AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

ECOFIN U.S. RENEWABLES INFRASTRUCTURE TRUST PLC

Earnings Release Jun 29, 2023

5050_bfr_2023-06-29_04549eeb-fba5-4de0-a3f1-8a2971d60035.html

Earnings Release

Open in Viewer

Opens in native device viewer

National Storage Mechanism | Additional information /*<![CDATA[*/ /**/ /**/ /**/ p{margin-right:0cm;margin-left:0cm;font-size:11.0pt;font-family:"Calibri","sans-serif";}link{ color: #0563C1 }visited{ color: #954F72 } .ar{size:595.3pt 841.9pt;margin:56.9pt 56.9pt 43.2pt 56.9pt;}div.ar{}p.bn{margin-right:0cm;margin-left:0cm;font-size:12.0pt;font-family:"Times New Roman","serif";margin:0cm;margin-bottom:.0001pt;text-align:justify}span.bl{font-size:11.0pt;font-family:"Calibri","sans-serif"}p.bo{margin-top:0cm;margin-right:0cm;margin-bottom:8.0pt;margin-left:0cm;line-height:107%;font-size:11.0pt;font-family:"Calibri","sans-serif";margin-bottom:0cm;margin-bottom:.0001pt;text-align: justify;line-height:normal}span.bj{color:black}p.bp{margin-top:0cm;margin-right:0cm;margin-bottom:8.0pt;margin-left:0cm;line-height:107%;font-size:11.0pt;font-family:"Calibri","sans-serif";margin-bottom:0cm;margin-bottom:.0001pt; text-align:center;line-height:normal}span.bg{font-size: 12.0pt;color:#212721}table.bq{width:482.45pt;margin-left:-5.15pt;border-collapse:collapse}tr.bc{height:55.95pt} td.bf{width:315.35pt;padding:0cm 5.4pt 0cm 5.4pt; height:55.95pt}td.bd{width:145.5pt;padding:0cm 5.4pt 0cm 5.4pt; height:55.95pt}p.br{margin-top:0cm;margin-right:0cm;margin-bottom:8.0pt;margin-left:0cm;line-height:107%;font-size:11.0pt;font-family:"Calibri","sans-serif";margin-bottom:0cm;margin-bottom:.0001pt; text-align:right;line-height:normal}tr.az{height:43.05pt}td.bb{width:315.35pt;padding:0cm 5.4pt 0cm 5.4pt; height:43.05pt}td.ba{width:145.5pt;padding:0cm 5.4pt 0cm 5.4pt; height:43.05pt}tr.aw{height:62.3pt}td.ay{width:315.35pt;padding:0cm 5.4pt 0cm 5.4pt; height:62.3pt}td.ax{width:145.5pt;padding:0cm 5.4pt 0cm 5.4pt; height:62.3pt}span.au{color:#0D0D0D;border:none windowtext 1.0pt; padding:0cm} span.at{color:#212721}span.as{color:#231F20} .fr-view-element{font-family: sans-serif;font-size: 12pt;line-height: 140%;padding: 20px;box-sizing: border-box;overflow-x: auto;min-height: 60px;text-align: left;margin-bottom: 10px;width: 837px;} .fr-view-element img{padding: 0 1px;} .fr-view-element .ar{margin: 63.8pt 1.6cm 62.35pt 1.6cm;} .fr-view-element p{font-size: 10pt;} /**/ /**/ /**/ /*]]>*/

RNS Number : 3068E

Ecofin US Renewables Infrastr.Trust

29 June 2023

This Announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation EU 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018.

29 June 2023

ECOFIN U.S. RENEWABLES INFRASTRUCTURE TRUST PLC

(the "Company")

Operational Update

Following a review of recent performance of the Company's assets, the Company now expects net cash flows at the portfolio level to be meaningfully lower than forecast for the quarters ending 30 June 2023 and 30 September 2023, with overall cash flows currently expected to return to forecast levels by the end of the calendar year. This reduction comes as a result of certain operational issues, including the recent events at Whirlwind, corrective maintenance interruptions at some of the solar assets leading to lower-than-expected energy performance, and one-time costs. The Investment Manager is actively engaged with Whirlwind's offtaker and interconnection provider to remedy the Whirlwind outage, as well as its operations managers to remediate the operational issues and improve asset performance, both operationally and financially.

The Board is conscious of the importance of dividend income to the Company's shareholders and will review the existing costs of the Company together with the Investment Manager. However, given the expected decline in cash flows, the Board announces it expects to declare in early August a reduced dividend of not less than 0.70 cents per share in respect of the quarter ending 30 June 2023. The Board believes a temporary reduction at this time is prudent.

For further information, please contact:

Ecofin Advisors, LLC (Investment Manager)

Edward Russell

Eileen Fargis

Jason Benson

Michael Hart
+1 913 981 1020
Peel Hunt LLP (Joint Corporate Broker)

Liz Yong

Luke Simpson

Huw Jeremy
+44 20 7418 8900
Stifel (Joint Corporate Broker)

Edward Gibson-Watt

Rajpal Padam
+44 20 7710 7600
Apex Listed Companies Services (UK) Limited (Company Secretary)             

Martin Darragh

Maria Matheou
+44 20 3327 9720
FTI Consulting (Financial PR)

Matthew O'Keeffe

Mitch Barltrop

Vee Montebello
+44 79 7607 5797

Further information on the Company can be found on its website at https://uk.ecofininvest.com/funds/us-renewables-infrastructure-trust-plc/.

The Company's LEI is 2138004JUQUL9VKQWD21.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDPPUAAQUPWPPR

Talk to a Data Expert

Have a question? We'll get back to you promptly.