AI assistant
DYNAMIC METALS LIMITED — Capital/Financing Update 2023
Jul 4, 2023
64809_rns_2023-07-04_9fae6687-ca7d-49ed-b12e-ac0bc3d5a57a.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX ANNOUNCEMENT 5 JULY 2023
LITHIUM EXPLORATION COMMENCES AT PIONEER DOME
HIGHLIGHTS
-
Up to 2000 soil samples to be taken as part of reconnaissance exploration program on recently granted E15/1721[1] at Pioneer Dome, highly prospective for Lithium-Caesium-Tantalum pegmatites
-
The tenement covers 20km of highly prospective strike along the western side of Essential Metals’ (ASX: ESS) Dome North lithium project which hosts a Mineral Resource of 11.2Mt @ 1.2% Li2O[2]
-
Assays remain pending for 48 drill holes from recently completed Sunday Soak (Ni), Mandilla (Au) and Higginsville (Au) AC drill programs[3]
Dynamic Metals Limited ( ASX: DYM ) (“ Dynamic ” or “ the Company ”) is pleased to announce exploration works have commenced at Pioneer Dome West ( PDW ), part of the larger Widgiemooltha Project (“ Widgiemooltha ” or the “ Project ”) in the Goldfields Region of Western Australia.
The Widgiemooltha area has emerged as a significant lithium belt hosting numerous spodumene deposits, with the Mt Marion, Bald Hill, and Buldania projects all within 25km of Dynamic tenure (Figure 1). The tenement is adjacent to Essential Metals’ (ASX: ESS) Dome North lithium project which hosts a Mineral Resource of 11.2Mt @ 1.2% Li2O[2] , and now under proposed acquisition by Develop Global (ASX: DVP)[4] .
==> picture [286 x 286] intentionally omitted <==
Figure 1.Dynamic’s Widgiemooltha Project tenements with key lithium projects and prospects
ASX DYM
T 61 8 6558 0637 . E [email protected]
The PDW target is located on E15/1721 and covers 20km of strike along the highly prospective western side of the Pioneer Dome. Previous exploration activities were focussed on gold and nickel potential, so limited historical geochemical information on lithium exists across the tenement.
Soil samples will be taken every 40m on 400m spaced lines to obtain geochemical data coverage across the interpreted greenstone sequence flanked on the east by the Pioneer Dome granite and to the west by regional granites (Figure 2). It is estimated the program will take approximately 4 weeks to complete.
Targets generated following the receipt of assays will be assessed and priority ranked for drill testing later in the year.
==> picture [448 x 449] intentionally omitted <==
Figure 2. Planned soil sampling area on E15/1721 highlighted in yellow with interpreted geology background. DYM tenure shaded blue (granted) and orange (pending). ESS tenure outlined in white.
Next Steps
Permitting for the next phase of drilling at Widgiemooltha is underway at the Democrat prospect (Ni) and is expected to be undertaken post completion of this soil sampling program.
Dynamic is awaiting assay results from 48 holes drilled across the Sunday Soak, Mandilla and Higginsville prospects with these results anticipated to be returned by the end of July.
Released with the authority of Dynamic Metals’ Board of Directors.
For further information on the Company and our projects, please visit: www.dynamicmetals.com.au
CONTACT
Karen Wellman
Managing Director [email protected] +61 8 6558 0637
ABOUT DYNAMIC METALS
Dynamic Metals (ASX: DYM) is a dedicated
exploration company focused on advancing a highly prospective portfolio of future facing critical minerals projects in Australia. The Company completed a successful IPO in January 2023 raising $7 million to fully fund an aggressive exploration program across the portfolio.
Dynamic’s flagship project, Widgiemooltha, covers an extensive area of c.880km[2] extending between Norseman and Kambalda. The region is well known for its numerous nickel and gold mines, but more recently has emerged in significance for its lithium mineralisation and prospectivity.
DYNAMIC METALS CAPITAL STRUCTURE
Share Price: $0.32/share Cash 31 Mar 2023 : $5.62M Shares on Issue: 49M Market Cap : $15.68M
==> picture [276 x 372] intentionally omitted <==
==> picture [65 x 63] intentionally omitted <==
==> picture [79 x 55] intentionally omitted <==
==> picture [55 x 61] intentionally omitted <==
Portfolio of Exposure to Substantial future-facing global exploration critical minerals decarbonisatio targets projects in n and battery generated Australia metals thematic across Li, Ni, Cu, PGE and Au
==> picture [58 x 67] intentionally omitted <==
==> picture [69 x 61] intentionally omitted <==
==> picture [55 x 61] intentionally omitted <==
Team has On-ground Attractive extensive activities valuation and experience and complete and leverage to successful track drilling exploration record commenced success
==> picture [247 x 69] intentionally omitted <==
REFERENCES
Additional details including JORC 2012 reporting tables, where applicable, can be found in the following releases lodged with ASX and referred to in this announcement:
-
Dynamic Metals ASX Announcement 31/05/2023: “Highly Prospective Lithium Tenure Granted at Widgiemooltha”
-
Essential Metals ASX Announcement 20/12/2022: “Dome North lithium upgrade boosts Indicated Resource tonnes by 50%”
==> picture [427 x 172] intentionally omitted <==
-
Dynamic Metals ASX Announcement 16/06/2023: “Three more prospects drill tested at Widgiemooltha”
-
Develop Global Limited ASX Announcement 03/07/2023: “Develop and Essential Metals enter into binding Scheme Implementation Deed”
FORWARD LOOKING STATEMENT
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Dynamic Metals Limited’s (Dynamic’s) current expectations, estimates and projections about the industry in which Dynamic operates, and beliefs and assumptions regarding Dynamic’s future performance. When used in this document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although Dynamic believes that its expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond the control of Dynamic and no assurance can be given that actual results will be consistent with these forward-looking statements.