 2023

Feb 13, 2023

64837_rns_2023-02-13_51c60639-4c9f-4a17-a5ca-fe6616005ec3.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

==> picture [225 x 40] intentionally omitted <==

==> picture [217 x 19] intentionally omitted <==

14 February 2023

Oropesa Tin Project – 2023 Mineral Resource Update

Highlights

Increase in Geological Confidence

  • 100% of 2023 Mineral Resource Estimate (MRE) tonnes located within the 2022 Optimisation Study[1] US$30k/t Pit Shell are classified as Measured or Indicated (no Inferred Resources within the US$30k/t Pit Shell).

  • 95% of 2023 MRE is classified either Measured or Indicated Resources, totaling 18.5Mt (+11%) at 0.39% Sn.

  • 38% of 2023 MRE is classified as Measured Resources, increasing by 3.1Mt (+73%) to 7.4Mt at 0.36% Sn.

  • Elementos will assess the 2023 MRE, applying applicable Modifying Factors, for conversion to JORC Ore Reserves as part of its Definitive Feasibility Study (DFS) due for delivery in Q2 CY23.

Increased Tonnage

  • Total 2023 MRE increases by 0.7Mt (+4%) to 19.6Mt at 0.39% Sn.

  • 2023 MRE Measured or Indicated Resource contained tin increases to 71.8kt (+12%)

Elementos (ASX: ELT) is pleased to announce a 2023 Mineral Resource Estimate (MRE) Update at its Oropesa Tin Project, Spain. The MRE update has achieved its goal of significantly upgrading the Inferred and Indicated Mineral Resource categories, increasing the geological confidence of the deposit. The MRE will be further assessed for conversion to JORC Ore Reserves, via techno-economic modification factors, during Oropesa’s Definitive Feasibility Study (DFS) which is currently underway and schedule for delivery during Q2 CY2023.

The Oropesa Tin Project MRE update was completed by Measured Group, following completion of an 11-hole in-fill drilling program and supersedes the Mineral Resource Estimate previously released in November 2021².

The Mineral Resource Estimate is summarised in Table 1, and illustrated in Figure 1 and Figure 2 to assist with further understanding. Full details and parameters used can be found in the Mineral Resource Statement and Appendix 1 – JORC Table 1.

2023 MINERAL RESOURCE ESTIMATE 2023 MINERAL RESOURCE ESTIMATE
Resource Classification Sn% Resource Tonnes Contained Tin Metal(tonnes)
Measured 0.36 7,418,212 26,800.5
Indicated 0.41 11,113,471 45,012.1
Subtotal: Measured & Indicated 0.39 18,531,683 71,812.6
Inferred 0.38 1,070,700 4,021
Total 0.39 19,602,383 75,833.6

Table 1 . 2023 Oropesa Mineral Resource Estimate at a 0.15% Sn cut-off

Level 7, 167 Eagle Street Brisbane Queensland 4000 Phone +61 (0)7 3212 6299 [email protected] elementos.com.au

Elementos Limited | ABN 49 138 468 756 | ASX: ELT

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

==> picture [488 x 283] intentionally omitted <==

Figure 1. Oropesa Resource Model plan coloured by 2023 Resource Classification

==> picture [488 x 269] intentionally omitted <==

Figure 2. Oropesa 2023 Mineral Resource Model section with topography & 2022 Optimisation Study pit shell[1] .

2

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Elementos Managing Director Joe David said the 2023 Mineral Resource Estimate Update’s outstanding results now secure a fundamental foundation to support Oropesa’s DFS.

“We are extremely pleased that our 2022 in-fill drilling program has resulted in such a robust Mineral Resource Estimate update.

“We achieved our main aim of upgrading all the Inferred Resources located within the 2022 Optimisation Study US$30,000 pit shell, to Measured and Indicated resources. ”

“This new MRE is material because only Measured and Indicated Resources can be used or assessed during the DFS process for conversion to JORC Ore Reserves.”

“This puts us in a privileged position at the back end of our DFS to support our goal of releasing a maiden JORC Ore Reserves Statement for the Oropesa Tin Project,” Mr David said.

==> picture [482 x 213] intentionally omitted <==

Figure 3. Oropesa Tin Project Mineral Resource Estimate Summary, Feb 2023 vs. Nov 2021

3

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Mineral Resource Estimate Comparison (Feb 2023 vs Nov 2021)

Table 2 below illustrates the variance between the Oropesa Tin Project February 2023 Mineral Resource Estimate update compared to the previous issued during November 2021.

==> picture [468 x 402] intentionally omitted <==

----- Start of picture text -----

2023 MINERAL RESOURCE ESTIMATE
Resource Clasification Sn% Resource Tonnes Contained Tin Metal (tonnes)
Measured 0.36 7,418,212.0 26,800.5
Indicated 0.41 11,113,471.0 45,012.1
Subtotal: Measured & Indicated 0.39 18,531,683 71,812.6
Inferred 0.38 1,070,700 4,021.0
Total 0.39 19,602,383 75,833.6
2021 RESOURCE CLASSIFICATION
Resource Clasification Sn% Resource Tonnes Contained Tin Metal (tonnes)
Measured 0.411 4,294,940 17,640.4
Indicated 0.376 12,326,041 46,320.6
Subtotal: Measured & Indicated 0.385 16,620,981 63,961.0
Inferred 0.512 2,236,861 11,456.6
Total 0.400 18,857,843 75,417.6
Comparison tonnes 2023 v 2021
Resource Clasification Sn% Resource Tonnes Contained Tin Metal (tonnes)
Measured -0.05 +3,123,272 +9,160
Indicated +0.03 -1,212,570 -1,308
Subtotal: Measured & Indicated +0.00 +1,910,702 +7,852
Inferred -0.14 -1,166,161 -7,436
Total -0.01 +744,540 +416
Comparison % 2023 v 2021
Resource Clasification Sn% Resource Tonnes Contained Tin Metal (tonnes)
Measured -12.0% +73% +51.9%
Indicated +7.8% -10% -2.8%
Subtotal: Measured & Indicated +0.7% +11% +12.3%
Inferred -26.7% -52% -64.9%
Total -3.3% +4% +0.6%
----- End of picture text -----

Table 2 . 2023 Oropesa Mineral Resource Estimate at a 0.15% Sn cut-off

4

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Mineral Resource Statement

Overview of Oropesa

The Oropesa property represents a 13km² concession package (Investigation Permit No. 13.050) located approximately 75km northwest of Cordoba and 180km northeast of Seville, within the province of Andalucía, in southern Spain. Elementos currently holds a 100%[^] interest in the Oropesa property with registered title to the property with the Andalucia mining authorities under the Spanish Mining Act through its 100%[1] subsidiary Minas de Estaña de España SLU (MESPA).

Project Geology

The Oropesa deposit is located within the Espiel Thrust Sheet, at the western margin of the Peñarroya basin, a Carboniferous, trans-tensional basin that formed during the Late Carboniferous Hercynian/Variscan orogeny. The Espiel Thrust Sheet is located between Ossa-Morena Zone and Central Iberian Zone within the Iberian Massif in southern Spain.

==> picture [488 x 320] intentionally omitted <==

Figure 4. Simplified Geology of the Iberian Massif

The Oropesa project area comprises intercalated sandstones and conglomerates with rare siltstones and shales. The sedimentary units have complex geometries, reflecting an active depositional environment and syn-sedimentary faulting. This geometry has been further complicated by a subsequent phase of deformation involving the reactivation of some basin-controlling faults as strike slip and reverse faults with associated folding of the stratigraphic package, producing upright to locally overturned bedding.

5

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

==> picture [488 x 332] intentionally omitted <==

Figure 5 . Regional Geology

The majority of the tin mineralisation (cassiterite with minor stannite) is replacement style, primarily occurring in granular sandstones at the contacts between the sandstone and conglomerate units. The mineralisation is volumetrically more significant as replacement style within the sandstones, however fault/structurally hosted mineralisation has also been interpreted as occurring within reverse thrust fault zones that bound and occur within the deposit. The tin mineralisation is associated with pervasive leaching of the host rocks, silica alteration and several phases of paragenetically late disseminated to semi-massive sulphides.

Geological Interpretation

The geometry of the Oropesa deposit is primarily the result of two major deformation phases, an initial strike-slip to extensional phase of deformation during basin formation followed by a strong contractional overprint.

The initial phase of basin formation produced a complicated geometry characterised by at least two major fault orientations: a basin-parallel, NW striking fault set, the original dip of which is still uncertain, and an oblique N-S striking, fault set with steep to subvertical dips. Both fault sets appear to have been active during basin formation, producing rapid lateral facies changes and the characteristic wedge-shaped stratigraphic packages interpreted from drill hole lithology logging.

Post sediment deposition tectonic activity appears to have been a key mechanism in providing structural conduits for mineralising fluids contemporaneously providing more permeable locations along the sandstone/conglomerate contact zones for the development of the ore body.

6

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

The geological interpretation of the Oropesa resource is based on the application of progressive analysis of the reported and observed data and the application of strike-slip restraining stepover geometries to the Oropesa deposit (McClay and Bonora, 2001). This model is based on the re-activation of basement structures by sinistral strike-slip movement in a northwest-southeast orientation that results in pop-up structures within the basin that are bounded by steep to shallow dipping reverse faults of similar orientation to the bounding structures but also can occur as pseudo-Riedel sheer structures between the bounding structures. This model can be used to explain the steeply dipping sedimentary boundaries adjacent to shallow dipping layers, separated by reverse thrust fault zones which are frequently located along the boundary between the sandstones and conglomerates (zones of weakness). The development of the thrust zones along the sedimentary boundaries enhances the permeability of these zones in preparation for the influx of mineralising fluids. This could explain the presence of a large proportion of the mineralisation at Oropesa along these lithological boundaries, albeit significantly deformed. The thrust planes promote the development of localised overturned folds.

==> picture [488 x 268] intentionally omitted <==

Figure 6. Sinistral strike-slip restraining stepover geometries as modelled by McClay and Bonora (2001), superimposed on the Oropesa deposit.

7

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

==> picture [442 x 243] intentionally omitted <==

  • Figure 7. Significant structures within the Oropesa resource interpreted from drill hole logging and IP geophysical data.

==> picture [407 x 369] intentionally omitted <==

Figure 8 . Lithological and structural interpretation including drill hole traces displaying Sn intercepts through Section A-A

8

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

==> picture [394 x 358] intentionally omitted <==

Figure 9. Lithological and structural interpretation including drill hole traces displaying Sn intercepts through Section B-B.

Controls on Mineralisation

Mineralisation at Oropesa is strongly lithologically controlled, with the majority of mineralisation occurring in sandstone as a replacement deposit (Figures 7 – 9). The more intensive mineralisation tends to occur close to the boundary between the sandstones and conglomerate, with overall contained tin reducing with increasing distance from lithological boundaries and interpreted mineralising conduit structures. Grain-size and stratigraphic position act as second-order controls. The boundary between the sandstone and conglomerate is intensely tectonised, possibly reflecting the rheological differences between the two distinctive lithologies, with original textures removed by the mineralisation.

In addition to the lithological controls, there are also several interpreted mineralised fault zones. The mineralised fault zones are commonly associated with zones of increasing deformation intensity. The mineralised fault zones are more readily recognised within the conglomerates.

9

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Timing of Mineralisation

Mineralisation occurred during the Variscan/Hercynian orogeny (Late Carboniferous-Permian). Mineralisation is suggested to have occurred syn-tectonically.

Exploration and Drilling Techniques

Eight drilling programs have been completed to compile the data in this report. Six drilling programs from 2010 – 2016 were completed as predominantly HQ diameter diamond drill (DD) holes, using a double tube recovery barrel. A small number of reverse circulation (RC) drill holes (12) and RC-DD tail drill holes (4) were carried out during the early phases of exploration (2012). Only intercepts from four RC drill holes have been employed in the development of the Mineral Resource Estimate. Further details of these drilling programs are reported in Mineral Resource Estimates released in 2015 and 2018. One RC and diamond twin hole has been completed.

Elementos completed an additional 46 diamond drill holes in 2020-21. The program consisted of PQ pre-collars (85.0mm ID) and HQ tails (63.5mm ID). Triple tube recovery barrels were employed on the HQ drilling.

Elementos completed 11 diamond drill holes in the 2022 in-fill drilling program for a total number of 320 drill holes. Core drilling in the latest program consisted of PQ pre-collars (85.0mm ID) and HQ tails (63.5mm ID). Triple tube recovery barrels were employed on the HQ drilling. Standard diamond drill bits were used.

The maximum drill core extracted was 3.1m. Diamond drill core are logged for geology, mineralisation, core recovery and RQD.

Measurements are taken systematically downhole between core blocks. Average drill core recovery from 2010-2016 was 92%. Average drill core recovery from 2020-21 was 98.5%. Average drill core recovery from 2022 was 92.6%.

All drill core has been photographed.

Drill hole survey data is recorded in the 1989 ETRS Spanish Datum (ETRS89) and ED50 Datum.

Sampling and Sub-sampling Techniques

Drill core samples and sample intervals were selected based on visual recognition of mineralisation and NITON portable XRF data. Whole core was split using a core saw operated by trained company personnel. The samples were recorded and submitted to an ISO-accredited ALS facility in Seville for preparation.

Sampling and Analysis Methods

Prior to 2020, the ALS facility in Seville followed procedure PREP-31 to weigh, dry and crush samples, and then take a further 250g split to be further pulverised so that >85% passed through a 75 micron mesh. Prepared samples were sent to ALS Laboratory, Vancouver, Canada for analysis for tin by glass fusion X-Ray fluorescence (XRF).

For the 2020-21 and 2022 drilling programs the ALS facility in Seville followed procedure CRU-31 to weigh, dry and crush the samples where 70% <2mm. A 1000g sample was split and pulverised to 85% passing 75 microns. Prepared samples were sent to the ALS laboratory in Galway, Ireland for analysis for tin by peroxide fusion, ICP-AES (MEICP81X).

Duplicate samples were selected from the prepared samples for analysis by ALS as part of their internal QAQC procedures.

10

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Routine industry standard QAQC procedures have been in place following drill hole ORPD059 (drilled in 2011), and 81% of drill hole intersections within the mineralisation wireframes are supported by QAQC data. The samples collected prior to the implementation of QAQC procedures were prepared and analysed at the same ALS laboratory facilities (Seville and Vancouver), and mineralised intersections and grade distributions are visually comparable to adjacent data supported by QAQC procedures (up until 2016).

From 2011 to 2016, the QAQC procedures featured the insertion of field blanks, CRM samples and duplicates, at a combined rate of approximately 6% in every batch sent to the laboratory. QAQC procedures for the 2020-21 and 2022 programs featured the insertion of accredited standards and blanks at an insertion rate of approximately 5% in every batch to the laboratory.

ALS Galway selected sample repeats for the 2022 program in accordance with its internal procedures.

Resource Estimation Methodology

For this Mineral Resource estimate, Measured Group has completed the following:

  • modelled the tin mineralisation horizons as a series of domains in 3D using Leapfrog and Vulcan Software;

  • the Mineral Resource Estimate is based on 16 discreet mineralised domains modelled within the overall mineralised zone.

  • created 2m composite samples for each drill hole per intersected domain and undertaken statistical analysis of these;

  • reviewed the sample composite data for grade outliers - based on histogram analysis, a top cut of 10% Sn was applied and no bottom cut was applied

  • undertaken geostatistical analyses to determine appropriate interpolation algorithms;

  • undertaken a Quantitative Kriging Neighbourhood analysis to test the sensitivity of the interpolation parameters;

  • interpolated tin grades and density data into the block model using Leapfrog and Vulcan Software;

  • visually and statistically validated the estimated block grades relative to the original sample results; and

  • reported the Mineral Resource according to the terminology, definitions and guidelines given in the JORC Code.

In comparison to the Measured Group 2021 Mineral Resource estimate for the project, which was comprised of Measured, Indicated and Inferred categories

Measured Group has upgraded the 2022 resource by;

  • an increase in the Measured and Indicated categories primarily due to new infill drilling confirming the continuity of the geology and mineralisation within specifically targeted areas of the deposit;

No by-products have been estimated as part of this Mineral Resource estimate.

No deleterious elements have been estimated for the Mineral Resource estimate.

Block dimensions are 2mx2mx2m. These dimensions were chosen to be similar to the down hole sample spacing. This dimension was chosen to enable a more realistic mining schedule to be developed in the next phase of work.

Selective mining units have not been modelled as part of this Mineral Resource estimate.

11

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

No significant correlation relationships were found between modelled variables during raw statistical analysis (between tin and density results)

Bulk Density

Approximately 2700 density measurements have been taken across the deposit. The data has been separated into fresh, transition and oxide zones based on observations made during drill core logging. The density data was collected using the weigh in air/weigh in water method.

Cut-off Grade for Mineral Resource Estimate Reporting

A cut-of grade of 0.15% Sn and a tin price of US$30,000/t was used for the Mineral Resource Estimate. Table 3 and Table 4 provides details of the assumptions used for open cut pit optimisation studies that were carried out to determine the cut-off grade. Figure 10 shows the 2023 MRE with Grade vs Tonnages.

Input Value
Overall Pit Wall Angle 41
O
MiningRecovery 95%
MiningDilution 5%
Ore Dilution Grade Sn% 0%
Crusher Split -10mm Mass Yield
(Bypass Ore Sorter – Direct Concentrator Feed)
21.5%
Crusher Split -10mm Sn Grade Upgrade y = 1.1238(Sn Feed) + 0.0002
Crusher Split +10mm Mass Yield
(TOMRA Feed)
78.5%
Ore Sorter High Grade Bypass Limit
(Bypass TOMRA – Direct Concentrator Feed)
>1% Sn
Ore Sorter Feed Mass Yield y=19.685(Sn Feed) + 0.5858
Ore Sorter Feed Tin Recovery y=21.131(Sn Feed) + 0.7738
Concentrate Output Sn Grade 62.4%
Concentrator Metal Recovery 74.2%
Cut-off Grade Sn% 0.15%

Table 3 . Open cut pit operating assumptions and modifying factors¹

12

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Input Units Value US$
Topsoil Stripping and Management $/bcm $3.24
Waste Mining (incl D&B) < 1km Haul $/Waste t $1.60
Ore Mining (incl D&B)< 1km Haul $/Ore t $1.87
Additional Cost for Haulage > 1km $/t/100m $0.018
Pit Dewatering $/t/70m depth $0.074
Grade Control Drilling $/Ore t $0.165
Ore Sorter Cost $/Ore Feed t $1.04
Ore Sorter Rejects Disposal $/Rejects t $1.05
Process Plant Costs $/Plant Feed t $16.19
Final Void Rehandle & Shaping $/Waste t $0.77
% of Waste Rehandled into Void % 61%
Pit and DumpRehabilitation $/Total Mined t $0.08
Infrastructure and Tailings Rehabilitation $/Ore t $1.05
General and Administration Costs $/Total Mined t $0.67
Freight $/conc. t $200
Smelting $/conc. t $450
SustainingCapital $/Ore t $1.42
Contingency % of Opex 5%

Table 4 . Open pit optimisation input cost assumptions¹

13

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

==> picture [497 x 286] intentionally omitted <==

Figure 10. Grade tonnage curves for Oropesa Mineral Resource Estimation

Classification of Mineral Resources

  • Resources are in domains that display reasonable to low geological confidence, where blocks are typically within 100m of sample data and bound by the maximum extents of the mineralisation wireframes. These areas require infill drilling to improve the quality of the geological interpretation and local block grade estimates to a level suitable for mine planning. Data quality, geological confidence, sample spacing and the interpreted continuity of grades controlled by the deposit has permitted Measured Group to classify the block model in the Measured, Indicated and Inferred Mineral Resource categories, as follows;

  • Measured Mineral Resources are where block grades are based on multiple drill hole intercepts, where there is typically 20m spacing and where there is good continuity shown by both assay grades and the resource wireframes.

  • Indicated Mineral Resources comprise the blocks the blocks in where there is a reasonable level of geological confidence in well drilled areas of the model and typically up to 70m beyond these areas.

  • Inferred Mineral Resources are in domains that display reasonable to low geological confidence, where blocks are typically within 100 m of sample data and bound by the maximum extents of the mineralisation wireframes. These areas require infill drilling to improve the quality of the geological interpretation and local block grade estimates to a level suitable for mine planning.

14

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

Mining and Metallurgical Methods and Parameters Considered To-date

The assumptions for the mining method involve extraction by traditional truck and shovel operations. Waste rock will be proportionally returned as back fill to the open pit as the mine advances from northwest to southeast. A mining dilution rate of 5% has been included in the assumptions.

An overall geotechnical slope angle of 41 ⁰.

A pilot plant processing study carried out in 2017 achieved tin recovery of approximately 74.2% producing a 62.4% Sn concentrate.

Elementos’ Board has authorised the release of this announcement to the market.

For more information, please contact:

Mr Duncan Cornish Joe David Company Secretary Chief Executive Officer Phone: +61 7 3221 7770 Phone 0419 187 430 [email protected] [email protected]

15

ASX:ELT

==> picture [161 x 18] intentionally omitted <==

ABOUT ELEMENTOS

Elementos is committed to the safe and environmentally conscious exploration, development, and production of its high-grade tin projects. Elementos owns two world class tin projects with large Mineral Resource bases and significant exploration potential in mining-friendly jurisdictions.

Led by an experience-heavy management team and Board, Elementos is positioned as a pure tin platform, with an ability to develop projects in multiple countries. The company is well-positioned to help bridge the significant supply shortfall in coming years. This shortfall is being partly driven by increasing global interest in electrification, green energy, automation, electric vehicles and the conversion to lead-free solders as electrical contacts.

Competent Persons Statement:

The information in this report that relates to Mineral Resources is based on information compiled and reviewed by Mr Chris Grove, who is a Member of the Australasian Institute of Mining and Metallurgy and is a Principal Geologist employed by Measured Group Pty Ltd. Mr Chris Grove has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources. Mr Chris Grove consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.’

ASX Limited has not reviewed and does not accept responsibility for the accuracy or adequacy of this release.

References to Previous Releases

The information in this report that relates to the Mineral Resources and Ore Reserves were last reported by the company in compliance with the 2012 Edition of the JORC Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Mineral Resources, Ore Reserves, production targets and financial information derived from a production target were included in market releases dated as follows:

  • 1 – “Optimisation Study Oropesa Tin Project”, 29[th] March 2022

  • 2 - “Oropesa Tin Project – Mineral Resource Estimate”, 8[th] November 2021

References

McClay, K, Bonora, M: 2001. Analog models of restraining stepovers in strike-slip fault systems. AAPG Bulletin, v 85, No. 2, 27p

The company confirms that it is not aware of any new information or data that materially affects the information included in the market announcements referred above and further confirms that all material assumptions underpinning the production targets [and financial information derived from it, together with all material assumptions and technical parameters underpinning the Ore Reserve and Mineral Resource statements contained in those market releases, continue to apply and have not materially changed.

16

JORC CODE, 2012 EDITION – TABLE 1

SECTION 1 SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections) Mineral Resource Report, Oropesa Tin Project, Spain – 14 February 2023

Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• Samples for this Mineral Resource Estimate have included historical data
used to compile five previous Mineral Resource estimates plus assay data
from a 11 diamond drill hole program completed during 2022.
• Sampling for geochemical assays that were used for this report are from
drilling undertaken from the surface. The assay data used for this updated
resource estimate is predominantly diamond drill core of HQ diameter (316
drill holes) with a small number (4) of reverse circulation holes. The drill holes
have been located by differential GPS with down hole surveys using a Reflex
single shot camera for each drill hole at intervals between 25 – 50m. The drill
holes are plotted on sections oriented perpendicular to the mineralisation, in
a northeast-southwest direction. The sections are located from 20m – 100m
apart allowing interpretation at similar intervals.
• Cassiterite mineralisation at Oropesa is rarely visible to the naked eye.
Historical mineral resource estimates have reported a strong relationship
between tin mineralisation (cassiterite) and sulphide mineralisation. High
levels of oxidation of the sulphide mineralisation to iron oxides has been
observed near the surface (gossans) and within sub-vertical fault zones.
Historical and current drilling data indicates that these highly oxidised zones
can contain significant quantities of tin mineralisation (cassiterite).
Cassiterite mineralisation within the transitional and fresh zones can be
recognised by silicification and leaching of the host sandstones and to a
lesser extent within conglomerates, with finely disseminated to semi-massive
sulphides (pyrite ± arsenopyrite) with late-stage infill colloform and/or vuggy
quartz. Cassiterite mineralisation at Oropesa has also been observed to be
associated with intense silicification, leaching and chlorite alteration of the
host rocks. Physical or chemical weatheringof the fine-grained sulphides
Criteria JORC Code explanation Commentary
has been observed as small voids (pitting) in the host rocks.
• Samples were selected based on visual observations and results from
portable NITON XRF examination of the drill core. Samples were split into half
core with a minimum sample weight of approximately 1kg. All samples have
been prepared and analysed in a certified commercial laboratory.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Eight drilling programs have been completed to date and data from each of
these programs has been used to complete the Mineral Resource estimate.
Six drilling programs from 2010 – 2016 were completed as predominantly HQ
diameter diamond drill (DD) holes, using a double tube recovery barrel. A
small number of reverse circulation (RC) drill holes (12) and RC-DD tail drill
holes (4) were carried out during the early phases of exploration (2012). Only
intercepts from 4 RC drill holes have been employed in the development of
the resource estimation. 46 DD drill holes were completed in 2020-21 with a
further 11 in-fill DD drill holes completed in 2022 for a total number of 320 drill
holes.
• Core drilling in the latest program consisted of PQ pre-collars (85.0mm ID)
and HQ tails (63.5mm ID). Triple tube recovery barrels were employed on the
HQ drilling. Standard diamond drill bits were used. One RC and diamond twin
hole has been completed
• Drilled core is not oriented.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• The maximum drill core extracted was 3.1m. Diamond drill hole core was
logged for geology, mineralisation, core recoveries and RQD. Measurements
were taken systematically downhole between core blocks. Average drill core
recovery from 2010-2016 was 92%. Average drill core recovery from 2020-21
was 98.5%. Average drill core recovery for 2022 was 92.6%.
• The mineralisation occurs predominantly in more porous softer sandstone
units. A mineralisation depth prediction table was used in the 2022 drill
program to assist the drillers in preparing to drill the mineralised zones and
maximise recoveries.
• Visual assessment of the drill core shows that core recovery is variable with
zones of lower recoveries often noted in zones of significant oxidation,

18

Criteria JORC Code explanation Commentary
mineralisation or structure. No clear relationship exists between tin grade
and recovery.
• Triple tube core barrels were used in the 2022 drilling program to enhance
drill core recovery
Logging • Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Geological and geotechnical logging (RQD and core recovery) was carried
out for all core. All data has been entered electronically.
• Qualitative (lithological) and qualitative (geotechnical) logging has been
completed for all core.
• All drill core has been photographed. The 2022 drill core was photographed
both wet and dry. The core is photographed within core boxes, which are
identified by drill hole number and start and finish depths. Drill run depths are
marked on core blocks.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-
half sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• Whole core was split using a core saw operated by trained Company
personnel. The samples were recorded and submitted to an ISO-accredited
ALS facility in Seville for preparation. Prior to 2020 the ALS facility followed
procedure PREP-31 to weigh, dry and crush samples, and then take a further
250g split to be further pulverised so that >85% passed through a 75 micron
mesh. Prepared samples were sent to ALS Laboratory, Vancouver, Canada
for analysis. For the 2020-21 and 2022 drilling programs the ALS facility in
Seville followed procedure CRU-31 to weigh, dry and crush the samples
where 70% <2mm. A 1000g sample was split and pulverised to 85% passing 75
microns. Prepared samples were sent to the ALS laboratory in Galway,
Ireland for analysis.
• Duplicate samples were selected from the prepared samples for analysis by
ALS as part of the internal QAQC procedures
Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
• ALS Vancouver analysed the pre-2020 samples for tin by glass fusion X-Ray
fluorescence (XRF)
• ALS, Galway, Ireland, analysed the 2020-21 and 2022 samples for tin by
peroxide fusion, ICP-AES (ME-ICP81X).

19

Criteria JORC Code explanation Commentary
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• Routine industry standard QAQC procedures have been in place following
drill hole ORPD059 (drilled in 2011). 82% of drill hole intersections within the
mineralisation wireframes are supported by QAQC data. The samples
collected prior to the implementation of QAQC procedures were prepared
and analysed at the same ALS laboratory facilities (Seville and Vancouver),
and mineralised intersections and grade distributions are visually
comparable to adjacent data supported by QAQC procedures (up until 2016).
• From 2011 to 2016 the QAQC procedures featured the insertion of field blanks,
CRM samples and duplicates, at a combined rate of approximately 6% in
every batch sent to the laboratory. QAQC procedures for the 2020-21 and
2022 programs featured the insertion of accredited standards and blanks at
an insertion rate of approximately 5% in every batch to the laboratory.
• ALS Galway selected sample repeats for the 2020-21 and 2022 programs in
accordance with their internal procedures.
• A limited number of samples from the 2020-21 program were submitted for
check assay for tin by XRF. A total of 46 samples were submitted from the
2020-21 and 2022 programs for laboratory comparison of the ICP-AES method.
Measured Group considers the assay data from the drill core to be accurate,
based on the generally accepted industry standard practices, and are
suitable for use in the geological resource estimate.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• A number of site visits were made to the project area by SRK (UK) in the
preparation of the previously reported geological resource estimates. For the
2021 and current report, Company representatives and Measured Group
personnel have made numerous site visits which has entailed a review of
exploration procedures, detailed examination of historical drill core, site
inspections, define and modify geological modelling concepts and
procedures and collect relevant information from on-site personnel.
• The geological logging and drilling program supervision is being carried out
by the Company’s Senior Geologist and experienced personnel. The drilling
program is controlled by the Company’s Competent Person
• Drill core is available for verification at the Company’s facilityin Fuente

20

Criteria JORC Code explanation Commentary
Obejuna, Spain.
• No twinned holes have been drilled in the 2022 drilling program.
• Geological data is recorded on laptop computers onto a standardized Excel
logging template employing the Company’s coding system. Data is uploaded
on a daily basis onto a commercial “cloud” data storage system.
• No adjustment has been made to the original assay data as received from
ALS.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill collars have been located using a differential GPS. The drill holes not
previously surveyed by this method in the historical geological resource
estimates were picked up during the 2020-21 drilling program.
• Downhole surveys (dip and azimuth) have been collected using a single shot
tool. Measurements were made at 25 – 50m intervals, depending on ground
conditions.
• Drill hole survey data is recorded in the 1989 ETRS Spanish Datum (ETRS89)
and ED50 Datum.
• The level of topographic control is from a photogrammetry survey completed
in 2021 which has an accuracy of ± 10cm.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
• The drilling pattern is sufficiently dense to establish geological and grade
continuity for the geological resource at a reasonable level of confidence.
Drill holes are oriented perpendicular to the strike of the known
mineralisation.
• Tin grade within the Oropesa deposit varies throughout the deposit and
appears as higher and lower grade patches within the deposit. Lateral
continuity and trends are not as predictable as grade trends between top to
bottom contacts of the mineralisation. The nature of the style of the
mineralisation, being a replacement deposit, suggests by virtue of that style,
that the continuity of the mineralisation is determined by the frequency of
structural conduits intersecting the more favourable lithological units
(sandstones),the distance that the mineralisingfluids have travelled from the

21

Criteria JORC Code explanation Commentary
structural conduits and the prevailing conditions within the host rocks.
• Closer drill hole spacing makes resource continuity and grade prediction
easier. For Oropesa, the grade variability between drill holes will be greater
than down the drill holes. To counter this variability and regions of lower drill
hole spacing, a downhole sample composite of 2m has been used to better
determine grade variability laterally and vertically within the deposit.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Where applicable, drill hole orientation is approximately perpendicular to
known mineralisation. Drill holes are typically angled between 45⁰and 85⁰
from horizontal. Intersection angles with the mineralisation range from 45⁰to
perpendicular.
• The orientation of the drilling is not considered to have introduced any bias to
the sample data or resource estimate.
Sample
security
• The measures taken to ensure sample security. • Transport of core samples to the ALS preparation facility in Seville is carried
out by Company personnel. All drill core and crushed reject samples are
stored in the Company’s secure warehouse facility in Fuente Obejuna, Spain.
The warehouse has restricted access to Company personnel only and is
connected to the local police by a security alarm system.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • Data used in previous resource estimates was validated by SRK (UK).
Validation checks on the 2020-21 and 2022 data were carried out by Company
and Measured Group personnel. Data was excluded or corrected as
considered appropriate. Measured is confident that the excel database is an
accurate reflection of the drilling and sampling data.

22

SECTION 2 REPORTING OF EXPLORATION RESULTS

Geological Resource Report, Oropesa Tin Project,

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.

Elementos Limited announced to the ASX the acquisition of Minas De Estaño
De España, SLU (“MESPA or the Company”) from TSX-V listed Eurotin Ltd on
31 July 2018: (Acquisition of the Oropesa Tin Project)

MESPA has registered title to the Oropesa project property with the
Andalucia mining authorities (Permit number 13.050), under the Spanish
Mining Act. The property is a 13km² concession in Andalucía, southern
Spain, located 75 km northwest of Cordoba and 180 km northeast of Seville.
In April 2022 the Company filed an updated Exploitation Permit application,
Environmental Impact Study and Restoration plan with the Andalucian
authorities for the Oropesa property. Under Spanish Law an Exploitation
Concession is granted for a 30-year period and may be extended for two
further periods of 30 years each and up to a maximum of 90 years.
Completing and filing the Exploitation Application prior to the expiration of
the Investigation Permit allows the Company to remain in compliance with
its title for the Oropesa property
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties.
Instituto Geológico y Minero de España (“IGME”) conducted an exploration
program in southern Spain between 1969–1990, including geological
mapping and geochemical surveys, which led to the discovery of tin on the
Oropesa property in 1982. Additional tin exploration targeted Oropesa and
the neighbouring La Grana property during 1983–1990, which included
further mapping, stream sediment sampling, geochemical soil sampling,
geophysical surveys, trenching and initial drilling.
Geology • Deposit type, geological setting and style of mineralisation.
The Oropesa deposit is characterised by replacement-style tin
mineralisation (cassiterite and minor stannite) occurring mainly at
sandstone-conglomerate contacts in the Peñarroya Basin, a Carboniferous
basin formed during the Hercynian/Variscan Orogeny. Reactivation of syn-
sedimentaryand basin-controllingfaults has resulted in complex,folded

23

Criteria JORC Code explanation Commentary
geometries. Subordinate fault-hosted mineralisation is also present.
Drill hole
Information
• A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information
is not Material and this exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain why this is the case.
• This report is an update of five previous geological resource estimates. Listing
all the detailed material pertaining to the historical reports and for this update
would not add any further material understanding of the deposit and
geological resource. No detailed exploration results are included in this
report.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• Weighted averaging based on core length and tin grade has been applied to
compositing drill hole assay data.
• A top-cut of 10% Sn has been applied to the high grade assays. No bottom
cut-off grade has been employed.
• No metal equivalent values are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect(eg‘down hole length,true width not
• This report is based on analytical data from ALS, Seville on drill core analyses
only. All drill core analytical data used in this report are based on downhole
widths only.
• The drill holes have been targeted to intersect the mineralisation
perpendicular to the known mineralisation boundaries.
• Drill holes are typicallyangled between 45⁰and 85⁰from horizontal.

24

Criteria JORC Code explanation Commentary
known’). Intersection angles with the mineralisation range from 45⁰to perpendicular.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.

n/a
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.

n/a
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminatingsubstances.

n/a
Further work • The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• The potential for additional replacement and structurally controlled
mineralisation remains open along strike and around the margins of the deposit.
Several north-northwest/south-southeast trending IP geophysical anomalies
are located sub-parallel to the main mineralised zone within the licence
boundaries. Measured Group notes that the geological model used to guide the
development of the mineralisation wireframes has significant implications for
exploration in the immediate vicinity as well as within the surrounding district.

25

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

Geological Resource Report, Oropesa Tin Project,

Criteria JORC Code explanation Commentary
Database
integrity
• Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for
Mineral Resource estimation purposes.
• Data validation procedures used.

SRK (UK) performed a number of database validation checks on the
Company’s digital database for all drill hole data used to estimate the
previous resource estimations. All new data from the 2020-21 and 2022
exploration programs has undergone a series of validation checks by
Company and Measured Group personnel. No material issues have been
identified in the final database.
Site visits • Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.
• If no site visits have been undertaken indicate why this is the case.

For the historical estimates SRK (UK) completed two site visits, in 2012 and
2015. The Competent Person for this report carried out a site inspection in
February 2020. The site visit was used to review exploration procedures,
examine the site, inspect select drill core examples, interview personnel and
any other relevant information. No site visits were made during the 2020-21
drilling campaign due to the restrictions on international travel and
additional implications from the advent of the COVID-19 pandemic in March
2020. Site visits were made during the 2022 drilling campaign by Company
personnel.
Geological
interpretation
• Confidence in (or conversely, the uncertainty of) the geological interpretation
of the mineral deposit.
• Nature of the data used and of any assumptions made.
• The effect, if any, of alternative interpretations on Mineral Resource
estimation.
• The use of geology in guiding and controlling Mineral Resource estimation.
• The factors affecting continuity both of grade and geology.

Mineralised boundaries for the current resource estimate have been
determined primarily on tin grade whilst honouring the significance of
lithological boundaries and structural corridors on tin mineralisation
continuity. Top and bottom of mineralised horizons have been determined
by a lower grade cut-off of 0.05% Sn to assist in the development and
continuity of the wireframe external and internal boundaries. Company
personnel created 3D solid wireframes from selected intervals using the
Wireframe feature in Micromine Software.
Dimensions • The extent and variability of the Mineral Resource expressed as length (along
strike or otherwise), plan width, and depth below surface to the upper and
lower limits of the Mineral Resource.

The mineralisation has been modelled from 16 separate features (domains).
Each feature is continuous based on mineralisation (Sn grade) continuity,
lithological and structural controls and zones of intensive pervasive

26

Criteria JORC Code explanation Commentary
alteration (limited use).
Estimation and
modelling
techniques
• The nature and appropriateness of the estimation technique(s) applied and
key assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and parameters used.
• The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.

For this resource estimate, Measured Group has completed the following:
o
modelled the tin mineralisation horizons as a series of domains in
3D using Leapfrog and Vulcan Software;
o
created 2m composite samples for each drill hole per intersected
domain and undertaken statistical analysis of these;
o
reviewed the sample composite data for grade outliers- based on
histogram analysis, a top cut of 10% Sn was applied and no bottom
cut was applied
o
undertaken geostatistical analyses to determine appropriate
interpolation algorithms;
o
undertaken a Quantitative Kriging Neighbourhood analysis to test
the sensitivity of the interpolation parameters;
o
interpolated tin grades and density data into the block model using
Leapfrog and Vulcan Software;
o
visually and statistically validated the estimated block grades
relative to the original sample results; and
o
reported the geological resource according to the terminology,
definitions and guidelines given in the JORC Code.

In comparison to the Measured Group 2021 resource estimate for the
project, which was comprised of Measured, Indicated and Inferred
categories, Measured has upgraded the resource by:
o
an increase in the Measured category and conversion of a
significant portion of the Inferred category to Indicated primarily
due to new infill drilling confirming the continuity of the geology
and mineralisation within specifically targeted areas of the deposit;

No by-products have been estimated as part of this resource estimate
although the data has been assayed and resides in the company resource
database..

No deleterious elements have been estimated for the resource estimate
although the data has been assayed and resides in the company resource
database.

27

Criteria JORC Code explanation Commentary
• The assumptions made regarding recovery of by-products.
• Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
• In the case of block model interpolation, the block size in relation to the
average sample spacing and the search employed.
• Any assumptions behind modelling of selective mining units.
• Any assumptions about correlation between variables.
• Description of how the geological interpretation was used to control the
resource estimates.
• Discussion of basis for using or not using grade cutting or capping.
• The process of validation, the checking process used, the comparison of
model data to drill hole data, and use of reconciliation data if available.

Block dimensions are 2x2x2m. These dimensions were chosen to be similar
to the down hole sample spacing. This dimension was chosen to enable a
more realistic mining schedule to be developed in the next phase of work.

Selective mining units have not been modelled as part of this Mineral
Resource estimate.

No significant correlation relationships were found between modelled
variables during raw statistical analysis (between tin and density results)

The limits on the block model domains are constrained by a 0.05% tin cut-off
grade, and lithological and structural wireframes that represent the complex
tectonic and lithological nature of the deposit.

Based on histogram analysis, a 10% Sn high grade cut-off was used. No low
grade cut-off was used.

Visual checks were carried out along sections and in 3D to compare model
block grades with drill hole data. Mean model grades were compared with
mean sample grades along a series of pre-defined sections, as presented on
validation plots. Block estimate grades were also compared to the mean of
the composite samples and Measured has accepted the grades in the block
model based on the visual, sectional and validation results.
Moisture • Whether the tonnages are estimated on a dry basis or with natural moisture,
and the method of determination of the moisture content.

Tonnages are estimated on a dry basis

28

Criteria JORC Code explanation Commentary
Cut-off
parameters
• The basis of the adopted cut-off grade(s) or quality parameters applied.
Measured Group has applied basic economic considerations to determine
which portion of the block model has reasonable prospects for economic
extraction by open-pit mining methods. To do this the geological resource
has been subject to a high-level pit optimisation study to assist with
determining the potential depth to which an open pit operation could be
considered viable and reported above a suitable cut-off grade for resource
reporting.

The mine planning exercise for this updatedMineral Resource envisages a
medium-sized open pit operation to a depth of approximately 230m. A cut-off
grade of 0.15% Sn was considered appropriate.
Mining factors
or assumptions
Metallurgical
factors or
assumptions
• Assumptions made regarding possible mining methods, minimum mining
dimensions and internal (or, if applicable, external) mining dilution. It is
always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential mining
methods, but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
• The basis for assumptions or predictions regarding metallurgical amenability.
It is always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential
metallurgical methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting Mineral
Resources may not always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the metallurgical assumptions

The assumptions for the mining method involve extraction by traditional
truck and shovel operations. Waste rock will be proportionally returned as
back fill to the open pit as the mine advances from northwest to southeast. A
mining dilution rate of 5% has been included in the assumptions.

A tin price of US$30,000/t has been employed.

29

Criteria JORC Code explanation Commentary

30

Criteria JORC Code explanation Commentary
Environmental
factors or
assumptions
• Assumptions made regarding possible waste and process residue disposal
options. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider the
potential environmental impacts of the mining and processing operation.
While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the

Waste rock will be placed in waste dumps adjacent to the open pit and be
placed as incremental back-fill within the open pit as operations permit.

Tailings from the processing plant will be stored in two separate facilities
(sulphide bearing and clean).

Measured is not aware of any environmental factors that would preclude
the reporting of this updated Mineral Resource estimate.

31

Criteria JORC Code explanation Commentary
status of early consideration of these potential environmental impacts should
be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
Bulk density • Whether assumed or determined. If assumed, the basis for the assumptions.
If determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness of the samples.
• The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
• Discuss assumptions for bulk density estimates used in the evaluation
process of the different materials.

Approximately 2,700 density measurements have been taken across the
deposit. The data has been separated into fresh, transition and oxide zones
based on observations made during drill core logging.

The density data was collected using the weigh in air/weigh in water
method.
Classification • The basis for the classification of the Mineral Resources into varying
confidence categories.
• Whether appropriate account has been taken of all relevant factors (ie
relative confidence in tonnage/grade estimations, reliability of input data,
confidence in continuity of geology and metal values, quality, quantity and
distribution of the data).
• Whether the result appropriately reflects the Competent Person’s view of the
deposit.
• Resources are in domains that display reasonable to low geological
confidence, where blocks are typically within 100m of sample data and bound
by the maximum extents of the mineralisation wireframes. These areas
require infill drilling to improve the quality of the geological interpretation and
local block grade estimates to a level suitable for mine planning. Data quality,
geological confidence, sample spacing and the interpreted continuity of
grades controlled by the deposit has permitted Measured Group to classify
the block model in the Measured, Indicated and Inferred Mineral Resource
categories, as follows;
• Measured Mineral Resources are where block grades are based on multiple
drill hole intercepts, where there is typically 20m spacing and where there is
good continuity shown by both assay grades and the resource wireframes.
• Indicated Mineral Resources comprise the blocks the blocks in where there
is a reasonable level of geological confidence in well drilled areas of the
model and typically up to 70m beyond these areas.
• Inferred Mineral Resources are in domains that display reasonable to low
geological confidence, where blocks are typically within 100 m of sample
data and bound by the maximum extents of the mineralisation wireframes.
These areas require infill drilling to improve the quality of the geological

32

Criteria JORC Code explanation Commentary
interpretation and local block grade estimates to a level suitable for mine
planning.

This classification was prepared by and reflects the views of the Competent
Person.
Audits or
reviews
• The results of any audits or reviews of Mineral Resource estimates.
No audits or reviews of historical Mineral Resource Estimates were carried
out.
Discussion of
relative
accuracy/
confidence
• Where appropriate a statement of the relative accuracy and confidence level
in the Mineral Resource estimate using an approach or procedure deemed
appropriate by the Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the relative accuracy of
the resource within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors that could affect
the relative accuracy and confidence of the estimate.
• The statement should specify whether it relates to global or local estimates,
and, if local, state the relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation should include
assumptions made and the procedures used.
• These statements of relative accuracy and confidence of the estimate should
be compared with production data, where available.

The Oropesa deposit is an open pit mining target which is at a relatively
advanced stage of drilling and geological understanding. Selective in-fill
drilling from surface and updated geological interpretation and modelling in
3D has added further confidence to the local scale geometry of the
mineralisation and grade distributions in the resource model.

33