ASX RELEASE

15 December 2011

ASX CODE: MZM ISSUED SHARES: 67.41M 52 WEEK HIGH: $0.95 52 WEEK LOW: $0.25

CONTACT:

JUSTIN BROWN Managing Director +61 438 745 675

BOARD:

Seamus Cornelius: Chairman Justin Brown: MD John Ribbons: Non-Exec

KEY PROJECTS:

BUTCHERBIRD (100%) Manganese, Copper

PEAK HILL (85-100%) Gold

DURACK (earning 85%) Gold, Copper

MT PADBURY (100% of gold) Gold, Manganese, Iron

KEY SHARE POSITIONS:

AUVEX MANGANESE LTD 3,750,000 FPO Shares

BUXTON RESOURCES LTD 3,760,000 FPO Shares

LITHEX RESOURCES LTD 1,525,000 FPO Shares

EXTERRA RESOURCES LTD 2,000,000 FPO Shares

==> picture [172 x 23] intentionally omitted <==

DSO MANGANESE POTENTIAL CONFIRMED AT BUTCHERBIRD MANAGANESE PROJECT

  • Six potential DSO localities identified with five tested in current programme via bulk sampling using scraping and trenching.

  • Mn grades of +40% Mn achieved at key, larger tonnage localities.

  • Test work emulated simple mining and mobile processing method, with very low capital requirements and operational risk.

  • Further work to be undertaken in 2012 to confirm DSO surface deposits size, recoveries and product grades.

The Company is pleased to advise that results have been received for a bulk sampling programme recently completed at the Butcherbird Manganese Project. The programme targeted five of six identified sites with potential for Direct Ship Ore (“DSO”) surface mineralisation grading 40% Mn.

The test work was undertaken to determine if these occurrences could complement the global JORC resources by providing early production material with low capital and operational costs with the benefit of minimal processing requirements.

Two sampling techniques were used; scraping, which removed the top 0.1m of material and trenching, which sampled the underlying 0.2-0.3m of material. Summary results are as follows:

Area/RawMaterial Type Exploration Target(t) Mn ProductType Est.Yield (%) ProductGrade %Mn
Cadgies Flats /Scrapings 30,000 - 50,000 Lump DSO 57% 40-42
Cadgies Flats /Trench 10,000 - 20,000 Lump DSO 46% 40-42
Bindi Bindi Hill /Scrapings 200,000 - 400,000 Lump DSO 59% 40-42
Bindi Bindi Hill /Trench 50,000 -100,000 Lump DSO 20% 40-42
Budgie Hill /Scrapings 60,000 - 100,000 Lump DSO 72% 40-42
Illgararie Hill /Scrapings 50,000 - 80,000 Lump DSO 61% 40-42
Illgararie Hill /Trench 10,000 - 30,000 Lump DSO 32% 40-42
TOTAL 410Kt – 780Kt Lump DSO 55% 40-42%
Table 1:Summary results and Exploration Target estimates for DSO lumpmanganese products from several surface deposits at Butcherbird.

**It should be noted that the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a Mineral Resource, and that it is

uncertain if further exploration will result in the determination of a Mineral Resource.

==> picture [172 x 22] intentionally omitted <==

The surface detrital manganese deposits are separate to the previously reported JORC resources. The manganese discussed herein occurs as unconsolidated slabs of platy and botryoidal manganese, which have been subjected to tertiary upgrading via surface weathering.

The test work completed on the samples, which were collected in October of 2011, involved screening, washing and crushing only. No gravity separation techniques were applied. These test results are inclusive of both screened natural lump and crushed oversize (+6mm/-32mm) material.

Results to date suggest that a DSO lump product is achievable from these areas via simple surface mining, washing, screening and crushing, yielding the specifications, ≥ 40% Mn, <0.1% P, <15% SiO2, and <7% Fe. The significant tonnages of DSO ore which could be potentially recovered from these deposits represents important short term manganese inventories which are expected to enhance the projects commercial outcome.

The envisaged production from these areas is in addition to the work currently being completed as part of the Feasibility Study that is looking at long term production of up to 1Mt of manganese ore from the existing JORC resources.

Composite ID Area Raw Material Type Mn Product Type Yield % Mn % Fe % P % SiO2 %
BTD001-3 Cadgies Flats Scrapings Lump DSO 57% 40.6 6.7 0.08 14.7
BTD004 Cadgies Flats Trench Lump DSO 46% 41.3 6.0 0.10 14.3
BTD005-7 Bindi Bindi Hill Scrapings Lump DSO 59% 41.5 6.0 0.05 14.2
BTD008 Bindi Bindi Hill Trench Lump DSO 20% 40.1 6.6 0.07 15.4
BTD009-12 Budgie Hill Scrapings Lump DSO 72% 39.6 6.6 0.07 16.2
BTD010 Budgie Hill Trench Lump DSO 16% 33.4 11.2 0.08 18.2
BTD013 Illgararie Hill Scrapings Lump DSO 61% 40.6 6.0 0.10 15.7
BTD014 Illgararie Hill Trench Lump DSO 32% 39.9 7.0 0.10 15.6
BTD015-16 Yanneri Ridge Scrapings Lump DSO 45% 36.5 8.3 0.11 17.7
*Not Tested Mungajerry Scrapings Lump DSO

Table 2: Detailed assay results for surface DSO manganese bulk sampling programme. Assays are for the natural lump and lump generated through crushing. Assays were undertaken by Nagrom Laboratories using XRF analysis.

Note: *Not tested indicated wet weather restricted access at time of testwork.

==> picture [496 x 367] intentionally omitted <==

Figure 1: Potential DSO manganese occurrences at Butcherbird Manganese Project.

Investor Coverage

Recent investor relations, corporate videos and broker/media coverage on the Company’s projects can be viewed on the Company’s website at www.montezumamining.com.au.

About Montezuma Mining Company Ltd

Listed in 2006, Montezuma (ASX: MZM) is a diversified explorer primarily focused on manganese, copper and gold. Montezuma has a 100% interest in the Butcherbird Manganese/Copper Project and an 85-100% interest in the Peak Hill and Durack Gold Projects in the Murchison region of Western Australia.

More Information

Justin Brown

Managing Director

Phone: +61 (8) 6315 1400 Mobile: +61 438 745 675

The information in this report that relates to exploration results is based on information compiled by Justin Brown, who is a member of the Australian Institute of Mining & Metallurgy. Mr Brown is a geologist who is a full time employee of Montezuma Mining Company Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Justin Brown consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.