Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

DUNDAS MINERALS LIMITED Capital/Financing Update 2024

Aug 20, 2024

64798_rns_2024-08-20_a7253cc9-2d21-423b-9447-b39548612507.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

Confirmation of High Grade Gold intercept at Windanya

D undas M inerals L imited

==> picture [26 x 27] intentionally omitted <==

Directors

Non-Executive Chairman Mark Chadwick

Managing Director Shane Volk

Non-Executive Director

Tim Hronsky

Company Secretary Shane Volk

Issued Capital (ASX: DUN)

Ordinary Shares: 84,628,046 Unlisted Options: 40,000,000

Highlights

  • 9.5 g/t Au (146m – 147m) assay from resample of the final six metres in drill hole 24WDRC015

  • Drill hole to be extended beyond its current depth of 150m

  • Two deep drill holes to test for primary gold mineralisation west of 24WDRC015, in the northern portion of the Aquarius gold prospect

  • Drilling scheduled to commence in September 2024

Dundas Minerals Limited (ASX: DUN) (“Dundas Minerals”, “Dundas” or “the Company”) is actively exploring for gold at the Windanya and Baden-Powell projects, located adjacent the Goldfields Highway ~60km north of Kalgoorlie, Western Australia.

– Assay results from 1 meter sample intervals Windanya

The receipt of assay results for six separate one metre sample intervals relating to the previously reported 4 meter and 2 metre composite samples from drill hole 24WDRC015, at the Company’s Windanya project, has confirmed the intercept of high grade gold mineralisation.

==> picture [173 x 242] intentionally omitted <==

----- Start of picture text -----

Baden-Powell &
Windanya gold
projects
----- End of picture text -----

The final six metres of the drill hole was resampled (144 metres to 150 metres). For the 146m – 147m interval the assay result was 9.5 grams per tonne (g/t) gold (Au), and for the preceding interval (145m – 146m), 0.725 g/t Au. Refer to Table 1 for the assay results for each 1 metre interval sampled.

Encouraged by the results, the Company is planning to extend the hole beyond its current length of 150 metres (approximately 130m below surface), to up to 300m.

Also, two additional RC drill holes, each to a planned depth of up to 300 metres are to be drilled southwest of 24WDRC015, in the northern part of the Aquarius gold prospect (Figure 1). At Aquarius, in November 2023, the Company reported very high grade gold in auger sample anomalies (including: 696ppb Au; 493ppb Au and 483ppb Au). Refer to ASX Announcement dated 2 November 2023 for complete details of the auger sampling results.

The Program of Work (PoW) for the additional drilling has been approved. Drilling is expected to commence in September 2024, weather conditions (rainfall) permitting.

==> picture [596 x 82] intentionally omitted <==

----- Start of picture text -----

Suite 13, 100 Railway Road
Suite 13, 100 Railway Road
Subiaco, WA 6008
Subiaco, WA 6008
[email protected]
[email protected] www.dundasminerals.com
www.dundasminerals.com
----- End of picture text -----

Page 2

==> picture [340 x 407] intentionally omitted <==

----- Start of picture text -----

RC Drillhole collar (2024)
ML Application Boundary
Capricorn EL Boundary
Gold Deposit
Aquarius
Gold Prospect
Target area
for RC drilling
(2 holes)
Scorpio Gold
Prospect
----- End of picture text -----

Figure 1: Windanya RC drill collar locations (2024), plus the location of the Capricorn gold deposit, and the Aquarius and Scorpio gold prospects (background: regional bedrock geology)

Table 1: 24WDRC015 Assay Results from 1 metre samples

==> picture [320 x 121] intentionally omitted <==

(Au 50g sample fire assay, all other elements Aqua Regia 25g sample. Refer to Table 1 for additional details)

In the Company’s ASX Announcement of 4 July 2024, it was reported that the end-of-hole 2 metre composite sample (148m-150m) returned an assay of 2m @ 3.142 g/t Au. It has since been determined that this result is for the preceding 4m interval (144m-148m), with the error caused by the misnumbering of the sample on submission to the assay laboratory. Refer to Table 2 for the corrected details for the assay results published by the Company on 4 July 2024.

==> picture [596 x 84] intentionally omitted <==

----- Start of picture text -----

Suite 13, 100 Railway Road
Subiaco, WA 6008
[email protected]
www.dundasminerals.com
----- End of picture text -----

Page 3

Table 2: 24WDRC015 Composite Assay Results 4 July 2024 (updated)

==> picture [316 x 592] intentionally omitted <==

(All elements Aqua Regia 25g sample)

Hole ID Depth East North Azimuth Dip
24WDRC015 150 332828 6640063 270
o
-60
o

==> picture [596 x 84] intentionally omitted <==

----- Start of picture text -----

Suite 13, 100 Railway Road
Subiaco, WA 6008
[email protected]
www.dundasminerals.com
----- End of picture text -----

Page 4

Authorised by: Shane Volk – Managing Director

About Dundas: Dundas Minerals Limited (ASX: DUN) is a battery-minerals and gold focussed exploration company exploring in the gold-rich Kalgoorlie region, and southern Albany-Fraser Orogen, Western Australia. In the Kalgoorlie region the Company has an option agreement with ASX listed Horizon Minerals Limited (ASX: HRZ) to acquire an 85% interest in two gold projects, Windanya (25,000oz Au inferred gold resources), and Baden-Powell (23,000oz Au inferred gold resources), and in the southern Albany-Fraser the Company holds various exploration licences and exploration rights for gold, copper and nickel.

Capital Structure: Ordinary shares on issue (DUN): 84,628,046; Unlisted Options: 15,000,000 (Exp. 16-06-29 Ex. $0.033); 15,000,000 (Exp. 16-06-29 Ex. $0.0374); 3,000,000 (Exp. 3-11-24 Ex. $0.30); 5,000,000 (Exp. 1-7-26 Ex. $0.25 & $0.30); 2,000,000 (Exp. 10-11-26 Ex. $0.25 & $0.30)

COMPETENT PERSONS STATEMENTS

The information in this announcement that relate to the Windanya soil sampling program are extracted from the ASX Announcement titled “Exceptionally High Grade Gold in Soils Anomalies at Windanya Project” published on 2 November 2023 . The report is available to view on the Company’s web site: www.dundasminerals.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX Announcement. The Company confirms that the form and context in which the Competent Person’s findings are presented in this report, have not been materially modified from the original ASX market announcement.

The exploration program and results reported in this Announcement was completed by Mr David Thompson, a Member of the Australian Institute of Geoscientists. Mr Thomson has sufficient experience relevant to the style of mineralisation and to the type of activity described in this Announcement to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Thompson is a consultant to Dundas Minerals Limited and consents to the inclusion in this Announcement of the matters based on his information in the form and content in which it appears.

DISCLAIMERS AND FORWARD-LOOKING STATEMENTS

This announcement contains forward looking statements. Forward looking statements are often, but not always, identified by the use of words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan", "estimate", "expect" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions.

The forward-looking statements in this announcement are based on current expectations, estimates, forecasts and projections about Dundas and the industry in which it operates. They do, however, relate to future matters and are subject to various inherent risks and uncertainties. Actual events or results may differ materially from the events or results expressed or implied by any forward-looking statements. The past performance of Dundas is no guarantee of future performance.

None of Dundas’s directors, officers, employees, agents or contractors makes any representation or warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forward-looking statement, or any events or results expressed or implied in any forward-looking statement, except to the extent required by law. You are cautioned not to place undue reliance on any forward-looking statement. The forwardlooking statements in this announcement reflect views held only as at the date of this announcement.

==> picture [596 x 84] intentionally omitted <==

----- Start of picture text -----

Suite 13, 100 Railway Road
Subiaco, WA 6008
[email protected]
www.dundasminerals.com
----- End of picture text -----

JORC Code, 2012 Edition – Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling •Nature and quality of sampling (e.g., cut channels, random chips, or •1m cuttings were collected in buckets and put on the ground in rows of 20
techniques specific specialised industry standard measurement tools appropriate to piles. Samples were taken by aluminium scoop from the 1m piles on the
the minerals under investigation, such as down hole gamma sondes, or ground and put into numbered calico sample bags.
handheld XRF instruments, etc.). •Regular cleaning by air and by hand was done to avoid contamination by
•Include reference to measures taken to ensure sample representivity and sticky clay material.
the appropriate calibration of any measurement tools or systems used.
•Aspects of the determination of mineralisation Material to the Public
•Reverse circulation drilling was used to obtain 1m cuttings from which a
representative sample was collected by handheld aluminium scoop.
Report.
Drilling •Drill type and details (e.g. core diameter, triple or standard tube, depth •Slimline (4½ in diameter) RC drilling was used with a face-sampling
techniques of diamond tails, face-sampling bit or other type, whether core is oriented hammer bit.
and if so, by what method, etc.). •It was a truck mounted drill rig (X300 4 x 4 MAN) that is a modified X150
with a 1050/350 compressor and a 636 Hurricane booster.
Drill sample •Method of recording and assessing sample recoveries and results. •Sample volumes were visually assessed, no anomalous volumes were
recovery •Measures taken to maximise sample recovery and ensure representative observed. Samples were generally dry, but in rare cases damp samples
nature of the samples. were noted, mostly the meter after rod changes.
•Whether a relationship exists between sample recovery and grade and •Regular cleaning of the cyclone, to avoid build-up of clayey material.
whether sample bias may have occurred due to preferential loss/gain of •Sample recovery was generally good; no sample bias was observed.
fine/coarsematerial.
Logging •Whether core and chip samples have been geologically and •Chips were collected in chip tray and logged qualitatively by the geologist.
geotechnically logged to a level of detail to support appropriate Mineral •Logging was qualitative in nature.
Resource estimation, mining studies and metallurgical studies.
•Whether logging is qualitative or quantitative in nature.
•The complete holes were logged in full.
•The total lengthand percentage oftherelevantintersectionslogged.
Sub-sampling •If core, whether cut or sawn and whether quarter, half or all core taken. •Samples were collected from the 1m sample piles by aluminium scoop. In
techniques and •If non-core, split type, and whether sampled wet or dry. the case of composite, up to 4 scoops were combined into one sample for
sample •For all sample types, the nature, quality and appropriateness of the assaying. The whole sample was pulverised in the laboratory and a 50g
preparation sample preparation technique. charge taken for fire assay, and/or 25g sample in the case of Aqua Regia.
•Quality control procedures adopted to maximise representivity of •The sample preparation is considered appropriate for the type of sampling.
samples. •Certified Reference Materials and field duplicates were inserted in the
•Measures to ensure that the sampling is representative of the in-situ sample submission at a rate of 1 in 25. In addition, internal standards and
material collected, including for instance results for field duplicate/second-
half sampling.
•Whether sample sizes are appropriate to the grain size of the material
repeat assays were used by the laboratory.
•The sample sizes were considered appropriate for the grain size of the
material.
sampled.

5

Criteria JORC Code explanation Commentary
Quality of assay
•The nature, quality and appropriateness of the assaying and laboratory
•Samples were submitted to the Intertek Genalysis laboratory in Kalgoorlie
data and procedures used and whether the technique is considered partial or total. for assaying by method AR25/MS33 (25g sample, reading by ICP-MS),
laboratory tests
•For geophysical tools, spectrometers, handheld XRF instruments, etc.,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
and for gold by method FA50/MS (50g sample, fire assay ICP-MS). Both
are standard industry practice and AR25/MS33 is considered a total
assay technique.
•Not applicable.
•Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy and precision have been established.
•Laboratory QA/QC involves the use of internal lab standards using
certified reference material, blanks, splits and replicates as part of the in-
house procedures. QC results (blanks, duplicates, standards) were in line
withcommercialprocedures,reproducibility and accuracy.
Verification of •The verification of significant intersections by either independent or •The results have been reviewed by the Company.
sampling and alternative company personnel. •No twinning of drillholes has been undertaken.
assaying •The use of twinned holes. •Data were collected in_Logchief_and later transferred to the Company’s
•Documentation of primary data, data entry procedures, data verification, independently managed database.
data storage (physical and electronic) protocols. •No adjustments were made.
•Discuss any adjustment to assay data.
Location of •Accuracy and quality of surveys used to locate drill holes (collar and •Drillhole collars were surveyed with handheld GPS with horizontal
data points down-hole surveys), trenches, mine workings and other locations used in accuracy of ±3m. Data are recorded in UTM coordinates, zone 51S
Mineral Resource estimation. Geocentric Datum of Australia 1994 (GDA-94).
•Specification of the grid system used. •Elevation was estimated to the nearest metre from Geoscience Australia
•Quality and adequacy of topographic control. DTM, which is more accurate than handheld GPS elevation data.
Downhole surveys were undertaken by gyro with readings taken every 5m
along the drill trace.
• Topographic control is considered adequate at this stage. Should the data
be subsequently used in a Mineral Resource Estimation, the collars can
be surveyed byDGPS.
Data spacing •Data spacing for reporting of Exploration Results. •Drillholes were irregularly spaced, as this was a reconnaissance program,
and distribution •Whether the data spacing and distribution is sufficient to establish the targeting various under-cover areas for gold mineralisation.
degree of geological and grade continuity appropriate for the Mineral •No attempt is made at this stage to undertake Mineral Resource or Ore
Resource and Ore Reserve estimation procedure(s) and classifications Reserve estimations.
applied. •1 metre samples have been taken for hole 24WDRC015.
•Whether sample compositinghas been applied.
Orientation of •Whether the orientation of sampling achieves unbiased sampling of •Holes were angled 60° towards 270°, roughly perpendicular to the regional
data in relation possible structures and the extent to which this is known, considering the strike and interpreted structures, but there is considerable uncertainty
to geological deposit type. about the attitude of possible structures.
structure •If the relationship between the drilling orientation and the orientation of •At this stage, there is insufficient data to assess the possibility of sampling
key mineralised structures is considered to have introduced a sampling bias.
bias, this should be assessed andreportedif material.
Sample security •The measures taken to ensure sample security. •Samples were collected in calico bags, in turn placed into larger bags that
were delivered to the Intertek laboratory in Kalgoorlie by a consultant to
the Company.

6

Criteria JORC Code explanation JORC Code explanation Commentary
Audits or reviews •The results of any audits or reviews of sampling techniques and data. •None.
Section 2 Reporting of Exploration Results
(Criterialistedin the preceding sectionalso apply to this section)
Criteria JORC Code explanation Commentary
Mineral tenement and •Type, reference name/number, location and ownership
•The results reported in this Announcement are from granted Licence
land tenure status including agreements or material issues with third parties such
P24/5059. The licence is 100% owned by Black Mountain Gold Limited, a
as joint ventures, partnerships, overriding royalties, native title
wholly owned subsidiary of Horizon Minerals Limited (ASX: HRZ). Dundas
interests, historical sites, wilderness or national park and
Minerals has an option to acquire an 85% joint venture interest in the
environmental settings. tenement on or before 29 August 2025 (refer ASX Announcement dated 30
•The security of the tenure held at the time of reporting along with
August 2023 for complete details).
any known impediments to obtaining a licence to operate in the
•The tenement is in good standing and there are no known impediments to
area. the security of, and access to the tenements.
Exploration by other •Acknowledgment and appraisal of exploration by other parties. •Horizon Minerals Limited has undertaken substantial previous exploration
parties on the tenements since 2017, including soils sampling, air core and RC
drilling, and published an inferred Mineral Resource estimation for the
Capricorn prospect within P24/5057. Previous exploration has also been
undertaken by Heron Resources Limited (2006-10), and Vale (2008).
Geology •Deposit type, geological setting and style of mineralisation. •The exploration target is Archaean lode gold on the western limb of the
Bardoc-Broad Arrow syncline.
Drillhole Information •A summary of all information material to the understanding of
•Tabulated in the main text.
the exploration results including a tabulation of the following
information for all Material drill holes:
oeasting and northing of the drill hole collar
oelevation or RL of the drill hole collar
odip and azimuth of the hole
odown hole length and interception depth
ohole length.
•If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not detract
from the understanding of the report, the Competent Person
should clearly explain why thisis the case.
Data aggregation •In
reporting
Exploration
Results,
weighting
averaging

•Not applicable.
methods techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
•Where aggregate intercepts incorporate short lengths of high-
grade results and longer lengths of low-grade results, the
procedure used for such aggregation should be stated and

7

Criteria JORC Code explanation Commentary Commentary
some typical examples of such aggregations should be shown
in detail.
•The assumptions used for any reporting of metal equivalent
values.
Relationship between •These relationships are important in the reporting of Exploration
Down hole length, true width not known.
mineralisation widths Results.
and intercept lengths •If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
•If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length,true width not known’).
Diagrams •Appropriate maps and sections (with scales) and tabulations of
Included in the main text.
intercepts should be included for any significant discovery being
reported. These should include, but not be limited to a plan view
ofdrill hole collar locations and appropriate sectional views.
Balanced reporting •Where comprehensive reporting of all Exploration Results is not
Not applicable.
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
Other substantive •Other exploration data, if meaningful and material, should be
Not applicable, no other material exploration data.
exploration data reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating
substances.
Further work •The nature and scale of planned further work (e.g. tests for
Follow-up work may include drilling extending the depth of drill hole
lateral extensions or depth extensions or large-scale step-out 24WDRC015 and RC drilling in an as yet untested area south of the
drilling). Capricorn Gold deposit.
•Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provide this information is not commercially sensitive.

8