AI assistant
EDP-Energias — Management Reports 2017
Oct 17, 2017
1909_iss_2017-10-17_4c7fa589-a8b5-4ae1-943f-be5dfd8ca787.pdf
Management Reports
Open in viewerOpens in your device viewer
9M 2017Volumes & Capacity Statement
Investor Relations Department
Rui Antunes, Head of IRMaria FontesPia DomecqPaloma Bastos-Mendes
Phone: +34 902 830 700Fax: +34 914 238 429Email: [email protected]:www.edpr.com
October 17th, 2017
EDP Renováveis, S.A. Head office: Plaza de la Gesta, 2 33007 Oviedo, Spain
| lec d ( h ) E ic ity Ge G W tr rat ne e |
9 M 1 7 |
9 M 1 6 |
% |
|---|---|---|---|
| Sp in a |
3, 3 0 7 |
3, 9 8 2 |
( ) 6 % |
| l Po rtu g a |
2, 2 0 8 |
2, 3 1 7 |
( ) 5 % |
| f Re Eu st o rop e |
2, 5 7 5 |
2, 2 8 2 |
+1 3 % |
| Eu rop e |
8, 5 1 4 |
8, 8 5 1 |
( ) % 1 |
| S U |
1 0, 2 3 2 |
8, 9 8 1 |
+1 4 % |
| da Ca na |
5 3 |
5 2 |
+1 % |
| Me ico x |
4 5 4 |
- | - |
| h ica No Am rt er |
1 0, 7 3 9 |
9, 0 3 3 |
+1 9 % |
| i l Bra z |
5 6 4 |
4 4 0 |
+2 8 % |
| l To ta |
1 9, 8 1 7 |
1 8, 0 5 4 |
+1 0 % |
| 3 Q 1 7 |
3 Q 1 |
9 M 1 |
9 M 1 6 |
|---|---|---|---|
| % 2 8 |
|||
| 2 | 2 | 2 | 2 |
| 4 | 1 | 7 | 8 |
| % | % | % | % |
| 2 | 1 | 2 | 2 |
| 1 | 7 | 5 | 3 |
| % | % | % | % |
| 2 | 2 | 2 | 2 |
| 2 | 1 | 6 | 7 |
| % | % | % | % |
| 2 | 2 | 3 | 3 |
| 3 | 4 | 4 | 2 |
| % | % | % | % |
| 1 | 2 | 2 | 2 |
| 3 | 1 | 7 | 7 |
| % | % | % | % |
| 3 9 % |
4 1 % |
- | |
| 2 | 2 | 3 | 3 |
| 3 | % | % | 2 |
| % | 4 | 4 | % |
| 5 | 3 | 4 | 3 |
| 5 | 2 | 2 | 0 |
| % | % | % | % |
| 2 | 2 | 3 | 2 |
| 3 | 2 | 0 | 9 |
| % | % | % | % |
| 9 6 % |
9 7 % |
9 9 % |
1 0 0 % |
| % 2 2 |
6 % 2 3 - |
7 % 2 6 |
| in Sp 2, 2 4 4 0 0 +5 +5 a l Po rtu 1, 2 5 3 +3 +3 g a f Re Eu st 1, 5 6 0 +1 8 +6 2 o rop e Eu 0 0 5, 5 7 +7 +1 1 4 rop e U S 4, 8 3 1 +1 9 9 +6 2 8 da Ca 3 0 na - - Me ico 2 0 0 +2 0 0 x - h |
6 8 - 4 1 |
|---|---|
| 0 9 1 |
|
| 3 0 3 |
|
| - | |
| - | |
| ica No Am rt 5, 0 6 0 +1 9 9 +8 2 7 er |
3 0 3 |
| l Bra i 2 0 4 z - - |
2 6 3 |
| 1 0, 3 2 1 +2 6 9 +9 4 2 E B I T D A M W |
6 7 5 |
| ( ) ( ) he l da d ( ) 3 3 1 2 5 2 5 Ot ity i Sp in U S te + r e q u co ns o a |
- |
| ity l i da d 1 0, 6 5 2 +2 4 5 +9 1 7 E B I T D A M W Eq te + u co ns o |
6 7 5 |
•EDPR produced 19.8 TWh of clean energy in the 9M17 (+10% YoY). The YoY increase inproduction benefits from the capacity additions over the last 12 months along with a higher YoYwind resource (30% vs 29% in the 9M16).
•In the 9M17, EDPR operations in Europe, North America and Brazil generated 43%, 54% and 3% of the total output, respectively. In Europe, EDPR generation decreased 1% YoY to 8.5 TWh, with YoY comparison impacted by the outstanding wind resource in the 9M16 vs a normalized windresource in the 9M17. In North America, EDPR output increased by 19% YoY, to 10.7 TWh, reflecting the higher capacity and the higher load factor of such projects. In Brazil, productionincreased to 564 GWh driven by capacity additions with higher wind resource.
•In the 9M17, EDPR achieved a 30% load factor (vs 29% in the 9M16) reflecting capacity additions with higher load factors and the wind resource in the period (99% vs 100% of P50 in 9M16). In the 3Q17, EDPR reached a 23% load factor (vs 22% in the 3Q16), with QoQ comparison benefiting from capacity additions with higher load factor.
•In Europe, EDPR reached 26% load factor (vs 27% in the 9M16), with YoY comparison penalized by 9M16 outstanding wind resource in Spain and Portugal. In the 9M17, EDPR accomplished a loadfactor of 26% in Spain, above market average (+3pp). In Portugal, EDPR reached a load factor of 27%, which was lower YoY but still higher if compared with an average 9M. In RoE, EDPR delivereda 25% load factor vs 23% in the 9M16. In North America, EDPR achieved a 34% load factor (vs 32%in the 9M16), benefitting from capacity additions with higher load factors. In Brazil, EDPR reacheda 42% load factor (vs 30% in the 9M16), also benefitting from a YoY higher wind resource along with the positive impact from the latest capacity additions.
•As of Sep-17 EDPR managed a global portfolio of 10.7 GW spread over 11 countries, of whichEurope accounted for 49%, including 2.4 GW in Spain, 1.6 GW in RoE and 1.3 GW in Portugal, North America for 49%, including 5.1 GW in US, 30 MW in Canada and 0.2 GW in Mexico, andBrazil for the remaining, equivalent to 0.2 GW.
•In the 9M17, EDPR global portfolio increased by 245 MW, of which 220 MW are related to newcapacity (US: 199 MW; France: 18 MW; Portugal: 3 MW) and the remaining 25 MW to the acquisition of a 50% participation in a Spanish wind farm that was previously equity accounted.
- •In the last 12 months EDPR increased its global portfolio by 917 MW, of which 90 MW in Europe and 827 MW in North America. In Europe, 44 MW were installed in Italy, 18 MW in France, 3 MWin Portugal and 25 MW net were added in Spain. In North America, were completed 6 wind farms, of which 5 in the US: Hidalgo (250 MW), Timber Road III (101 MW), Meadow Lake V (100 MW), Redbed Plains (99 MW) and Jericho Rise (78 MW), and 1 wind farmin Mexico (200 MW).
- •As of Sep-17, EDPR had 675 MW under construction. In the US were under construction 303 MW, namely Quilt Block 98 MW (Wisconsin), Arkwright 78 MW (New York) and Hog Creek 66 MW (Ohio) projects, along with 60 MW (South Carolina) related to solar PV projects with qualified facility PPAs for the entire production over 15 years. In Europe were 109 MW under construction, of which 68 MW in Spain, 37 MW in Italy and 4 MW in France. In Brazil were under construction a total of 263MW from Babilonia and JAU and Aventura wind farms.
Next Events: 9M17 Results will be published on October 31st, 2017 before the Euronext Lisbon market opens.