ELEMENT 25 LIMITED — Capital/Financing Update 2021
Dec 12, 2021
64810_rns_2021-12-12_8195aeda-8a0a-4936-a9d9-0377e0ed326a.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
Early cashflow rapid expansion…
ASX ANNOUNCEMENT 13 DECEMBER 2021
Butcherbird Manganese Project – Recommencement of Production Update
-
Logwasher repair and plant engineering modifications nearing completion, processing plant to restart as soon as re-assembly is complete.
-
All replacement parts are on site or in Perth for final engineering activities.
-
Manganese shipment departed on 5 December as scheduled.
-
Processing plant engineering modifications to improve processing efficiencies being completed in parallel with repair works.
-
Pre-processing of material via the scalping screen is ongoing – substantial stocks of material are available for processing on restart.
Element 25 Limited ( E25 or Company ) ( ASX:E25 ) advised on 22 November 2021, the processing plant at the Company’s Butcherbird Manganese Project ( Project ) experienced a logwasher shaft failure on 18 November 2021 which disrupted production.
The Company is pleased to advise that all replacement parts have arrived, associated engineering works are near complete, and final installation activities are underway to allow production to recommence as quickly as possible. The current estimated start-up date is 19 December 2021.
Replacement parts were sourced from the original equipment manufacturer ( OEM ) in Northern Ireland and air-freighted to Australia as planned. As part of the overall risk-management strategy, the failed shaft was also repaired in a local fabrication workshop to provide a temporary interim solution in the case of any unforeseen logistics disruptions. This will not be required, however will provide an emergency replacement option for any similar future incident.
The latest E25 ore shipment left on board the bulk vessel MV Top Fair as scheduled on 5 December 2021.
In parallel with the repair works, a range of modifications have been made to the plant to improve plant access for maintenance, manage material flow through the plant, reduce wear on key components, improve noise and dust control as well as adjusting the overall site layout to increase operational and maintenance scheduling flexibility and throughput.
COMPANY SNAPSHOT
Market Summary Board of Directors: ASX code: E25 Seamus Cornelius Chairman Shares on issue: 153M Justin Brown MD Share price: $1.03 John Ribbons NED
Element 25 Limited is developing the world class Butcherbird Manganese Project in Western Australia to produce high quality manganese concentrate and high purity manganese products for traditional and new energy markets.
Element 25 Limited
==> picture [595 x 67] intentionally omitted <==
Project team focus
E25’s Operations team continues to focus on delivering nameplate production and anticipates achieving nameplate production at Butcherbird by Q1 2022.
The Business Development team is focussing on E25’s multi-stage development strategy, including a Stage 2 expansion of the concentrate business followed by a Stage 3 development to convert the concentrate material into HPMSM for electric vehicle EV batteries to power the global transition away from fossil fuel powered mobility.
Manganese is emerging as an increasingly important ingredient for EV batteries, with potential supply constraints for nickel and cobalt forcing battery manufacturers to look to high manganese cathodes to produce the vast amount of cathode material required by the EV industry in coming years[1] .
The Project is ideally placed to feed this potential demand, with advanced flowsheet development work undertaken in 2019 and 2020 confirming a simple leach process for E25 ores which, when combined with offsets, will target the world’s first Zero Carbon Manganese for EV cathode manufacture[2] .
The Company anticipates releasing a Scoping Study in Q4 2021 prior to the release of the PFS in H1 2022.
Battery EV Penetration Rate Forecast to Increase
As battery electric vehicle (BEV) makers seek to increase the uptake of electric vehicles, one commercial driver is cost reduction. VW's Power Day suggested a 50% cost reduction for batteries with cell design (-15%),
==> picture [248 x 131] intentionally omitted <==
Table 1. Europe BEV sales volumes (m) and penetration (%)
production process (-10%), cathode/anode materials (-20%) and battery systems (-5%) driving the change. Global BEV penetration is expected to rise to 15.2% by 2025 and 39.5% in 2030 – led by Europe and China, according to Morgan Stanley’s latest report[3] . The main driver in the cathode materials is a shift to a high manganese cathode material for the volume production, which is expected to underpin strong demand growth for battery-grade manganese sulphate. Current estimates put demand by 2030 at 13 times current supply and a deficit of 1.3Mt even factoring in planned supply increases[4] .
1 https://thenextavenue.com/2021/01/22/svolt-opens-orders-for-its-nmx-nickel-manganese-batteries/
2 Reference: Company ASX release dated 12 February 2019
3 Morgan Stanley Research published 3 September 2021
4 Euromanganese company presentation dated September 2021
Element 25 Limited
==> picture [595 x 67] intentionally omitted <==
About the Butcherbird Manganese Project
E25’s Butcherbird Manganese Project is a world-class manganese resource with current JORC resources of more than 263Mt of manganese ore[5] . In May 2020, the Company completed a Pre-Feasibility Study ( PFS )[6] with respect to developing the deposit to produce manganese concentrate for export to generate early cashflow with a modest capital requirement[7] . Stage 1 of the Project development plan is complete and E25 has commenced shipping ore to offtake partners.
The PFS also highlighted the Project’s potential for significant growth beyond the initial Stage 1 production volumes (the studies examined the potential for a 2X and 3X expansion to Stage 1 within 12 months of initial commissioning), and the Company expects to expedite the expansion of the Project in 2H FY2022.
In addition to the concentrate export business, the Company has completed extensive research & development and laboratory test work into the production of high purity manganese products including battery grade manganese sulphate (HPMSM) and High Purity Electrolytic Manganese Metal (HPEMM). The work has highlighted that the Butcherbird ores are highly amenable to an ambient temperature, atmospheric pressure leach process, resulting in a very efficient extraction of the manganese into solution, the key requirement for the cost effective and sustainable production of HPMSM and HPEMM.
The Project straddles the Great Northern Highway and the Goldfields Gas Pipeline, providing turnkey logistics and energy solutions. The Company plans to integrate renewable energy into the power solution over time to target a zero-carbon footprint for the Project, which is expected to also reduce energy costs. A cleaner, lower carbon flowsheet and high penetration renewable energy will place Butcherbird at the forefront of sustainable high purity manganese production.
Mineral Resources
| Category | Tonnes (Mt) | Mn (%) | Si (%) | Fe (%) | Al (%) |
|---|---|---|---|---|---|
| Measured | 16 | 11.6 | 20.6 | 11.7 | 5.7 |
| Indicated | 41 | 10.0 | 20.9 | 11.0 | 5.8 |
| Inferred | 206 | 9.8 | 20.8 | 11.4 | 5.9 |
| Total | 263 | 10.0 | 20.8 | 11.4 | 5.9 |
Notes:
• Reported at a 7% Mn cut-off for the Measured and Indicated categories and an 8% Mn cut-off for the Inferred categories. • All figures rounded to reflect the appropriate level of confidence (apparent differences may occur due to rounding)
5 Reference: Company ASX release dated 17 April 2019.
6 Reference: Company ASX release dated 19 May 2020.
7 Reference: Company ASX release dated 3 December 2020.
Element 25 Limited
==> picture [595 x 67] intentionally omitted <==
Mining Reserve
Based on the results of the Pre-Feasibility Study completed in May 2020, E25 has published a Maiden Ore Reserve for the Project of 50.55Mt in the Proved and Probable categories[8] .
| Classification | Tonnes (Mt) | Grade (Mn%) | Contained Mn (Mt) | Recovered Mn (Mt) |
|---|---|---|---|---|
| Proved | 14.4 | 11.5 | 1.65 | 1.35 |
| Probable | 36.2 | 9.8 | 3.56 | 2.92 |
| Total | 50.6 | 10.3 | 5.21 | 4.27 |
Justin Brown
Managing Director
Company information, ASX announcements, investor presentations, corporate videos and other investor material in the Company’s projects can be viewed at: http://www.element25.com.au.
Competent Persons Statement
The company confirms that in the case of estimates of Mineral Resource or Ore Reserves, all material assumptions and technical parameters underpinning the estimates in the market announcements dated 17 April 2019 and 19 May 2020 continue to apply and have not materially changed. The company confirms that the form and context in which the competent person’s findings are presented has not been materially modified from the original market announcements.
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Justin Brown who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results and Exploration Targets were compiled, Mr Brown was an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brown consents to the inclusion of this information in the form and context in which it appears in this report.
This announcement is authorised for market release by Element 25 Limited’s Board of Directors.