Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ELEMENTOS LIMITED Capital/Financing Update 2022

Sep 28, 2022

64837_rns_2022-09-28_c40d9763-4b90-4ae6-8608-7b206329ce72.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Elementos Limited Level 7, 167 Eagle St ABN 49 138 468 756 Brisbane Queensland 4000 ASX: ELT Phone +61 (0)7 2111 1110 elementos.com.au [email protected]

==> picture [185 x 76] intentionally omitted <==

29 September 2022

ASX RELEASE

Metallurgical upgrades and conventional tin flowsheet confirmed for Oropesa Project’s Definitive Feasibility Study.

Highlights

  • Pilot-scale metallurgical test work confirms conventional and modern tin flowsheet for Oropesa Project, producing high-grade commercial tin concentrate

  • Robust metallurgical upgrades and flow sheet confirmed from a representative bulk sample to set the basis of the Oropesa DFS

  • Mineralogy confirms Oropesa is cassiterite tin-bearing mineral (>99%), with <0.5% stannite in ore.

  • All physical test work completed; final reporting of pilot and variability test work underway

  • Elementos will continue commercial offtake discussions based on concentrate specifications derived from pilot scale results.

Elementos Limited’s (ASX: ELT) pilot scale metallurgical test work program has successfully confirmed ore from its flagship Oropesa Project in Spain can be processed via a conventional tin flow sheet to produce a high-grade and commercially desirable tin concentrate.

Testing at Wardell Armstrong International’s (WAI) laboratory in Cornwall, UK used a large representative bulk sample sourced from the Oropesa Tin Project in Andalucía, Spain. Metallurgical upgrade results from the pilot plant have confirmed the project’s Definitive Feasibility Study (DFS) flow sheet, which will now be further matured with process engineering contractor Duro Felguera, which was recently awarded the ECI Mineral Process Plant Contract[1] .

The flow sheet encompasses crushing and grinding, sulphide flotation, a gravity tin recovery circuit, tin flotation recovery circuits and magnetic separation (see Figure 2). The pilot plant test work program has confirmed robust average metallurgical upgrade factors, summarised in Table 1 below.

Plant
Feed
%
Concentrate
Grade
%
Tin Concentrate
Plant Recovery
%
Tin (Sn)
0.46
61.4
74.1
Iron (Fe)
12.85
4.9
Total sulphide (Stot)
5.02
3.2
Lead(Pb)
0.04
0.2

Table 1: Pilot Plant Metallurgical Upgrade Results

1 ASX: 20 Sept 2022 - Process Plant contract awarded Oropesa Tin Project

ASX:ELT

TOMORROW’S TIN

Elementos confirms production of a commercially appealing >61% tin concentrate with low impurity specifications. The company, as previously detailed, is engaged with a number of tin smelters and traders and will further progress commercial offtake discussions based on achieving these grades on a pilot-scale basis.

Metallurgical upgrade factors are based on a representative bulk sample which has been confirmed as representative of the ore for the project on the following criteria: spatial distribution, ore domain, averagegrade, weathering and geology. Summarized as follows:

  • Spatial locations of the individual samples used in the bulk sample provide sufficient coverage of the potential open pit;

  • Proportions of the weathering types used in the bulk sample are generally representative of the proportions of the total mineable resource;

  • Samples are considered representative of a range of mineralised domains with the greatest number of samples coming from the largest mineralised domains (by tonnage); and

  • Average grade of the bulk sample (0.46% Sn) is consistent with the estimated average deposit grade being fed into the plant.

==> picture [489 x 230] intentionally omitted <==

Figure 1: Oropesa Long Section Showing Block Model, Optimisation Study Pit Shell and Sample Locations

In addition to the summarised overall metallurgical upgrade and flowsheet information, test work has again confirmed, via mineralogy tests, that Oropesa tin ore is hosted in cassiterite (>99%) mineralisation, with only the minor quantities of tin (<1%) hosted in stannite. Cassiterite is the ‘economic’ form of tin mineralisation, with stannite being a difficult tin mineral to recover. This aligns with and confirms the findings from previous mineralogy test work on the deposit.

2

ASX:ELT

TOMORROW’S TIN

Elementos Managing Director Joe David said the company was pleased with the robust metallurgical upgrades achieved in Oropesa test work.

“After a prolonged yet detailed metallurgical program Elementos is very pleased to be able to release these robust metallurgical results. These results confirm the DFS flowsheet for the project with a production of a commercially appealing, high grade and low impurity, tin concentrate of around 61% Tin. The resulting concentrate is not only low in impurities but is confirmed to be produced with economic average recoveries above 74%, using a conventional and modern tin concentrate process flow sheet.

“This pilot scale flowsheet is now the basis for the DFS. We are pleased that this test work has built-on the core flowsheets from previous test work programs, with only minor optimisation changes being made during this program to creating a more robust flowsheet and concentrate product.

“The flow sheet from this test work will now be provided, under the ECI contract, to Duro Felguera who we will work alongside to mature the process engineering through the DFS design gates and into an EPC delivery contract.”

Mr David said the high-grade concentrate specifications produced would serve ongoing commercial offtake discussions with smelters and traders.

“The feedback on the concentrate to date has been very positive and we will continue to mature commercial discussions,” he said.

3

==> picture [186 x 76] intentionally omitted <==

Elementos Limited Level 7, 167 Eagle St ABN 49 138 468 756 Brisbane Queensland 4000 ASX: ELT Phone +61 (0)7 2111 1110 elementos.com.au [email protected]

==> picture [731 x 395] intentionally omitted <==

Figure 2: Simplified Oropesa Tin Project DFS process flowsheet

Elementos Limited Level 7, 167 Eagle St ABN 49 138 468 756 Brisbane Queensland 4000 ASX: ELT Phone +61 (0)7 2111 1110 elementos.com.au [email protected]

==> picture [185 x 76] intentionally omitted <==

Elementos’ Board has authorised the release of this announcement to the market.

For more information, please contact:

Mr Duncan Cornish Mr Joe David Company Secretary Managing Director Phone: +61 7 3221 7770 Phone +61 7 2111 1110 [email protected] [email protected]

ABOUT ELEMENTOS

Elementos is committed to the safe and environmentally conscious exploration, development, and production of its global tin projects. The company owns two world class tin projects with large resource bases and significant exploration potential in mining-friendly jurisdictions. Led by an experienced-heavy management team and Board, Elementos is positioned as a pure tin platform, with an ability to develop projects in multiple countries. The company is well-positioned to help bridge the forecast significant tin supply shortfall in coming years. This shortfall is being partly driven by reduced productivity of major tin miners in addition to increasing global demand due to electrification, green energy, automation, electric vehicles and the conversion to lead-free solders as electrical contacts.

Competent Persons Statement:

The information in this report that relates to the Annual Mineral Resources and Ore Reserves Statement, Exploration Results and Exploration Targets is based on information and supporting documentation compiled by Mr Chris Creagh, who is a consultant to Elementos Ltd. Mr Creagh is a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and who consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Chris Creagh has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012).

The information in this announcement that relates to Metallurgical Results is based on and fairly reflects, information compiled by James Turner, a Competent Person who is a Member of the Institute of Materials, Minerals and Mining who was a consultant of Wardell Armstrong International. Mr Turner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the metallurgical test work activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). The Company confirms that the form and context in which the information is presented has not been materially modified and it is not aware of any new information or data that materially affects the information included in the relevant market announcements, as detailed in the body of this announcement.

The Australian Securities Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release.

References to Previous Releases

The information in this report that relates to the Mineral Resources and Ore Reserves were last reported by the company in compliance with the 2012 Edition of the JORC Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Mineral Resources, Ore Reserves, production targets and financial information derived from a production target were included in market releases dated as follows:

ASX:ELT

TOMORROW’S TIN

  • 1 – “Oropesa Tin Project Mineral Resource Estimate”, 8[th] November 2021

  • 2 – “Oropesa Tin Project additional mineralisation”, 16[th] March 2022

  • 3 – “2022 Oropesa Drilling Program Commences”, 26[th] June 2022

  • 4 – “Optimisation Study Oropesa Tin Project”, 29[th] March 2022

The company confirms that it is not aware of any new information or data that materially affects the information included in the market announcements referred above and further confirms that all material assumptions underpinning the production targets and all material assumptions and technical parameters underpinning the Ore Reserve and Mineral Resource statements contained in those market releases continue to apply and have not materially changed.

6

ASX:ELT

TOMORROW’S TIN

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

Pilot Plant Metallurgical Test Work, Oropesa Tin Project, Spain – September 2022 – Wardell-Armstrong

Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
Approximately 2.87 tonnes of sample was collected for laboratory scale and pilot
plant scale test work, comprising HQ and PQ diameter half core samples from
147 exploration drill holes that were in secure storage from historical drilling
campaigns carried out between 2010 and 2016.
The samples were from mineralised intersections that were used to estimate a
Mineral Resource at Oropesa and released to the ASX on 8thNovember 2021 -
“Oropesa Tin Project - Mineral Resource Estimate”.
Approximately 840kg of the sample was set aside for laboratory scale
confirmatory test work. Approximately 2020kg of sample material was processed
using pilot plant scale equipment to produce quantities of concentrate suitable
for downstream test work with a focus on obtaining saleable grade tin
concentrates from tin dressing and tin flotation circuits. The sample underwent
the test work programme at the Wardell-Armstrong Laboratories in Truro, United
Kingdom.
This sample was subjected to a range of tests including:

Head assay

Laboratory scale confirmatory test work including sulphide flotation,
several stages of milling and gravity separation.

Pilot Plant Stage 1 – initial milling, sulphide flotation (roughing followed
by regrinding and two stages of cleaning) and the first stage of gravity
processing

Pilot Plant Stage 2 – screening of Stage 1 gravity tailings, a second
stage of gravity separation followed by regrinding and a third stage of
gravity separation

Pilot Plant Stage 3 – desliming of the tailings produced during Stage

7

ASX:ELT

TOMORROW’S TIN

Criteria JORC Code explanation Commentary
2 processing before the final stage of pilot scale gravity processing

Tin dressing – gravity concentrates blended for the tin dressing circuit
which involved multiple gravity stages, sulphide flotation and magnetic
separation

Tin flotation – Nine rougher flotation tests, eight cleaner flotation tests
and a locked cycle test. Two stage WHIMS magnetic separation and a
final gravity clean on the non-magnetic fraction.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
N/A
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
N/A
Logging • Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
N/A
Sub-sampling
techniques and
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
The drill core samples were submitted as half core following diamond saw
cutting at the Company’s core preparation facility in Fuente Obejuna, Spain. The
samples were selected from analyses of half core samples that were sent for
preparation to ALS Laboratories samplepreparation facilityin Seville,Spain

8

ASX:ELT

TOMORROW’S TIN

Criteria JORC Code explanation Commentary
sample
preparation
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-
half sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
(“ALS Seville”), and then dispatched to ALS Vancouver, Canada (“ALS
Vancouver”) for analysis for tin by glass fusion X-Ray fluorescence (“XRF”).
No duplicate samples were required for the test work programme.
The sample was crushed to 100% passing 2.36mm, thoroughly blended and
homogenised before low temperature drying. The sample was representatively
split into 20kg charges ready for the test work. A sub-sample was taken and
pulverised to 100% passing -75μm before submission for head assay by XRF and
ICP-MS. A representative sub-sample was submitted for quantitative
mineralogical analysis using the Zeiss Mineralogic® system. crushed through a
top size of 25mm and sub-sampled for assay. A single 2kg sub-sample was
crushed to 100% passing 500μm and screened into four size fractions, +125μm, -
125μm +75μm, -75μm +38μm, and -38μm, to confirm the distribution of both mass
and metal in each size fraction.
Quality of
assay data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
The metallurgical pilot plant test work programme was managed by recognised
metallurgical consultants, SCYPI, based in Oviedo, Spain. The test work was
independently carried out by Wardell Armstrong Laboratories in Truro, United
Kingdom.
Sample preparation is covered in the section above
Tin (Sn) was analysed by XRF (fused bead) and wet chemical techniques
No standards or blank samples were supplied for the pilot plant test programme.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Sampling and analytical methods are of a good standard and as such the results
are considered representative of the performance that could be expected from
the application of the process flowsheet developed as a result of the pilot plant
test programme.

9

ASX:ELT

TOMORROW’S TIN

Criteria JORC Code explanation Commentary
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Samples were selected from half drill core that was used in the estimation of a
Mineral Resource that was released to the ASX on 8thNovember 2021 -
“Oropesa Tin Project - Mineral Resource Estimate”and are located within the
open pit shell from the Oropesa optimisation study released to the ASX on 29th
March 2022, “Optimisation Study Oropesa Tin Project”.
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
Samples were composited from mineralised intersections from diamond drill
holes that are spatially representative of the mineralisation throughout the
mineral resource. Sufficient sample was collected to reach the sample size
required to carry out the bulk test.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Where applicable, the drill core has been collected from drill holes that are
oriented approximately perpendicular to known mineralisation.
The orientation of the drilling is not considered to have introduced any bias to
the sample data.
Sample
security
• The measures taken to ensure sample security. The drill core is stored in Company locked facilities in Fuente Obejuna, Spain.
Sample security was supervised by Company, SCYPI and Wardell Armstrong
personnel. All samples were sealed prior to transport. An independent transport
company was used to transport the samples from Oropesa to Truro.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. No audits have been undertaken

10

ASX:ELT

TOMORROW’S TIN

Section 2 Reporting of Exploration Results

Pilot Plant Metallurgical Test Work, Oropesa Tin Project, Spain – September 2022 – Wardell-Armstrong

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Elementos Limited announced to the ASX the acquisition of Minas De Estaño De
España, SLU (“MESPA or the Company”) from TSX-V listed Eurotin Ltd on 31 July
2018: (Acquisition of the Oropesa Tin Project)
MESPA has registered title to the Oropesa project property with the Andalucia
mining authorities (Permit number 13.050), under the Spanish Mining Act. The
property is a 14.51km² concession in Andalucía, southern Spain, located 75 km
northwest of Cordoba and 180 km northeast of Seville. On 10th October 2017 the
Company filed an Exploitation Permit application for the Oropesa property. Under
Spanish Law an Exploitation Concession is granted for a 30-year period and may
be extended for two further periods of 30 years each and up to a maximum of 90
years. Completing and filing the Exploitation Application prior to the expiration of
the Investigation Permit allows the Company to remain in compliance with its
title for the Oropesa property
There are no known litigations potentially affecting the Oropesa Project
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. Instituto Geológico y Minero de España (“IGME”) conducted an exploration
program in southern Spain between1969–1990, including geological mapping and
geochemical surveys, which led to the discovery of tin on the Oropesa property
in 1982.Additional tin exploration targeted Oropesa and the neighbouring La
Grana property during 1983–1990, which included further mapping, stream
sediment sampling, geochemical soils, geophysical surveys, trenching and initial
drilling.
Geology • Deposit type, geological setting and style of mineralisation. The Oropesa deposit is characterised by replacement-style tin mineralisation
(cassiterite and minor stannite) occurring mainly at sandstone-conglomerate
contacts in the Peñarroya Basin, a Carboniferous basin formed during the
Hercynian/Variscan Orogeny. Reactivation of syn-sedimentary and basin-
controlling faults has resulted in complex, folded geometries. Subordinate fault-
hosted mineralisation is also present.

11

ASX:ELT

TOMORROW’S TIN

Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information
is not Material and this exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain why this is the case.
An estimated Mineral Resource for Oropesa was released to the ASX on 8th
November 2021 - “Oropesa Tin Project Mineral Resource Estimate”. Please refer
to this announcement for information related to the geological resource.*1
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
N/A
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (eg ‘down hole length, true width not
known’).
N/A

12

ASX:ELT

TOMORROW’S TIN

Criteria JORC Code explanation Commentary
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
N/A
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
All data and resource estimates have been previously reported.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
Wardell Armstrong International Ltd were requested by Minas de Estaño de
España to conduct a comprehensive pilot plant test work programme on the
Oropesa tin deposit in Spain. The main aim of the testing was to further develop
a process flowsheet that was originally proposed in an initial pilot plant test work
programme completed by Wardell Armstrong in December 2017, which was
released on the ASX on 18thOctober 2019 “Oropesa Presentation – Seville
Spain”. The 2017 pilot plant test programme used samples from drill holes that
were targeted at maximum recovery of mineralised samples. This updated pilot
plant test programme has targeted maximising the amount of tin that can be
recovered from an ore sample that is more representative of the ore that is
located throughout the proposed open pit operation at Oropesa. For the current
exercise, approximately 2.8 tonnes of drill core from 147 drill holes across the
resource was selected for processing. The bulk sample tin head grade was
0.46% Sn, with 5.02% S and 12.85% Fe.
A full metallurgical balance was generated using the mass pulls and recoveries
from the pilot plant work, and the ancillary test work. From this a tin recovery of
74.1% at a combined concentrate of 61.4% Sn was achieved. 60.5% of the
recovered tin came from gravity concentration at a grade of 58-64% Sn, and the
remaining 39.5% came from tin flotation at a grade of 58% Sn. The gravity
concentrate contained 3.5% Fe and 2.9% S, both within concentrate
specification limits. The tin flotation concentrates contained 5.8% Fe and 3.5% S.
Further work • The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Complete the proposed diamond drilling program. Current plan is for a total of
9 drill holes for approximately 1,590m.
• Completion of a new geological resource model
• Converting resources from Inferred to Indicated

13

ASX:ELT

TOMORROW’S TIN

Criteria JORC Code explanation Commentary
• Follow-up exploration drill testing on significant open-ended mineralisation
trends that were identified during the 2021 exploration drilling program

Section 3 Estimation and Reporting of Mineral Resources

n/a

Section 4 Estimation and Reporting of Ore Reserves

n/a

Section 5 Estimation and Reporting of Diamonds and Other Gemstones

14