ELEMENT 25 LIMITED Capital/Financing Update 2022

Jul 27, 2022

64810_rns_2022-07-27_67a240b9-5e94-4896-9aed-79160b0bfe49.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Massive resource - multiple growth pathways…

ASX ANNOUNCEMENT 28 JULY 2022

Dense Media Separation Bulk Trial Achieves 9-30% Grade Uplift on Butcherbird Ores

  • Bulk Dense Media Separation ( DMS ) trial conducted on Butcherbird manganese ores confirms the potential for improved processing using a DMS drum circuit vs ore sorters.

  • Approximately 280 tonnes of material from the current operational areas transported to existing DMS facility for batch processing to evaluate DMS process effectiveness.

  • Programme conducted as part of option evaluation for future plant expansion.

  • Results indicate potential product grade improvement of 9-30%.

  • More consistent separation of ore and waste achieved compared to ore sorters.

  • Potential commercial benefits include a reduction in ore haulage and shipping costs and improvements in payability (achieved price/dmtu) due to higher grades.

  • Butcherbird expansion studies will review options to incorporate a DMS drum in the processing circuit in future planned upgrades to the existing facility.

Element 25 Limited ( E25 or Company ) ( ASX:E25 ) is pleased to

announce that it has completed a bulk trial, processing approximately 280 tonnes of Butcherbird manganese ores through the Dense Media Separation ( DMS ) plant located at the Bootu Creek Manganese Mine in the Northern Territory.

The Bootu Creek Mine is owned by E25’s off-take partner, OM Holdings Limited ( OMH ). The test programme was undertaken in midJune 2022.

The 280 tonne trial parcel, made up of six parcels of between 44 to 49 tonnes each, was transported to the Bootu Creek Manganese Mine via road train for processing through the existing production DMS facility.

==> picture [225 x 225] intentionally omitted <==

Figure 1. Bootu Creek DMS processing plant (ref: DRA Global)

COMPANY SNAPSHOT

Market Summary Board of Directors: ASX code: E25 Seamus Cornelius Chairman Shares on issue: 153M Justin Brown MD Share price: $0.565 John Ribbons NED

Element 25 Limited is developing the world class Butcherbird Manganese Project in Western Australia to produce high quality manganese concentrate and high purity manganese products for traditional and new energy markets.

Element 25 Limited

==> picture [595 x 67] intentionally omitted <==

The six parcels were processed through the DMS drum plant using three different media densities of 2.7, 2.9 and 3.1 g/cm[3] , to provide data on the optimal processing design parameters for Butcherbird material.

The trial results clearly indicate that the use of a DMS drum can meaningfully improve manganese product grades by improving the elimination of waste and gangue materials from the product stream.

Manganese pricing is positively impacted by higher grades and eliminating sub-grade waste material also reduces the overall haulage and shipping costs of transporting the concentrate to market, thereby reducing overall operating costs, .

==> picture [503 x 281] intentionally omitted <==

Figure 2. Butcherbird feed material on the wash screen after densimetric separation showing a clear delineation product and waste.

Trial Programme Results

Six parcels of ore were processed. Sample A consisted of five parcels of low-grade Butcherbird post ore-sorter manganese product with the primary feed material sourced from current operational mining faces to provide material for the test programme. Sample B consisted of a single sample of post- scalper ore which had undergone primary screening for the removal of fines material, with the coarse fraction used for the test programme through the DMS circuit. This was then compared to material from the same parcel of scalped ore which was further processed at Butcherbird via the existing process plant.

Element 25 Limited

==> picture [595 x 67] intentionally omitted <==

The results from the DMS processing of Sample A resulted in the removal of an additional 3.5-7.3% of waste material by weight from the run-of-mine feed that had undergone processing using the current production circuit. All cut densities yielded a similar result with a slightly better result at the highest cut density of 3.1 g/cm[3] .

The net result is an increase in the final manganese grades from 28.3% Mn to up to 30.9% Mn, equivalent to a 9.1% improvement. Importantly this demonstrates that even for material where the ore-sorters struggle to achieve the optimum product grades, the DMS process is likely to deliver a higher product grade.

DMS Density Product Grade Grade Uplift Product Volume Saving compared
to Ore Sorter (%)
(g/cm3) (% Mn) (%)
Ore Sorter Grade - 28.30 -
DMS Grade 2.7 30.84 9.0 3.5
2.9 30.85 9.0 4.5
3.1 30.88 9.1 7.3

Figure 3. DMS test results for Sample A

Sample B comprised sub-grade material which was treated using two different methods. The bulk of the parcel was processed through the existing plant at Butcherbird, and yielded a below specification grade of 24.4% Mn due to presence of clays and other factors which impacted the effective operation of the ore sorter and its ability to remove the waste material.

The ore sorters work using optical colour sensors which measure the Red-Green-Blue ( RGB ) colour of each feed particle. The sorters classify each particle as either ore or Figure 4. Butchebrird ore post DMS processing waste according to the algorithm that is currently being used. Consequently, it is very important that material is presented as cleanly as possible as any surficial clays or other debris can negatively impact the ore sorter effectiveness.

The DMS process relies on particle density so surface contamination should have only a minor detrimental impact. Importantly and as expected, the DMS plant was not effected by the presence of clays and other surface effects and successfully upgraded the relatively poor ore-sorter result of 24.4% Mn to an significantly improved grade of 32-33.4% Mn depending on the cut density.

Element 25 Limited

==> picture [595 x 67] intentionally omitted <==

As the cut density increases, the product grade increases, also as expected, however there is an associated recovery loss. The optimal density cut is still to be defined, however it is clear from these results that a relatively easily achievable medium density of 2.7 is adequate and the optimal density may be even lower, potentially reducing media costs.

DMS Density Manganese Grade Mn Recovery Rejects Volume Extra Rejects Removed
(g/cm3) (%Mn) (%) (%) compared to Ore Sorting
alone(%)
Scalper Feed - 9.8 - - -
Ore Sorter Feed - 21.5 100.0 - -
Ore Sorter Product - 24.4 82.1 27.8 -
DMS Grade 2.7 32.0 92.2 36.5 8.7
2.9 32.2 88.6 39.7 11.9
3.1 33.4 72.2 59.5 31.7

Figure 5. DMS test results for Sample B

Sample B shows that the use of a DMS circuit can increase the manganese grade by an extra 7.55 to 8.92% by the removal of material which is currently part of the tonnage of waste in the Ore Sorter product. This allows manganese grades to increase from 24.4% Mn to between 32.0 and 33.4% Mn for that material, equivalent to at least a 30% improvement.

Element 25’s, Managing Director Justin Brown, said “ The DMS trial has demonstrated that there are significant potential improvements and costs savings available to Element 25 by using a DMS drum circuit as an alternative to the current ore sorting stage of the manganese processing flow sheet. A modified process including DMS should result in more consistent grades and recoveries which in turn should attract higher premiums on price and reduce operating costs. The Company is currently undertaking engineering work to include a DMS drum in a future plant reconfiguration at Butcherbird .”

Element 25 Limited

==> picture [595 x 69] intentionally omitted <==

About the Butcherbird Manganese Project

E25’s Butcherbird Manganese Project is a world-class manganese resource with current JORC resources of more than 263Mt of manganese ore[1] . In May 2020, the Company completed a Pre-Feasibility Study ( PFS )[2] with respect to developing the deposit to produce manganese concentrate for export to generate early cashflow with a modest capital requirement[3] . Stage 1 of the Project development plan is complete and E25 has commenced shipping ore to offtake partners.

The PFS also highlighted the Project’s potential for significant growth beyond the initial Stage 1 production volumes (the studies examined the potential for a 2X and 3X expansion to Stage 1 within 12 months of initial commissioning), and the Company plans to expedite the expansion of the Project as soon as practicable once final process optimisation work is completed and relevant approvals are in place.

In addition to the concentrate export business, the Company has completed extensive research & development and laboratory test work into the production of high purity manganese products including battery grade manganese sulphate (HPMSM) and High Purity Electrolytic Manganese Metal (HPEMM). The work has highlighted that the Butcherbird ores are highly amenable to an ambient temperature, atmospheric pressure leach process, resulting in a very efficient extraction of the manganese into solution, the key requirement for the cost effective and sustainable production of HPMSM and HPEMM.

The Project straddles the Great Northern Highway and the Goldfields Gas Pipeline, providing turnkey logistics and energy solutions. The Company plans to integrate renewable energy into the power solution over time to target a zero-carbon footprint for the Project, which is expected to also reduce energy costs. A cleaner, lower carbon flowsheet and high penetration renewable energy will place Butcherbird at the forefront of sustainable high purity manganese production.

Mineral Resources

Category Tonnes (Mt) Mn (%) Si (%) Fe (%) Al (%)
Measured 16 11.6 20.6 11.7 5.7
Indicated 41 10.0 20.9 11.0 5.8
Inferred 206 9.8 20.8 11.4 5.9
Total 263 10.0 20.8 11.4 5.9

Notes:

• Reported at a 7% Mn cut-off for the Measured and Indicated categories and an 8% Mn cut-off for the Inferred categories.

• All figures rounded to reflect the appropriate level of confidence (apparent differences may occur due to rounding)

1 Reference: Company ASX release dated 17 April 2019.

2 Reference: Company ASX release dated 19 May 2020.

3 Reference: Company ASX release dated 3 December 2020.

Element 25 Limited

==> picture [595 x 69] intentionally omitted <==

Mining Reserve

Based on the results of the Pre-Feasibility Study completed in May 2020, E25 has published a Maiden Ore Reserve for the Project of 50.55Mt in the Proved and Probable categories[4] .

Classification Tonnes (Mt) Grade (Mn%) Contained Mn (Mt) Recovered Mn (Mt)
Proved 14.4 11.5 1.65 1.35
Probable 36.2 9.8 3.56 2.92
Total 50.6 10.3 5.21 4.27

Justin Brown

Managing Director

Company information, ASX announcements, investor presentations, corporate videos and other investor material in the Company’s projects can be viewed at: http://www.element25.com.au.

Competent Persons Statement

The company confirms that in the case of estimates of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning the estimates in the market announcements dated 17 April 2019 and 19 May 2020 continue to apply and have not materially changed. The company confirms that the form and context in which the competent person’s findings are presented has not been materially modified from the original market announcements.

The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results and Exploration Targets were compiled, Mr Brown was an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to the inclusion of this information in the form and context in which it appears in this report.

This announcement is authorised for market release by Element 25 Limited’s Board of Directors.

4 Reference: Element 25 Limited Reserve Statement lodged with ASX 19 May 2020.

Element 25 Limited

Appendix 1 - JORC Code, 2012 Edition – Table 1 – Butcherbird Project Exploration Drilling

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Sampling techniques Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such

Samples were selected for from cones of product or waste using a hand-held scoop.
The geology of the manganese mineralisation at Butcherbird comprises interlayered bands of
as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not manganese and non manganese clay and shale.
be taken as limiting the broad meaning of sampling. Composite samples for assay were split using a riffle splitter from composite samples collected
Include reference to measures taken to ensure sample representivity and the appropriate from ore-piles using a hand-help scoop to provide a representative sub-sample for assaying.
calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases more explanation may be required,
such as where there is coarsegold that has inherent sampling problems.
Drilling techniques Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails,
N/A. Samples were from mining.
face-samplingbit or other type,whether core is oriented and if so,bywhat method,etc).
Drill sample recovery
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
N/A. Samples were from mining.
samples.
Whether a relationship exists between sample recovery and grade and whether sample bias
mayhave occurred due topreferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource estimation, mining studies and
N/A. Samples were from mining. Geological logging was not relevant to the processing test
work.
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
The total length andpercentage of the relevant intersections logged.
Sub-sampling
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

Samples were from mining. Scooped samples were subsampled for assay using a riffle splitter.
QAQC is limited to the internal lab procedures. Duplicates were not collected for this sampling
techniques and For all sample types, the nature, quality and appropriateness of the sample preparation programme.
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of

The samples are believed to be representative for the purposes for which they were collected.
samples.
Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to thegrain size of the material beingsampled.
Quality of assay data The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.

Samples were assayed using the on-site laboratory via XRF assay processing.
and laboratory tests For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature ofqualitycontrolprocedures adopted(egstandards,blanks,duplicates,external
Criteria JORC Code explanation JORC Code explanation Commentary Commentary
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Verification of The verification of significant intersections by either independent or alternative company
personnel.
N/A. Samples were from mining.
sampling and assaying
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
Location of data Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Sample locations were taken from the operational mining faces within the current pit.
points Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing and
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of geological
N/A. Samples were from mining.
distribution and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositinghas been applied.
Orientation of data in Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type.
N/A. Samples were from mining. Geological horizons are flat lying. Test parcels were from
vertical mining faces.
relation to geological If the relationship between the drilling orientation and the orientation of key mineralised There is no known sample biasing.
structure structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
Sample security The measures taken to ensure sample security. The samples were transported to the site laboratory via a reputable transport company.
Audits or reviews The results of any audits or reviews of sampling techniques and data. No audit was undertaken for this programme.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Mineral tenement and Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native title
The Butcherbird Project consists of granted exploration licenses E52/2350 and 3606 and Mining
Lease M52/1074.
land tenure status interests, historical sites, wilderness or national park and environmental settings. The tenure is 100% owned by Element 25 Ltd.
The security of the tenure held at the time of reporting along with any known impediments
to obtaininga licence to operate in the area.
Exploration done by Acknowledgment and appraisal of exploration by other parties. The historical exploration data has been collected by Element 25 Limited and has been reported
to high standards.
other parties The methods of exploration and techniques used are considered appropriate for the deposit
types sought (Mn)
Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Geology Deposit type, geological setting and style of mineralisation. The geological target is supergene enriched zones of a regional manganiferous subtidal marine
shale.
Drill hole Information A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
These details are provided in tabulated form in the body of this report.
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
Data aggregation In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Widths and grades are reported based on established experience with mining at the Butcherbird
Project which has typically used a 7% resource cut-off for economic mineralisation.
methods Material and should be stated. No top-cut is applied as it is not appropriate for this style of mineralisation.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown in detail.
The assumptions used for anyreportingof metal equivalent values should be clearlystated.
Relationship between If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.
The mineralisation is flat lying. Test parcels were taken from 2m mining faces.
mineralisation widths If it is not known and only the down hole lengths are reported, there should be a clear
and intercept lengths statement to this effect (eg ‘down hole length, true width not known’).
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
N/A. Samples were from existing mining areas.
limited to aplan view of drill hole collar locations and appropriate sectional views.
Balanced reporting Where comprehensive reporting of all Exploration Results is not practicable, representative
reporting of both low and high grades and/or widths should be practiced to avoid
All relevant assays have been reported.
misleadingreportingof Exploration Results.
Other substantive Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey results;
All relevant geological information has been reported.
exploration data bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.
Further work The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
N/A. Samples were from existing mining areas.
Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially
sensitive.